Prior art keywords
box beam
passage box
supporting plate
channel body
underway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621238756.0U
Other languages
Chinese (zh)
Inventor
贺维国
范国刚
洪开荣
张美琴
邢永辉
于勇
褚凯
沈永芳
宋超业
王林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201621238756.0U priority Critical patent/CN206256467U/en
Application granted granted Critical
Publication of CN206256467U publication Critical patent/CN206256467U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A kind of underway, the utility model is related to technical field of traffic transportation;It includes channel body, pile foundation and supporting plate;Channel body is arranged on supporting plate, and supporting plate is arranged in pile foundation;Described channel body is made up of several passage box beam pipelines, is connected by magnet circle between every two neighboring passage box beam pipeline;Described magnet circle is connected with one end of passage box beam pipeline.Its difficulty of construction is small, speed of application fast, low cost, greatly improves efficiency of construction, and practicality is stronger.

Description

A kind of underway
Technical field
The utility model is related to technical field of traffic transportation, and in particular to a kind of underway.
Background technology
China is vast in territory, and seashore line length, river, river, lake and island are numerous, many using to environment, landscape shadow in recent years The small underway mode of sound.Conventional underway mainly uses shield machine method, three kinds of shapes of drilling and blasting method method or sunken tube method Formula.Shield method is to tunnel to form passage in the earth formation using shield machine, and drilling and blasting method is to use jewel hole, explosion muck removal in the earth formation Mode forms passage, and sunken tube method is formerly to excavate be integrally embedded in passage after very deep foundation trench in foundation trench under water The mode of kind.Three of the above mode section is larger, and edpth of tunnel is big, and complex process, cost are high.
Utility model content
The purpose of this utility model is the defect and deficiency for prior art, there is provided a kind of simple structure, design is closed Reason, a kind of underway easy to use, its difficulty of construction is small, speed of application fast, low cost, greatly improves efficiency of construction, real It is stronger with property.
To achieve the above object, the technical solution adopted in the utility model is:It includes channel body, pile foundation and supporting plate; Channel body is arranged on supporting plate, and supporting plate is arranged in pile foundation;Described channel body is made up of several passage box beam pipelines, Connected by magnet circle between per two neighboring passage box beam pipeline;Described magnet circle connects with one end of passage box beam pipeline Connect.
Further, the length of described passage box beam pipeline is more than or equal to 120m.
Further, the cross-sectional area of described passage box beam pipeline is 12-40m2
Further, it is provided with waterproof grommet between several described passage box beam pipelines.
After said structure, the utility model has the beneficial effect that:A kind of underway described in the utility model, it is applied Work difficulty is small, speed of application fast, low cost, greatly improves efficiency of construction, and practicality is stronger, and the utility model has structure letter It is single, set reasonable, the advantages of low manufacture cost.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is constructing structure schematic diagram of the present utility model.
Fig. 2 is construction sectional view of the present utility model.
Fig. 3 is the connection diagram of passage box beam pipeline in the utility model.
Description of reference numerals:
The water surface 1, water-bed 2, passage box beam pipeline 3, pile foundation 4, supporting plate 5, mast-up 6, lifting components 7, magnet circle 8, waterproof Sealing ring 9, electric roller 10.
Specific embodiment
The utility model is further described below in conjunction with the accompanying drawings.
Referring to as shown in Figure 1-Figure 3, the technical scheme that this specific embodiment is used is:It includes channel body, pile foundation 4 With supporting plate 5;Channel body is arranged on supporting plate 5, and supporting plate 5 is arranged in pile foundation 4;Described channel body is by several channel boxes Beam pipeline 3 is constituted, and the length of each passage box beam pipeline 3 is 120m, and magnet is passed through between every two neighboring passage box beam pipeline 3 Circle 8 is connected, and magnet circle 8 is embedded in one end of passage box beam pipeline 3, and realizes sealing by sealant tape, several channel boxes Waterproof grommet 9 is provided between beam pipeline 3, waterproof grommet 9 sticks in the other end of passage box beam pipeline 3 by marine glue; The cross-sectional area of described passage box beam pipeline 3 is 12-40m2
The construction process of this specific embodiment is as follows:
1st, the landform and line requirements according to the water surface below 1 fit port line plane, vertical line type;
2nd, according to circuit is flat, vertical line type, channel body is divided into some sections of passage box beam pipelines, every section of passage box beam The length of pipeline is equal to 120m;
3rd, the near joints in every two sections of passage box beams pipeline 3 set pile foundation 4 and supporting plate 5, and pile foundation 4 and supporting plate 5 is pre-buried In water-bed 2, the top surface absolute altitude of supporting plate 5 is identical with channel body floor level, and the installation that mast-up 6 is reserved on supporting plate 5 is pre-buried Part;
4th, while pile foundation 4 and supporting plate 5 are constructed, preformed channel box beam pipeline 3 is embedded in the top board of passage box beam pipeline 3 Lifting components 7, while being respectively mounted waterproof grommet 9 and magnet circle 8 at the two ends of every section of passage box beam pipeline 3;
The 5th, mast-up 6 is installed on supporting plate 5;
6th, after the completion of passage box beam pipeline 3 is prefabricated, mast-up 6 is using the built-in fitting on hoisting rope and passage box beam pipeline 3 Connection, the upper end of hoisting rope is flexibly connected by electric roller 10 with mast-up 6, so as to passage box beam pipeline 3 be hung in water Dress docking(The gravity of passage box beam pipeline 3 is more than buoyancy).
After said structure, this specific embodiment has the beneficial effect that:One kind described in this specific embodiment is under water Passage, its difficulty of construction is small, speed of application fast, low cost, greatly improves efficiency of construction, and practicality is stronger, the utility model tool There is a simple structure, set reasonable, the advantages of low manufacture cost.
The above, is only used to illustrate the technical solution of the utility model and unrestricted, those of ordinary skill in the art couple Other modifications or equivalent that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope, all should cover in the middle of right of the present utility model.

Claims (4)

1. a kind of underway, it is characterised in that:It includes channel body, pile foundation and supporting plate;Channel body is arranged on supporting plate, Supporting plate is arranged in pile foundation;Described channel body is made up of several passage box beam pipelines, per two neighboring passage box beam pipe Connected by magnet circle between road;Described magnet circle is connected with one end of passage box beam pipeline.
2. a kind of underway according to claim 1, it is characterised in that:The length of described passage box beam pipeline is more than Equal to 120m.
3. a kind of underway according to claim 1, it is characterised in that:The cross-sectional area of described passage box beam pipeline It is 12-40m2
4. a kind of underway according to claim 1, it is characterised in that:Between several described passage box beam pipelines It is provided with waterproof grommet.
CN201621238756.0U 2016-11-19 2016-11-19 A kind of underway Active CN206256467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621238756.0U CN206256467U (en) 2016-11-19 2016-11-19 A kind of underway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621238756.0U CN206256467U (en) 2016-11-19 2016-11-19 A kind of underway

Publications (1)

Publication Number Publication Date
CN206256467U true CN206256467U (en) 2017-06-16

Family

ID=59025006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621238756.0U Active CN206256467U (en) 2016-11-19 2016-11-19 A kind of underway

Country Status (1)

Country Link
CN (1) CN206256467U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436762A (en) * 2016-11-19 2017-02-22 中铁隧道勘测设计院有限公司 Underwater channel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436762A (en) * 2016-11-19 2017-02-22 中铁隧道勘测设计院有限公司 Underwater channel

Similar Documents

Publication Publication Date Title
CN206256468U (en) A kind of underway of simple type
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN107090844A (en) Offshore wind farm grouped piles cap composite foundation and construction method
CN203271763U (en) Lining segment for sea-crossing shield tunnel
CN203256774U (en) Underground cable trench construction structure for electric engineering
CN202164660U (en) Layered water intake gallery for earth surface reservoir
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN102561404A (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN203129183U (en) Nuclear power plant sea area drainage structure constructed in immersed tube method
CN206256467U (en) A kind of underway
CN205954679U (en) Utility tunnel's pipeline branch mouth
CN106436762A (en) Underwater channel
CN207420594U (en) Underground traffic hole concrete anti-seepage structure
CN202559382U (en) Concrete prefabricated combined duct with stepped conical spigot and socket
CN106120828A (en) A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall
CN109577373A (en) A kind of prefabricated piping lane of hydraulic engineering
CN202000365U (en) Seepage-proof structure for underground continuous wall
CN204690730U (en) Diaphragm wall skeleton
CN204691255U (en) Diaphragm wall
CN204662506U (en) A kind of cable communication well
CN206256469U (en) A kind of underway being easily installed
CN106638690A (en) Simple underwater channel
CN202055256U (en) Concentrated water diversion and drainage device for large-area water seepage slope surface
CN216920436U (en) Single-port single-control same-range horizontal connecting pipe for underground garage of shallow soil source heat pump
CN207092031U (en) A kind of dam

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180625

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hebei Avenue, new Hongqiao, Hongqiao District, Tianjin City, No. 1

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.

TR01 Transfer of patent right