CN106120828A - A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall - Google Patents
A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall Download PDFInfo
- Publication number
- CN106120828A CN106120828A CN201610472967.9A CN201610472967A CN106120828A CN 106120828 A CN106120828 A CN 106120828A CN 201610472967 A CN201610472967 A CN 201610472967A CN 106120828 A CN106120828 A CN 106120828A
- Authority
- CN
- China
- Prior art keywords
- wall
- foundation ditch
- water stop
- axes agitating
- agitating pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The present invention proposes the Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall, before guide wall of underground continuous wall is constructed, first lead, inside and outside foundation ditch, three axes agitating pile of constructing respectively outside wall, deeply following 3 5m at the bottom of stake deep entrance foundation ditch, wall hanging curtain is led in formation, then carries out trenching construction.Foundation ditch of the present invention forms both sides Sandwich biscuit type curtain, foundation ditch is wrapped in both sides and can effectively prevent infiltration, then carry out trenching construction, it is ensured that quality of wall and foundation ditch are internal water-tight.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to the Sandwich biscuit type curtain water stop of a kind of diaphragm wall
Construction method.
Background technology
New World center three, the Wuhan phase office building project that New World Development (Wuhan) company limited plans to build, is by one 37
The comprehensive office building of five layers of annex composition of layer high building and floor height 68 meters.Construction area 140,000, below ground sets four layers of ground
Lower room, excavation of foundation pit area 13240, excavation of foundation pit degree of depth 21m 27m (" cheating in hole " 27m).
Foundation ditch surrounding enviroment are the severeest, complicated: north side is positioned at liberates business district, main road, next-door neighbour aviation road viaduct (and
Foundation ditch limit is distributed various pipe network facilities and box culvert);Next-door neighbour foundation ditch southern side and west side _ _ _ _ _ have many 58 floor natural foundation,
Dilapidated house of the remote past;Deep basal pit stratum upper part is furnished with thickness compared with current-formed silt layer big, that intensity is low and silt clay
Soft Soil Layer, middle part is layer of sand and boulder bed, and the underlying stratum degree of depth reaches more than 55 meters.And the groundwater run off of this foundation ditch enriches, with
The Changjiang river communicates, and the substrate of this foundation ditch enters layer of sand, it is necessary to take sealing and deep-well draining, precipitation treatment measures.
In this project practice of construction operation process, it is necessary to diaphram wall of constructing around foundation ditch, yet with this base
There is abundant water resource bottom hole, thus directly implement diaphragm wall structure, easily cause seepage, affecting diaphragm wall shapes, sternly
The foundation pit side-wall that also can affect the end, hole more than of weight leaks.
Summary of the invention
In order to solve the problems referred to above, the present invention proposes the Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall,
By using the curtain water stop of Sandwich biscuit type to construct, three axes agitating pile of constructing in the both sides of diaphragm wall foundation ditch, stake deep entrance base
Deeply following 3 5m in the end, hole, are formed and lead wall hanging curtain, then carry out trenching construction, it is ensured that quality of wall and foundation ditch are internal water-tight.
The technical scheme is that and be achieved in that:
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall, before guide wall of underground continuous wall is constructed, first at base
Leading, inside and outside hole, three axes agitating pile of constructing respectively outside wall, at the bottom of stake deep entrance foundation ditch, deeply following 3 5m, are formed and lead wall hanging
Curtain, then carry out trenching construction.
Preferably, at least 1 row's three axes agitating pile of constructing inside foundation ditch, at least 2 row's three axes agitating pile of constructing outside foundation ditch.
Preferably, described three axes agitating pile three becomes the distance of overlap joint between a group, and adjacent two groups to be less than every
Radius.
Preferably, every diameter 600mm of described three axes agitating pile, often overlap between the group adjacent stake of three axes agitating pile away from
From for 150mm, between adjacent two groups, the distance of overlap joint is 300mm.
Preferably, every diameter 850mm of described three axes agitating pile, often overlap between the group adjacent stake of three axes agitating pile away from
From for 150mm, between adjacent two groups, the distance of overlap joint is 300mm.
Preferably, the distance at two row's three axes agitating pile centers of foundation ditch homonymy is 400mm.
What the present invention produced has the beneficial effect that this method easy construction, and the suitability is strong, and three axes agitating pile forms sandwich biscuit
The curtain water stop form of formula, at the bottom of stake deep entrance foundation ditch, deeply following 3 5m, are formed and lead wall hanging curtain, then carry out trenching construction, it is ensured that
Quality of wall and foundation ditch are internal water-tight.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to
Other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is the Construction Principle schematic diagram of the present invention;
Fig. 2 is that three axes agitating pile connects rows of schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise
Embodiment, broadly falls into the scope of protection of the invention.
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall, constructs at guide wall of underground continuous wall
Before, first lead, inside and outside foundation ditch 1, three axes agitating pile 2 of constructing respectively outside wall, deeply following 3 5m at the bottom of stake deep entrance foundation ditch,
Wall hanging curtain is led in formation, then carries out trenching construction.
Such as every diameter 850mm or 600mm of three axes agitating pile in embodiment in Fig. 2, the program uses and adopts inside foundation ditch
Using single three axes agitating pile, arrange two row's three axes agitating pile outside foundation ditch, the distance at two row's three axes agitating pile centers is 400mm,
Can be the most stranded, prevent percolating water.Between the stake that often group three axes agitating pile is adjacent, overlap distance is 150mm, first constructs
The partial distance intersecting overlap joint between the three axes agitating pile 22 of three axes agitating pile 21 and rear construction is 300mm, it is ensured that often organize stake it
Between overlap joint reliability.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention
Within god and principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.
Claims (6)
1. the Sandwich biscuit type curtain water stop construction method of a diaphragm wall, it is characterised in that construct at guide wall of underground continuous wall
Before, first lead, inside and outside foundation ditch, three axes agitating pile of constructing respectively outside wall, deeply following 3 5m, shape at the bottom of stake deep entrance foundation ditch
Become to lead wall hanging curtain, then carry out trenching construction.
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall the most as claimed in claim 1, it is characterised in that foundation ditch
Inner side construction at least 1 row's three axes agitating pile, at least 2 row's three axes agitating pile of constructing outside foundation ditch.
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall the most as claimed in claim 1 or 2, it is characterised in that
Described three axes agitating pile three becomes the distance of the overlap joint radius less than every between a group, and adjacent two groups.
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall the most as claimed in claim 3, it is characterised in that described
Every diameter 600mm of three axes agitating pile, between the stake that often group three axes agitating pile is adjacent, overlap distance is 150mm, adjacent two
Between group, the distance of overlap joint is 300mm.
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall the most as claimed in claim 3, it is characterised in that described
Every diameter 850mm of three axes agitating pile, between the stake that often group three axes agitating pile is adjacent, overlap distance is 150mm, adjacent two
Between group, the distance of overlap joint is 300mm.
The Sandwich biscuit type curtain water stop construction method of a kind of diaphragm wall the most as claimed in claim 4, it is characterised in that foundation ditch
The distance at two row's three axes agitating pile centers of homonymy is 400mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610472967.9A CN106120828A (en) | 2016-06-23 | 2016-06-23 | A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610472967.9A CN106120828A (en) | 2016-06-23 | 2016-06-23 | A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106120828A true CN106120828A (en) | 2016-11-16 |
Family
ID=57266397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610472967.9A Pending CN106120828A (en) | 2016-06-23 | 2016-06-23 | A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120828A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532587A (en) * | 2018-04-13 | 2018-09-14 | 王正兴 | A kind of rainy season railway website construction method of underground continuous wall |
CN109811778A (en) * | 2019-03-27 | 2019-05-28 | 中建四局第一建筑工程有限公司 | A kind of ultra-deep foundation pit goes along with sb. to guard him water sealing structure and method |
CN110485430A (en) * | 2019-07-24 | 2019-11-22 | 青岛理工大学 | A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100910576B1 (en) * | 2007-11-02 | 2009-08-04 | 쌍용건설 주식회사 | Embed anchor and construction method of composite basement wall using the same |
CN102312445A (en) * | 2010-06-29 | 2012-01-11 | 中交第三航务工程勘察设计院有限公司 | Diaphragm wall and construction method thereof |
CN203668969U (en) * | 2013-12-12 | 2014-06-25 | 安徽省建筑科学研究设计院 | Reinforcing waterproof structure of underground diaphragm wall |
CN204174625U (en) * | 2014-07-28 | 2015-02-25 | 中国建筑第四工程局有限公司 | The superimposed cantilever foundation pit supporting construction of a kind of piling wall |
CN204401638U (en) * | 2014-12-23 | 2015-06-17 | 中国建筑西南勘察设计研究院有限公司 | A kind of foundation pit waterproof curtain wall |
CN104963346A (en) * | 2015-06-30 | 2015-10-07 | 中国二十冶集团有限公司 | Support construction method for deep foundation pit in complex geological condition |
CN102787607B (en) * | 2012-08-28 | 2016-09-14 | 大元建业集团股份有限公司 | A kind of deep foundation pit precipitation construction method for supporting being applicable to coastal area |
-
2016
- 2016-06-23 CN CN201610472967.9A patent/CN106120828A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100910576B1 (en) * | 2007-11-02 | 2009-08-04 | 쌍용건설 주식회사 | Embed anchor and construction method of composite basement wall using the same |
CN102312445A (en) * | 2010-06-29 | 2012-01-11 | 中交第三航务工程勘察设计院有限公司 | Diaphragm wall and construction method thereof |
CN102787607B (en) * | 2012-08-28 | 2016-09-14 | 大元建业集团股份有限公司 | A kind of deep foundation pit precipitation construction method for supporting being applicable to coastal area |
CN203668969U (en) * | 2013-12-12 | 2014-06-25 | 安徽省建筑科学研究设计院 | Reinforcing waterproof structure of underground diaphragm wall |
CN204174625U (en) * | 2014-07-28 | 2015-02-25 | 中国建筑第四工程局有限公司 | The superimposed cantilever foundation pit supporting construction of a kind of piling wall |
CN204401638U (en) * | 2014-12-23 | 2015-06-17 | 中国建筑西南勘察设计研究院有限公司 | A kind of foundation pit waterproof curtain wall |
CN104963346A (en) * | 2015-06-30 | 2015-10-07 | 中国二十冶集团有限公司 | Support construction method for deep foundation pit in complex geological condition |
Non-Patent Citations (1)
Title |
---|
张炳信: "套管灌注桩咬合旋喷桩止水帷幕施工技术及应用", 《广东土木与建筑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532587A (en) * | 2018-04-13 | 2018-09-14 | 王正兴 | A kind of rainy season railway website construction method of underground continuous wall |
CN109811778A (en) * | 2019-03-27 | 2019-05-28 | 中建四局第一建筑工程有限公司 | A kind of ultra-deep foundation pit goes along with sb. to guard him water sealing structure and method |
CN110485430A (en) * | 2019-07-24 | 2019-11-22 | 青岛理工大学 | A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210013697U (en) | Construction structure of near-penetrating building of underground excavation section of subway station entrance and exit | |
CN103775110A (en) | Underground excavation construction method for multilayer underground space of soft soil area | |
CN107587516A (en) | A kind of efficient sealing of Follow-up type hinders sand precipitation hybrid system and its construction method | |
CN106013086A (en) | Construction method for processing underground continuous wall joint through boss type I-steel joint box | |
CN112081125A (en) | Bottom sealing structure of foundation pit in submersible sandy gravel stratum and construction process | |
CN106120828A (en) | A kind of Sandwich biscuit type curtain water stop construction method of diaphragm wall | |
CN106120805B (en) | The construction method of ultra-deep foundation pit supporting under dilapidated house environment | |
CN206204972U (en) | A kind of prefabricated tubular pile as well-points dewatering | |
CN205444257U (en) | Novel drainage system is prevented to bottom plate | |
CN107642361A (en) | A kind of method that Underground Subway Station is built using rectangular shield push-bench | |
CN205662938U (en) | Drainage excavation structure falls in foundation ditch | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN105926668A (en) | Construction method of partition wall between ultradeep foundation pit and place near dangerous building | |
CN204715364U (en) | A kind of foundation pit support device | |
CN204898684U (en) | Super dark excavation supporting system | |
CN204898465U (en) | Ecological drainage facility of permafrost region dish | |
CN208815560U (en) | A kind of structure of Underground Subway Station construction period full station sealing | |
CN110344395A (en) | A kind of supporting leg type underground continuous wall construction method | |
CN215252961U (en) | Bottom sealing structure for foundation pit of submersible sandy gravel stratum | |
CN110629732A (en) | Prefabricated combined river bank protection and construction arrangement method thereof | |
CN215857732U (en) | Dive sand cobble stratum foundation ditch back cover structure | |
CN105625299B (en) | A kind of wall board type Novel underground diaphragm wall and its construction method | |
CN205000346U (en) | Slope frame for slope reinforcement and water drainage | |
CN113026778A (en) | Submersible sandy gravel stratum foundation pit bottom sealing structure and construction method | |
CN211547830U (en) | Structure for preventing ground from being wetted |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161116 |
|
RJ01 | Rejection of invention patent application after publication |