CN206256469U - A kind of underway being easily installed - Google Patents

A kind of underway being easily installed Download PDF

Info

Publication number
CN206256469U
CN206256469U CN201621238758.XU CN201621238758U CN206256469U CN 206256469 U CN206256469 U CN 206256469U CN 201621238758 U CN201621238758 U CN 201621238758U CN 206256469 U CN206256469 U CN 206256469U
Authority
CN
China
Prior art keywords
lozenges
box beam
beam pipeline
supporting plate
underway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621238758.XU
Other languages
Chinese (zh)
Inventor
贺维国
范国刚
洪开荣
郑余朝
刘庆方
曾珂
马军秋
李军
毕经东
江水德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201621238758.XU priority Critical patent/CN206256469U/en
Application granted granted Critical
Publication of CN206256469U publication Critical patent/CN206256469U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of underway being easily installed, the utility model is related to technical field of traffic transportation;It includes box beam pipeline;Described box beam pipeline is mutually inserted by several segmented bodies and constituted;One end outer wall of described segmented body is provided with insertion end lozenges, and its other end is provided with expansion termination, and the inwall for expanding termination is provided with receiving terminal lozenges;Clamping is engaged with the receiving terminal lozenges in latter segmented body by the insertion end lozenges in previous segmented body between several described segmented bodies;Waterstop is provided between described insertion end lozenges and receiving terminal lozenges;The bottom of described box beam pipeline is provided with supporting plate, and the bottom of supporting plate is provided with pile foundation;The top surface absolute altitude of described supporting plate is equal to the elevation of bottom of box beam pipeline.Its manufacture difficulty is small, and difficulty of construction is small, easy for installation, and speed of application is fast, and low cost is practical.

Description

A kind of underway being easily installed
Technical field
The utility model is related to technical field of traffic transportation, and in particular to a kind of underway being easily installed.
Background technology
China is vast in territory, and seashore line length, river, river, lake and island are numerous, many using to environment, landscape shadow in recent years The small underway mode of sound.Underway joint waterproofing is one of key factor of whole engineering success or failure, conventional underway All it is embedded in the soil layer below the bottom, passage section is big, joint stress is complicated, joint waterproofing complex process, operation are more, construction Difficulty is big, long in time limit, cost is high.Section is smaller and the passage force modes without earthing lead to the big cross section for having earthing under water under water Road is completely different, therefore its joint should not be indiscriminately imitated at the top of big cross section and have earthing underway joint form, needed one kind badly and be adapted to Section is smaller and the passage without earthing under water.
Utility model content
The purpose of this utility model is the defect and deficiency for prior art, there is provided a kind of simple structure, design is closed Reason, the underway being easily installed easy to use, its manufacture difficulty are small, and difficulty of construction is small, easy for installation, and speed of application is fast, Low cost, it is practical.
To achieve the above object, the technical solution adopted in the utility model is:It includes box beam pipeline;Described box beam pipe Road is mutually inserted by several segmented bodies and constituted;One end outer wall of described segmented body is provided with insertion end lozenges, its other end Expansion termination is provided with, the inwall for expanding termination is provided with receiving terminal lozenges;By previous between several described segmented bodies Insertion end lozenges in segmented body is engaged clamping with the receiving terminal lozenges in latter segmented body;Described insertion end wedge Waterstop is provided between shape face and receiving terminal lozenges;The bottom of described box beam pipeline is provided with supporting plate, and the bottom of supporting plate is provided with Pile foundation;The top surface absolute altitude of described supporting plate is equal to the elevation of bottom of box beam pipeline.
Further, the length of described segmented body is more than or equal to 120m.
Further, the cross-sectional area of described box beam pipeline is 12-40m2
Further, described expansion termination is that rim of a cup formula expands termination.
After said structure, the utility model has the beneficial effect that:A kind of water being easily installed described in the utility model Lower channel, its manufacture difficulty is small, and difficulty of construction is small, easy for installation, and speed of application is fast, and low cost is practical, the utility model With simple structure, set reasonable, the advantages of low manufacture cost.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 be in Fig. 1 A-A to sectional view.
Fig. 3 is the annexation schematic diagram of segmented body in the utility model.
Description of reference numerals:
Box beam pipeline 1, segmented body 2, receiving terminal lozenges 3, pile foundation 4, supporting plate 5, expansion termination 6, waterstop 7, insertion end Lozenges 8.
Specific embodiment
The utility model is further described below in conjunction with the accompanying drawings.
Referring to as shown in Figure 1-Figure 3, the technical scheme that this specific embodiment is used is:It includes box beam pipeline 1;It is described Box beam pipeline 1 be made up of several segmented bodies 2;One end outer wall of described segmented body 2 is provided with insertion end lozenges 8, and its is another One end is provided with expansion termination 6, and the inwall for expanding termination 6 is provided with receiving terminal lozenges 3, insertion end lozenges 8, segmented body 2, expansion Termination 6 and receiving terminal lozenges 3 are integral type structure;By in previous segmented body 2 between several described segmented bodies 2 Insertion end lozenges 8 be engaged clamping with the receiving terminal lozenges 3 in latter segmented body 2;Described insertion end lozenges 8 Waterstop 7 is provided between receiving terminal lozenges 3;The bottom of described box beam pipeline 1 is provided with supporting plate 5, and the bottom of supporting plate 5 is provided with Pile foundation 4;The top surface absolute altitude of described supporting plate 5 is equal to the elevation of bottom of box beam pipeline 1;The top surface absolute altitude of described supporting plate 5 is equal to The elevation of bottom of box beam pipeline 1;The length of described segmented body 2 is 120m;The cross-sectional area of described box beam pipeline 1 is 40m2
The installation steps of this specific embodiment are as follows:Port line is fitted according to underwater topography and line requirements to put down Face, vertical alignment;According to track plan and vertical alignment, box beam pipeline 1 is divided into some sections, is 120m per segment length; The elevation of bottom of box beam pipeline 1, pile foundation 4 are equal in the top surface absolute altitude of every section of near joints setting pile foundation 4 and supporting plate 5, and supporting plate 5 It is embedded in riverbed with supporting plate 5;While pile foundation 4 and supporting plate 5 are constructed, prefabricated case beam pipeline 1;During prefabricated case beam pipeline 1, point One end of segment body 2 expands, in rim of a cup formula(Expand termination 6), inwall wedge shape(That is receiving terminal lozenges 3), other end outer wall is in Wedge shape, and waterstop 7 is installed in outside;After box beam pipeline 1 is lifted on underwater pile 4, connect to form passage using plug-in type.
After said structure, this specific embodiment has the beneficial effect that:One kind described in this specific embodiment is easy to The underway of installation, its manufacture difficulty is small, and difficulty of construction is small, easy for installation, and speed of application is fast, and low cost is practical, this Utility model has a simple structure, sets reasonable, the advantages of low manufacture cost.
The above, is only used to illustrate the technical solution of the utility model and unrestricted, those of ordinary skill in the art couple Other modifications or equivalent that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope, all should cover in the middle of right of the present utility model.

Claims (4)

1. a kind of underway being easily installed, it is characterised in that:It includes box beam pipeline;Described box beam pipeline is by several Segmented body is mutually inserted composition;One end outer wall of described segmented body is provided with insertion end lozenges, and its other end is provided with bellend Head, the inwall for expanding termination is provided with receiving terminal lozenges;By in previous segmented body between several described segmented bodies Insertion end lozenges is engaged clamping with the receiving terminal lozenges in latter segmented body;Described insertion end lozenges and reception Waterstop is provided between the lozenges of end;The bottom of described box beam pipeline is provided with supporting plate, and the bottom of supporting plate is provided with pile foundation;Described The top surface absolute altitude of supporting plate is equal to the elevation of bottom of box beam pipeline.
2. a kind of underway being easily installed according to claim 1, it is characterised in that:The length of described segmented body More than or equal to 120m.
3. a kind of underway being easily installed according to claim 1, it is characterised in that:Described expansion termination is cup Mouth formula expands termination.
4. a kind of underway being easily installed according to claim 1, it is characterised in that:Described box beam pipeline it is disconnected Face area is 12-40m2
CN201621238758.XU 2016-11-19 2016-11-19 A kind of underway being easily installed Active CN206256469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621238758.XU CN206256469U (en) 2016-11-19 2016-11-19 A kind of underway being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621238758.XU CN206256469U (en) 2016-11-19 2016-11-19 A kind of underway being easily installed

Publications (1)

Publication Number Publication Date
CN206256469U true CN206256469U (en) 2017-06-16

Family

ID=59025037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621238758.XU Active CN206256469U (en) 2016-11-19 2016-11-19 A kind of underway being easily installed

Country Status (1)

Country Link
CN (1) CN206256469U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638691A (en) * 2016-11-19 2017-05-10 中铁隧道勘测设计院有限公司 Underwater channel easy to install

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638691A (en) * 2016-11-19 2017-05-10 中铁隧道勘测设计院有限公司 Underwater channel easy to install

Similar Documents

Publication Publication Date Title
CN206256468U (en) A kind of underway of simple type
CN203498799U (en) Prefabricated hollow pipe pile water-facing envelop enclosure
CN101705697A (en) Diaphragm wall joint flexible water stop installing device and method
CN103031835B (en) Method for increasing foundation bearing capacity
CN201520969U (en) Prefabricated hollow diaphragm wall body
CN103835316B (en) A kind of joint design of coercion underground continuous wall and construction method
CN206256469U (en) A kind of underway being easily installed
CN202577363U (en) H-shaped steel joint structure of underground diaphragm wall
CN106638691A (en) Underwater channel easy to install
CN208934007U (en) A kind of connection structure of pipe gallery
CN103806412A (en) Water leakage repair structure for water pool expansion joint
CN203549141U (en) Novel floor slab sleeve
CN201554042U (en) Installer for diaphragm wall connector flexible water stops
CN215669707U (en) Basement outer wall expansion joint waterproof construction
CN207749588U (en) A kind of floor built-in type soil stack connector
CN201865118U (en) Grouting spiral anchor base
CN201280726Y (en) Combination anti-floating piled anchor node water-proof structure
CN108547282A (en) A kind of the composite structure diaphram wall and its construction method of steel and concrete
CN103696407A (en) Assembly-type concrete water saving groove
CN206256467U (en) A kind of underway
CN203668938U (en) Post grouting side wall grouting and guniting annular valve structure
CN202157339U (en) Concrete inspection well chamber with flexible-joint connecting branch pipe
CN206015685U (en) A kind of Collapsible Loess District deep basal pit diaphram wall inner support system
CN206035047U (en) Prefabricated assembled underground granary of plastic cover
CN203729265U (en) Pool expansion joint leakage repair structure

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180625

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hebei Avenue, new Hongqiao, Hongqiao District, Tianjin City, No. 1

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.

TR01 Transfer of patent right