CN106638691A - Underwater channel easy to install - Google Patents

Underwater channel easy to install Download PDF

Info

Publication number
CN106638691A
CN106638691A CN201611017224.9A CN201611017224A CN106638691A CN 106638691 A CN106638691 A CN 106638691A CN 201611017224 A CN201611017224 A CN 201611017224A CN 106638691 A CN106638691 A CN 106638691A
Authority
CN
China
Prior art keywords
supporting plate
box beam
lozenges
beam pipeline
segmented body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611017224.9A
Other languages
Chinese (zh)
Inventor
贺维国
范国刚
洪开荣
郑余朝
刘庆方
曾珂
马军秋
李军
毕经东
江水德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201611017224.9A priority Critical patent/CN106638691A/en
Publication of CN106638691A publication Critical patent/CN106638691A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/067Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides an underwater channel easy to install, and relates to the technical field of transportation. The underwater channel includes a box girder pipe; the box girder pipe is formed by a plurality of segmented bodies which are connected with one another in an inserting mode; the outer wall of one end of each segmented body is provided with an inserting end wedge surface, and the other end of each segmented body is provided with an expanding end socket, and the inner wall of each expanding end socket is provided with a receiving end wedge surface; the segmented bodies are connected in a clamping mode through the matching of the inserting end wedge surface of one segmented body with the receiving end wedge surface of the next segmented body; a water-stop belt is arranged between each inserting end wedge surface and the corresponding receiving end wedge surface; supporting plates are arranged at the bottom of the box girder pipe, and the bottoms of the supporting plates are provided with pile foundations; the scale height of the top surface of each supporting plate is larger or equal to that of the bottom of the box girder pipe. The underwater channel is small in manufacturing and construction difficulty, convenient to install, high in construction speed, low in cost and high in practicability.

Description

A kind of underway being easily installed
Technical field
The present invention relates to technical field of traffic transportation, and in particular to a kind of underway being easily installed.
Background technology
China is vast in territory, and seashore line length, river, river, lake and island are numerous, many using to environment, landscape shadow in recent years The little underway mode of sound.Underway joint waterproofing is one of key factor of whole engineering success or failure, conventional underway All it is embedded in the soil layer below the bottom, passage section is big, joint stress is complicated, joint waterproofing complex process, operation are more, construction Difficulty is big, long in time limit, cost is high.Section is less and under water the passage force modes without earthing lead to the big cross section for having earthing under water Road is completely different, therefore its joint should not be indiscriminately imitated and have earthing underway joint form at the top of big cross section, needed one kind badly and be adapted to Section is less and the passage without earthing under water.
The content of the invention
It is reasonable in design, make present invention aims to the defect and deficiency of prior art, there is provided a kind of simple structure With the underway being easily easily installed, its manufacture difficulty is little, and difficulty of construction is little, easy for installation, and speed of application is fast, cost It is low, it is practical.
For achieving the above object, the technical solution used in the present invention is:It includes box beam pipeline;Described box beam pipeline by Several segmented bodies are mutually inserted composition;One end outer wall of described segmented body is provided with insertion end lozenges, and its other end is provided with Expand termination, the inwall for expanding termination is provided with receiving terminal lozenges;By previous segmentation between several described segmented bodies Insertion end lozenges on body is engaged clamping with the receiving terminal lozenges in latter segmented body;Described insertion end lozenges Waterstop is provided between receiving terminal lozenges;The bottom of described box beam pipeline is provided with supporting plate, and the bottom of supporting plate is provided with pile foundation; The top surface absolute altitude of described supporting plate is equal to the elevation of bottom of box beam pipeline.
Further, the length of described segmented body is more than or equal to 120m.
Further, the cross-sectional area of described box beam pipeline is 12-40m2
Further, described expansion termination is that rim of a cup formula expands termination.
The installation steps of the present invention are as follows:Fit port line plane, indulge disconnected according to underwater topography and line requirements Upper thread shape;According to track plan and vertical alignment, box beam pipeline is divided into into some sections, 120m is more than or equal to per segment length; Every section of near joints arrange pile foundation and supporting plate, and the top surface absolute altitude of supporting plate is equal to the elevation of bottom of box beam pipeline, pile foundation and supporting plate It is embedded in riverbed;While pile foundation and supporting plate is constructed, prefabricated case beam pipeline;During prefabricated case beam pipeline, one end of segmented body Expand, in rim of a cup formula, inwall wedge shape, other end outer wall is wedge shaped, and waterstop is installed in outside;By box beam lifting pipeline under water After in pile foundation, connect to form passage using plug-in type.
After said structure, the present invention has the beneficial effect that:A kind of underway being easily installed of the present invention, its Manufacture difficulty is little, and difficulty of construction is little, easy for installation, and speed of application is fast, and low cost is practical, and the present invention has simple structure, It is reasonable to arrange, the advantages of low manufacture cost.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the structural representation of the present invention.
Fig. 2 be in Fig. 1 A-A to sectional view.
Fig. 3 is the annexation schematic diagram of segmented body in the present invention.
Description of reference numerals:
Box beam pipeline 1, segmented body 2, receiving terminal lozenges 3, pile foundation 4, supporting plate 5, expansion termination 6, waterstop 7, insertion end wedge shape Face 8.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is further illustrated.
Referring to as shown in Figure 1-Figure 3, the technical scheme that this specific embodiment is adopted is:It includes box beam pipeline 1;It is described Box beam pipeline 1 be made up of several segmented bodies 2;One end outer wall of described segmented body 2 is provided with insertion end lozenges 8, and its is another One end is provided with expansion termination 6, and the inwall for expanding termination 6 is provided with receiving terminal lozenges 3, insertion end lozenges 8, segmented body 2, expansion Termination 6 and receiving terminal lozenges 3 are integral type structure;By in previous segmented body 2 between several described segmented bodies 2 Insertion end lozenges 8 be engaged clamping with the receiving terminal lozenges 3 in latter segmented body 2;Described insertion end lozenges 8 Waterstop 7 is provided between receiving terminal lozenges 3;The bottom of described box beam pipeline 1 is provided with supporting plate 5, and the bottom of supporting plate 5 is provided with Pile foundation 4;The top surface absolute altitude of described supporting plate 5 is equal to the elevation of bottom of box beam pipeline 1;The top surface absolute altitude of described supporting plate 5 is equal to The elevation of bottom of box beam pipeline 1;The length of described segmented body 2 is 120m;The cross-sectional area of described box beam pipeline 1 is 40m2
The installation steps of this specific embodiment are as follows:Port line is fitted according to underwater topography and line requirements to put down Face, vertical alignment;According to track plan and vertical alignment, box beam pipeline 1 is divided into into some sections, is 120m per segment length; In every section of near joints, pile foundation 4 and supporting plate 5 are set, and the top surface absolute altitude of supporting plate 5 is equal to the elevation of bottom of box beam pipeline 1, pile foundation 4 It is embedded in riverbed with supporting plate 5;While pile foundation 4 and supporting plate 5 are constructed, prefabricated case beam pipeline 1;During prefabricated case beam pipeline 1, point One end of segment body 2 expands, in rim of a cup formula(Expand termination 6), inwall wedge shape(That is receiving terminal lozenges 3), other end outer wall is in Wedge shape, and waterstop 7 is installed in outside;After box beam pipeline 1 is lifted on underwater pile 4, connect to form passage using plug-in type.
After said structure, this specific embodiment has the beneficial effect that:One kind described in this specific embodiment is easy to The underway of installation, its manufacture difficulty is little, and difficulty of construction is little, easy for installation, and speed of application is fast, and low cost is practical, this Invention has simple structure, and it is reasonable to arrange, the advantages of low manufacture cost.
The above, only to illustrate technical scheme and unrestricted, those of ordinary skill in the art are to this Other modifications or equivalent that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, All should cover in the middle of scope of the presently claimed invention.

Claims (5)

1. a kind of underway being easily installed, it is characterised in that:It includes box beam pipeline;Described box beam pipeline is by several Segmented body is mutually inserted composition;One end outer wall of described segmented body is provided with insertion end lozenges, and its other end is provided with bellend Head, the inwall for expanding termination is provided with receiving terminal lozenges;By in previous segmented body between several described segmented bodies Insertion end lozenges is engaged clamping with the receiving terminal lozenges in latter segmented body;Described insertion end lozenges and reception Waterstop is provided between the lozenges of end;The bottom of described box beam pipeline is provided with supporting plate, and the bottom of supporting plate is provided with pile foundation;Described The top surface absolute altitude of supporting plate is equal to the elevation of bottom of box beam pipeline.
2. a kind of underway being easily installed according to claim 1, it is characterised in that:The length of described segmented body More than or equal to 120m.
3. a kind of underway being easily installed according to claim 1, it is characterised in that:Described expansion termination is cup Mouth formula expands termination.
4. a kind of underway being easily installed according to claim 1, it is characterised in that:Described box beam pipeline it is disconnected Face area is 12-40m2
5. a kind of underway being easily installed according to claim 1, it is characterised in that:Its installation steps are as follows: Port line plane, vertical alignment are fitted according to underwater topography and line requirements;According to track plan and vertical section line Shape, by box beam pipeline some sections are divided into, and 120m is more than or equal to per segment length;In every section of near joints, pile foundation and supporting plate are set, and The top surface absolute altitude of supporting plate is equal to the elevation of bottom of box beam pipeline, and pile foundation and supporting plate are embedded in riverbed;In construction pile foundation and supporting plate While, prefabricated case beam pipeline;During prefabricated case beam pipeline, one end of segmented body expands, in rim of a cup formula, inwall wedge shape, the other end Outer wall is wedge shaped, and waterstop is installed in outside;After on box beam lifting pipeline under water pile foundation, connect to form logical using plug-in type Road.
CN201611017224.9A 2016-11-19 2016-11-19 Underwater channel easy to install Pending CN106638691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611017224.9A CN106638691A (en) 2016-11-19 2016-11-19 Underwater channel easy to install

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611017224.9A CN106638691A (en) 2016-11-19 2016-11-19 Underwater channel easy to install

Publications (1)

Publication Number Publication Date
CN106638691A true CN106638691A (en) 2017-05-10

Family

ID=58808041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611017224.9A Pending CN106638691A (en) 2016-11-19 2016-11-19 Underwater channel easy to install

Country Status (1)

Country Link
CN (1) CN106638691A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254984A (en) * 2020-01-20 2020-06-09 中交第三航务工程局有限公司 Pipe joint connecting structure of underwater cable-stayed suspension tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB189808884A (en) * 1898-04-16 1899-02-11 John Spencer Improvements in the Mode and Means for Making the Junctions of Tubes or Pipes which are also applicable to Telegraph Posts and other similar purposes.
JPH06299796A (en) * 1993-04-13 1994-10-25 Kubota Corp Segment for tunnel
JPH0921141A (en) * 1995-07-05 1997-01-21 Tomen Kenki Kk Construction of undersea or under-river tunnel
CN204728364U (en) * 2015-04-24 2015-10-28 中交公路规划设计院有限公司 The bonded prestress pipe of immersed tube tunnel segmentation
CN206256469U (en) * 2016-11-19 2017-06-16 中铁隧道勘测设计院有限公司 A kind of underway being easily installed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB189808884A (en) * 1898-04-16 1899-02-11 John Spencer Improvements in the Mode and Means for Making the Junctions of Tubes or Pipes which are also applicable to Telegraph Posts and other similar purposes.
JPH06299796A (en) * 1993-04-13 1994-10-25 Kubota Corp Segment for tunnel
JPH0921141A (en) * 1995-07-05 1997-01-21 Tomen Kenki Kk Construction of undersea or under-river tunnel
CN204728364U (en) * 2015-04-24 2015-10-28 中交公路规划设计院有限公司 The bonded prestress pipe of immersed tube tunnel segmentation
CN206256469U (en) * 2016-11-19 2017-06-16 中铁隧道勘测设计院有限公司 A kind of underway being easily installed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254984A (en) * 2020-01-20 2020-06-09 中交第三航务工程局有限公司 Pipe joint connecting structure of underwater cable-stayed suspension tunnel
CN111254984B (en) * 2020-01-20 2021-10-01 中交第三航务工程局有限公司 Pipe joint connecting structure of underwater cable-stayed suspension tunnel

Similar Documents

Publication Publication Date Title
CN206256468U (en) A kind of underway of simple type
CN206538788U (en) Prefabricated piping lane
JP4588804B1 (en) Temporary cut-off method, temporary cut-off structure
CN103031835B (en) Method for increasing foundation bearing capacity
CN102359118B (en) Annular foundation of underground continuous wall and construction method thereof
CN103835316B (en) A kind of joint design of coercion underground continuous wall and construction method
CN106638691A (en) Underwater channel easy to install
CN206256469U (en) A kind of underway being easily installed
CN2567270Y (en) Movable cylinder foundation breakwater structure
CN104313999A (en) Bridge pier structure
CN208934007U (en) A kind of connection structure of pipe gallery
CN105040730B (en) Connection processing method for enclosure bored concrete pile and cellar structure floor slab in reversed foundation pit
CN203530959U (en) High-strength underground diaphragm wall
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN106436762A (en) Underwater channel
CN212296413U (en) Back-pasting type pi-shaped rubber water stop for tunnel engineering
CN205804562U (en) Prefabricated socket joint formula drainage shaft structure
CN109695456B (en) Rail transit and comprehensive pipe gallery combined construction structure and construction method thereof
CN206256467U (en) A kind of underway
CN106451276B (en) A kind of pre-buried wire box of Prefabricated stacking floor and its installation method
CN204662374U (en) A kind of box-type suction foundation siphon gallery water intaking structure
CN104775398A (en) Box tube type basic siphon corridor water taking structure and application thereof
CN204589744U (en) Lawn brick
CN214363844U (en) Double-row water accumulation device
CN206538786U (en) Begun to speak in prefabricated reinforced concrete blind plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190213

Address after: 300000 Tianjin Free Trade Test Zone (Airport Economic Zone) No. 36 West Central Road

Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Address before: 300000 Hebei Avenue, new Hongqiao, Hongqiao District, Tianjin City, No. 1

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510