CN109025203A - The green pure seam construction method of U.S. by hand in mountain - Google Patents
The green pure seam construction method of U.S. by hand in mountain Download PDFInfo
- Publication number
- CN109025203A CN109025203A CN201710428243.9A CN201710428243A CN109025203A CN 109025203 A CN109025203 A CN 109025203A CN 201710428243 A CN201710428243 A CN 201710428243A CN 109025203 A CN109025203 A CN 109025203A
- Authority
- CN
- China
- Prior art keywords
- gap
- joint trimming
- mountain
- trimming agent
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000009966 trimming Methods 0.000 claims abstract description 51
- 239000000919 ceramic Substances 0.000 claims abstract description 27
- 239000003795 chemical substances by application Substances 0.000 claims description 56
- 239000000428 dust Substances 0.000 claims description 9
- 238000012856 packing Methods 0.000 claims description 5
- 238000007790 scraping Methods 0.000 claims description 5
- 238000003756 stirring Methods 0.000 claims description 4
- 239000004927 clay Substances 0.000 claims description 3
- 239000003292 glue Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 2
- 239000000049 pigment Substances 0.000 claims description 2
- 238000007711 solidification Methods 0.000 claims description 2
- 230000008023 solidification Effects 0.000 claims description 2
- 230000003670 easy-to-clean Effects 0.000 abstract description 13
- 238000000034 method Methods 0.000 abstract description 9
- 238000004140 cleaning Methods 0.000 abstract description 7
- 230000003796 beauty Effects 0.000 abstract description 6
- 241000894006 Bacteria Species 0.000 abstract description 4
- 230000005574 cross-species transmission Effects 0.000 description 3
- 238000005034 decoration Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000001035 drying Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/165—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/165—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
- E04F21/1652—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers for smoothing and shaping joint compound to a desired contour
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
The invention discloses a kind of green pure seam construction methods of U.S. by hand in mountain, comprising the following steps: A. cleaning gap, B. T-me line paper, C. tune mixes joint trimming agent, D. beauty stitches construction, E. tears U.S. line paper.The present invention makes edge clout easy to clean and putting up U.S. line paper in slot edge, and utilizes the green nano ceramics mud blind in mountain, easy to clean, wear-resisting, will never fade;And on the one hand provided U.S. seam construction method solves the disadvantage that be easy to shelter evil people and countenance evil practices in gap, not only easy to clean to sweep but also effectively prevent bacteria breed, has ensured human health;On the other hand because its method is simple, it can be in and do it yourself to operate, great market application and popularization value.
Description
Technical field
The present invention relates to building decoration technology field, more particularly to a kind of green pure seam construction party of U.S. by hand in mountain
Method.
Background technique
The parlor of household, kitchen and toilet would ordinarily be encountered that ceramic tile gap is black by leucismus, extremely antihygienic problem now, and brickwork joint becomes
Bacterium is bred in clandestine meeting, generates peculiar smell, seriously endangers human health, and this bacterium is especially apparent in summer.This puzzlement decoration row
The problem of industry many years, is captured by joint trimming agent, it not only solves a series of problem that brickwork joint blackening is caused, also significantly
Finishing class is improved, joint trimming agent is high-grade house fitting-up product, is suitable for the beautification of the gaps such as ceramic tile, stone material, kitchen and bath bathroom yin
Angle decoration.Joint trimming agent color multiplicity, not only oil-stain-preventing, rub resistance, intensity are high, and can thoroughly change showing for seam black mould change
As.
Application No. is the patent documents of CN201310162744.9 to disclose a kind of construction method of joint trimming agent, passes through utilization
Plastic tube clogs ceramic tile seam, although construction rapidly, can improve to a certain extent, gap filling is uneven and out-of-flatness;But
The bad control of its construction method, joint trimming agent often spill over floor edge, and while being wiped by wet sponge is easily accessible by seam
Gap joint trimming agent influences joint filling effect.
Therefore, how to provide that a kind of method is simple, U.S. seam construction method of edge clout easy to clean is those skilled in the art
The problem of member's urgent need to resolve.
Summary of the invention
In view of this, the present invention provides a kind of green pure seam construction methods of U.S. by hand in mountain, by putting up beauty in slot edge
Line paper and make edge clout easy to clean, and utilize the green nano ceramics mud blind in mountain, it is easy to clean, wear-resisting, will never change colour;And
And this method is simple, can be in and do it yourself to operate, great market application and popularization value.
In order to achieve the above object, the present invention adopts the following technical scheme:
A kind of green pure seam construction method of U.S. by hand in mountain, which comprises the following steps:
A. it clears up gap: removing sundries along gap two sides with tool, and clear up dust debris with dust catcher, it will using rag
The dust wiped clean being attached on ceramic tile surface;
B. T-me line paper: the gap cleared up through step A is carried over and respectively in the two sides T-me line paper in the gap, U.S. line
Paper is apart from 0.2~0.5mm of slot edge;
C. adjust and mix joint trimming agent: the component A of joint trimming agent and B component are mixed according to 1:1 ratio, 2~5min of stirring to uniform,
The gum outlet for cutting the sealing of hungry area cylinder simultaneously, and the joint trimming agent being stirred is fitted into the hungry area cylinder, while by institute
It states the air inside hungry area cylinder to drain, fills the hungry area cylinder, covers rear cover and load onto glue rifle;
D. U.S. seam construction: the step C sharp mouth rubber hose for having been filled with the packing element of joint trimming agent is cut into 45 degree of angle angles, and described
The width for being sized to be slightly smaller than the gap cleared up through step A of sharp mouth rubber hose will along the gap for posting U.S. line paper through step B
The joint trimming agent is uniformly filled into the gap, while being compacted smooth out by the joint trimming agent having had been filled with using scraping blade, and will
Connector and the incision position repairing in the gap are uniform, straight;
E. it tears U.S. line paper: after the completion of the gap U.S. seam in step D, tearing the U.S. line paper off;
Preferably, in step A, the tool includes cutter and wallpaper knife.
Preferably, in step C, the joint trimming agent is the green nano ceramics mud two-component joint trimming agent in mountain, wherein a is described
The component A of the green two-component nano ceramics mud in mountain is curing agent, and be translucent shape, and B component is pigment;The mountain of another money is green double
The component A and B component of component nano ceramics mud are in coloured clay shape.
Preferably, the component A of the joint trimming agent and B component are stirred is for described in preventing in subsequent step
Joint trimming agent solidification is incomplete.
Preferably, in step E, the U.S. line paper will be torn before the joint trimming agent smoothes out ot-yet-hardened.
It can be seen via above technical scheme that compared with prior art, the present disclosure provides a kind of green pure craft in mountain
U.S. seam construction method, clears up plate brickwork joint gap with tool first, crevice cleaning, drying when ensuring to construct, and cleans dynamics and want
It is moderate, ceramic tile can not be scratched;
Secondly T-me line paper, U.S. line paper will paste along gap sideline, can not paste tape edge line or off-seam sideline is too far, especially
Pay attention to pasting to obtain straight beauty in cross interface, to ensure that joint trimming agent will not spill over floor edge, only needed after the completion of U.S. seam by
U.S. line paper is torn, and saves cleaning labour;
Then it adjusting and mixes material, the present invention uses nano ceramics mud two-component joint trimming agent, and its is rich in color, and color is beautiful,
And it is easy to clean, wear-resisting, will never fade, will not be recessed when in addition constructing will not pollute ceramic tile;
The sharp mouth rubber hose of packing element is cut into 45 degree of angle angles by U.S. seam construction simultaneously, and the size of sharp mouth rubber hose is smaller
The speed that width in gap is filled in place when guaranteeing to spray joint trimming agent, and sprayed should uniformly, while will have been filled out with scraping blade
The joint trimming agent compacting substituted the bad for the good smoothes out, and has connector and incision position to repair uniform, straight, to ensure that U.S. seam effect is smoothly beautiful;
U.S. line paper is finally torn when joint trimming agent does not solidify, to ensure that joint trimming agent is not uprooped, and paying attention to can not
Joint trimming agent is fallen on ceramic tile or furniture, in order to avoid difficult cleaning.
The green pure seam construction method of U.S. by hand in mountain provided by the invention is made and putting up U.S. line paper in slot edge more than edge
Expect easy to clean, and utilizes the green nano ceramics mud blind in mountain, it is easy to clean, wear-resisting, will never fade;And provided U.S. seam
On the one hand construction method solves the disadvantage that be easy to shelter evil people and countenance evil practices in gap, not only easy to clean to sweep but also effectively prevent bacterium
It breeds, has ensured human health;On the other hand because its method is simple, it can be in and do it yourself to operate, great market application pushes away
Wide value.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
Fig. 1 attached drawing is the schematic diagram of the green pure seam construction method of U.S. by hand in mountain provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a kind of green purely manual U.S. seam construction methods in mountain, by putting up U.S. line paper in slot edge
And make edge clout easy to clean, and utilize the green nano ceramics mud blind in mountain, it is easy to clean, wear-resisting, will never change colour;And it should
Method is simple, can be in and do it yourself to operate, great market application and popularization value.
Attached drawing 1 is referred to, the present invention provides a kind of green pure seam construction methods of U.S. by hand in mountain, comprising the following steps:
A. it clears up gap: removing sundries along gap two sides with tool, and clear up dust debris with dust catcher, it will using rag
The dust wiped clean being attached on ceramic tile surface;
Plate brickwork joint gap is cleared up with tool, crevice cleaning, drying when ensuring to construct, and clean dynamics and want moderate, it can not
Scratch ceramic tile.
B. T-me line paper: carrying over the gap cleared up through step A and respectively in the two sides T-me line paper in gap, U.S. line paper away from
From 0.2~0.5mm of slot edge;
Pay special attention to paste to obtain straight beauty in cross interface, to ensure that joint trimming agent will not spill over floor edge, and
U.S. line paper need to only be torn after the completion of U.S. seam, save cleaning labour.
C. adjust and mix joint trimming agent: the component A of joint trimming agent and B component are mixed according to 1:1 ratio, 2~5min of stirring to uniform,
The gum outlet of hungry area cylinder sealing is cut simultaneously, and the joint trimming agent being stirred is fitted into hungry area cylinder, while will be inside hungry area cylinder
Air drain, fill hungry area cylinder, cover rear cover and load onto glue rifle;
The present invention uses nano ceramics mud two-component joint trimming agent, rich in color, color is beautiful and easy to clean,
It is wear-resisting, will never fade, it will not be recessed when in addition constructing, ceramic tile will not be polluted.
D. the step C sharp mouth rubber hose for having been filled with the packing element of joint trimming agent U.S. seam construction: is cut into 45 degree of angle angles, and sharp mouth
The width for being sized to be slightly smaller than the gap cleared up through step A of rubber hose stitches beauty along the gap for posting U.S. line paper through step B
Agent is uniformly filled into the gap, while being compacted smooth out by the joint trimming agent having had been filled with using scraping blade, and connecing gap
Head and incision position repairing are uniform, straight;
Not only guarantee that filling is in place when spraying joint trimming agent, but also the speed sprayed should uniformly, while will be had been filled with scraping blade
Good joint trimming agent is compacted smooth out, and has connector and incision position to repair uniform, straight, to ensure that U.S. seam effect is smoothly beautiful.
E. it tears U.S. line paper: after the completion of the gap U.S. seam in step D, tearing U.S. line paper off.
U.S. line paper is torn when joint trimming agent does not solidify, to ensure that joint trimming agent is not uprooped, and paying attention to can not will be beautiful
Seam agent is fallen on ceramic tile or furniture, in order to avoid difficult cleaning.
In order to further optimize the above technical scheme, in step A, tool includes cutter and wallpaper knife.
In order to further optimize the above technical scheme, in step C, the joint trimming agent is the green nano ceramics mud two-component beauty in mountain
Agent is stitched, wherein the component A of the green two-component nano ceramics mud in a mountain is curing agent, be translucent shape, and B component is face
Material;The component A and B component of the green two-component nano ceramics mud in the mountain of another money are in coloured clay shape.
In order to further optimize the above technical scheme, the component A of the joint trimming agent and B component are stirred be for
Prevent the joint trimming agent in subsequent step from solidifying incomplete.
In order to further optimize the above technical scheme, in step E, the U.S. line paper will smooth out not yet solidifying in the joint trimming agent
Gu tearing before.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment
For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part
It is bright.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (5)
1. a kind of green pure seam construction method of U.S. by hand in mountain, which comprises the following steps:
A. it clears up gap: removing sundries along gap two sides with tool, and clear up dust debris with dust catcher, will be adhered to using rag
Dust wiped clean on ceramic tile surface;
B. T-me line paper: carrying over the gap cleared up through step A and respectively in the two sides T-me line paper in the gap, U.S. line paper away from
From 0.2~0.5mm of slot edge;
C. it adjusts and mixes joint trimming agent: the component A of joint trimming agent and B component are mixed according to 1:1 ratio, 2~5min of stirring is to uniform, simultaneously
The gum outlet for cutting the sealing of hungry area cylinder, and the joint trimming agent being stirred is fitted into the hungry area cylinder, while by the sky
Air inside packing element drains, and fills the hungry area cylinder, covers rear cover and load onto glue rifle;
D. the step C sharp mouth rubber hose for having been filled with the packing element of joint trimming agent U.S. seam construction: is cut into 45 degree of angle angles, and the sharp mouth
The width for being sized to be slightly smaller than the gap cleared up through step A of rubber hose will be described along the gap for posting U.S. line paper through step B
Joint trimming agent is uniformly filled into the gap, while being compacted smooth out by the joint trimming agent having had been filled with using scraping blade, and will be described
Connector and the incision position repairing in gap are uniform, straight;
E. it tears U.S. line paper: after the completion of the gap U.S. seam in step D, tearing the U.S. line paper off.
2. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that in step A, the kit
Include cutter and wallpaper knife.
3. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that in step C, the joint trimming agent
For the green nano ceramics mud two-component joint trimming agent in mountain, wherein the component A of the green two-component nano ceramics mud in a mountain is solidification
Agent, be translucent shape, and B component is pigment;The component A and B component of the green two-component nano ceramics mud in the mountain of another money be in
Coloured clay shape.
4. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that by the A group of the joint trimming agent
It is incomplete to prevent the joint trimming agent in subsequent step from solidifying that part and B component, which stir,.
5. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that in step E, the U.S. line paper
It to be torn before the joint trimming agent smoothes out ot-yet-hardened.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710428243.9A CN109025203A (en) | 2017-06-08 | 2017-06-08 | The green pure seam construction method of U.S. by hand in mountain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710428243.9A CN109025203A (en) | 2017-06-08 | 2017-06-08 | The green pure seam construction method of U.S. by hand in mountain |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109025203A true CN109025203A (en) | 2018-12-18 |
Family
ID=64629525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710428243.9A Pending CN109025203A (en) | 2017-06-08 | 2017-06-08 | The green pure seam construction method of U.S. by hand in mountain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025203A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779178A (en) * | 2019-01-29 | 2019-05-21 | 苏州金螳螂建筑装饰股份有限公司 | A kind of the joint filling structure and its method of indoor decoration surface layer |
CN114197786A (en) * | 2021-11-18 | 2022-03-18 | 深圳市奇信集团股份有限公司 | Ceramic tile joint filling structure and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008285820A (en) * | 2007-05-15 | 2008-11-27 | Yaguchi Giko:Kk | Method of securing adhesive agent filling gap during repair of floated tile ceramic piece and peeling tool used therefor |
CN102837244A (en) * | 2012-10-09 | 2012-12-26 | 河北科技大学 | Electric ceramic tile seam trimming machine |
CN103233566A (en) * | 2013-05-07 | 2013-08-07 | 张云春 | Construction method of joint trimming agent |
CN104624446A (en) * | 2014-12-31 | 2015-05-20 | 李东雷 | Anti-sticking liquid coating device of cement types of seam beautifying agent, glass cement, sealant, true porcelain cement and the like |
CN105503039A (en) * | 2015-12-24 | 2016-04-20 | 北京宝辰联合科技有限公司 | Pasty joint mixture comprising two components |
CN105971256A (en) * | 2016-05-16 | 2016-09-28 | 曾海平 | Plastic-steel mud plastic bag filling and smearing construction method |
CN106760431A (en) * | 2016-12-28 | 2017-05-31 | 徐丽亚 | The construction and decoration U.S. seam glue constructing device of combined type |
-
2017
- 2017-06-08 CN CN201710428243.9A patent/CN109025203A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008285820A (en) * | 2007-05-15 | 2008-11-27 | Yaguchi Giko:Kk | Method of securing adhesive agent filling gap during repair of floated tile ceramic piece and peeling tool used therefor |
CN102837244A (en) * | 2012-10-09 | 2012-12-26 | 河北科技大学 | Electric ceramic tile seam trimming machine |
CN103233566A (en) * | 2013-05-07 | 2013-08-07 | 张云春 | Construction method of joint trimming agent |
CN104624446A (en) * | 2014-12-31 | 2015-05-20 | 李东雷 | Anti-sticking liquid coating device of cement types of seam beautifying agent, glass cement, sealant, true porcelain cement and the like |
CN105503039A (en) * | 2015-12-24 | 2016-04-20 | 北京宝辰联合科技有限公司 | Pasty joint mixture comprising two components |
CN105971256A (en) * | 2016-05-16 | 2016-09-28 | 曾海平 | Plastic-steel mud plastic bag filling and smearing construction method |
CN106760431A (en) * | 2016-12-28 | 2017-05-31 | 徐丽亚 | The construction and decoration U.S. seam glue constructing device of combined type |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779178A (en) * | 2019-01-29 | 2019-05-21 | 苏州金螳螂建筑装饰股份有限公司 | A kind of the joint filling structure and its method of indoor decoration surface layer |
CN114197786A (en) * | 2021-11-18 | 2022-03-18 | 深圳市奇信集团股份有限公司 | Ceramic tile joint filling structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108930395B (en) | Beautiful seam glue feeding device for building decoration | |
CN102505831B (en) | Construction method for paving plasters on ground and manmade stone | |
CN108797929A (en) | Ecological stone material construction | |
CN103952052A (en) | Travertine-like elastic texture coating and preparation method thereof | |
CN112681643A (en) | Construction method for washing stone on outer wall surface | |
CN105086897A (en) | Dual-component water-based bright colorized tile decorative crack-sealer | |
CN109025203A (en) | The green pure seam construction method of U.S. by hand in mountain | |
CN207314771U (en) | U.S.'s seam auxiliary tool | |
CN109025136A (en) | Glue for tile pastes tapestry brick construction method between more boiled water rooms | |
CN109208924A (en) | A kind of brickwork joint joint filling and pointing device and construction method | |
CN101392565A (en) | Dry brick wall construction method | |
CN104343325B (en) | A kind of building door window frame and the method for blocking in hole gap | |
CN208717677U (en) | The zip mode of measures of cracks on concrete pavement repairs structure | |
CN109853888A (en) | A kind of historical building plucking wall surface construction technology | |
CN108979034A (en) | Wall surface construction technology | |
CN108558305A (en) | The inorganic tile gap filler and preparation method thereof of squeezing and coating construction | |
CN108455903A (en) | A kind of repair materials and restorative procedure of historical building metope | |
WO1999055987A1 (en) | Method for producing a coating with decorative patterns, mineral coating and tools for implementing same | |
JPH0684604B2 (en) | Joint material and its construction method | |
KR20130113568A (en) | Concrete crack repair method and repair mortar manufacturing method | |
CN105971256A (en) | Plastic-steel mud plastic bag filling and smearing construction method | |
CN203867106U (en) | Reinforced historic building single-piece brick wall | |
CN107100355A (en) | A kind of jointing method | |
CN103233566A (en) | Construction method of joint trimming agent | |
CN110821101A (en) | Construction method for paint outer wall line pressing groove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |