CN109025203A - The green pure seam construction method of U.S. by hand in mountain - Google Patents

The green pure seam construction method of U.S. by hand in mountain Download PDF

Info

Publication number
CN109025203A
CN109025203A CN201710428243.9A CN201710428243A CN109025203A CN 109025203 A CN109025203 A CN 109025203A CN 201710428243 A CN201710428243 A CN 201710428243A CN 109025203 A CN109025203 A CN 109025203A
Authority
CN
China
Prior art keywords
gap
joint trimming
mountain
trimming agent
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710428243.9A
Other languages
Chinese (zh)
Inventor
苏三六
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710428243.9A priority Critical patent/CN109025203A/en
Publication of CN109025203A publication Critical patent/CN109025203A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
    • E04F21/1652Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers for smoothing and shaping joint compound to a desired contour

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The invention discloses a kind of green pure seam construction methods of U.S. by hand in mountain, comprising the following steps: A. cleaning gap, B. T-me line paper, C. tune mixes joint trimming agent, D. beauty stitches construction, E. tears U.S. line paper.The present invention makes edge clout easy to clean and putting up U.S. line paper in slot edge, and utilizes the green nano ceramics mud blind in mountain, easy to clean, wear-resisting, will never fade;And on the one hand provided U.S. seam construction method solves the disadvantage that be easy to shelter evil people and countenance evil practices in gap, not only easy to clean to sweep but also effectively prevent bacteria breed, has ensured human health;On the other hand because its method is simple, it can be in and do it yourself to operate, great market application and popularization value.

Description

The green pure seam construction method of U.S. by hand in mountain
Technical field
The present invention relates to building decoration technology field, more particularly to a kind of green pure seam construction party of U.S. by hand in mountain Method.
Background technique
The parlor of household, kitchen and toilet would ordinarily be encountered that ceramic tile gap is black by leucismus, extremely antihygienic problem now, and brickwork joint becomes Bacterium is bred in clandestine meeting, generates peculiar smell, seriously endangers human health, and this bacterium is especially apparent in summer.This puzzlement decoration row The problem of industry many years, is captured by joint trimming agent, it not only solves a series of problem that brickwork joint blackening is caused, also significantly Finishing class is improved, joint trimming agent is high-grade house fitting-up product, is suitable for the beautification of the gaps such as ceramic tile, stone material, kitchen and bath bathroom yin Angle decoration.Joint trimming agent color multiplicity, not only oil-stain-preventing, rub resistance, intensity are high, and can thoroughly change showing for seam black mould change As.
Application No. is the patent documents of CN201310162744.9 to disclose a kind of construction method of joint trimming agent, passes through utilization Plastic tube clogs ceramic tile seam, although construction rapidly, can improve to a certain extent, gap filling is uneven and out-of-flatness;But The bad control of its construction method, joint trimming agent often spill over floor edge, and while being wiped by wet sponge is easily accessible by seam Gap joint trimming agent influences joint filling effect.
Therefore, how to provide that a kind of method is simple, U.S. seam construction method of edge clout easy to clean is those skilled in the art The problem of member's urgent need to resolve.
Summary of the invention
In view of this, the present invention provides a kind of green pure seam construction methods of U.S. by hand in mountain, by putting up beauty in slot edge Line paper and make edge clout easy to clean, and utilize the green nano ceramics mud blind in mountain, it is easy to clean, wear-resisting, will never change colour;And And this method is simple, can be in and do it yourself to operate, great market application and popularization value.
In order to achieve the above object, the present invention adopts the following technical scheme:
A kind of green pure seam construction method of U.S. by hand in mountain, which comprises the following steps:
A. it clears up gap: removing sundries along gap two sides with tool, and clear up dust debris with dust catcher, it will using rag The dust wiped clean being attached on ceramic tile surface;
B. T-me line paper: the gap cleared up through step A is carried over and respectively in the two sides T-me line paper in the gap, U.S. line Paper is apart from 0.2~0.5mm of slot edge;
C. adjust and mix joint trimming agent: the component A of joint trimming agent and B component are mixed according to 1:1 ratio, 2~5min of stirring to uniform, The gum outlet for cutting the sealing of hungry area cylinder simultaneously, and the joint trimming agent being stirred is fitted into the hungry area cylinder, while by institute It states the air inside hungry area cylinder to drain, fills the hungry area cylinder, covers rear cover and load onto glue rifle;
D. U.S. seam construction: the step C sharp mouth rubber hose for having been filled with the packing element of joint trimming agent is cut into 45 degree of angle angles, and described The width for being sized to be slightly smaller than the gap cleared up through step A of sharp mouth rubber hose will along the gap for posting U.S. line paper through step B The joint trimming agent is uniformly filled into the gap, while being compacted smooth out by the joint trimming agent having had been filled with using scraping blade, and will Connector and the incision position repairing in the gap are uniform, straight;
E. it tears U.S. line paper: after the completion of the gap U.S. seam in step D, tearing the U.S. line paper off;
Preferably, in step A, the tool includes cutter and wallpaper knife.
Preferably, in step C, the joint trimming agent is the green nano ceramics mud two-component joint trimming agent in mountain, wherein a is described The component A of the green two-component nano ceramics mud in mountain is curing agent, and be translucent shape, and B component is pigment;The mountain of another money is green double The component A and B component of component nano ceramics mud are in coloured clay shape.
Preferably, the component A of the joint trimming agent and B component are stirred is for described in preventing in subsequent step Joint trimming agent solidification is incomplete.
Preferably, in step E, the U.S. line paper will be torn before the joint trimming agent smoothes out ot-yet-hardened.
It can be seen via above technical scheme that compared with prior art, the present disclosure provides a kind of green pure craft in mountain U.S. seam construction method, clears up plate brickwork joint gap with tool first, crevice cleaning, drying when ensuring to construct, and cleans dynamics and want It is moderate, ceramic tile can not be scratched;
Secondly T-me line paper, U.S. line paper will paste along gap sideline, can not paste tape edge line or off-seam sideline is too far, especially Pay attention to pasting to obtain straight beauty in cross interface, to ensure that joint trimming agent will not spill over floor edge, only needed after the completion of U.S. seam by U.S. line paper is torn, and saves cleaning labour;
Then it adjusting and mixes material, the present invention uses nano ceramics mud two-component joint trimming agent, and its is rich in color, and color is beautiful, And it is easy to clean, wear-resisting, will never fade, will not be recessed when in addition constructing will not pollute ceramic tile;
The sharp mouth rubber hose of packing element is cut into 45 degree of angle angles by U.S. seam construction simultaneously, and the size of sharp mouth rubber hose is smaller The speed that width in gap is filled in place when guaranteeing to spray joint trimming agent, and sprayed should uniformly, while will have been filled out with scraping blade The joint trimming agent compacting substituted the bad for the good smoothes out, and has connector and incision position to repair uniform, straight, to ensure that U.S. seam effect is smoothly beautiful;
U.S. line paper is finally torn when joint trimming agent does not solidify, to ensure that joint trimming agent is not uprooped, and paying attention to can not Joint trimming agent is fallen on ceramic tile or furniture, in order to avoid difficult cleaning.
The green pure seam construction method of U.S. by hand in mountain provided by the invention is made and putting up U.S. line paper in slot edge more than edge Expect easy to clean, and utilizes the green nano ceramics mud blind in mountain, it is easy to clean, wear-resisting, will never fade;And provided U.S. seam On the one hand construction method solves the disadvantage that be easy to shelter evil people and countenance evil practices in gap, not only easy to clean to sweep but also effectively prevent bacterium It breeds, has ensured human health;On the other hand because its method is simple, it can be in and do it yourself to operate, great market application pushes away Wide value.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 attached drawing is the schematic diagram of the green pure seam construction method of U.S. by hand in mountain provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a kind of green purely manual U.S. seam construction methods in mountain, by putting up U.S. line paper in slot edge And make edge clout easy to clean, and utilize the green nano ceramics mud blind in mountain, it is easy to clean, wear-resisting, will never change colour;And it should Method is simple, can be in and do it yourself to operate, great market application and popularization value.
Attached drawing 1 is referred to, the present invention provides a kind of green pure seam construction methods of U.S. by hand in mountain, comprising the following steps:
A. it clears up gap: removing sundries along gap two sides with tool, and clear up dust debris with dust catcher, it will using rag The dust wiped clean being attached on ceramic tile surface;
Plate brickwork joint gap is cleared up with tool, crevice cleaning, drying when ensuring to construct, and clean dynamics and want moderate, it can not Scratch ceramic tile.
B. T-me line paper: carrying over the gap cleared up through step A and respectively in the two sides T-me line paper in gap, U.S. line paper away from From 0.2~0.5mm of slot edge;
Pay special attention to paste to obtain straight beauty in cross interface, to ensure that joint trimming agent will not spill over floor edge, and U.S. line paper need to only be torn after the completion of U.S. seam, save cleaning labour.
C. adjust and mix joint trimming agent: the component A of joint trimming agent and B component are mixed according to 1:1 ratio, 2~5min of stirring to uniform, The gum outlet of hungry area cylinder sealing is cut simultaneously, and the joint trimming agent being stirred is fitted into hungry area cylinder, while will be inside hungry area cylinder Air drain, fill hungry area cylinder, cover rear cover and load onto glue rifle;
The present invention uses nano ceramics mud two-component joint trimming agent, rich in color, color is beautiful and easy to clean, It is wear-resisting, will never fade, it will not be recessed when in addition constructing, ceramic tile will not be polluted.
D. the step C sharp mouth rubber hose for having been filled with the packing element of joint trimming agent U.S. seam construction: is cut into 45 degree of angle angles, and sharp mouth The width for being sized to be slightly smaller than the gap cleared up through step A of rubber hose stitches beauty along the gap for posting U.S. line paper through step B Agent is uniformly filled into the gap, while being compacted smooth out by the joint trimming agent having had been filled with using scraping blade, and connecing gap Head and incision position repairing are uniform, straight;
Not only guarantee that filling is in place when spraying joint trimming agent, but also the speed sprayed should uniformly, while will be had been filled with scraping blade Good joint trimming agent is compacted smooth out, and has connector and incision position to repair uniform, straight, to ensure that U.S. seam effect is smoothly beautiful.
E. it tears U.S. line paper: after the completion of the gap U.S. seam in step D, tearing U.S. line paper off.
U.S. line paper is torn when joint trimming agent does not solidify, to ensure that joint trimming agent is not uprooped, and paying attention to can not will be beautiful Seam agent is fallen on ceramic tile or furniture, in order to avoid difficult cleaning.
In order to further optimize the above technical scheme, in step A, tool includes cutter and wallpaper knife.
In order to further optimize the above technical scheme, in step C, the joint trimming agent is the green nano ceramics mud two-component beauty in mountain Agent is stitched, wherein the component A of the green two-component nano ceramics mud in a mountain is curing agent, be translucent shape, and B component is face Material;The component A and B component of the green two-component nano ceramics mud in the mountain of another money are in coloured clay shape.
In order to further optimize the above technical scheme, the component A of the joint trimming agent and B component are stirred be for Prevent the joint trimming agent in subsequent step from solidifying incomplete.
In order to further optimize the above technical scheme, in step E, the U.S. line paper will smooth out not yet solidifying in the joint trimming agent Gu tearing before.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (5)

1. a kind of green pure seam construction method of U.S. by hand in mountain, which comprises the following steps:
A. it clears up gap: removing sundries along gap two sides with tool, and clear up dust debris with dust catcher, will be adhered to using rag Dust wiped clean on ceramic tile surface;
B. T-me line paper: carrying over the gap cleared up through step A and respectively in the two sides T-me line paper in the gap, U.S. line paper away from From 0.2~0.5mm of slot edge;
C. it adjusts and mixes joint trimming agent: the component A of joint trimming agent and B component are mixed according to 1:1 ratio, 2~5min of stirring is to uniform, simultaneously The gum outlet for cutting the sealing of hungry area cylinder, and the joint trimming agent being stirred is fitted into the hungry area cylinder, while by the sky Air inside packing element drains, and fills the hungry area cylinder, covers rear cover and load onto glue rifle;
D. the step C sharp mouth rubber hose for having been filled with the packing element of joint trimming agent U.S. seam construction: is cut into 45 degree of angle angles, and the sharp mouth The width for being sized to be slightly smaller than the gap cleared up through step A of rubber hose will be described along the gap for posting U.S. line paper through step B Joint trimming agent is uniformly filled into the gap, while being compacted smooth out by the joint trimming agent having had been filled with using scraping blade, and will be described Connector and the incision position repairing in gap are uniform, straight;
E. it tears U.S. line paper: after the completion of the gap U.S. seam in step D, tearing the U.S. line paper off.
2. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that in step A, the kit Include cutter and wallpaper knife.
3. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that in step C, the joint trimming agent For the green nano ceramics mud two-component joint trimming agent in mountain, wherein the component A of the green two-component nano ceramics mud in a mountain is solidification Agent, be translucent shape, and B component is pigment;The component A and B component of the green two-component nano ceramics mud in the mountain of another money be in Coloured clay shape.
4. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that by the A group of the joint trimming agent It is incomplete to prevent the joint trimming agent in subsequent step from solidifying that part and B component, which stir,.
5. the green pure seam construction method of U.S. by hand in mountain according to claim 1, which is characterized in that in step E, the U.S. line paper It to be torn before the joint trimming agent smoothes out ot-yet-hardened.
CN201710428243.9A 2017-06-08 2017-06-08 The green pure seam construction method of U.S. by hand in mountain Pending CN109025203A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710428243.9A CN109025203A (en) 2017-06-08 2017-06-08 The green pure seam construction method of U.S. by hand in mountain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710428243.9A CN109025203A (en) 2017-06-08 2017-06-08 The green pure seam construction method of U.S. by hand in mountain

Publications (1)

Publication Number Publication Date
CN109025203A true CN109025203A (en) 2018-12-18

Family

ID=64629525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710428243.9A Pending CN109025203A (en) 2017-06-08 2017-06-08 The green pure seam construction method of U.S. by hand in mountain

Country Status (1)

Country Link
CN (1) CN109025203A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779178A (en) * 2019-01-29 2019-05-21 苏州金螳螂建筑装饰股份有限公司 A kind of the joint filling structure and its method of indoor decoration surface layer
CN114197786A (en) * 2021-11-18 2022-03-18 深圳市奇信集团股份有限公司 Ceramic tile joint filling structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008285820A (en) * 2007-05-15 2008-11-27 Yaguchi Giko:Kk Method of securing adhesive agent filling gap during repair of floated tile ceramic piece and peeling tool used therefor
CN102837244A (en) * 2012-10-09 2012-12-26 河北科技大学 Electric ceramic tile seam trimming machine
CN103233566A (en) * 2013-05-07 2013-08-07 张云春 Construction method of joint trimming agent
CN104624446A (en) * 2014-12-31 2015-05-20 李东雷 Anti-sticking liquid coating device of cement types of seam beautifying agent, glass cement, sealant, true porcelain cement and the like
CN105503039A (en) * 2015-12-24 2016-04-20 北京宝辰联合科技有限公司 Pasty joint mixture comprising two components
CN105971256A (en) * 2016-05-16 2016-09-28 曾海平 Plastic-steel mud plastic bag filling and smearing construction method
CN106760431A (en) * 2016-12-28 2017-05-31 徐丽亚 The construction and decoration U.S. seam glue constructing device of combined type

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008285820A (en) * 2007-05-15 2008-11-27 Yaguchi Giko:Kk Method of securing adhesive agent filling gap during repair of floated tile ceramic piece and peeling tool used therefor
CN102837244A (en) * 2012-10-09 2012-12-26 河北科技大学 Electric ceramic tile seam trimming machine
CN103233566A (en) * 2013-05-07 2013-08-07 张云春 Construction method of joint trimming agent
CN104624446A (en) * 2014-12-31 2015-05-20 李东雷 Anti-sticking liquid coating device of cement types of seam beautifying agent, glass cement, sealant, true porcelain cement and the like
CN105503039A (en) * 2015-12-24 2016-04-20 北京宝辰联合科技有限公司 Pasty joint mixture comprising two components
CN105971256A (en) * 2016-05-16 2016-09-28 曾海平 Plastic-steel mud plastic bag filling and smearing construction method
CN106760431A (en) * 2016-12-28 2017-05-31 徐丽亚 The construction and decoration U.S. seam glue constructing device of combined type

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779178A (en) * 2019-01-29 2019-05-21 苏州金螳螂建筑装饰股份有限公司 A kind of the joint filling structure and its method of indoor decoration surface layer
CN114197786A (en) * 2021-11-18 2022-03-18 深圳市奇信集团股份有限公司 Ceramic tile joint filling structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN108930395B (en) Beautiful seam glue feeding device for building decoration
CN102505831B (en) Construction method for paving plasters on ground and manmade stone
CN108797929A (en) Ecological stone material construction
CN103952052A (en) Travertine-like elastic texture coating and preparation method thereof
CN112681643A (en) Construction method for washing stone on outer wall surface
CN105086897A (en) Dual-component water-based bright colorized tile decorative crack-sealer
CN109025203A (en) The green pure seam construction method of U.S. by hand in mountain
CN207314771U (en) U.S.'s seam auxiliary tool
CN109025136A (en) Glue for tile pastes tapestry brick construction method between more boiled water rooms
CN109208924A (en) A kind of brickwork joint joint filling and pointing device and construction method
CN101392565A (en) Dry brick wall construction method
CN104343325B (en) A kind of building door window frame and the method for blocking in hole gap
CN208717677U (en) The zip mode of measures of cracks on concrete pavement repairs structure
CN109853888A (en) A kind of historical building plucking wall surface construction technology
CN108979034A (en) Wall surface construction technology
CN108558305A (en) The inorganic tile gap filler and preparation method thereof of squeezing and coating construction
CN108455903A (en) A kind of repair materials and restorative procedure of historical building metope
WO1999055987A1 (en) Method for producing a coating with decorative patterns, mineral coating and tools for implementing same
JPH0684604B2 (en) Joint material and its construction method
KR20130113568A (en) Concrete crack repair method and repair mortar manufacturing method
CN105971256A (en) Plastic-steel mud plastic bag filling and smearing construction method
CN203867106U (en) Reinforced historic building single-piece brick wall
CN107100355A (en) A kind of jointing method
CN103233566A (en) Construction method of joint trimming agent
CN110821101A (en) Construction method for paint outer wall line pressing groove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218