CN108979034A - Wall surface construction technology - Google Patents

Wall surface construction technology Download PDF

Info

Publication number
CN108979034A
CN108979034A CN201810974693.2A CN201810974693A CN108979034A CN 108979034 A CN108979034 A CN 108979034A CN 201810974693 A CN201810974693 A CN 201810974693A CN 108979034 A CN108979034 A CN 108979034A
Authority
CN
China
Prior art keywords
mortar
parts
metope
thermal insulation
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810974693.2A
Other languages
Chinese (zh)
Inventor
吴文洁
薛承波
章唯
何彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Century Pearl Decoration Design Engineering Co Ltd
Original Assignee
Wenzhou Century Pearl Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Century Pearl Decoration Design Engineering Co Ltd filed Critical Wenzhou Century Pearl Decoration Design Engineering Co Ltd
Priority to CN201810974693.2A priority Critical patent/CN108979034A/en
Publication of CN108979034A publication Critical patent/CN108979034A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only

Abstract

The invention discloses a kind of wall surface construction technologies, it is related to construction wall construction field, solves the problems, such as the putty and the easy cracking of thermal insulation mortar that the surface of existing air-entrained concrete building block is smeared, its key points of the technical solution are that the following steps are included: a. interior wall wall skiving;B. metope is handled;C. interior wall gluing;D. it scrapes daub and closes mortar;E. plucking operates;F. Puttying;G. spread coated paint;H. anti-drain process;I. infusion is dismissed;J. metope is cleared up;K. boundary mortar is smeared;L. thermal insulation mortar is prepared;M. it sprinkles water;N. thermal insulation mortar is smeared;O. it conserves, pass through the applying mortar progress plucking operation on the surface of air-entrained concrete building block, improve the adhesion strength of thermal insulation mortar and putty and air-entrained concrete building block surface, to prevent putty from cracking with thermal insulation mortar, to prevent the thermal insulation mortar powder and powder of lacquer putty for use on end that fall after cracking from polluting the environment, meet requirement of the building trade for environmental protection.

Description

Wall surface construction technology
Technical field
The present invention relates to construction wall construction fields, more specifically, it is related to a kind of wall surface construction technology.
Background technique
With the continuous development of building trade, construction material is also gradually developed towards the direction of energy conservation and environmental protection, Especially building material, in architectural engineering using more and more extensive, compared with other building wall materials, aerating is mixed The characteristics of solidifying earth building blocks have itself has the advantages that production energy consumption is low, light-weight, speed of application is fast, especially its heat preservation effect Fruit is good, there is good social benefit.However the characteristics of due to air-entrained concrete building block itself, it is applied on exterior wall building block surface Thermal insulation mortar and the putty smeared indoors in block surfaces be easy to appear cracking, crack the putty and thermal insulation mortar fallen Powder can not recycle, and will cause environmental pollution, do not meet requirement of the present building trade for environmental protection, need one kind now The wall surface construction technology for preventing the thermal insulation mortar for being applied to block surfaces and putty from cracking.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of wall surface construction technology, by Applying mortar carries out plucking operation on the surface of air-entrained concrete building block, improves thermal insulation mortar and putty and air-entrained concrete building block The adhesion strength on surface, thus the problem of preventing putty and thermal insulation mortar from cracking, to prevent the heat preservation sand fallen after cracking Starch end and powder of lacquer putty for use on end pollute the environment, and meet requirement of the building trade for environmental protection.
To achieve the above object, the present invention provides the following technical scheme that a kind of wall surface construction technology, it is characterised in that: The following steps are included:
A. interior wall wall skiving: carrying out wall skiving on the metope of interior wall, and the depth of skiving is 3-4mm;
B. metope handle: by inside and outside metope dust and dirt clean out;
C. interior wall gluing: one layer of glue of spary on the surface of interior wall will guarantee that glue spary is equal during carrying out spary It is even;
D. it scrapes daub and closes mortar: according to parts by weight by 10 parts of land plaster, 15 parts of cement, 30 parts of fine sand and 13 parts Glue stirs evenly and water is added to be made into glued mortar, glued mortar is scraped on the surface for being put on interior wall, glued mortar scrapes the thickness smeared Degree control is in 2-3mm;
E. plucking operates: after glued mortar is plastered, plastering face is contacted using trowel immediately, it then will using trowel Hair side is taken on the surface of mortar out of;
20 parts of land plaster and 7 parts of glue: being uniformly mixed by f. Puttying according to parts by weight, and water is added to match into putty, And putty is scraped and is put on metope;
G. it spread coated paint: after putty surface has been done, is scraped on the surface of putty and smears a coating;
H. anti-drain process: corner protector and painting are carried out with seam crossing of the cement mortar to window auxiliary case, window frame and window side, thus by seam Locate to sealing up;
I. it dismisses infusion: stamping foaming agent in the shear wall screw hole of exterior wall, blocked screw hole using foaming agent;
J. metope is cleared up: mortar remaining on metope, grease stain and floating ash are cleared up;
K. it smears boundary mortar: being according to parts by weight uniformly mixed 8 parts of cement, 10 parts of middle sand and 7 parts of interfacial agents, It is prepared into boundary mortar, boundary mortar is applied on metope by boundary mortar by way of tooth ash knife brush, so that boundary After facing sand slurry is applied on metope, surface is hair side;
L. thermal insulation mortar is prepared: according to parts by weight by 20 parts of cement, 10 parts of flyash, 2 parts of polypropene staple, 4 The saddle U.S. copolymer condensation rubber powder, 2 parts of hydroxypropyl methyl cellulose, 6 parts of wood fibre and 10 parts of glass bead of part It stirs evenly;
M. it sprinkles water: before the smearing for carrying out thermal insulation mortar for 24 hours, watering being carried out to metope and is moistened, the standard of watering is with wall Until the non-whitening of surface;
N. smear thermal insulation mortar: thermal insulation mortar, which divides twice, to be smeared, and the thickness control that first pass is smeared is in 12-16mm, mortar It needs to be uniformly covered on metope, and cannot repeat to smear pressure in the process smeared;Knot is smeared for the first time Beam carries out the smearing of second of thermal insulation mortar again after for 24 hours, second of thickness control smeared is in 20-21mm;
O. it conserves: after second thermal insulation mortar smears 36h, sprinkling maintenance being carried out to thermal insulation mortar, with wall when watering Until the non-whitening of surface;
P. it smears anticracking grout: after heat-insulation mortar bed thorough solidification, carrying out the smearing of anticracking grout, anticracking grout is in two times Smear, smear for the first time with a thickness of 1.6-1.8mm, then carry out the smearing of second layer anticracking grout, second layer anticracking grout Smearing thickness in 2.6-2.8mm.
By using above-mentioned technical proposal, by carrying out hair pulling treatment on the surface of glued mortar, can increase putty with The stability connected between glued mortar, thus after effectively preventing built on the sand because of the connection between putty and glued mortar And the problem of cracking.By the way that the surface of boundary mortar is made into hair side, can increase between thermal insulation mortar and boundary mortar Connection stability, so that thermal insulation mortar causes to protect because of connecting between boundary mortar unstable after effectively preventing The problem of warm mortar cracks, and can prevent because of the problem of powder of lacquer putty for use on caused by cracking and thermal insulation mortar powder fall off, To reduce powder of lacquer putty for use on and Thermal insulation mortar powder to pollution caused by environment, meets present building trade and environmental protection is wanted It asks.
The present invention is further arranged to: in the step a, carry out metope skiving process in need to guarantee skiving it The flatness of metope afterwards, so that the flatness deviation of metope controls within 2mm.
By using above-mentioned technical proposal, the flatness for improving metope can effectively be improved between glued mortar and metope The stability of connection, so that putty be further prevented to crack.
The present invention is further arranged to: in the step c, the ratio of glue glue and water when being prepared when spary For 6:1.
By using above-mentioned technical proposal, according to will not being both not easy because glue is too sticky for this ratio preparation Surface of wall spraying uniformly, will not influence the adhesion strength of glue because of dilutional hyponatremia.
The present invention is further arranged to: in the step f, needs in two times scrape in the process of Puttying to smear, First pass scrape smearing according to lateral direction, scrape smearing according to vertical direction for second time, scrape in the process smeared It should be noted that connecing stubble and flattening putty when receiving head, and dirty dirt is cleaned, then carries out next process again.
By using above-mentioned technical proposal, both sides carry out scraping according to different directions smearing can be improved to be connected between the putty of both sides The stability connect, prevents between two layers of putty that there is a situation where crack.
The present invention is further arranged to: in the step j, when carrying out metope cleaning, the protrusion of 10mm will be greater than on metope Object is evened out, and metope has the position in cavity to need filling-in, then carries out feather plucking processing to flat and smooth surface, will using unhairing machine Metope feather plucking it is coarse.
By using above-mentioned technical proposal, after metope carries out feather plucking processing, can increase boundary mortar and metope it Between the stability that connects, prevent from cracking between boundary mortar and wall.
The present invention is further arranged to: in the step l, the time of repose of thermal insulation mortar be more than after 1h must not again into It exercises and uses.
By using above-mentioned technical proposal, the adhesion strength between wall has been significantly after thermal insulation mortar is placed one hour The problem of reducing, needing using thermal insulation mortar cracking is easy to appear.
The present invention is further arranged to: in the step n, needing keeping the temperature using trowel after in first time, smearing terminates Mortar is that will carry out hair pulling treatment on the surface of first layer thermal insulation mortar when initial set.
By using above-mentioned technical proposal, enable to the surface of first layer thermal insulation mortar thick by using hair pulling treatment It is rough, increase the stability connected between second layer thermal insulation mortar and first layer thermal insulation mortar, prevents from going out between two layers of thermal insulation mortar The phenomenon that now cracking.
The present invention is further arranged to: in the step p, having been smeared first layer and has been utilized sponge to first layer cracking resistance sand later The surface of slurry carries out plucking.
By using above-mentioned technical proposal, the roughness on first layer anticracking grout surface is improved by plucking, to increase The stability connected between second layer anticracking grout and first layer anticracking grout prevents from occurring cracking between two layers of anticracking grout Situation.
In conclusion the present invention has the advantages that compared with the prior art
1, the present invention by the surface of air-entrained concrete building block applying mortar carry out plucking operation, improve thermal insulation mortar and greasy The adhesion strength of son and air-entrained concrete building block surface, thus the problem of preventing putty and thermal insulation mortar from cracking;
2, the present invention is by carrying out feather plucking processing in exterior wall surface, can increase connected between boundary mortar and wall it is firm Property, thus the problem of preferably preventing thermal insulation mortar from cracking.
Specific embodiment
A kind of embodiment one: wall surface construction technology, comprising the following steps:
Interior wall wall skiving: carrying out wall skiving on the metope of interior wall, and the depth of skiving is 3mm, is carrying out metope skiving Need to guarantee the flatness of the metope after skiving in process, so that the flatness deviation of metope controls within 2mm;
Metope processing: by inside and outside metope dust and dirt clean out;
Interior wall gluing: one layer of glue of spary on the surface of interior wall will guarantee that glue spary is uniform during carrying out spary; The glue when spary ratio of glue and water when being prepared is 6:1;
It scrapes daub and closes mortar: according to parts by weight by 10 parts of land plaster, 15 parts of cement, 30 parts of fine sand and 13 parts of glue It stirs evenly and water is added to be made into glued mortar, glued mortar is scraped on the surface for being put on interior wall, glued mortar scrapes the thickness smeared Control is in 2mm;
Plucking operation: after glued mortar is plastered, plastering face is contacted using trowel immediately, then utilizes trowel by sand Hair side is taken on the surface of slurry out of;
20 parts of land plaster and 7 parts of glue: being uniformly mixed by Puttying according to parts by weight, and adds water proportion at putty, It needs in two times scrape to smear in the process of Puttying, first pass scrape smearing according to lateral direction, and second time according to perpendicular To direction scrape smearing, scrape in the process smeared it should be noted that connecing stubble and flattening putty when receiving head, and by dirty dirt It cleans, then carries out next process again;
Spread coated paint: it after putty surface has been done, is scraped on the surface of putty and smears a coating;
Anti- drain process: corner protector and painting are carried out with seam crossing of the cement mortar to window auxiliary case, window frame and window side, thus by seam crossing To sealing up, so as to prevent window side from generating leakage;
It dismisses infusion: stamping foaming agent in the shear wall screw hole of exterior wall, blocked screw hole using foaming agent, prevent Only water by screw hole is flowed into interior after outer wall cracking;
Metope cleaning: mortar remaining on metope, grease stain and floating ash are cleared up, and the protrusion of 10mm will be greater than on metope It evens out, metope has the position in cavity to need filling-in, then feather plucking processing is carried out to flat and smooth surface, using unhairing machine by wall Face feather plucking it is coarse;
It smears boundary mortar: being according to parts by weight uniformly mixed 8 parts of cement, 10 parts of middle sand and 7 parts of interfacial agents, make For at boundary mortar, boundary mortar is applied on metope by boundary mortar by way of tooth ash knife brush, so that interface After mortar is applied on metope, surface is hair side;
Prepare thermal insulation mortar: according to parts by weight by 20 parts of cement, 10 parts of flyash, 2 parts of polypropene staple, 4 parts Saddle U.S. copolymer condensation rubber powder, 2 parts of hydroxypropyl methyl cellulose, 6 parts of wood fibre and 10 parts of glass bead stir Mix uniformly, the time of repose of thermal insulation mortar be more than 1h later must not carry out again using;
Watering: before the smearing for carrying out thermal insulation mortar for 24 hours, watering is carried out to metope and is moistened, the standard of watering is with wall table Until the non-whitening of face;
Smear thermal insulation mortar: thermal insulation mortar, which divides twice, to be smeared, and the thickness control that first pass is smeared needs equal in 12mm, mortar Even is covered on metope, and cannot repeat to smear pressure in the process smeared, and smears end in first time Hair pulling treatment is carried out on the surface of first layer thermal insulation mortar when needing initial set afterwards using trowel in thermal insulation mortar i.e.;It applies for the first time The smearing for carrying out second of thermal insulation mortar after terminating for 24 hours again is smeared, second of thickness control smeared is in 20mm;
Maintenance: after second thermal insulation mortar smears 36h, carrying out sprinkling maintenance to thermal insulation mortar, with the table of wall when watering Until the non-whitening of face;
It smears anticracking grout: after heat-insulation mortar bed thorough solidification, carrying out the smearing of anticracking grout, anticracking grout applies in two times Smear, smear for the first time with a thickness of 1.6mm, smeared and carried out using surface of the sponge to first layer anticracking grout after first layer Then plucking carries out the smearing of second layer anticracking grout, the smearing thickness of second layer anticracking grout is in 2.6mm.
A kind of embodiment two: wall surface construction technology, comprising the following steps:
Interior wall wall skiving: carrying out wall skiving on the metope of interior wall, and the depth of skiving is 3.5mm, is carrying out metope skiving Process in need to guarantee the flatness of metope after skiving so that the flatness deviation of metope controls within 2mm;
Metope processing: by inside and outside metope dust and dirt clean out;
Interior wall gluing: one layer of glue of spary on the surface of interior wall will guarantee that glue spary is uniform during carrying out spary; The glue when spary ratio of glue and water when being prepared is 6:1;
It scrapes daub and closes mortar: according to parts by weight by 10 parts of land plaster, 15 parts of cement, 30 parts of fine sand and 13 parts of glue It stirs evenly and water is added to be made into glued mortar, glued mortar is scraped on the surface for being put on interior wall, glued mortar scrapes the thickness smeared Control is in 2.5mm;
Plucking operation: after glued mortar is plastered, plastering face is contacted using trowel immediately, then utilizes trowel by sand Hair side is taken on the surface of slurry out of;
20 parts of land plaster and 7 parts of glue: being uniformly mixed by Puttying according to parts by weight, and adds water proportion at putty, It needs in two times scrape to smear in the process of Puttying, first pass scrape smearing according to lateral direction, and second time according to perpendicular To direction scrape smearing, scrape in the process smeared it should be noted that connecing stubble and flattening putty when receiving head, and by dirty dirt It cleans, then carries out next process again;
Spread coated paint: it after putty surface has been done, is scraped on the surface of putty and smears a coating;
Anti- drain process: corner protector and painting are carried out with seam crossing of the cement mortar to window auxiliary case, window frame and window side, thus by seam crossing To sealing up, so as to prevent window side from generating leakage;
It dismisses infusion: stamping foaming agent in the shear wall screw hole of exterior wall, blocked screw hole using foaming agent, prevent Only water by screw hole is flowed into interior after outer wall cracking;
Metope cleaning: mortar remaining on metope, grease stain and floating ash are cleared up, and the protrusion of 10mm will be greater than on metope It evens out, metope has the position in cavity to need filling-in, then feather plucking processing is carried out to flat and smooth surface, using unhairing machine by wall Face feather plucking it is coarse;
It smears boundary mortar: being according to parts by weight uniformly mixed 8 parts of cement, 10 parts of middle sand and 7 parts of interfacial agents, make For at boundary mortar, boundary mortar is applied on metope by boundary mortar by way of tooth ash knife brush, so that interface After mortar is applied on metope, surface is hair side;
Prepare thermal insulation mortar: according to parts by weight by 20 parts of cement, 10 parts of flyash, 2 parts of polypropene staple, 4 parts Saddle U.S. copolymer condensation rubber powder, 2 parts of hydroxypropyl methyl cellulose, 6 parts of wood fibre and 10 parts of glass bead stir Mix uniformly, the time of repose of thermal insulation mortar be more than 1h later must not carry out again using;
Watering: before the smearing for carrying out thermal insulation mortar for 24 hours, watering is carried out to metope and is moistened, the standard of watering is with wall table Until the non-whitening of face;
Smear thermal insulation mortar: thermal insulation mortar, which divides twice, to be smeared, and the thickness control that first pass is smeared needs equal in 14mm, mortar Even is covered on metope, and cannot repeat to smear pressure in the process smeared, and smears end in first time Hair pulling treatment is carried out on the surface of first layer thermal insulation mortar when needing initial set afterwards using trowel in thermal insulation mortar i.e.;It applies for the first time The smearing for carrying out second of thermal insulation mortar after terminating for 24 hours again is smeared, second of thickness control smeared is in 20.5mm;
Maintenance: after second thermal insulation mortar smears 36h, carrying out sprinkling maintenance to thermal insulation mortar, with the table of wall when watering Until the non-whitening of face;
It smears anticracking grout: after heat-insulation mortar bed thorough solidification, carrying out the smearing of anticracking grout, anticracking grout applies in two times Smear, smear for the first time with a thickness of 1.7mm, smeared and carried out using surface of the sponge to first layer anticracking grout after first layer Then plucking carries out the smearing of second layer anticracking grout, the smearing thickness of second layer anticracking grout is in 2.7mm.
A kind of embodiment three: wall surface construction technology, comprising the following steps:
Interior wall wall skiving: carrying out wall skiving on the metope of interior wall, and the depth of skiving is 4mm, is carrying out metope skiving Need to guarantee the flatness of the metope after skiving in process, so that the flatness deviation of metope controls within 2mm;
Metope processing: by inside and outside metope dust and dirt clean out;
Interior wall gluing: one layer of glue of spary on the surface of interior wall will guarantee that glue spary is uniform during carrying out spary; The glue when spary ratio of glue and water when being prepared is 6:1;
It scrapes daub and closes mortar: according to parts by weight by 10 parts of land plaster, 15 parts of cement, 30 parts of fine sand and 13 parts of glue It stirs evenly and water is added to be made into glued mortar, glued mortar is scraped on the surface for being put on interior wall, glued mortar scrapes the thickness smeared Control is in 3mm;
Plucking operation: after glued mortar is plastered, plastering face is contacted using trowel immediately, then utilizes trowel by sand Hair side is taken on the surface of slurry out of;
20 parts of land plaster and 7 parts of glue: being uniformly mixed by Puttying according to parts by weight, and adds water proportion at putty, It needs in two times scrape to smear in the process of Puttying, first pass scrape smearing according to lateral direction, and second time according to perpendicular To direction scrape smearing, scrape in the process smeared it should be noted that connecing stubble and flattening putty when receiving head, and by dirty dirt It cleans, then carries out next process again;
Spread coated paint: it after putty surface has been done, is scraped on the surface of putty and smears a coating;
Anti- drain process: corner protector and painting are carried out with seam crossing of the cement mortar to window auxiliary case, window frame and window side, thus by seam crossing To sealing up, so as to prevent window side from generating leakage;
It dismisses infusion: stamping foaming agent in the shear wall screw hole of exterior wall, blocked screw hole using foaming agent, prevent Only water by screw hole is flowed into interior after outer wall cracking;
Metope cleaning: mortar remaining on metope, grease stain and floating ash are cleared up, and the protrusion of 10mm will be greater than on metope It evens out, metope has the position in cavity to need filling-in, then feather plucking processing is carried out to flat and smooth surface, using unhairing machine by wall Face feather plucking it is coarse;
It smears boundary mortar: being according to parts by weight uniformly mixed 8 parts of cement, 10 parts of middle sand and 7 parts of interfacial agents, make For at boundary mortar, boundary mortar is applied on metope by boundary mortar by way of tooth ash knife brush, so that interface After mortar is applied on metope, surface is hair side;
Prepare thermal insulation mortar: according to parts by weight by 20 parts of cement, 10 parts of flyash, 2 parts of polypropene staple, 4 parts Saddle U.S. copolymer condensation rubber powder, 2 parts of hydroxypropyl methyl cellulose, 6 parts of wood fibre and 10 parts of glass bead stir Mix uniformly, the time of repose of thermal insulation mortar be more than 1h later must not carry out again using;
Watering: before the smearing for carrying out thermal insulation mortar for 24 hours, watering is carried out to metope and is moistened, the standard of watering is with wall table Until the non-whitening of face;
Smear thermal insulation mortar: thermal insulation mortar, which divides twice, to be smeared, and the thickness control that first pass is smeared needs equal in 16mm, mortar Even is covered on metope, and cannot repeat to smear pressure in the process smeared, and smears end in first time Hair pulling treatment is carried out on the surface of first layer thermal insulation mortar when needing initial set afterwards using trowel in thermal insulation mortar i.e.;It applies for the first time The smearing for carrying out second of thermal insulation mortar after terminating for 24 hours again is smeared, second of thickness control smeared is in 21mm;
Maintenance: after second thermal insulation mortar smears 36h, carrying out sprinkling maintenance to thermal insulation mortar, with the table of wall when watering Until the non-whitening of face;
It smears anticracking grout: after heat-insulation mortar bed thorough solidification, carrying out the smearing of anticracking grout, anticracking grout applies in two times Smear, smear for the first time with a thickness of 1.8mm, smeared and carried out using surface of the sponge to first layer anticracking grout after first layer Then plucking carries out the smearing of second layer anticracking grout, the smearing thickness of second layer anticracking grout is in 2.8mm.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of wall surface construction technology, it is characterised in that: the following steps are included:
A. interior wall wall skiving: carrying out wall skiving on the metope of interior wall, and the depth of skiving is 3-4mm;
B. metope handle: by inside and outside metope dust and dirt clean out;
C. interior wall gluing: one layer of glue of spary on the surface of interior wall will guarantee that glue spary is equal during carrying out spary It is even;
D. it scrapes daub and closes mortar: according to parts by weight by 10 parts of land plaster, 15 parts of cement, 30 parts of fine sand and 13 parts Glue stirs evenly and water is added to be made into glued mortar, glued mortar is scraped on the surface for being put on interior wall, glued mortar scrapes the thickness smeared Degree control is in 2-3mm;
E. plucking operates: after glued mortar is plastered, plastering face is contacted using trowel immediately, it then will using trowel Hair side is taken on the surface of mortar out of;
20 parts of land plaster and 7 parts of glue: being uniformly mixed by f. Puttying according to parts by weight, and water is added to match into putty, And putty is scraped and is put on metope;
G. it spread coated paint: after putty surface has been done, is scraped on the surface of putty and smears a coating;
H. anti-drain process: corner protector and painting are carried out with seam crossing of the cement mortar to window auxiliary case, window frame and window side, thus by seam Locate to sealing up;
I. it dismisses infusion: stamping foaming agent in the shear wall screw hole of exterior wall, blocked screw hole using foaming agent;
J. metope is cleared up: mortar remaining on metope, grease stain and floating ash are cleared up;
K. it smears boundary mortar: being according to parts by weight uniformly mixed 8 parts of cement, 10 parts of middle sand and 7 parts of interfacial agents, It is prepared into boundary mortar, boundary mortar is applied on metope by boundary mortar by way of tooth ash knife brush, so that boundary After facing sand slurry is applied on metope, surface is hair side;
L. thermal insulation mortar is prepared: according to parts by weight by 20 parts of cement, 10 parts of flyash, 2 parts of polypropene staple, 4 The saddle U.S. copolymer condensation rubber powder, 2 parts of hydroxypropyl methyl cellulose, 6 parts of wood fibre and 10 parts of glass bead of part It stirs evenly;
M. it sprinkles water: before the smearing for carrying out thermal insulation mortar for 24 hours, watering being carried out to metope and is moistened, the standard of watering is with wall Until the non-whitening of surface;
N. smear thermal insulation mortar: thermal insulation mortar, which divides twice, to be smeared, and the thickness control that first pass is smeared is in 12-16mm, mortar It needs to be uniformly covered on metope, and cannot repeat to smear pressure in the process smeared;Knot is smeared for the first time Beam carries out the smearing of second of thermal insulation mortar again after for 24 hours, second of thickness control smeared is in 20-21mm;
O. it conserves: after second thermal insulation mortar smears 36h, sprinkling maintenance being carried out to thermal insulation mortar, with wall when watering Until the non-whitening of surface;
P. it smears anticracking grout: after heat-insulation mortar bed thorough solidification, carrying out the smearing of anticracking grout, anticracking grout is in two times Smear, smear for the first time with a thickness of 1.6-1.8mm, then carry out the smearing of second layer anticracking grout, second layer anticracking grout Smearing thickness in 2.6-2.8mm.
2. wall surface construction technology according to claim 1, it is characterised in that: in the step a, carrying out metope skiving Need to guarantee the flatness of the metope after skiving in process, so that the flatness deviation of metope controls within 2mm.
3. wall surface construction technology according to claim 1, it is characterised in that: in the step c, glue when spary exists The ratio of glue and water is 6:1 when being prepared.
4. wall surface construction technology according to claim 1, it is characterised in that: in the step f, work as in the process of Puttying In need in two times scrape to smear, first pass scrape smearing according to lateral direction, is scraped according to vertical direction for second time It smears, scrape needing to pay attention to connecing stubble and flattening putty when receiving head in the process smeared, and dirty dirt is cleaned, then carry out again Next process.
5. wall surface construction technology according to claim 1, it is characterised in that: in the step j, when carrying out metope cleaning, By on metope be greater than 10mm protrusion even out, metope have cavity position need filling-in, then to flat and smooth surface into Row feather plucking processing, using unhairing machine by the coarse of metope feather plucking.
6. wall surface construction technology according to claim 1, it is characterised in that: in the step l, when the standing of thermal insulation mortar Between more than must not carry out again after 1h using.
7. wall surface construction technology according to claim 1, it is characterised in that: in the step n, smearing in first time terminates Hair pulling treatment is carried out on the surface of first layer thermal insulation mortar when needing initial set later using trowel in thermal insulation mortar i.e..
8. wall surface construction technology according to claim 1, it is characterised in that: in the step p, after having smeared first layer Plucking is carried out using surface of the sponge to first layer anticracking grout.
CN201810974693.2A 2018-08-24 2018-08-24 Wall surface construction technology Pending CN108979034A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810974693.2A CN108979034A (en) 2018-08-24 2018-08-24 Wall surface construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810974693.2A CN108979034A (en) 2018-08-24 2018-08-24 Wall surface construction technology

Publications (1)

Publication Number Publication Date
CN108979034A true CN108979034A (en) 2018-12-11

Family

ID=64546761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810974693.2A Pending CN108979034A (en) 2018-08-24 2018-08-24 Wall surface construction technology

Country Status (1)

Country Link
CN (1) CN108979034A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109809756A (en) * 2019-04-03 2019-05-28 武汉雅凡节能科技有限公司 The indehiscent anticracking grout of one centimeter of one-pass molding of one kind and its construction method
CN110700599A (en) * 2019-10-24 2020-01-17 中建八局第四建设有限公司 Plastering-free construction process for shear wall surface
CN112239340A (en) * 2020-09-14 2021-01-19 上海典臣工程设计有限公司 Antifouling lime art mortar

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1526892A (en) * 2003-09-19 2004-09-08 北京振利高新技术公司 Polyurethane spraying and adhering construction process for binding at corner and door and window opening and the prefabricated polyurethane block thereof
CN1594776A (en) * 2004-07-16 2005-03-16 张志峰 Novel anti-crack internal insulation wall and construction technique
CN101575899A (en) * 2009-06-01 2009-11-11 潍坊昌大建设集团有限公司 Construction process for internal wall surface of building wall body
CN103469978A (en) * 2013-02-07 2013-12-25 郭矿平 Wall surface construction technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1526892A (en) * 2003-09-19 2004-09-08 北京振利高新技术公司 Polyurethane spraying and adhering construction process for binding at corner and door and window opening and the prefabricated polyurethane block thereof
CN1594776A (en) * 2004-07-16 2005-03-16 张志峰 Novel anti-crack internal insulation wall and construction technique
CN101575899A (en) * 2009-06-01 2009-11-11 潍坊昌大建设集团有限公司 Construction process for internal wall surface of building wall body
CN103469978A (en) * 2013-02-07 2013-12-25 郭矿平 Wall surface construction technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109809756A (en) * 2019-04-03 2019-05-28 武汉雅凡节能科技有限公司 The indehiscent anticracking grout of one centimeter of one-pass molding of one kind and its construction method
CN110700599A (en) * 2019-10-24 2020-01-17 中建八局第四建设有限公司 Plastering-free construction process for shear wall surface
CN112239340A (en) * 2020-09-14 2021-01-19 上海典臣工程设计有限公司 Antifouling lime art mortar

Similar Documents

Publication Publication Date Title
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN108979034A (en) Wall surface construction technology
CN101565997A (en) Construction method for large-area irregular floor tile
CN101935196A (en) Putty for building external wall
CN103343655A (en) Wall window construction method
CN108797929A (en) Ecological stone material construction
CN102587527A (en) Steel column-coated fire-protection construction method
CN112575979A (en) Construction method of plastering waterproof mortar for building exterior wall
CN107989299A (en) A kind of coating application method of Assembled wall panels
CN112267628A (en) Construction method of plastering-free system for interior wall decoration of constructional engineering
CN110761507A (en) Construction method of external wall chopped false stone
CN103306384B (en) The construction method of waterproof sealing cream is smeared before cement final set
CN105820637A (en) Reflective thermal insulation coating system
CN103291024A (en) Novel cement-based plastering mortar construction method
CN103774696A (en) Construction process of cement-based permeable-crystallization type waterproof material
CN107476448A (en) A kind of construction method for waterproof at toilet doorway
CN205577324U (en) Vitrified tile spreads and pastes structure
CN105239745A (en) Integral wallboard and board seam processing method
CN109555316A (en) Environment protection architecture construction method
CN108005321A (en) A kind of method that exterior wall bulk finish coat adds stone-like coating layer
CN207959812U (en) A kind of artificial stone paving structure
CN205063236U (en) Integration wallboard
CN109469291A (en) A kind of concrete surface separates, moulding construction method
CN110984497A (en) Construction process for preventing hollowing of wall surface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211