CN109025136A - Glue for tile pastes tapestry brick construction method between more boiled water rooms - Google Patents

Glue for tile pastes tapestry brick construction method between more boiled water rooms Download PDF

Info

Publication number
CN109025136A
CN109025136A CN201810802303.3A CN201810802303A CN109025136A CN 109025136 A CN109025136 A CN 109025136A CN 201810802303 A CN201810802303 A CN 201810802303A CN 109025136 A CN109025136 A CN 109025136A
Authority
CN
China
Prior art keywords
tile
brick
glue
tapestry
tapestry brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810802303.3A
Other languages
Chinese (zh)
Inventor
屈彩芳
陈军芳
黄朝伟
魏夏林
何美艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No9 Metallurgical Construction Ltd Corp
Original Assignee
No9 Metallurgical Construction Ltd Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No9 Metallurgical Construction Ltd Corp filed Critical No9 Metallurgical Construction Ltd Corp
Priority to CN201810802303.3A priority Critical patent/CN109025136A/en
Publication of CN109025136A publication Critical patent/CN109025136A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0885Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements specially adapted for being adhesively fixed to the wall; Fastening means therefor; Fixing by means of plastics materials hardening after application

Abstract

Glue for tile pastes tapestry brick construction method between providing a kind of more boiled water rooms, it is main to be modeled by row's brick, wall basic level cleans water-proofing treatment, it hangs vertical set side and looks for rule, ceramic tile glue is mixed in proportion, with glue for tile and combine wedge screeder and infrared level auxiliary edge furring brick, finished product protection etc. forms the tapestry brick process for pasting construction in the new more boiled water rooms of one kind, get rid of process of the previous traditional cement mortar as bonding agent, with adhesive strength height, flexibility is good, it is water-fast, freeze-thawing resistant, the good and easy for construction good characteristics of ageing-resistant performance, with good workability, glue for tile can effectively penetrate into the gap of substrate surface, making to form later tapestry brick has good adhesive property, it shortens working hours, construction method is simple, it is easy to control;The flatness between ceramic tile and ceramic tile both can be quickly adjusted and kept using wedge screeder, prevent ceramic tile from shifting during cement or glue for tile solidify, also controllable ceramic tile space effect.

Description

Glue for tile pastes tapestry brick construction method between more boiled water rooms
Technical field
The invention belongs to tapestry brick technical field of construction, and in particular to glue for tile pastes tapestry brick construction party between a kind of more boiled water rooms Method.
Background technique
In recent years, Building Trade in China development speed is swift and violent, and many new techniques, material are also constantly applied to building neck Domain, in today of rapid development, environmental protection and the energy saving attention for causing many people gradually.For the decoration between more boiled water rooms, due to Metope base is required to brush polyurethane waterproof coating between present more boiled water rooms, and bonding applique surface brick, the prior art are general between more boiled water rooms Ceramic tile is pasted using traditional construction technique, that is, using cement mortar, ceramic tile hollowing is easy to produce in this way or falls off, Er Qieshi Work difficulty is big, and work efficiency is low.In addition the construction of traditional tapestry brick is controlled ceramic tile seam and flatness by operator's experience substantially, is applied Working medium amount and perception are unable to get guarantee, it is therefore necessary to propose to improve.
Summary of the invention
Present invention solves the technical problem that: glue for tile pastes tapestry brick construction method, the present invention between providing a kind of more boiled water rooms The stickup that tapestry brick is carried out using dedicated glue for tile has good workability, ceramic tile since glue for tile status categories are pureed Glue can effectively penetrate into the gap of substrate surface, so that making to form later tapestry brick has good adhesive property, shorten Working time, and the less important work of screeder and infrared ray level is combined, keep the stickup of tapestry brick uniformly overall beautiful.
The technical solution adopted by the present invention: glue for tile pastes tapestry brick construction method between more boiled water rooms, it is characterised in that: including Following steps:
(1) row's brick modeling: according to tapestry brick specification and metope actual size and water power is combined to warm up mounting condition, utilizes BIM Modeling technique carries out making row's brick meet drawing requirement to row's brick anyhow;
(2) wall basic level is handled: before bonding applique surface brick, being cleared up surface of wall impurity, and check metope waterproof layer, is guaranteed anti- Water layer meets the requirements;
(3) hang it is vertical, set side, look for rule: according to drawing requirement and BIM row's brick drawing, in the utilization of waterproof qualification metope Infrared ray level pops up horizontal and vertical control line, it is ensured that ceramic tile arrangement is uniformly beautiful;
(4) glue for tile is mixed: glue for tile and water being proportionally added into plastic barrel, using electric mixer by ceramic tile Glue and water stir, and reach lubricating uniform and without obvious bulk;Then by the glue for tile slurries after stirring before preparing construction It places 5 to 10 minutes, allows glue for tile to be sufficiently humidified so as to, be stirred for before use 2 minutes;
(5) furring brick is inlayed: the step of inlaying furring brick are as follows: smear bottom glue for tile slurries and levelling → snap the line point in wall basic level Lattice → tapestry brick daub simultaneously carries out frosting treatment → edge furring brick → ceramic tile screeder is placed → and inlays the leveling of furring brick → screeder Ceramic tile face;It is specific as follows:
1) be uniformly spread out in sawtooth ash hilt glue for tile slurries handled well in step (2) to tile work wall basic level surface, And plucking into strips, keeps strip glue for tile full and continuous uninterrupted, then uses infrared ray water on the glue for tile of wall basic level Quasi- instrument snap the line lattice on the glue for tile that wall basic level is smeared;
2) tapestry brick back side glue for tile plucking: lying against ground for tapestry brick, clears up the tapestry brick back side with the towel soaked Sundries, then glue for tile slurries are uniformly applied to the entire back side of tapestry brick, and guarantee that tapestry brick quadrangle all applies and spread glue for tile, Then plucking is carried out into the strip of deep 10mm with sawtooth ash knife, be ready for wall in tapestry brick paving;
3) when tapestry brick paving, stickup of the tapestry brick in wall basic level should carry out from bottom to top, in two adjacent tapestry bricks Between using the levelling adjuster of ceramic tile as temporary support, level height is controlled by infrared ray level;
4) when tapestry brick is laid with, tapestry brick is pasted on wall according to lattice control line, brick face is patted using rubber hammer, makes Brick is firmly bonded smooth, and wedge screeder is placed on first tapestry brick edge back side after the complete first block of tapestry brick of paving, is connect Second block of tapestry brick of paving, wedge screeder is carved into insertion after paving is good, with dedicated tight clamp combination wedge screeder pressure Enter smooth to tapestry brick, the laying of other tapestry bricks is according to the above method and so on;
(6) finished product protection: finished product protection includes tapestry brick cleaning and tapestry brick jointing;Detailed process is as follows: tapestry brick is viscous After the completion of patch, through self-test without hollowing, tapestry brick surface is cleaned with staple, it is levelling wedge can be removed later within 48 hours Then device carries out jointing with jointing agent again, with cotton that the element slurry wiping in jointing is even, and cleans brick face.
In above-mentioned steps (1), when the BIM arranges brick, guarantee that tile gap is uniform, big metope, pillar will arrange full sized brick, same The vertically and horizontally arranged non-full sized brick that must not have less than quarter brick on one metope, non-full sized brick row should come secondary position.
In above-mentioned steps (4), the mixed proportion of the glue for tile and water is that 25 kilograms of glues for tile are added 6~6.5 kilograms Water, the glue for tile slurry summer being stirred are finished in 2 hours, and winter is finished in 3 hours;Such as ceramic tile in bucket in work progress Glue pulp surface skinning, should reject skinning, reuse after never adding water to mix the rubber cement done, prevent glue for tile dry and hard Influence adhesion strength.
In above-mentioned steps (5), the strip and tapestry brick back side glue for tile of the glue for tile on tile work wall basic level surface Strip be mutually perpendicular to.
In above-mentioned steps (6), plastics are gently beaten with wooden mallet when removing wedge screeder and carve son, wedge screeder pedestal Bottom break then completes the dismounting of wedge screeder.
The present invention compared with prior art the advantages of:
1, this programme is that tapestry brick inlaying process is new between the new more boiled water rooms of one kind for being designed and making rational planning for and calculating Method, the main material pasted using glue for tile as tapestry brick, due to glue for tile status categories be pureed, have it is good and Yi Xing, glue for tile can effectively penetrate into the gap of substrate surface, so that making to form later tapestry brick has good bonding The setting time of performance, glue for tile is shorter, improves the adhesive property for forming later tapestry brick, shortens the activity duration, has Have that adhesive strength is high, flexibility is good, speed of application is fast, quality control is simple, labor intensity is low, material consumption is few, dust of constructing Pollute the advantages that small, water-fast, freeze-thawing resistant, ageing-resistant performance are good and easy for construction;
2, this programme both can quickly adjust and keep the flatness between tapestry brick and tapestry brick using wedge screeder, It prevents tapestry brick from shifting during cement or glue for tile solidify, can also play the role of controlling ceramic tile space to guarantee decorations Surface brick adherence is overall beautiful out;
3, construction method is simple in this programme, is easy to grasp, and can effectively shorten construction period, improves construction efficiency.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, to this Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not For limiting the present invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work Every other embodiment obtained is put, shall fall within the protection scope of the present invention.Specific embodiment is as follows:
Glue for tile pastes tapestry brick construction method between more boiled water rooms, it is characterised in that: the following steps are included:
(1) row's brick modeling: according to tapestry brick specification and metope actual size and water power is combined to warm up mounting condition, utilizes BIM Modeling technique so that row's brick is met drawing requirement to row's brick anyhow, guarantee that tile gap is uniform, pay attention in big metope, pillar Full sized brick is arranged, the vertically and horizontally arranged non-full sized brick that must not have less than quarter brick on same metope, non-full sized brick row should come time mian part Position;
(2) wall basic level is handled: since preceding process is in wall basic level before brush polyurethane waterproof coating, project management department is right Wall plastering construction quality and flatness and verticality are checked and accepted, pre- advanced to the wall position that code requirement is not achieved Processing is gone, wall leveling degree and verticality substantially conform to code requirement.Before bonding applique surface brick, it is miscellaneous need to only to clear up surface of wall Matter, and check metope waterproof layer, but to guarantee that waterproof layer meets the requirements, if waterproof is undesirable, order waterproof teams and groups Again it handles;
(3) hang it is vertical, set side, look for rule: according to drawing requirement and BIM row's brick drawing, in the utilization of waterproof qualification metope Infrared ray level pops up horizontal and vertical control line, it is ensured that ceramic tile arrangement is uniformly beautiful;
(4) glue for tile is mixed: detailed process is as follows:
1) glue for tile and water are proportionally added into plastic barrel, it is preferred that the mixed proportion of glue for tile and water is 25 kilograms 6~6.5 kilograms of water is added in glue for tile, and the glue for tile that can also be subject to illustrates;
2) then glue for tile and water are stirred using electric mixer, reaches lubricating uniform and without obvious bulk;
3) in order to ensure the workability of glue for tile, the glue for tile slurries after stirring are placed 5 to 10 points before preparing to construct Clock allows glue for tile to be sufficiently humidified so as to, and is stirred for before use 2 minutes;
4) the glue for tile slurry summer being stirred is finished in 2 hours, and winter is finished in 3 hours;In work progress such as Glue for tile pulp surface skinning, should reject skinning in bucket, reuse after the rubber cement do is never added water mixing, prevent porcelain The dry and hard influence adhesion strength of brick glue.
(5) furring brick is inlayed: the step of inlaying furring brick are as follows: smear bottom glue for tile slurries and levelling → snap the line point in wall basic level Lattice → tapestry brick daub simultaneously carries out frosting treatment → edge furring brick → ceramic tile screeder is placed → and inlays the leveling of furring brick → screeder Ceramic tile face;It is specific as follows:
1) be uniformly spread out in sawtooth ash hilt glue for tile slurries handled well in step (2) to tile work wall basic level surface, And plucking into strips, keeps strip glue for tile full and continuous uninterrupted, then uses infrared ray water on the glue for tile of wall basic level Quasi- instrument snap the line lattice on the glue for tile that wall basic level is smeared;
2) tapestry brick back side glue for tile smears plucking: tapestry brick being lain against ground, clears up tapestry brick with the towel soaked The sundries such as the floating ash at the back side, dirt, then glue for tile slurries are uniformly applied to the entire back side of tapestry brick, and guarantee tapestry brick quadrangle It all applies and spreads glue for tile, then carry out plucking into the strip of deep 10mm with sawtooth ash knife, be ready for wall in tapestry brick paving. Pay attention to guaranteeing that the strip of the strip and tapestry brick back side glue for tile of the glue for tile on tile work wall basic level surface is mutually perpendicular to;
3) when tapestry brick paving, stickup of the tapestry brick in wall basic level should carry out from bottom to top, in two adjacent tapestry bricks Between using the levelling adjuster of ceramic tile as temporary support, level height is controlled by infrared ray level;
4) when tapestry brick is laid with, tapestry brick is pasted on wall according to lattice control line, brick face is patted using rubber hammer, makes Brick is firmly bonded smooth, and wedge screeder is placed on first tapestry brick edge back side after the complete first block of tapestry brick of paving, is connect Second block of tapestry brick of paving, be placed in wedge screeder between two adjacent tapestry bricks, by wedge screeder after paving is good Insertion is carved, is pressed into that tapestry brick is smooth with dedicated tight clamp combination wedge screeder, the laying of other adjacent tapestry bricks is by above-mentioned Method and so on;
(6) finished product protection: finished product protection includes tapestry brick cleaning and tapestry brick jointing;Detailed process is as follows: tapestry brick is viscous After the completion of patch, through self-test without hollowing, tapestry brick surface is cleaned with staple, it is levelling wedge can be removed later within 48 hours Device gently beats plastics with wooden mallet when removing wedge screeder and carves son, and the fracture of wedge screeder base bottom is then completed to carve The dismounting of shape screeder.Then jointing is carried out with jointing agent again, it is with cotton that the element slurry wiping in jointing is even, and clean brick face.
The present invention carries out the stickup of tapestry brick using dedicated glue for tile, gets rid of previous traditional cement mortar as bonding The process of agent, glue for tile have good adhesive strength height, flexibility, water-fast, freeze-thawing resistant, ageing-resistant performance good and easy for construction Good characteristics there is good workability, glue for tile can effectively penetrate into base since glue for tile status categories are pureed In the gap on surface, so that making to form later tapestry brick has good adhesive property, shorten working hours, construction method letter It is single, it is easy to control.In addition the present invention both can be adjusted quickly using wedge screeder and keep smooth between ceramic tile and ceramic tile Degree prevents ceramic tile from shifting during cement or glue for tile solidify, and can also play the role of controlling ceramic tile space.
Above-described embodiment, only presently preferred embodiments of the present invention, is not intended to limit the invention practical range, therefore all with this The equivalence changes that content described in invention claim is done should all be included within scope of the invention as claimed.

Claims (5)

1. glue for tile pastes tapestry brick construction method between boiled water room more than, it is characterised in that: the following steps are included:
(1) row's brick modeling: according to tapestry brick specification and metope actual size and water power is combined to warm up mounting condition, is modeled using BIM Technology carries out making row's brick meet drawing requirement to row's brick anyhow;
(2) wall basic level is handled: before bonding applique surface brick, being cleared up base course wall surface impurity, and check metope waterproof layer, is guaranteed anti- Water layer meets the requirements;
(3) hang it is vertical, set side, look for rule: it is sharp on the metope surface of waterproof qualification according to drawing requirement and BIM row's brick drawing Horizontal and vertical control line is popped up with infrared ray level, it is ensured that ceramic tile arrangement is uniformly beautiful;
(4) glue for tile be mixed: glue for tile and water are proportionally added into plastic barrel, using electric mixer by glue for tile with Water stirring, reaches lubricating uniform and without obvious bulk;Then the glue for tile slurries after stirring are placed 5 before preparing to construct To 10 minutes, glue for tile is allowed to be sufficiently humidified so as to, is stirred for before use 2 minutes;
(5) inlay furring brick: the step of edge furring brick are as follows: wall basic level smear bottom glue for tile slurries and levelling → snap the line lattice → Tapestry brick daub simultaneously carries out frosting treatment → edge furring brick → ceramic tile screeder is placed → and inlays furring brick → screeder leveling ceramic tile Face;Detailed process is as follows:
1) be uniformly spread out in sawtooth ash hilt glue for tile slurries handled well in step (2) to tile work wall basic level surface, and Plucking into strips, keeps strip glue for tile full and continuous uninterrupted, then uses infrared ray level on the glue for tile of wall basic level The snap the line lattice on the glue for tile that wall basic level is smeared;
2) tapestry brick back side glue for tile smears plucking: tapestry brick being lain against ground, clears up the tapestry brick back side with the towel soaked Sundries, then glue for tile slurries are uniformly applied to the entire back side of tapestry brick, and guarantee that tapestry brick quadrangle all applies and spread glue for tile, Then plucking is carried out into the strip of deep 10mm with sawtooth ash knife, be ready for wall in tapestry brick paving;
3) when tapestry brick paving, stickup of the tapestry brick in wall basic level should carry out from bottom to top, between two adjacent tapestry bricks Using the levelling adjuster of ceramic tile as temporary support, level height is controlled by infrared ray level;
4) when tapestry brick is laid with, tapestry brick is pasted on wall according to lattice control line, pats brick face using rubber hammer, keep brick viscous Knot is securely smooth, and wedge screeder is placed on first tapestry brick edge back side after the complete first block of tapestry brick of paving, is then spread Second block of tapestry brick is pasted, wedge screeder is carved into insertion after paving is good, is pressed into dedicated tight clamp combination wedge screeder Tapestry brick is smooth, and the laying of other tapestry bricks is according to the above method and so on;
(6) finished product protection: finished product protection includes tapestry brick cleaning and tapestry brick jointing;Detailed process is as follows: tapestry brick has been pasted Cheng Hou cleans tapestry brick surface with staple through self-test without hollowing, can remove wedge screeder later within 48 hours, so Jointing is carried out with jointing agent again afterwards, it is with cotton that the element slurry wiping in jointing is even, and clean brick face.
2. glue for tile pastes tapestry brick construction method between more boiled water rooms according to claim 1, it is characterised in that: above-mentioned steps (1) in, when the BIM arranges brick, guarantee that tile gap is uniform, big metope, pillar will arrange full sized brick, the vertical and horizontal row on same metope Column must not have the non-full sized brick less than quarter brick, and non-full sized brick row should come secondary position.
3. glue for tile pastes tapestry brick construction method between more boiled water rooms according to claim 1, it is characterised in that: above-mentioned steps (4) in, the mixed proportion of the glue for tile and water is the water that 25 kilograms of glues for tile are added 6~6.5 kilograms, the glue for tile being stirred Slurry summer is finished in 2 hours, and winter is finished in 3 hours;Such as glue for tile pulp surface skinning in bucket in work progress, Skinning should be rejected, be reused after never adding water to mix the rubber cement done, prevent the dry and hard influence adhesion strength of glue for tile.
4. glue for tile pastes tapestry brick construction method between more boiled water rooms according to claim 1, it is characterised in that: above-mentioned steps (5) in, the strip of the strip and tapestry brick back side glue for tile of the glue for tile to tile work wall basic level surface is mutually perpendicular to.
5. glue for tile pastes tapestry brick construction method between more boiled water rooms according to claim 1, it is characterised in that: above-mentioned steps (6) in, plastics is gently beaten with wooden mallet when removing wedge screeder and carve son, the fracture of wedge screeder base bottom is then complete At the dismounting of wedge screeder.
CN201810802303.3A 2018-07-18 2018-07-18 Glue for tile pastes tapestry brick construction method between more boiled water rooms Pending CN109025136A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810802303.3A CN109025136A (en) 2018-07-18 2018-07-18 Glue for tile pastes tapestry brick construction method between more boiled water rooms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810802303.3A CN109025136A (en) 2018-07-18 2018-07-18 Glue for tile pastes tapestry brick construction method between more boiled water rooms

Publications (1)

Publication Number Publication Date
CN109025136A true CN109025136A (en) 2018-12-18

Family

ID=64643776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810802303.3A Pending CN109025136A (en) 2018-07-18 2018-07-18 Glue for tile pastes tapestry brick construction method between more boiled water rooms

Country Status (1)

Country Link
CN (1) CN109025136A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030965A (en) * 2019-05-22 2019-07-19 宁波希澈机械科技有限公司 A kind of automation high-rise building exposed wall facing brick intensity detection machine
CN110130620A (en) * 2019-05-20 2019-08-16 广东华坤建设集团有限公司 A kind of two-sided sawtooth scraper of assembled architecture and wall brick plaster method
CN112663890A (en) * 2020-12-10 2021-04-16 百合盛华建筑科技有限公司 Bonding type construction method for indoor large-size ceramic wall brick
CN112922256A (en) * 2021-01-26 2021-06-08 龙强建工有限公司 Ceramic tile pasting process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677853A (en) * 2012-05-21 2012-09-19 张立功 Implementation method for renovating by pasting ceramic tile on surface of indoor old ceramic tile
CN204662909U (en) * 2015-04-04 2015-09-23 余姚市东华电器塑料厂 A kind of novel laying ceramic tile screeder
KR20160115107A (en) * 2015-03-26 2016-10-06 이승진 Insulation tile of passive type and Construction method of tile using the same
CN106284929A (en) * 2016-08-16 2017-01-04 中天建设集团有限公司天津分公司 A kind of furring tile anti-hollowing edge patch construction method
CN107060299A (en) * 2017-03-30 2017-08-18 上海爱迪技术发展有限公司 The stone material or the levelling construction method of ground tile paving of half-dried cement mortar terrace
CN107254954A (en) * 2017-06-09 2017-10-17 北京家装云网络科技有限公司 Ground paving ceramic tile construction technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677853A (en) * 2012-05-21 2012-09-19 张立功 Implementation method for renovating by pasting ceramic tile on surface of indoor old ceramic tile
KR20160115107A (en) * 2015-03-26 2016-10-06 이승진 Insulation tile of passive type and Construction method of tile using the same
CN204662909U (en) * 2015-04-04 2015-09-23 余姚市东华电器塑料厂 A kind of novel laying ceramic tile screeder
CN106284929A (en) * 2016-08-16 2017-01-04 中天建设集团有限公司天津分公司 A kind of furring tile anti-hollowing edge patch construction method
CN106284929B (en) * 2016-08-16 2018-06-22 中天建设集团有限公司 A kind of anti-hollowing edge patch construction method of furring tile
CN107060299A (en) * 2017-03-30 2017-08-18 上海爱迪技术发展有限公司 The stone material or the levelling construction method of ground tile paving of half-dried cement mortar terrace
CN107254954A (en) * 2017-06-09 2017-10-17 北京家装云网络科技有限公司 Ground paving ceramic tile construction technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
本书编委会: "《施工员一本通》", 30 June 2013 *
李慧民: "《BIM技术应用基础教程》", 30 April 2017 *
陈玮,孙元奇: "瓷砖胶粘贴饰面砖施工工法", 《"瓷砖胶粘贴饰面砖施工工法",百度文库,第1-7页》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130620A (en) * 2019-05-20 2019-08-16 广东华坤建设集团有限公司 A kind of two-sided sawtooth scraper of assembled architecture and wall brick plaster method
CN110030965A (en) * 2019-05-22 2019-07-19 宁波希澈机械科技有限公司 A kind of automation high-rise building exposed wall facing brick intensity detection machine
CN110030965B (en) * 2019-05-22 2019-11-19 东阳阿语机械科技有限公司 A kind of automation high-rise building exposed wall facing brick intensity detection machine
CN112663890A (en) * 2020-12-10 2021-04-16 百合盛华建筑科技有限公司 Bonding type construction method for indoor large-size ceramic wall brick
CN112922256A (en) * 2021-01-26 2021-06-08 龙强建工有限公司 Ceramic tile pasting process

Similar Documents

Publication Publication Date Title
CN109025136A (en) Glue for tile pastes tapestry brick construction method between more boiled water rooms
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
CN112267628A (en) Construction method of plastering-free system for interior wall decoration of constructional engineering
CN201598769U (en) Wall patch
CN101008192A (en) Construction method of outer wall insulation system adopting composite insulation surface tile
CN110616861B (en) Thermal power plant concrete structure modification construction method
CN108360782A (en) A kind of method of wall tile
CN109797568B (en) Preparation method of sandstone paster stone
CN203834826U (en) Novel staircase water drip tank
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs
CN109853888A (en) A kind of historical building plucking wall surface construction technology
CN203867106U (en) Reinforced historic building single-piece brick wall
CN201908415U (en) Wall decorative board layer structure
CN211949245U (en) Roof stone flashing structure
CN109779172A (en) A kind of laser floating screed brushing gypsum plastering construction method
CN109025109A (en) A kind of construction technology coating inner wall of building face
CN206538953U (en) Structure of plastering is exempted from a kind of Novel interior wall gypsum bottoming
CN109610764B (en) Granite facade paving construction technology
CN110821101A (en) Construction method for paint outer wall line pressing groove
CN106150020A (en) A kind of construction technology utilizing flowing mortar adhesively face brick
CN112356611A (en) Landscape mountain stone and manufacturing method thereof
CN106284917A (en) A kind of construction technology utilizing flowable mortar adhesively face brick
CN205907857U (en) Two -sided partition wall that adorns firmly
CN206220388U (en) A kind of engraving structure of plastering of landscape metope
CN202882303U (en) Cement decorative board wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication