CN106284929A - A kind of furring tile anti-hollowing edge patch construction method - Google Patents

A kind of furring tile anti-hollowing edge patch construction method Download PDF

Info

Publication number
CN106284929A
CN106284929A CN201610680728.2A CN201610680728A CN106284929A CN 106284929 A CN106284929 A CN 106284929A CN 201610680728 A CN201610680728 A CN 201610680728A CN 106284929 A CN106284929 A CN 106284929A
Authority
CN
China
Prior art keywords
tile
ceramic tile
hollowing
edge
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610680728.2A
Other languages
Chinese (zh)
Other versions
CN106284929B (en
Inventor
陈永伟
刘光辉
尤克泉
牛超
吴广浩
吴晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongtian Fangyuan curtain wall Co., Ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd Tianjin Branch filed Critical Zhongtian Construction Group Co Ltd Tianjin Branch
Priority to CN201610680728.2A priority Critical patent/CN106284929B/en
Publication of CN106284929A publication Critical patent/CN106284929A/en
Application granted granted Critical
Publication of CN106284929B publication Critical patent/CN106284929B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of furring tile anti-hollowing edge patch construction method, including base treatment, patch ash cake, row's brick, snap the line lattice, leaching brick, edge tiling, tile pointing and wiping seam, curing step.The inventive method construction is simple, uses the ceramic tile of the method paving of the present invention, prevents the generation that basic unit chaps, thus prevent the generation of hollowing phenomenon, and the inventive method tile laying is attractive in appearance, dividing joint is uniform in employing.The instrument of watering in the inventive method improves operations area, thus is effectively improved work efficiency.The inventive method is simple, efficiency of construction is high, and tile paste is attractive in appearance and effectively prevent the generation of hollowing phenomenon, has the value of wide popularization and application.

Description

A kind of furring tile anti-hollowing edge patch construction method
Technical field
The invention belongs to building field, especially a kind of furring tile anti-hollowing edge patch construction method.
Background technology
Tile laying is an elaboration, and construction material, master worker's technique are suffered from the highest requirement, regardless of whether which Individual link goes wrong, and is all likely to result in ceramic tile hollowing, comes off, and dividing joint is irregular, the irregular phenomenon of metope.Tile laying if any Hollowing, it is easy to cause loosen in the future, come off, the generation of the problem that ftractures, crushes etc., there is also potential safety hazard.
The reason causing hollowing is as follows:
1, substrate surface perpendicularity exceeds standard, and causes coat of plaster became uneven or blocked up, thus causes sending out of surface checking Raw;
2, plaster environment ventilation and being dried, but be negligent of maintenance and cause mortar dehydration very fast and cause serious cracking;
3, the smooth combination of housing surface is bad, and large area bottoming two basic unit, without space, produces irregular contraction Testudinis seam.
Ceramic tile dividing joint is irregular, and whole structure unsightly, shrinks disunity for Summer and winter ceramic tile gap, easily causes metope Out-of-flatness, the generation of the narrow extruding in gap obscission even occurs.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that a kind of furring tile anti-hollowing edge patch construction party Method.
The solution of the present invention is achieved in that
A kind of furring tile anti-hollowing edge patch construction method, step is as follows:
Step one, base treatment
Before sticking brick, first substrate surface is cleaned up, root out the remaining slurry of metope and inner corner trim etc., burr, inspection Survey perpendicularity and the flatness of basic unit's facade;
Base course wall is watered by a few days ago use instrument that waters in construction, water even, drenched, surface is anhydrous;
Block wall needs again to water moistening before building by laying bricks or stones, it is ensured that body of wall is moist and loses open fire;
Step 2, patch ash cake
Being attached on bottom ash with useless ceramic tile, ash cake spacing is 1.0~2.0m, and upper and lower ash cake guiding ruler finds vertically, the most several Individual ash cake bracing wire or levelling with guiding ruler;
Step 3, row brick, snap the line lattice
Width, height and design requirement according to metope, ejects ceramic tile and the vertical suture of face brick location and horizontal suture;
Step 4, leaching brick
Ceramic tile is before pasting, and the previous day to be carried is immersed in the water, and pastes first 1~2 hour, stands up and dry in the shade after pulling ceramic tile out, Surface drying endogenous dampness, front and back all must not have greasy dirt;
Step 5, edge tiling
Completely smear mortar at the ceramic tile back side, four limits spread to inclined-plane, thickness about 5mm, and the corner of ceramic tile is completely starched, and is allowed to leeched line, Tap ceramic tile surface after ceramic tile is in place with wooden handle gently, be allowed to put down with proximal surface;
After having pasted one block of ceramic tile, check surfacing with plaster ground, and seam is dialled straight with plastic cross card;
Step 6, tile pointing stitch with wiping
After mortar final set, carry out self-inspection, have hollowing, out-of-flatness phenomenon to repair immediately, dip in atherosclerotic white cement element with hairbrush After slurry is coated with seam, then being wiped uniformly by the element slurry of seam with cloth, ceramic tile surface is cleaned;
Step 7, maintenance
After inlay ceramic tile completes 24 hours, carrying out ceramic tile pasting thin film water-preserving curing, curing time is more than 7 days.
And, in the mortar in described step 5, cement is 1:1 with the ratio of sand, and this cement is higher than 32.5 grades of ordinary silicon Acid salt cement, 108 glue adding 20%, sand is medium sand.
And, in described step 5, ceramic tile edge is cut oblique angle at 45 ° by external corner piece machine for working stone or skin grinder, protects Card seam is straight, closely knit;
Little furring tile pressed by the big furring tile of inner corner trim, sweeps off the mortar of ceramic tile surface and draws seam with clamp, and wiping only with staple.
And, in described step 5, during inlay ceramic tile, indoor inlay patch from bottom to top, and every face wall inlays patch from bottom to top, From the steady good guiding ruler in the position of the most lower two row's ceramic tiles, perps horizon rule hangs vertically, suitable for reading draws level to lead to line.
And, in described step 5, the height of edge tiling is every day 1.2~1.5 meters, and sticking brick position is the fullest First feed ash full, spread dry cement at mortar joint suitable for reading.
And, in described step 5, mortar need to use in 3 hours, and mortar often uses 10 minutes, needs manual stirring Once.
And, the instrument of watering in described step one includes that water pipe, transverse tube, described water pipe connect with in the middle part of transverse tube, this horizontal stroke Pipe front end uniform intervals is shaped with multiple apopore.
Advantages of the present invention and good effect be:
1, the inventive method construction is simple, uses the ceramic tile of the method paving of the present invention, prevents the generation that basic unit chaps, because of And preventing the generation of hollowing phenomenon, the inventive method tile laying is attractive in appearance, dividing joint is uniform in employing.
2, the instrument of watering in the inventive method improves operations area, is effectively increased work efficiency.
3, the inventive method is simple, efficiency of construction is high, and tile paste is attractive in appearance and effectively prevent the generation of hollowing phenomenon, tool There is the value of wide popularization and application.
Accompanying drawing explanation
Fig. 1 is the process chart of the present invention;
Fig. 2 is the structural representation of instrument of watering in the present invention.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings and by specific embodiment.
A kind of furring tile anti-hollowing edge patch construction method, as it is shown in figure 1, comprise the steps:
Step one, base treatment
Before sticking brick, first substrate surface to be cleaned up, root out the remaining slurry of metope and inner corner trim etc., burr, Perpendicularity with 2m vertical checkout ruler inspection facade;The flatness on surface is detected with 2m guiding ruler and clearance gauge;
Base course wall is watered by a few days ago use instrument that waters in construction, water even, drenched, surface is anhydrous.
Block wall needs again to water moistening before building by laying bricks or stones, it is ensured that body of wall is moist and loses open fire and is advisable.
The described instrument that waters is as in figure 2 it is shown, include water pipe 3, transverse tube 1, and described water pipe connects with in the middle part of transverse tube, before this transverse tube End uniform intervals is shaped with multiple apopore 2.This waters, and tool construction is simple, be effectively increased the efficiency of construction that metope waters.
Step 2, patch ash cake
Being attached on bottom ash with useless ceramic tile, ash cake spacing is generally 1.0~2.0m, and upper and lower ash cake guiding ruler finds vertically, horizontal To several ash cake bracing wires or levelling with guiding ruler, it is used for controlling surfacing.
Index point spacing is that 1.5 × 1.5m or 2 × 2m is advisable, and face brick paving knocks out to time herein again.Care mark point pastes Complete, carry out a preliminary examination after having intensity.
Step 3, row brick, snap the line lattice
Width, height and design requirement according to metope, ejects ceramic tile and the vertical suture of face brick location and horizontal suture.But It is noted that same metope must not have a non-full sized brick of a more than row, and should be inlayed and be attached to more hidden position.But also it is noted that one Make peace symmetry.As met prominent fastener, application full sized brick set cuts identical, and the most handy non-full sized brick arbitrarily pieces together edge patch.
Step 4, leaching brick
Ceramic tile is before pasting, and the previous day to be carried is immersed in the water moistening, before pasting 1~2h, stands up and dry in the shade after pulling out, surface drying Endogenous dampness, or water is wiped, scrub, front and back all must not have greasy dirt.
Step 5, edge tiling
In edge patch, in mortar, cement is 1:1 (volume ratio) with the ratio of sand, uses cement to be not less than 32.5 grades of ordinary silicon Acid salt cement, 108 glue adding 20%, sand is medium sand (sieving), and construction environment temperature is minimum more than 5 DEG C, at the ceramic tile back side Completely smearing mortar, four limits spread to inclined-plane, thickness about 5mm, notice that corner is completely starched, and are allowed to leeched line, after ceramic tile is in place with wooden handle gently Tap brick face, be allowed to put down with proximal surface.After having pasted one piece of brick, check surfacing with plaster ground, and will seam with plastic cross card Dial straight.
Face brick edge can be cut oblique angle at 45 ° with machine for working stone or skin grinder by external corner piece, it is ensured that seam is straight, closely knit. Inner corner trim should greatly face brick press little face brick, and note consider primary line of sight towards.Guarantee that the seam at negative and positive angle is clear and coherent.Sweep off surface mortar Draw seam with clamp, and wipe only with staple.
Step 6, tile pointing stitch with wiping
After mortar final set, self-inspection should be carried out, to repair immediately if any hollowing, out-of-flatness phenomenon, dip in atherosclerotic plain boiled water with hairbrush After mud element slurry is coated with seam, then being wiped uniformly by the element slurry of seam with cloth, brick face is cleaned, and the most handy dry cement powder wipes seam.
Step 7, maintenance
After face brick edge patch completes 24 hours, carrying out ceramic tile pasting thin film water-preserving curing, curing time is no less than 7 days.
It is to be noted that
1, used cement should have product certificate bright or retrial list, if dispatching from the factory more than three months, should make by result of the test With.
2, sand should not use sea sand, fine sand, and face brick water absorption rate is the most excessive, need to extend soaking time.
3, inlaying furring brick engineering, patch is typically inlayed from bottom to top in indoor, and every face wall inlays patch from bottom to top, from the most lower two row's bricks The steady good guiding ruler in position, perps horizon rule hangs vertically, suitable for reading preferably draws level to lead to line.
4, edge patch height generally every day 1.2~1.5m.Have to check for ceramic tile mortar joint suitable for reading the fullest, the fullest necessarily First to feed ash full, for avoiding posting ceramic tile sliding, dry cement can be spread at mortar joint suitable for reading, to strengthen resistant slide power;
5, use plastic clamp, to guarantee that mortar joint is clear and coherent, mark with by the mortar of sealing with patch;
6, pre-tile work need to suitably increase with the mortar amount of the opposite joint side posting ceramic tile, meets ceramic tile side, bottom surface seam Place's full degree of mortar at bed joint;
7, the mortar stirred need to use in 3 hours, and when suitably adjusting use according to construction environment temperature Between;Mortar often uses 10 minutes, needs manual stirring once, it is to avoid mortar laminated segregation.
It is emphasized that embodiment of the present invention is illustrative rather than determinate, bag the most of the present invention Include the embodiment being not limited to described in detailed description of the invention, every by those skilled in the art according to technical scheme Other embodiments drawn, also belong to the scope of protection of the invention.

Claims (7)

1. a furring tile anti-hollowing edge patch construction method, it is characterised in that: step is as follows:
Step one, base treatment
Before sticking brick, first substrate surface is cleaned up, root out the remaining slurry of metope and inner corner trim etc., burr, detect base The perpendicularity of layer facade and flatness;
Base course wall is watered by a few days ago use instrument that waters in construction, water even, drenched, surface is anhydrous;
Block wall needs again to water moistening before building by laying bricks or stones, it is ensured that body of wall is moist and loses open fire;
Step 2, patch ash cake
Being attached on bottom ash with useless ceramic tile, ash cake spacing is 1.0~2.0m, and upper and lower ash cake guiding ruler finds vertically, horizontal several ashes Cake bracing wire or levelling with guiding ruler;
Step 3, row brick, snap the line lattice
Width, height and design requirement according to metope, ejects ceramic tile and the vertical suture of face brick location and horizontal suture;
Step 4, leaching brick
Ceramic tile is before pasting, and the previous day to be carried is immersed in the water, and pastes first 1~2 hour, stands up and dry in the shade after pulling ceramic tile out, surface drying Endogenous dampness, front and back all must not have greasy dirt;
Step 5, edge tiling
Completely smear mortar at the ceramic tile back side, four limits spread to inclined-plane, thickness about 5mm, and the corner of ceramic tile is completely starched, and is allowed to leeched line, ceramic tile Tap ceramic tile surface after in place with wooden handle gently, be allowed to put down with proximal surface;
After having pasted one block of ceramic tile, check surfacing with plaster ground, and seam is dialled straight with plastic cross card;
Step 6, tile pointing stitch with wiping
After mortar final set, carry out self-inspection, have hollowing, out-of-flatness phenomenon to repair immediately, dip in atherosclerotic white cement element slurry with hairbrush and be coated with After seam, then being wiped uniformly by the element slurry of seam with cloth, ceramic tile surface is cleaned;
Step 7, maintenance
After inlay ceramic tile completes 24 hours, carrying out ceramic tile pasting thin film water-preserving curing, curing time is more than 7 days.
Furring tile the most according to claim 1 anti-hollowing edge patch construction method, it is characterised in that: in described step 5 In mortar, cement is 1:1 with the ratio of sand, and this cement is higher than 32.5 grades of Portland cements, 108 glue adding 20%, sand For medium sand.
Furring tile the most according to claim 1 anti-hollowing edge patch construction method, it is characterised in that: in described step 5, Ceramic tile edge is cut oblique angle at 45 ° by external corner piece machine for working stone or skin grinder, it is ensured that seam is straight, closely knit;
Little furring tile pressed by the big furring tile of inner corner trim, sweeps off the mortar of ceramic tile surface and draws seam with clamp, and wiping only with staple.
Furring tile the most according to claim 1 anti-hollowing edge patch construction method, it is characterised in that: in described step 5, During inlay ceramic tile, indoor inlay patch from bottom to top, and every face wall inlays patch from bottom to top, lean on the best from the position of the most lower two row's ceramic tiles Chi, perps horizon rule hangs vertically, suitable for reading draws level to lead to line.
Furring tile the most according to claim 1 anti-hollowing edge patch construction method, it is characterised in that: in described step 5, The height of edge tiling is every day 1.2~1.5 meters, and what sticking brick position was the fullest first feed, and ash is full, spreads dry at mortar joint suitable for reading Cement.
Furring tile the most according to claim 1 anti-hollowing edge patch construction method, it is characterised in that: in described step 5, Mortar need to use in 3 hours, and mortar often uses 10 minutes, needs manual stirring once.
Furring tile the most according to claim 1 anti-hollowing edge patch construction method, it is characterised in that: in described step one The instrument of watering includes that water pipe, transverse tube, described water pipe connect with in the middle part of transverse tube, and this transverse tube front end uniform intervals is shaped with multiple water outlet Hole.
CN201610680728.2A 2016-08-16 2016-08-16 A kind of anti-hollowing edge patch construction method of furring tile Active CN106284929B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610680728.2A CN106284929B (en) 2016-08-16 2016-08-16 A kind of anti-hollowing edge patch construction method of furring tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610680728.2A CN106284929B (en) 2016-08-16 2016-08-16 A kind of anti-hollowing edge patch construction method of furring tile

Publications (2)

Publication Number Publication Date
CN106284929A true CN106284929A (en) 2017-01-04
CN106284929B CN106284929B (en) 2018-06-22

Family

ID=57678797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610680728.2A Active CN106284929B (en) 2016-08-16 2016-08-16 A kind of anti-hollowing edge patch construction method of furring tile

Country Status (1)

Country Link
CN (1) CN106284929B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884537A (en) * 2017-04-06 2017-06-23 合肥欧克斯新型建材有限公司 A kind of outdoor tile bonding construction method
CN106930498A (en) * 2017-04-18 2017-07-07 重庆市富环建筑材料有限责任公司 The barbola work of ceramic tile
CN107035090A (en) * 2017-06-09 2017-08-11 北京广佳建筑装饰股份有限公司 A kind of anti-hollowing construction method of stone wall surface
CN108265946A (en) * 2017-12-15 2018-07-10 夹江县盛世东方陶瓷有限公司 A kind of ceramics painting and calligraphy brick patch block method
CN109025136A (en) * 2018-07-18 2018-12-18 九冶建设有限公司 Glue for tile pastes tapestry brick construction method between more boiled water rooms
CN110439235A (en) * 2019-07-23 2019-11-12 深圳市惠深博越智慧建造科技有限公司 The anti-hollowing construction technology of tapestry brick
CN113323314A (en) * 2021-06-10 2021-08-31 中国建筑第八工程局有限公司 External wall paving construction method for sintered ceramic tiles in freeze-thaw environment
CN113565283A (en) * 2020-04-29 2021-10-29 河南远大可持续建筑科技有限公司 Method for paving ceramic tiles on wall surface of autoclaved aerated concrete wall panel
CN114352056A (en) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 Construction process for renovating ecological face bricks on old wall surfaces
CN115354835A (en) * 2022-06-22 2022-11-18 安徽八方工程有限公司 Composite facing brick paving tool and paving method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120855A (en) * 2013-04-28 2014-10-29 杨哲 Construction method for paving ground tile floor
CN104790624A (en) * 2015-04-03 2015-07-22 北京中铁装饰工程有限公司 Ceramic tile attaching construction method
CN104989071A (en) * 2015-05-20 2015-10-21 莆田学院 Method for paving new ground tiles on original cushion layer
CN205348651U (en) * 2015-12-23 2016-06-29 上海波涛装饰(集团)有限公司 Ceramic tile layer that drops is roused in air defense

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120855A (en) * 2013-04-28 2014-10-29 杨哲 Construction method for paving ground tile floor
CN104790624A (en) * 2015-04-03 2015-07-22 北京中铁装饰工程有限公司 Ceramic tile attaching construction method
CN104989071A (en) * 2015-05-20 2015-10-21 莆田学院 Method for paving new ground tiles on original cushion layer
CN205348651U (en) * 2015-12-23 2016-06-29 上海波涛装饰(集团)有限公司 Ceramic tile layer that drops is roused in air defense

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884537A (en) * 2017-04-06 2017-06-23 合肥欧克斯新型建材有限公司 A kind of outdoor tile bonding construction method
CN106930498A (en) * 2017-04-18 2017-07-07 重庆市富环建筑材料有限责任公司 The barbola work of ceramic tile
CN106930498B (en) * 2017-04-18 2019-08-20 重庆市富环建筑材料有限责任公司 The barbola work of ceramic tile
CN107035090A (en) * 2017-06-09 2017-08-11 北京广佳建筑装饰股份有限公司 A kind of anti-hollowing construction method of stone wall surface
CN108265946A (en) * 2017-12-15 2018-07-10 夹江县盛世东方陶瓷有限公司 A kind of ceramics painting and calligraphy brick patch block method
CN109025136A (en) * 2018-07-18 2018-12-18 九冶建设有限公司 Glue for tile pastes tapestry brick construction method between more boiled water rooms
CN110439235A (en) * 2019-07-23 2019-11-12 深圳市惠深博越智慧建造科技有限公司 The anti-hollowing construction technology of tapestry brick
CN113565283A (en) * 2020-04-29 2021-10-29 河南远大可持续建筑科技有限公司 Method for paving ceramic tiles on wall surface of autoclaved aerated concrete wall panel
CN113323314A (en) * 2021-06-10 2021-08-31 中国建筑第八工程局有限公司 External wall paving construction method for sintered ceramic tiles in freeze-thaw environment
CN114352056A (en) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 Construction process for renovating ecological face bricks on old wall surfaces
CN115354835A (en) * 2022-06-22 2022-11-18 安徽八方工程有限公司 Composite facing brick paving tool and paving method thereof

Also Published As

Publication number Publication date
CN106284929B (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN106284929B (en) A kind of anti-hollowing edge patch construction method of furring tile
CN101565997A (en) Construction method for large-area irregular floor tile
CN103046709B (en) Building construction method of inner wall surface
CN107254954A (en) Ground paving ceramic tile construction technology
CN102400525B (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN102140836A (en) Construction method of large-size floor tile
CN202990345U (en) Stone face plate wet combining structure
CN105399389A (en) Building inner wall whitewashing gypsum and process flow thereof
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN104234362B (en) Outdoor tile construction method
CN202990369U (en) Water stop device with bathroom threshold stones
CN102828600A (en) Method for laying floor artificial stones
CN105525726A (en) Aerated brick wall plastering construction method
CN102094496A (en) Method for manufacturing imitation brick wall
CN108590185A (en) Building exterior wall heat preserving construction technology
CN104120848A (en) Construction method for internal wall facing bricks
CN110761507A (en) Construction method of external wall chopped false stone
CN203905374U (en) Hanging piece for hanging stones or tiles in wet hanging mode
CN104120860A (en) Construction method for cement mortar ground leveling
CN103899072A (en) Hanging member for wet hanging of stone or tiles and wet hanging method
CN103291024B (en) A kind of construction method of novel cement-based motar
CN107574936B (en) A kind of heat preserving exterior wall construction technology
CN109138423A (en) External wall thermal insulation/decoration integration board construction technology
CN102888959A (en) Method for constructing external wall by using premixed dry mortar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180518

Address after: No. 65, Wu Ning Dong Road, Dongyang, Zhejiang Province

Applicant after: Zhongtian Construction Group Co., Ltd.

Address before: 300171 the 9 layer of Tianxing riverside Plaza 81, eleven Jing Road, Hedong District, Tianjin.

Applicant before: Zhongtian Construction Group Co., Ltd. Tianjin Branch

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200324

Address after: 322100, No. 65, Nanjing East Road, Dongyang, Zhejiang, Jinhua

Co-patentee after: Zhejiang Zhongtian Fangyuan curtain wall Co., Ltd

Patentee after: ZHONGTIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: 322100 No. 65 Nanjing Ning East Road, Zhejiang, Dongyang

Patentee before: ZHONGTIAN CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right