CN202990369U - Water stop device with bathroom threshold stones - Google Patents

Water stop device with bathroom threshold stones Download PDF

Info

Publication number
CN202990369U
CN202990369U CN 201220663403 CN201220663403U CN202990369U CN 202990369 U CN202990369 U CN 202990369U CN 201220663403 CN201220663403 CN 201220663403 CN 201220663403 U CN201220663403 U CN 201220663403U CN 202990369 U CN202990369 U CN 202990369U
Authority
CN
China
Prior art keywords
layer
stone
water stop
waterstop
washroom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201220663403
Other languages
Chinese (zh)
Inventor
薛维波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Original Assignee
HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd filed Critical HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Priority to CN 201220663403 priority Critical patent/CN202990369U/en
Application granted granted Critical
Publication of CN202990369U publication Critical patent/CN202990369U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a water stop device with bathroom threshold stones, which comprises a base layer structure main body, a door pocket and a decorative ground; a civil engineering trowelling layer is arranged above the inner side of the base layer structure main body; an inner side binding layer is arranged above the civil engineering trowelling layer; the bathroom stone is arranged above the inner side binding layer; a chiseling layer is arranged at the middle part of the base layer structure main body; a fine stone concrete water stop is arranged at the upper part of the chiseling layer; an outer side binding layer is arranged above the fine stone concrete water stop; the threshold stone is arranged above the outer side binding layer; and further, coating film waterproof layers are respectively arranged between the fine stone concrete water stop and the outer side binding layer and between the civil engineering trowelling layer and the inner side binding layer. The water stop device has the beneficial effects that through innovative structure design and novel technical process, the problem of water seepage of the binding layer below the threshold stone is better solved; and the water stop device has the advantages of good quality effect, high stability and good maneuverability and is very suitable for large-scale popularization and application.

Description

A kind of washroom threshold stone waterstop device
Technical field
The utility model relates to a kind of washroom threshold stone waterstop device.
Background technology
At present, along with people's living standard improve constantly and to the further upgrading of living space functional requirement and aesthetic requirement, the closing in of interior decoration engineering is received the limit and is processed and more and more become the focus that everybody pays close attention to.As widely used treatment measures---ground threshold stone, employing acceptable to all and extensive gradually in different spaces ground handing-over decoration construction.But, if it is improper that threshold stone especially is in the washroom threshold stone paving of dry and wet zone boundary, the phenomenon that washroom threshold stone below infiltration but very easily occurs, and as a kind of common fault, the seepage problem below washroom threshold stone has become everybody chronic illness of puzzlement.
Find through after sufficient research and analysis, cement mortar or cementing agent setting course below washroom threshold stone are the central core of circulation of seeping water under washroom threshold stone.Be in a rear procedure of washroom integral waterproofing construction due to the construction of threshold stone setting course, conventional waterproof construction can't seal waterproofing work to it, thereby becomes the passage that leaks, exosmoses that stockpiles water possible in the washroom.
The utility model content
Of the present utility modelly be to provide a kind of novel washroom threshold stone waterstop device, to solve the problem that seeps water under existing washroom threshold stone.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of washroom threshold stone waterstop device, comprise base layer structure main body, door pocket and decorative ground, the inside front of described base layer structure main body is provided with the floating layer of civil engineering, is provided with inboard setting course above the floating layer of civil engineering, is provided with the washroom stone material above inboard setting course; Base layer structure main body middle part is provided with the dabbing layer, and dabbing layer top is provided with the pea gravel concreten waterstop, and described pea gravel concreten waterstop top is provided with outside setting course, and described outside setting course top is provided with threshold stone.
Further, be equipped with film waterproof material between described pea gravel concreten waterstop and outside setting course and between the floating layer of civil engineering and inboard setting course.
Preferably, described threshold stone and decorative ground position level.
Preferably, the thickness of described film waterproof material is 1-1.5mm.
The beneficial effects of the utility model are: structure design and novel technological process by innovation, well solved the problem of setting course infiltration under threshold stone, and mass effect is good, stability is high, operability good, and very suitable large-scale promotion is used.
Description of drawings
The below is described in further detail the utility model with reference to the accompanying drawings.
Fig. 1 is the structural representation sectional view of the utility model embodiment described a kind of washroom threshold stone waterstop device.
In figure:
1, base layer structure main body; 2, door pocket; 3, decorative ground; 4, the floating layer of civil engineering; 5, inboard setting course; 6, washroom stone material; 7, dabbing layer; 8, pea gravel concreten waterstop; 9, film waterproof material; 10, outside setting course; 11, threshold stone.
The specific embodiment
As shown in Figure 1, the described a kind of washroom of the utility model embodiment threshold stone waterstop device, comprise base layer structure main body 1, door pocket 2 and decorative ground 3, the inside front of described base layer structure main body 1 is provided with the floating layer 4 of civil engineering, the floating layer of civil engineering 4 top are provided with inboard setting course 5, and inboard setting course 5 tops are provided with washroom stone material 6; Base layer structure main body 1 middle part is provided with dabbing layer 7, and dabbing layer 7 top are provided with pea gravel concreten waterstop 8, and described pea gravel concreten waterstop 8 tops are provided with outside setting course 10, and setting course 10 tops, the described outside are provided with threshold stone 11; Be equipped with film waterproof material 9 between described pea gravel concreten waterstop 8 and outside setting course 10 and between the floating layer 4 of civil engineering and inboard setting course 5; Described threshold stone 11 and decorative ground 3 position levels.
The thickness of described film waterproof material 9 is 1-1.5mm.
During concrete the use, at first removing base layer structure main body 1(is the civil engineering leveling layer) lip-deep dirt, oil stain, floating ash and dregs, and according to the building elevation line that over contract side provides, eject 1 meter absolute altitude line and accomodation ground paving finished surface absolute altitude line by level gauge.Simultaneously, eject threshold stone construction outline line and construction control line.
According to measuring the unwrapping wire result, the structure basic unit of threshold stone below is cut, cut the elevation of bottom of part apart from decorating finished surface 40mm left and right.The civil engineering structure basic unit bottom partly that cuts must dabbing be processed, and forms dabbing layer 7.
Build repairing with the C20 pea gravel concreten to cutting part, receive light with trowel simultaneously and process, form pea gravel concreten waterstop 8.And pea gravel concreten waterstop 8 top finished surfaces are decorated 10mm left and right under finished surface at accomodation ground.
After the construction of waterstop pea gravel concreten is completed 7 days, adopt coating film waterproof material, the integral waterproofing construction is carried out in threshold stone waterstop top and accomodation ground, form film waterproof material 9.And during every time waterproof construction, whole construction of waterproof layer must be completed by a whole gas, and after must not stopping over, row is continuous again is coated with, in case form the construction of waterproof layer seam, affects waterproof effect.After the complete and requirement maintenance by the waterproofing materials description of film waterproof material 9 construction, carry out 48 hours closed-water tests by code requirement.
After film waterproof material 9 closed-water tests are qualified, carry out the conventional paving construction of ground stone material (or ceramic tile) in washroom threshold stone and washroom.Consider the restriction on ground stone material (or ceramic tile) and threshold stone joint thickness execution conditions in the washroom, in the suggestion washroom, ground stone material (or ceramic tile) adopts cement mortar (conventional proportioning 1:3, weight ratio) paving of stone material cementing agent is adopted in paving, threshold stone.
This product is applied to the indoor and public aisle of all dwelling houses of Shanghai Luwan District Shanghai Greenland 1960 plot projects, the fine fitment engineering of elevator hall, and washroom threshold stone has wherein all used this structure and technology.This structure and technique effect are obvious, workable, are convenient to simultaneously that the technician tells somebody what one's real intentions are, operating personnel's constructing operation, obtain the consistent favorable comment of owner and supervisor.
The utility model is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present utility model; no matter but do any variation on its shape or structure; every have identical with a application or akin technical scheme, within all dropping on protection domain of the present utility model.

Claims (4)

1. washroom threshold stone waterstop device, comprise base layer structure main body (1), door pocket (2) and decorative ground (3), it is characterized in that: the inside front of described base layer structure main body (1) is provided with the floating layer of civil engineering (4), the floating layer of civil engineering (4) top is provided with inboard setting course (5), is provided with washroom stone material (6) above inboard setting course (5); Base layer structure main body (1) middle part is provided with dabbing layer (7), dabbing layer (7) top is provided with pea gravel concreten waterstop (8), described pea gravel concreten waterstop (8) top is provided with outside setting course (10), is provided with threshold stone (11) above described outside setting course (10).
2. a kind of washroom according to claim 1 threshold stone waterstop device, is characterized in that: be equipped with film waterproof material (9) between described pea gravel concreten waterstop (8) and outside setting course (10) and between the floating layer of civil engineering (4) and inboard setting course (5).
3. a kind of washroom according to claim 1 threshold stone waterstop device is characterized in that: described threshold stone (11) and decorative ground (3) position level.
4. a kind of washroom according to claim 2 threshold stone waterstop device, it is characterized in that: the thickness of described film waterproof material (9) is 1-1.5mm.
CN 201220663403 2012-12-05 2012-12-05 Water stop device with bathroom threshold stones Active CN202990369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220663403 CN202990369U (en) 2012-12-05 2012-12-05 Water stop device with bathroom threshold stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220663403 CN202990369U (en) 2012-12-05 2012-12-05 Water stop device with bathroom threshold stones

Publications (1)

Publication Number Publication Date
CN202990369U true CN202990369U (en) 2013-06-12

Family

ID=48561562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220663403 Active CN202990369U (en) 2012-12-05 2012-12-05 Water stop device with bathroom threshold stones

Country Status (1)

Country Link
CN (1) CN202990369U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790264A (en) * 2014-03-03 2014-05-14 江苏省苏中建设集团股份有限公司 Construction method for seepproof screen of low-temperature hot water radiant heating floor toilet
CN104100171A (en) * 2014-07-11 2014-10-15 谢国敏 Water blocking bar with waterproof membrane edge
CN104818835A (en) * 2015-05-18 2015-08-05 青岛建安建设集团有限公司 Toilet threshold stone waterproof structure and construction method
CN106639000A (en) * 2016-11-25 2017-05-10 绿城装饰工程集团有限公司 Dry-wet-area separation water proof structure and construction method
CN107675811A (en) * 2017-09-25 2018-02-09 青岛恒科瑞新信息科技有限公司 Bathroom waterproof system and construction method
CN107905497A (en) * 2017-11-21 2018-04-13 上海聚通装饰集团有限公司 A kind of threshold closes up with floor and its manufacture craft
CN108086489A (en) * 2016-11-22 2018-05-29 得意昭和防水工程行 Water sealing structure with height adjustable sealing pier and its apply method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790264A (en) * 2014-03-03 2014-05-14 江苏省苏中建设集团股份有限公司 Construction method for seepproof screen of low-temperature hot water radiant heating floor toilet
CN103790264B (en) * 2014-03-03 2015-09-09 江苏省苏中建设集团股份有限公司 Low temperature hot water radiation heating washroom, ground seepproof screen construction method
CN104100171A (en) * 2014-07-11 2014-10-15 谢国敏 Water blocking bar with waterproof membrane edge
CN104818835A (en) * 2015-05-18 2015-08-05 青岛建安建设集团有限公司 Toilet threshold stone waterproof structure and construction method
CN104818835B (en) * 2015-05-18 2017-04-19 青岛建安建设集团有限公司 Toilet threshold stone waterproof structure and construction method
CN108086489A (en) * 2016-11-22 2018-05-29 得意昭和防水工程行 Water sealing structure with height adjustable sealing pier and its apply method
CN106639000A (en) * 2016-11-25 2017-05-10 绿城装饰工程集团有限公司 Dry-wet-area separation water proof structure and construction method
CN107675811A (en) * 2017-09-25 2018-02-09 青岛恒科瑞新信息科技有限公司 Bathroom waterproof system and construction method
CN107675811B (en) * 2017-09-25 2020-01-07 深圳市坐标建筑装饰工程股份有限公司 Bathroom waterproof system and construction method
CN107905497A (en) * 2017-11-21 2018-04-13 上海聚通装饰集团有限公司 A kind of threshold closes up with floor and its manufacture craft

Similar Documents

Publication Publication Date Title
CN202990369U (en) Water stop device with bathroom threshold stones
CN101565997A (en) Construction method for large-area irregular floor tile
CN101886460B (en) Press polishing method of plastered mesh cloth of inner wall
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
Bechthold et al. Ceramic Material Systems: in architecture and interior design
CN102400525B (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN103821296A (en) Wall plastering technique for aerated concrete block filler wall
CN104098317A (en) Plaster dry blend and use method thereof
CN101457581A (en) Construction method for auto-flowing floor
CN104088416A (en) Gypsum heat preservation painting mortar construction process
CN103291024B (en) A kind of construction method of novel cement-based motar
CN102344278B (en) Permeable crystallization type cement-based waterproof mucilage
CN203452212U (en) Building wall surface heat insulation system and building wall body
CN103046756A (en) Construction method for decorative ganged brick masonry
CN103774696A (en) Construction process of cement-based permeable-crystallization type waterproof material
CN103643754B (en) The waterproof treatment structure of building wall body interface seam crossing and processing method
CN108640612A (en) A kind of polishing concrete decoration terrace
CN205172303U (en) A novel gate manger plate platform node construction for waterproof room
CN106639315A (en) Anti-crack construction method for junction of plaster filler wall and fair-faced concrete wall
CN208518097U (en) Shower cabinet waterproof construction
CN103044072A (en) Oriented reflective ultra-thin vitrified clay-porcelain exterior wall tile/floor tile and manufacturing method thereof
CN208776593U (en) A kind of polishing concrete decoration terrace
CN204040398U (en) A kind of ground self-leveling system
CN107152103A (en) A kind of clear water brick decorative wall
CN103572932A (en) Flexible wall pasting wood veneer

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model