CN108928758A - Lifting conveyer is used in a kind of laying of urban road pipeline - Google Patents
Lifting conveyer is used in a kind of laying of urban road pipeline Download PDFInfo
- Publication number
- CN108928758A CN108928758A CN201810961427.6A CN201810961427A CN108928758A CN 108928758 A CN108928758 A CN 108928758A CN 201810961427 A CN201810961427 A CN 201810961427A CN 108928758 A CN108928758 A CN 108928758A
- Authority
- CN
- China
- Prior art keywords
- lifting conveyer
- pipeline
- urban road
- sliding
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C25/00—Cranes not provided for in groups B66C17/00 - B66C23/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
- B66C1/425—Gripping members engaging only the external or internal surfaces of the articles motor actuated
- B66C1/427—Gripping members engaging only the external or internal surfaces of the articles motor actuated by hydraulic or pneumatic motors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/06—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of urban road pipeline laying lifting conveyers, including lifting conveyer main body, first hydraulic cylinder, support frame, ladder and pipeline, battery is provided with above the lifting conveyer main body, and battery is mounted on the right side of the servo motor of the left side above hoisting board and is provided with screw rod, and screw rod is mutually engaged with the screw thread mouth on link block, the first hydraulic cylinder is mounted on the lower end surface of sliding panel, the inside of the support plate is connected by second hydraulic cylinder with clamping device, the ladder is between hoisting board and pedestal, and the intermediate position of pedestal is provided with placing groove, and bar is provided at left and right sides of placing groove, the pipeline is located at the inside of bar.The urban road pipeline, which is laid with, uses lifting conveyer, and during urban road pipeline paving, avoidable pipeline shakes, and is conducive to the connection at pipeline opening, and can once transport multiple pipelines, improves the installation effectiveness of pipeline.
Description
Technical field
The present invention relates to pipe laying unit technical field, specially a kind of urban road pipeline is laid with lifting transport dress
It sets.
Background technique
The laying of urban road pipeline connects into long-distance pipe, underground usually using attachment devices such as welding or flanges
Pipeline is all the important component part in city, to solve the labor intensity that worker is laid with pipeline, occurs pipeline laying on the market
Device, such as Publication No. CN207316229U, publication date be 20180504 a kind of Pipelayer, the pipeline be laid with
Machine, cannot during pipeline is laid with although solving the intensity that worker is laid with pipeline during being laid with pipeline
Multiple pipelines are transported simultaneously, and during clamping pipe, the abrasion to pipe surface easily occurs, is unfavorable for the guarantor to pipeline
Shield.
Summary of the invention
The purpose of the present invention is to provide a kind of urban road pipeline laying lifting conveyers, to solve above-mentioned background
The road pipeline currently on the market that technology proposes is laid with cannot be simultaneously during being laid with pipeline with lifting conveyer
Multiple pipelines are transported, and during clamping pipe, the abrasion to pipe surface easily occurs, is unfavorable for asking pipe protection
Topic.
To achieve the above object, the invention provides the following technical scheme: a kind of urban road pipeline is laid with lifting transport
Device, including lifting conveyer main body, first hydraulic cylinder, support frame, ladder and pipeline, the lifting conveyer main body
Top is provided with battery, and battery is mounted on the left side above hoisting board, and battery and watching inside guard shield
Electrical connection of motor is taken, screw rod is provided on the right side of the servo motor, and screw rod is mutually engaged with the screw thread mouth on link block, and
And the right end of screw rod is provided with scotch, the lower end of the link block is welded to connect by the upper surface of sliding mouth and sliding panel,
And the two sides of link block pass through support wheel with slide the mouth lower section that is connected, and slides board ends and pass through movable pulley and rise
Sliding rail inside platform sling upper sliding slot is connected, and the first hydraulic cylinder is mounted on the lower end surface of sliding panel, and first hydraulic cylinder
Lower section be connected with support plate, the inside of the support plate is connected by second hydraulic cylinder with clamping device, the support
The upper end of frame and the lower end surface of hoisting board are welded to connect, and the lower end of support frame is welded on the upper surface of pedestal, and on pedestal
The front side of side is provided with control cabinet, and the ladder is between hoisting board and pedestal, and the intermediate position of pedestal is provided with placement
Slot, and bar is provided at left and right sides of placing groove, the pipeline is located at the inside of bar.
Preferably, the link block is through sliding mouth, and right angle setting each other between link block and sliding panel.
Preferably, the hoisting board includes sliding groove and sliding rail, and there are two sliding groove and sliding rail be respectively provided with, and sliding groove
It is axisymmetricly installed about the center line of hoisting board with sliding rail.
Preferably, the placing groove is located at the upper surface of pedestal, and the length of placing groove is less than the length of pedestal.
Preferably, the shape and structure of the support plate be inverted " recessed " type structure, and the top of support plate and hoisting board it
Between parallel installation each other.
Preferably, the clamping device includes mounting groove and rotating roller, and mounting groove is located at the lower section on the inside of clamping device,
And rotating roller is located at the inside of mounting groove.
Preferably, the bar equidistant arrangement is in the two sides of placing groove, and between adjacent 2 bars in placing groove the same side
Distance is greater than the width of clamping device.
Preferably, the center line of the screw thread mouth and the center line of screw rod coincide, and screw rod is located at hoisting board interposition
The top set.
Preferably, the sliding mouth is through hoisting board, and the left end for sliding mouth is located at the right side of servo motor.
Preferably, the length of the sliding panel is greater than the width of sliding mouth, and the thickness in the middle part of sliding panel is greater than its two sides
Thickness.
Compared with prior art, the beneficial effects of the present invention are: the urban road pipeline, which is laid with, uses lifting conveyer,
During urban road pipeline paving, avoidable pipeline shakes, and is conducive to the connection at pipeline opening, and can once transport multiple
Pipeline improves the installation effectiveness of pipeline,
1, sliding mouth is offered in the middle position of hoisting board, playing makes link block drive sliding panel to be controlled by sliding mouth
Mobile effect, and then the support plate controlled below first hydraulic cylinder is moved left and right, and is conducive to control clamping inside support plate
The pipeline that device clamps is moved left and right, the convenient installation to pipeline, and during Pipe installing, can avoid pipeline hair
It is raw to shake, be conducive to the installation of pipeline opening junction, and battery is placed on to the left end of hoisting board, for lifting conveyer
While main body provides electric energy, and it can play the role of serving as clump weight;
2, it is provided with rotating roller in the mounting groove on the inside of clamping device, plays during gripping means grips pipeline, makes
Pipeline enters the inside of clamping device by rotating roller, reduces the friction between clamping device and pipeline, is conducive to pipeline
Protection;
3, it is provided with bar above pedestal, plays the role of being supported bar to placed longitudinally pipeline two sides, favorably
In the transport to multiple pipelines simultaneously of lifting conveyer main body, deceleration lifting conveyer main body to the transport number of pipeline,
The time generated by transport pipeline is advantageously reduced, the efficiency of Pipe installing is improved.
Detailed description of the invention
Fig. 1 is that a kind of lifting conveyer main structure of urban road pipeline laying lifting conveyer of the present invention is shown
It is intended to;
Fig. 2 is that a kind of lifting conveyer main body of urban road pipeline laying lifting conveyer of the present invention is right to be shown depending on structure
It is intended to;
Fig. 3 is that a kind of urban road pipeline of the present invention is laid with the hoisting board partial enlargement structural representation for using lifting conveyer;
Fig. 4 is that a kind of urban road pipeline of the present invention is laid with A point enlarged structure schematic diagram in Fig. 2 with lifting conveyer;
Fig. 5 is that a kind of urban road pipeline of the present invention is laid with B point enlarged structure schematic diagram in the soil 3 with lifting conveyer;
Fig. 6 is that a kind of urban road pipeline of the present invention is laid with the clamping device inside structure schematic diagram for using lifting conveyer;
Fig. 7 is that a kind of urban road pipeline of the present invention is laid with the portion a-a schematic cross-sectional view in Fig. 6 with lifting conveyer.
In figure: 1, lifting conveyer main body;2, battery;3, guard shield;4, servo motor;5, screw rod;6, it connects
Block;7, scotch;8, hoisting board;801, sliding groove;802, sliding rail;9, placing groove;10, first hydraulic cylinder;11, support plate;12,
Second hydraulic cylinder;13, clamping device;1301, mounting groove;1302, rotating roller;14, support frame;15, control cabinet;16, ladder;
17, bar;18, pipeline;19, pedestal;20, screw thread mouth;21, mouth is slided;22, sliding panel;23, movable pulley;24, support wheel.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-7 is please referred to, the present invention provides a kind of technical solution: a kind of urban road pipeline laying lifting transport dress
Set, including lifting conveyer main body 1, battery 2, guard shield 3, servo motor 4, screw rod 5, link block 6, scotch 7, rise
Platform sling 8, sliding groove 801, sliding rail 802, placing groove 9, first hydraulic cylinder 10, support plate 11, second hydraulic cylinder 12, clamping device
13, mounting groove 1301, rotating roller 1302, support frame 14, control cabinet 15, ladder 16, bar 17, pipeline 18, pedestal 19, screw thread mouth
20, mouth 21, sliding panel 22, movable pulley 23 and support wheel 24, the top of lifting conveyer main body 1 are slided and are provided with battery 2,
And battery 2 is mounted on the left side of 8 top of hoisting board, and battery 2 electrically connects with the servo motor 4 inside guard shield 3
It connecing, the right side of servo motor 4 is provided with screw rod 5, and screw rod 5 is engaged with 20 phase of screw thread mouth on link block 6, and screw rod 5
Right end is provided with scotch 7, and the lower end of link block 6 is welded to connect by the upper surface of sliding mouth 21 and sliding panel 22, and is connected
The two sides of block 6 pass through support wheel 24 and are connected with sliding mouth 21, and the lower section at 22 both ends of sliding panel passes through movable pulley 23
It is connected with the sliding rail 802 inside 8 upper sliding slot 801 of hoisting board, first hydraulic cylinder 10 is mounted on the lower end surface of sliding panel 22, and
The lower section of first hydraulic cylinder 10 is connected with support plate 11, and the inside of support plate 11 passes through second hydraulic cylinder 12 and clamping device 13
It is connected, the upper end of support frame 14 and the lower end surface of hoisting board 8 are welded to connect, and the lower end of support frame 14 is welded on pedestal 19
Upper surface, and the front side of 19 top of pedestal is provided with control cabinet 15, and ladder 16 is between hoisting board 8 and pedestal 19, and bottom
The intermediate position of seat 19 is provided with placing groove 9, and the left and right sides of placing groove 9 is provided with bar 17, and pipeline 18 is located at gear
The inside of bar 17.
The link block 6 of this example is through mouth 21, and right angle setting each other between link block 6 and sliding panel 22 is slided, in this way
It is provided with and drives sliding panel 22 to be moved left and right conducive to link block 6.
Hoisting board 8 includes sliding groove 801 and sliding rail 802, and there are two sliding groove 801 and sliding rail 802 be respectively provided with, and is slided
Slot 801 and sliding rail 802 are axisymmetricly installed about the center line of hoisting board 8, are provided with pass through sliding conducive to hoisting board 8 in this way
Slot 801 and sliding rail 802 are coupled with 8 both ends movable pulley 23 of hoisting board.
Placing groove 9 is located at the upper surface of pedestal 19, and the length of placing groove 9 is less than the length of pedestal 19, is provided in this way
Placement conducive to pipeline by placing groove 9 in 19 upper surface of pedestal.
The shape and structure of support plate 11 is inversion " recessed " type structure, and between the top of support plate 11 and hoisting board 8 each other
Parallel installation, is provided with the support conducive to support plate 11 to clamping device 13, and facilitate clamping device 13 to the folder of pipeline in this way
Tightly.
Clamping device 13 includes mounting groove 1301 and rotating roller 1302, and mounting groove 1301 is located at 13 inside of clamping device
Lower section, and rotating roller 1302 is located at the inside of mounting groove 1301, and setting can be in the process of 13 clamping pipe of clamping device in this way
In, so that pipeline is entered the inside of clamping device 13 by rotating roller 1302, advantageously reduces between clamping device 13 and pipeline
Friction.
17 equidistant arrangement of bar is in the two sides of placing groove 9, and the distance between adjacent 2 bars 17 in 9 the same side of placing groove
It greater than the width of clamping device 13, is provided in this way placed longitudinally between 2 bars 17 conducive to multiple pipelines, facilitates handling
It is transported while defeated apparatus main body 1 is to multiple pipelines, and facilitates transport of the clamping device 13 to pipeline.
The center line of screw thread mouth 20 and the center line of screw rod 5 coincide, and screw rod 5 is located at the upper of 8 middle position of hoisting board
Side is provided with drives link block 6 to be moved conducive to screw rod 5 in this way.
Mouth 21 is slided through hoisting board 8, and the left end for sliding mouth 21 is located at the right side of servo motor 4, is provided in this way
Conducive to movement of the link block 6 on sliding mouth 21.
The length of sliding panel 22 is greater than the width of sliding mouth 21, and the thickness at 22 middle part of sliding panel is greater than the thickness of its two sides
Degree is provided with is moved on the sliding rail 802 in sliding groove 801 conducive to sliding panel 22 by movable pulley 23 in this way.
The working principle of the present embodiment: when using the urban road pipeline laying lifting conveyer, firstly, it is necessary to
It is noted that the control of the wheel of 19 lower end of servo motor 4 and pedestal and the control of first hydraulic cylinder 10 and second hydraulic cylinder 12
It is controlled by control cabinet 15, the control and first hydraulic cylinder 10 to the wheel of 19 lower end of servo motor 4 and pedestal
It is control mode common in the art with the control mode of second hydraulic cylinder 12, control principle also non-those skilled in the art
Common knowledge, details are not described herein, as shown in Figs. 1-2, user open control cabinet 15 on switch, start 19 lower end of pedestal
Wheel, so that lifting conveyer main body 1 is moved to specified region by the wheel of 19 lower end of pedestal, and make support plate 11
In the surface of pipeline, then, the telescopic rod in first hydraulic cylinder 10 is controlled by control cabinet 15 and drives support plate 11 to moving down
It is dynamic, 12 band of second hydraulic cylinder on the inside of support plate 11 is controlled after support plate 11 drops to certain altitude, then through control cabinet 15
Dynamic clamping device 13 is mobile, and then is clamped 2 clamping devices 13 of 11 inside of support plate to pipeline, then, passes through control
Case 15 processed controls the telescopic rod in first hydraulic cylinder 10 and support plate 11 is driven to move up, 13 inside mounting groove 1301 of clamping device
Interior rotating roller 1302 can make pipeline enter clamping by rotating roller 1302 during 13 clamping pipe of clamping device
The inside of device 13.
As shown in Figs. 1-5, after plate 11 to be supported rises to certain altitude, servo motor 4 is controlled by control cabinet 15 and is rotated,
Servo motor 4 drives screw rod 5 to rotate by speed reducer, and the screw thread mouth 20 on link block 6 drives and slides under the occlusion of screw rod 5
The movable pulley 23 at 22 both ends of movable plate is moved by the sliding rail 802 in sliding groove 801 to 4 side of servo motor, plate to be supported
After 11 are moved to the surface of placing groove 9, the telescopic rod in first hydraulic cylinder 10 is controlled by control cabinet 15 and drives support plate 11
It moves down, it is hydraulic after support plate 11 drops to certain altitude, then through second on the inside of the control of control cabinet 15 support plate 11
Cylinder 12 drives clamping device 13 to shrink, and then opens 2 clamping devices 13 of 11 inside of support plate, and pipeline can be put into 2
On the placing groove 9 of a 17 inside of bar, then, aforesaid operations are repeated, remaining pipeline is sequentially placed into 17 inside of bar
On pipeline, after placing to pipeline, starts the wheel of 19 lower end of pedestal, pass through lifting conveyer main body 1 under pedestal 19
The wheel at end is moved to the region of Pipe installing.
Operator controls the telescopic rod in first hydraulic cylinder 10 by control cabinet 15 and support plate 11 is driven to move down, and works as branch
After fagging 11 drops to certain altitude, then is driven by the second hydraulic cylinder 12 that control cabinet 15 controls 11 inside of support plate and clamp dress
It is mobile to set 13, and then is clamped 2 clamping devices 13 of 11 inside of support plate to the pipeline of 17 inside of bar, then, leads to
Crossing the telescopic rod that control cabinet 15 controls in first hydraulic cylinder 10 drives support plate 11 to move up, and is watched by the control of control cabinet 15
The rotation of motor 4 is taken, servo motor 4 drives the rotation of screw rod 5 by speed reducer, and the screw thread mouth 20 on link block 6 is stung with screw rod 5
Under conjunction, drive the movable pulley 23 at 22 both ends of sliding panel by the sliding rail 802 in sliding groove 801 to far from 4 side of servo motor into
Row movement after plate 11 to be supported is moved to the surface in pipe laying region, is controlled in first hydraulic cylinder 10 by control cabinet 15
Telescopic rod drive support plate 11 move down, after support plate 11 drops to the specified altitude assignment of Pipe installing, stop the first liquid
Then the decline of cylinder pressure 10 setter and can install pipeline, to Pipe installing after, then controlled by control cabinet 15
The second hydraulic cylinder 12 of 11 inside of support plate drives clamping device 13 to shrink, and then makes 2 clamping devices of 11 inside of support plate
13 open, and clamping device 13 can be made to separate with pipeline, and control the telescopic rod band in first hydraulic cylinder 10 by control cabinet 15
Dynamic support plate 11 moves up, and then, repeats aforesaid operations, installs to the pipeline to 17 inside of bar, to complete one
Series of tasks.
The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field, needs
Understand, term " center ", " longitudinal direction ", " transverse direction ", "front", "rear", "left", "right", "vertical", "horizontal", "top",
The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, be only for convenient for
The description that simplifies of the invention is described, rather than indicates or implies signified device or element and must have a particular orientation, be spy
Fixed orientation construction and operation, thus should not be understood as the limitation to present invention protection content.
The standardized element that the present invention uses can commercially, and shaped piece is according to specification and attached drawing note
Load can carry out customized, and the specific connection type of each part is all made of in the prior art mature bolt, rivet, welding etc.
Conventional means, mechanical, part and equipment are all made of model conventional in the prior art, in addition circuit connection is using in the prior art
Conventional connection type, this will not be detailed here.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art,
It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc.
With replacement, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection scope of invention.
Claims (10)
1. a kind of urban road pipeline, which is laid with, uses lifting conveyer, including lifting conveyer main body (1), first hydraulic cylinder
(10), support frame (14), ladder (16) and pipeline (18), it is characterised in that: set above the lifting conveyer main body (1)
It is equipped with battery (2), and battery (2) is mounted on the left side above hoisting board (8), and battery (2) and guard shield (3)
Internal servo motor (4) is electrically connected, and is provided with screw rod (5) on the right side of the servo motor (4), and screw rod (5) with connect
Screw thread mouth (20) on block (6) is mutually engaged, and the right end of screw rod (5) is provided with scotch (7), under the link block (6)
End is welded to connect by the upper surface of sliding mouth (21) and sliding panel (22), and the two sides of link block (6) pass through support wheel
(24) it is connected with sliding mouth (21), and the lower section at sliding panel (22) both ends passes through on movable pulley (23) and hoisting board (8)
The internal sliding rail (802) of sliding groove (801) is connected, and the first hydraulic cylinder (10) is mounted on the lower end surface of sliding panel (22),
And the lower section of first hydraulic cylinder (10) is connected with support plate (11), passes through second hydraulic cylinder on the inside of the support plate (11)
(12) it is connected with clamping device (13), the upper end of support frame as described above (14) and the lower end surface of hoisting board (8) are welded to connect, and are propped up
The lower end of support (14) is welded on the upper surface of pedestal (19), and the front side above pedestal (19) is provided with control cabinet (15),
The ladder (16) is located between hoisting board (8) and pedestal (19), and the intermediate position of pedestal (19) is provided with placing groove (9),
And bar (17) are provided at left and right sides of placing groove (9), the pipeline (18) is located at the inside of bar (17).
2. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: the company
Block (6) is connect through sliding mouth (21), and right angle setting each other between link block (6) and sliding panel (22).
3. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: described
Platform sling (8) includes sliding groove (801) and sliding rail (802), and there are two sliding groove (801) and sliding rail (802) be respectively provided with, and is slided
The center line of slot (801) and sliding rail (802) about hoisting board (8) is axisymmetricly installed.
4. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: described to put
The upper surface that slot (9) is located at pedestal (19) is set, and the length of placing groove (9) is less than the length of pedestal (19).
5. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: the branch
The shape and structure of fagging (11) is inversion " recessed " type structure, and parallel each other between the top of support plate (11) and hoisting board (8)
Installation.
6. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: the folder
Tight device (13) includes mounting groove (1301) and rotating roller (1302), and mounting groove (1301) is located on the inside of clamping device (13)
Lower section, and rotating roller (1302) is located at the inside of mounting groove (1301).
7. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: the gear
Bar (17) equidistant arrangement is in the two sides of placing groove (9), and the distance between adjacent 2 bars (17) in placing groove (9) the same side are big
Width in clamping device (13).
8. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: the spiral shell
The center line of line mouth (20) and the center line of screw rod (5) coincide, and screw rod (5) is located at the top in hoisting board (8) middle position.
9. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: the cunning
(21) are opened one's mouth through hoisting board (8), and the left end for sliding mouth (21) is located at the right side of servo motor (4).
10. a kind of urban road pipeline according to claim 1, which is laid with, uses lifting conveyer, it is characterised in that: described
The length of sliding panel (22) is greater than the width of sliding mouth (21), and the thickness in the middle part of sliding panel (22) is greater than the thickness of its two sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810961427.6A CN108928758A (en) | 2018-08-22 | 2018-08-22 | Lifting conveyer is used in a kind of laying of urban road pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810961427.6A CN108928758A (en) | 2018-08-22 | 2018-08-22 | Lifting conveyer is used in a kind of laying of urban road pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108928758A true CN108928758A (en) | 2018-12-04 |
Family
ID=64445670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810961427.6A Withdrawn CN108928758A (en) | 2018-08-22 | 2018-08-22 | Lifting conveyer is used in a kind of laying of urban road pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108928758A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110937518A (en) * | 2019-12-09 | 2020-03-31 | 王长波 | Pipeline embedding device for hydraulic engineering |
CN111139916A (en) * | 2020-01-18 | 2020-05-12 | 广州坚磊建设有限公司 | Direct-buried section reinforced concrete drainage pipeline installation construction process |
CN111409771A (en) * | 2020-04-30 | 2020-07-14 | 天津市管道工程集团有限公司 | Transmission transfer equipment for overwater pipeline laying |
CN112174008A (en) * | 2020-09-27 | 2021-01-05 | 湖南楚怀建材有限公司 | Hoisting machine for manufacturing large-caliber reinforced concrete drain pipe |
CN112282021A (en) * | 2020-11-13 | 2021-01-29 | 宋炜 | Based on municipal works road laying structure |
CN112660988A (en) * | 2020-12-28 | 2021-04-16 | 中建八局第三建设有限公司 | A conveyer that is used for heavy steel pipe of heavy bore in piping lane |
CN113071991A (en) * | 2021-03-24 | 2021-07-06 | 广东新江永安建设工程有限公司 | Construction method of municipal water supply pipeline |
CN116902876A (en) * | 2023-09-13 | 2023-10-20 | 中感(安徽)矿山技术有限公司 | Multifunctional vertical lifting installation device |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2603756Y (en) * | 2002-10-29 | 2004-02-18 | 陈炯 | Crane for pipe |
JP2006131371A (en) * | 2004-11-08 | 2006-05-25 | Toshiba Corp | Pipe suspending tool and suspending method |
US8029036B2 (en) * | 2006-02-13 | 2011-10-04 | Kal-Sal Works Ltd. | Apparatus for lifting pipelines |
CN202847517U (en) * | 2012-10-26 | 2013-04-03 | 河南送变电工程公司 | Side unloading device for steel tube tower material transportation vehicle |
CN203410345U (en) * | 2013-08-13 | 2014-01-29 | 沈阳飞研航空设备有限公司 | Crawler belt pipe conveying self-unloader |
KR20140004732U (en) * | 2013-02-13 | 2014-08-21 | 주식회사 현대미포조선 | Cart for ornamenting ship |
CN104553949A (en) * | 2015-01-26 | 2015-04-29 | 湖南江麓特种装备有限公司 | Dumping unit of pipeline transporter |
CN106740377A (en) * | 2017-01-01 | 2017-05-31 | 赣州科源甬致科技有限公司 | A kind of pile for prestressed pipe transport vehicle with Multi Loading and Unloading Functions |
CN206437794U (en) * | 2017-01-17 | 2017-08-25 | 湖南城市学院 | A kind of shaped steel carrying implement for building |
CN206553086U (en) * | 2017-01-06 | 2017-10-13 | 云南汉工钢结构工程有限公司 | A kind of new structure of heavy crane beam |
CN108045291A (en) * | 2017-11-24 | 2018-05-18 | 安徽睿知信信息科技有限公司 | A kind of small size formula tubing carrying implement |
-
2018
- 2018-08-22 CN CN201810961427.6A patent/CN108928758A/en not_active Withdrawn
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2603756Y (en) * | 2002-10-29 | 2004-02-18 | 陈炯 | Crane for pipe |
JP2006131371A (en) * | 2004-11-08 | 2006-05-25 | Toshiba Corp | Pipe suspending tool and suspending method |
US8029036B2 (en) * | 2006-02-13 | 2011-10-04 | Kal-Sal Works Ltd. | Apparatus for lifting pipelines |
CN202847517U (en) * | 2012-10-26 | 2013-04-03 | 河南送变电工程公司 | Side unloading device for steel tube tower material transportation vehicle |
KR20140004732U (en) * | 2013-02-13 | 2014-08-21 | 주식회사 현대미포조선 | Cart for ornamenting ship |
CN203410345U (en) * | 2013-08-13 | 2014-01-29 | 沈阳飞研航空设备有限公司 | Crawler belt pipe conveying self-unloader |
CN104553949A (en) * | 2015-01-26 | 2015-04-29 | 湖南江麓特种装备有限公司 | Dumping unit of pipeline transporter |
CN106740377A (en) * | 2017-01-01 | 2017-05-31 | 赣州科源甬致科技有限公司 | A kind of pile for prestressed pipe transport vehicle with Multi Loading and Unloading Functions |
CN206553086U (en) * | 2017-01-06 | 2017-10-13 | 云南汉工钢结构工程有限公司 | A kind of new structure of heavy crane beam |
CN206437794U (en) * | 2017-01-17 | 2017-08-25 | 湖南城市学院 | A kind of shaped steel carrying implement for building |
CN108045291A (en) * | 2017-11-24 | 2018-05-18 | 安徽睿知信信息科技有限公司 | A kind of small size formula tubing carrying implement |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110937518A (en) * | 2019-12-09 | 2020-03-31 | 王长波 | Pipeline embedding device for hydraulic engineering |
CN111139916A (en) * | 2020-01-18 | 2020-05-12 | 广州坚磊建设有限公司 | Direct-buried section reinforced concrete drainage pipeline installation construction process |
CN111409771A (en) * | 2020-04-30 | 2020-07-14 | 天津市管道工程集团有限公司 | Transmission transfer equipment for overwater pipeline laying |
CN112174008A (en) * | 2020-09-27 | 2021-01-05 | 湖南楚怀建材有限公司 | Hoisting machine for manufacturing large-caliber reinforced concrete drain pipe |
CN112282021A (en) * | 2020-11-13 | 2021-01-29 | 宋炜 | Based on municipal works road laying structure |
CN112660988A (en) * | 2020-12-28 | 2021-04-16 | 中建八局第三建设有限公司 | A conveyer that is used for heavy steel pipe of heavy bore in piping lane |
CN112660988B (en) * | 2020-12-28 | 2022-04-08 | 中建八局第三建设有限公司 | A conveyer that is used for heavy steel pipe of heavy bore in piping lane |
CN113071991A (en) * | 2021-03-24 | 2021-07-06 | 广东新江永安建设工程有限公司 | Construction method of municipal water supply pipeline |
CN116902876A (en) * | 2023-09-13 | 2023-10-20 | 中感(安徽)矿山技术有限公司 | Multifunctional vertical lifting installation device |
CN116902876B (en) * | 2023-09-13 | 2023-12-08 | 中感(安徽)矿山技术有限公司 | Multifunctional vertical lifting installation device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108928758A (en) | Lifting conveyer is used in a kind of laying of urban road pipeline | |
CN106760902A (en) | A kind of power distribution network power transmission line Special electric line bar automatic mounting machine | |
CN209306850U (en) | A kind of mobile boom hoisting of cable channel cover plate installation | |
CN209272263U (en) | Steel processing device | |
CN112025733B (en) | Underwater inspection robot suitable for power pipe gallery | |
CN105331373A (en) | Split type rotating lifting gear for repairing of oven door of coke oven and use method of split type rotating lifting gear | |
CN110711976A (en) | Welding device for casting production | |
CN106672606A (en) | Stacked feeding-discharging equipment | |
CN209352169U (en) | Material transferring device and the material transmission line body equipment with it between a kind of wire body | |
CN208576775U (en) | A kind of reinforcing bar fast bunding device | |
CN203978875U (en) | A kind of maritime platform is built ventilation equipment | |
CN109175586A (en) | A kind of pipeline welding equipment | |
CN209009805U (en) | A kind of automatic auxiliary paper device of quartz production | |
CN209903112U (en) | Dismounting device is used in speed reducer maintenance | |
CN211768793U (en) | Pipe feeding machine | |
CN207588318U (en) | A kind of supporting rack switching mechanism for the installation of middle-placed switch cabinet plank | |
CN210125700U (en) | Bar cutting device is used in pole production | |
CN207588319U (en) | A kind of draw frame machine of middle-placed switch cabinet plank | |
CN211110658U (en) | Lifting machine for pre-buried steel plates of construction roads | |
CN209188047U (en) | Shot pick device | |
CN207930234U (en) | A kind of electronic distribution ring main unit clamping processing tool | |
CN207588317U (en) | A kind of middle-placed switch cabinet installation system | |
CN209303865U (en) | A kind of pipeline welding equipment | |
CN207242929U (en) | A kind of horizontal mobile lighter processes filling apparatus | |
CN217350474U (en) | Steel construction section bar hoist device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181204 |
|
WW01 | Invention patent application withdrawn after publication |