A kind of pile for prestressed pipe transport vehicle with Multi Loading and Unloading Functions
Technical field
The invention belongs to pile for prestressed pipe technical field of transportation, more particularly to a kind of pile for prestressed pipe with Multi Loading and Unloading Functions
Transport vehicle.
Background technology
Prestressed concrete pipe pile can be divided into post-tensioned prestressing stake and pretensioned-prestressed tube pile.Pretensioned prestressing
Pile tube is a kind of hollow cylinder elongate concrete prefabricated components being made of pretensioned prestressing technique and centrifugal casting, main
To be made up of cylindrical shape pile body, end plate and steel hoop etc..
Current pile for prestressed pipe is generally required pile tube is sling using crane, and be placed on the sweep of transport vehicle in transport
On, can increase the cost that pile tube is loaded and unloaded using crane, and crane cannot arrive in the very nick of time and load and unload on-the-spot meeting waste more time,
Connecing the cost for improving handling, therefore need research and development one kind badly can load and unload pile tube, reduce pile tube lay day and cost, improve handling
The pile for prestressed pipe transport vehicle with Multi Loading and Unloading Functions of efficiency.
The content of the invention
(1)The technical problem to be solved
The present invention can increase the cost that pile tube is loaded and unloaded, and hang to overcome current pile for prestressed pipe in transport using crane
Car cannot be arrived in the very nick of time and load and unload on-the-spot meeting waste more time, and the shortcoming of the cost of handling is improved indirectly, the invention solves the problems that
Technical problem be to provide one kind can load and unload pile tube, reduce pile tube lay day and cost, improve the efficiency of loading and unloading with handling
The pile for prestressed pipe transport vehicle of function.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides the pile for prestressed pipe transport vehicle that such a has Multi Loading and Unloading Functions,
Include car body, sweep, N shapes frame, guide rail, ball, drive mechanism, moving beam, tooth bar, inverted T shaped plate, wire guide, crane
Structure and clamping device, rear vehicle are provided with sweep, and the mode that sweep top is bolted is provided with multiple N shapes framves, N shape framves
The mode being bolted in the middle of inside top is connected with two guide rails, is symmetrical arranged before and after two guide rails, and two guide rails
Between leave gap, the inside top of guide rail and bottom are provided with ball, driving machine are provided between two right hand tops of guide rail
Structure, is provided with moving beam between two guide rail inner sides, moving beam and two slides coordinate, and moving beam top passes through spiral shell
Tether the mode for connecing and be connected with tooth bar, the bottom of moving beam is connected with inverted T shaped plate, inverted T shaped plate by way of being welded to connect
The left and right sides be provided with wire guide, jack machinism is installed on inverted T shaped plate, jack machinism include hoist engine, fixed pulley and
Steel wire rope, the mode that hoist engine is bolted is arranged on the crown center of inverted T shaped plate, and the left and right sides of hoist engine is equipped with
Fixed pulley, the mode that fixed pulley is bolted be arranged on inverted T shaped plate on, fixed pulley and positioned at wire guide top, elevator
Two steel wire ropes are wound with machine, wherein one bypasses left side fixed pulley and through the wire guide in left side, another bypasses right side
Fixed pulley and through the wire guide on right side, the tail end of two steel wire ropes is respectively connected with clamping device.
Preferably, drive mechanism includes casing, bearing, dividing plate, first rotating shaft, big sprocket wheel, gear, motor, small
Sprocket wheel and chain, the mode that casing is bolted are connected with front side rail and rear side rail respectively, and bottom half is opening,
Bearing is fitted with front side rail and rear side rail in casing, first rotating shaft, first turn are installed between two bearings
Axle middle part is provided with gear, and gear is located between two bearings, wheel and rack engagement, and the front end of first rotating shaft is provided with big chain
Middle part is welded with dividing plate in wheel, casing, and dividing plate middle part is provided with first through hole, and the mode that dividing plate top is bolted is provided with
Motor, minor sprocket is connected with the output shaft of motor by shaft coupling, is wound with chain on minor sprocket, chain it is another
End is through first through hole and is wound in big sprocket wheel.
Preferably, clamping device includes threaded rod, the second rotating shaft, curved splint, fairlead, connecting rod, tension spring
With the first nut, the top of threaded rod is connected with steel wire rope, and threaded rod bottom level is welded with the second rotating shaft, in the second rotating shaft
Two pieces of curved splints are provided with, two pieces of curved splints are symmetrical arranged, and threaded rod is provided with the fairlead that can be slid on, fairlead
The mode being connected through the hinge and the top of curved splint between is connected with connecting rod, and the threaded rod outside below fairlead is cased with
Tension spring, the threaded rod outside above fairlead is provided with the first nut being engaged with threaded rod.
Preferably, riser, movable mechanism and swing rope mechanism are also included, sweep left end top passes through what is be welded to connect
Mode is connected with riser, and the upper level of riser is provided with movable mechanism, and movable mechanism includes housing, the first electricity
Machine, rear bearing block, screw mandrel, the second nut, guide rod and guide pad, the mode that housing is bolted are connected on riser, shell
Body right side is set for open, and the mode that leading flank is bolted in housing is provided with the first motor, the trailing flank in housing
The mode being bolted is provided with rear bearing block, and screw mandrel, screw mandrel are connected with by shaft coupling on the output shaft of the first motor
Rear end interference connect by way of be connected in the bearing of rear bearing block, guide rod, guide rod are provided with the housing on the right side of screw mandrel
Rear and front end be respectively welded at front and rear both sides in housing, screw mandrel is provided with the second nut, and guide rod is provided with guide pad, is oriented to
Block is connected with the second nut, is provided with swing rope mechanism on the right side of guide pad, swing rope mechanism include U-shaped fixed plate, the 3rd rotating shaft,
Roller bearing and clapboard, the left end of U-shaped fixed plate are welded on the right side of guide pad, and the front and rear both sides on the inside of U-shaped fixed plate are pacified
Equipped with the 3rd rotating shaft, the 3rd rotating shaft outside is provided with roller bearing by way of interference is connected, and the right-hand member of U-shaped fixed plate is welded with two
Block clapboard, it is symmetrical before and after two pieces of clapboards.
Preferably, also include insurance institution, clamping device is provided with insurance institution, insurance institution include retainer ring,
Link, safety rope and hook, retainer ring are welded on the top of one of curved splint, and link is welded on another piece of curved splint
Top, safety rope is connected with retainer ring, the tail end of safety rope is connected with the hook that can be hung on link.
Preferably, support meanss are also included, support meanss, support meanss bag is symmetrically arranged on two with before and after sweep right part
Guide block, sliding sleeve, support bar, trapezoidal fixing tooth, support block, check lock lever, handle, back-moving spring and fix bar, guide block welding are included
On sweep, left side vertical is provided with the first guide hole in guide block, and support bar is provided with the first guide hole, is welded on the sweep below guide block
There is sliding sleeve, sliding sleeve is slidably matched with support bar, the right flank of support bar is provided with multiple trapezoidal fixing tooths, and trapezoidal fixing tooth is along support
The axial direction of bar is uniformly distributed, and the bottom of support bar is welded with support block, and the right part level of guide block is provided with the second guide hole, the second guide hole
Connected with the first guide hole, check lock lever is provided with the second guide hole, check lock lever right-hand member is welded with handle, handle left surface and guide block right side
Back-moving spring is connected between face, back-moving spring is simultaneously enclosed within check lock lever outside.
Preferably, fix bar is also included, two fix bars, two fixations is connected between every two adjacent N shape framves
Bar intersects setting, and two crossover locations of fix bar are by rivet, the mode that fix bar two ends are bolted
It is connected with N shape framves.
Preferably, electronic reel, drawstring and travel switch are also included, electronic reel is provided with two, and two altogether
Electronic reel is separately mounted to the top of both sides before and after the N shape framves of the rightmost side, and drawstring, the tail end of drawstring are wound with electronic reel
The top of support bar is connected to, travel switch is provided with below electronic reel, the mode that travel switch is connected by screw is pacified
On N shape framves, there is connection between travel switch and electronic reel.
Preferably, N shapes frame is that H profile steel and channel-section steel are welded, and N shape framves are vertically channel-section steel, and the transverse direction of N shape framves is H types
Steel, the thickness of channel-section steel is at least 10mm, and the thickness of H profile steel is at least 12mm.
Operation principle:When initial, moving beam is contracted in guide rail inner side.When being transported to pile tube using the present invention, move
Motor vehicles bodies to stack pile tube side.Start drive mechanism, drive mechanism drives tooth bar to move right, and moving beam is therewith to the right
It is mobile, when inverted T shaped plate moves to guide rail right side, drive mechanism is closed, start hoist engine and rotate counterclockwise around thereon
Two steel wire ropes are released, and after steel wire rope is released, are moved down in the presence of clamping device self gravitation, move to correct position
Afterwards, hoist engine is closed.Then operation clamping device clamps pile tube.Hoist engine is again started up after clamping to rotate clockwise steel wire
Rope is rolled, and clamping device and the pile tube for clamping thereon are moved up, and after pile tube is moved upwards up to correct position, closes elevator
Machine.Being again started up drive mechanism drives tooth bar to be moved to the left, and clamping device and the pile tube for clamping thereon are moved to the left therewith, wait to manage
When the left end of stake moves to the left end of sweep, drive mechanism is closed.Then it is again started up hoist engine and rotates counterclockwise and will be wound on it
On two steel wire ropes release, pile tube moves down, pile tube is placed on sweep, is then shut off hoist engine.So just can
Conveniently pile tube is hung on sweep, aforesaid operations are repeated, substantial amounts of pile tube can be loaded and unloaded, improve the work of handling
Make efficiency.
Because drive mechanism includes casing, bearing, dividing plate, first rotating shaft, big sprocket wheel, gear, motor, minor sprocket
And chain, the mode that casing is bolted is connected with front side rail and rear side rail respectively, and bottom half is opening, is located at
Bearing is fitted with front side rail and rear side rail in casing, first rotating shaft is installed, in first rotating shaft between two bearings
Portion is provided with gear, and gear is located between two bearings, wheel and rack engagement, and the front end of first rotating shaft is provided with big sprocket wheel, case
Middle part is welded with dividing plate in vivo, and dividing plate middle part is provided with first through hole, and the mode that dividing plate top is bolted is provided with driving
Motor, minor sprocket is connected with the output shaft of motor by shaft coupling, and chain is wound with minor sprocket, and the other end of chain is worn
Cross first through hole and be wound in big sprocket wheel.When needing to make tooth bar and moving beam move right, start motor counterclockwise
Rotate and drive minor sprocket to rotate, minor sprocket rotated by chain-driving big sprocket wheel, first rotating shaft concomitant rotation, gear inverse time therewith
Pin is rotated, because wheel and rack is engaged, gear is rotated counterclockwise can drive tooth bar to move right.When need to make tooth bar and
When moving beam is moved to the left, starts motor and rotate counterclockwise, then tooth bar and moving beam can be driven to be moved to the left.
Because clamping device includes threaded rod, the second rotating shaft, curved splint, fairlead, connecting rod, tension spring and
One nut, the top of threaded rod is connected with steel wire rope, and threaded rod bottom level is welded with the second rotating shaft, and the second rotating shaft is provided with
Two pieces of curved splints, two pieces of curved splints are symmetrical arranged, and threaded rod is provided with the fairlead that can be slid on, fairlead and arc
The mode being connected through the hinge between the top of clevis plate is connected with connecting rod, and the threaded rod outer sheath below fairlead is tensioned
Spring, the threaded rod outside above fairlead is provided with the first nut being engaged with threaded rod.When needing to clamp pile tube, first use
Spanner turns the first nut and rotates counterclockwise, and the first nut is moved up on threaded rod, in the presence of tension spring, is oriented to
Set upward sliding, connecting rod pulls two pieces of curved splints to be opened laterally around the second rotating shaft.Then two pieces of curved splints are placed
In the outside of pile tube, then turn the first nut with spanner and rotate clockwise, the first nut is moved down on threaded rod, in tension force
Spring-compressed, fairlead slide downward, connecting rod promotes two pieces of curved splints around the second rotating shaft to medial movement, so as to by pile tube
Clamp, pile tube can be lifted by crane after clamping.The first nut is turned with spanner to rotate counterclockwise, by two pieces of curved splints
Open, you can unclamp pile tube.
Because also including riser, movable mechanism and swing rope mechanism, sweep left end top passes through the side being welded to connect
Formula is connected with riser, and the upper level of riser is provided with movable mechanism, and movable mechanism includes housing, the first electricity
Machine, rear bearing block, screw mandrel, the second nut, guide rod and guide pad, the mode that housing is bolted are connected on riser, shell
Body right side is set for open, and the mode that leading flank is bolted in housing is provided with the first motor, the trailing flank in housing
The mode being bolted is provided with rear bearing block, and screw mandrel, screw mandrel are connected with by shaft coupling on the output shaft of the first motor
Rear end interference connect by way of be connected in the bearing of rear bearing block, guide rod, guide rod are provided with the housing on the right side of screw mandrel
Rear and front end be respectively welded at front and rear both sides in housing, screw mandrel is provided with the second nut, and guide rod is provided with guide pad, is oriented to
Block is connected with the second nut, is provided with swing rope mechanism on the right side of guide pad, swing rope mechanism include U-shaped fixed plate, the 3rd rotating shaft,
Roller bearing and clapboard, the left end of U-shaped fixed plate are welded on the right side of guide pad, and the front and rear both sides on the inside of U-shaped fixed plate are pacified
Equipped with the 3rd rotating shaft, the 3rd rotating shaft outside is provided with roller bearing by way of interference is connected, and the right-hand member of U-shaped fixed plate is welded with two
Block clapboard, it is symmetrical before and after two pieces of clapboards.When gripping means grips pile tube, and need that pile tube is placed on the one of sweep
During side, start the first motor, drive the second nut to move to housing central section by screw mandrel, swing rope mechanism also moves.Then
Start jack machinism pile tube is sling, restart drive mechanism and drive tooth bar and moving beam to be moved to the left, move steel wire rope
Before and after between the roller bearing of both sides.After moving beam moves to correct position, drive mechanism is closed.Then it is again started up the first electricity
Machine, drives the second nut to move by screw mandrel, and swing rope mechanism moves, because steel wire rope is between the roller bearing of front and rear both sides,
So roller bearing stirs a side oscillation of the steel wire rope to sweep, clamping device and the pile tube for clamping thereon also swing therewith, treat pile tube
After moving to the correct position above sweep.The first motor is closed, is starting jack machinism, pile tube is placed on sweep, risen
Steel wire rope on heavy-duty machine structure is slided on roller bearing, enough reduces the abrasion of steel wire rope, effectively increases the service life of steel wire rope.Such as
This can just adjust position of the pile tube pendulum on sweep, improve flexibility of the invention and practicality.
Because also including insurance institution, clamping device is provided with insurance institution, and insurance institution includes retainer ring, hangs
Ring, safety rope and hook, retainer ring are welded on the top of one of curved splint, and link is welded on another piece of curved splint
Top, is connected with safety rope in retainer ring, the tail end of safety rope is connected with the hook that can be hung on link.Work as gripping apparatus grips
Firmly during pile tube, safety rope is wound on pile tube lower section, and hook is hung on link.Safety effect can be just so played, when hanging
When clamping device fails in pile tube work, safety rope can block pile tube, prevent pile tube from falling.Pile tube is efficiently avoid to be fallen
It is bad, security during swing pipe stake is also improved, prevent the pile tube for falling from injuring other people by a crashing object, trigger security incident.
Because also including support meanss, support meanss are symmetrically arranged on two with before and after sweep right part, support meanss include
There are guide block, sliding sleeve, support bar, trapezoidal fixing tooth, support block, check lock lever, handle, back-moving spring and fix bar, guide block is welded on
On sweep, left side vertical is provided with the first guide hole in guide block, and support bar is provided with the first guide hole, is welded with the sweep below guide block
Sliding sleeve, sliding sleeve is slidably matched with support bar, and the right flank of support bar is provided with multiple trapezoidal fixing tooths, and trapezoidal fixing tooth is along support bar
Axial direction be uniformly distributed, the bottom of support bar is welded with support block, and the right part level of guide block is provided with the second guide hole, the second guide hole with
First guide hole is connected, and check lock lever is provided with the second guide hole, and check lock lever right-hand member is welded with handle, handle left surface and guide block right flank
Between be connected with back-moving spring, back-moving spring is simultaneously enclosed within check lock lever outside.When needing to use the present invention that pile tube is sling, first draw
Dynamic handle is moved right, and check lock lever moves right therewith, back-moving spring stretching.Between check lock lever pulls out two trapezoidal fixing tooths
When, support bar slide downward under self gravitation effect, after support block is contacted with ground, unclamps handle.In the work of back-moving spring
Make check lock lever under to left movement, and insert left side two trapezoidal fixing tooths between, rod lock will be supported.Such branch that can just allow
Strut bears gravity during lifting, it is to avoid in lifting, the vehicle head part of car body is tilted, and improves stability of the invention.Work as pipe
After stake completed loading, handle is pulled to move right again.Then support bar is promoted to move upwards, when support bar is moved upwards up to conjunction
Right position postpones unclamps handle, check lock lever is locked support bar.
Because also including fix bar, two fix bars, two fix bar phases are connected between every two adjacent N shape framves
Mutually arranged in a crossed manner, two crossover locations of fix bar are by rivet, the mode that fix bar two ends are bolted and N shapes
Frame is connected.Fix bar plays the effect consolidated mutually between N shape framves, it is to avoid N shapes frame uses rear flexural deformation for a long time.
Because also including electronic reel, drawstring and travel switch, electronic reel is provided with two altogether, and two electronic
Reel is separately mounted to the top of both sides before and after the N shape framves of the rightmost side, and drawstring, the tail end connection of drawstring are wound with electronic reel
Travel switch is provided with below the top of support bar, electronic reel, the mode that travel switch is connected by screw is arranged on N
On shape frame, there is connection between travel switch and electronic reel.After pile tube completed loading, handle is pulled to move right again
It is dynamic.Then start electronic reel and rotate counterclockwise and roll drawstring, drawstring pulls support bar to move upwards, works as supporting bar top
After touching travel switch, electronic reel stops.Then handle is unclamped, check lock lever is locked support bar.When will
Support bar is lowered into when being contacted with ground, pulls handle to move right, started electronic reel and rotate clockwise and puts drawstring
Go out, support bar can so slowly declined, it is to avoid the decline of support bar moment causes ground to be smashed.
(3)Beneficial effect
When the present invention is transported to pile tube, pile tube can be loaded and unloaded, without waiting for crane handling, saved the stand-by period, dropped
Low shipping and delivery cost, improve stable in operating efficiency, and cargo handling process, improve the security of swing pipe stake, and this
Invention has the advantages that simple to operate, low cost of manufacture.
Brief description of the drawings
Fig. 1 is the first dimensional structure diagram of the invention.
Fig. 2 is the enlarged diagram of part A of the invention.
Fig. 3 is the main structure diagram of jack machinism of the present invention.
Fig. 4 is the dimensional structure diagram of rear side rail of the present invention.
Fig. 5 is that the section view knot of the front view of drive mechanism of the present invention is intended to.
Fig. 6 is the first right side structural representation of clamping device of the present invention.
Fig. 7 is second dimensional structure diagram of the invention.
Fig. 8 is the schematic cross-sectional view of the top view of the movable mechanism of the present invention.
Fig. 9 is that the plan structure of swing rope mechanism of the present invention regards schematic diagram.
Figure 10 is second right side structural representation of clamping device of the present invention.
Figure 11 is the third dimensional structure diagram of the invention.
Figure 12 is the first main structure diagram of support meanss of the present invention.
Figure 13 is second main structure diagram of support meanss of the present invention.
Mark in accompanying drawing for:1- car bodies, 2- sweeps, 3-N shape framves, 4- guide rails, 401- balls, 5- drive mechanisms, 501-
Casing, 502- bearings, 503- dividing plates, 504- first through hole, 505- first rotating shafts, 506- big sprocket wheels, 507- gears, 508- drives
Motor, 509- minor sprockets, 510- chains, 6- moving beams, 7- tooth bars, 8- inverted T shaped plates, 9- wire guides, 10- jack machinisms,
101- hoist engines, 102- fixed pulleys, 103- steel wire ropes, 11- clamping devices, 111- threaded rods, the rotating shafts of 112- second, 113- arcs
Clamping plate, 114- fairleads, 115- connecting rods, 116- tension springs, the nuts of 117- first, 12- risers, 13- moves forward and backward mechanism,
1301- housings, the motors of 1302- first, 1303- rear bearing blocks, 1304- screw mandrels, the nuts of 1305- second, 1306- guide rods, 1307-
Guide pad, 14- swing ropes mechanism, 1401-U shape fixed plates, the rotating shafts of 1402- the 3rd, 1403- roller bearings, 1404- clapboards, 15- insurances
Mechanism, 1501- retainer rings, 1502- links, 1503- safety ropes, 1504- hooks, 16- support meanss, 1601- guide blocks, 1602-
First guide hole, the guide holes of 1603- second, 1604- sliding sleeves, 1605- support bars, the trapezoidal fixing tooths of 1606-, 1607- support blocks,
1608- check lock levers, 1609- handles, 1610- back-moving springs, 17- fix bars, the electronic reels of 18-, 19- drawstrings, 20- strokes are opened
Close.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of pile for prestressed pipe transport vehicle with Multi Loading and Unloading Functions, as shown in figs 1-9, include car body 1, sweep 2, N shapes frame 3,
Guide rail 4, ball 401, drive mechanism 5, moving beam 6, tooth bar 7, inverted T shaped plate 8, wire guide 9, jack machinism 10 and clamping device
11, the rear portion of car body 1 is provided with sweep 2, and the mode that the top of sweep 2 is bolted is provided with multiple N shapes framves 3, the inner side of N shapes frame 3
The mode that crown center is bolted is connected with two guide rails 4, is symmetrical arranged before and after two guide rails 4, and two guide rails 4 it
Between leave gap, the inside top of guide rail 4 and bottom are provided with ball 401, driving are provided between two right hand tops of guide rail 4
Mechanism 5, moving beam 6 is provided between two inner sides of guide rail 4, and moving beam 6 is slidably matched with two guide rails 4, and moving beam 6 is pushed up
The mode that portion is bolted is connected with tooth bar 7, and the bottom of moving beam 6 is connected with inverted T-shaped by way of being welded to connect
Plate 8, the left and right sides of inverted T shaped plate 8 is provided with wire guide 9, and jack machinism 10 is provided with inverted T shaped plate 8, and jack machinism 10 includes
There are hoist engine 101, fixed pulley 102 and steel wire rope 103, the mode that hoist engine 101 is bolted is arranged on inverted T shaped plate 8
Crown center, the left and right sides of hoist engine 101 is equipped with fixed pulley 102, and the mode that fixed pulley 102 is bolted is arranged on
On inverted T shaped plate 8, fixed pulley 102 and be located at wire guide 9 top, two steel wire ropes 103 are wound with hoist engine 101, wherein one
Root bypasses left side fixed pulley 102 and through the wire guide 9 in left side, and another bypasses right side fixed pulley 102 and leading through right side
String holes 9, the tail end of two steel wire ropes 103 is respectively connected with clamping device 11.
Drive mechanism 5 include casing 501, bearing 502, dividing plate 503, first rotating shaft 505, big sprocket wheel 506, gear 507,
Motor 508, minor sprocket 509 and chain 510, the mode that casing 501 is bolted respectively with front side rail 4 and rear side
Guide rail 4 is connected, and the bottom of casing 501 is opening, and bearing is fitted with the front side rail 4 and rear side rail 4 in casing 501
502, first rotating shaft 505 is installed between two bearings 502, the middle part of first rotating shaft 505 is provided with gear 507, and gear 507 is located at two
Between bearing 502, gear 507 is engaged with tooth bar 7, and the front end of first rotating shaft 505 is provided with middle part in big sprocket wheel 506, casing 501
Dividing plate 503 is welded with, the middle part of dividing plate 503 is provided with first through hole 504, and the mode that the top of dividing plate 503 is bolted is provided with
Motor 508, minor sprocket 509 is connected with the output shaft of motor 508 by shaft coupling, and chain is wound with minor sprocket 509
Bar 510, the other end of chain 510 passes through first through hole 504 and is wound in big sprocket wheel 506.
Clamping device 11 includes threaded rod 111, the second rotating shaft 112, curved splint 113, fairlead 114, connecting rod
115th, the nut 117 of tension spring 116 and first, the top of threaded rod 111 is connected with steel wire rope 103, the bottom water of threaded rod 111
Downhand welding is connected to the second rotating shaft 112, and the second rotating shaft 112 is provided with two pieces of curved splints 113, and two pieces of curved splints 113 are symmetrical arranged,
Threaded rod 111 is provided with the fairlead 114 that can be slid on, by hinge between fairlead 114 and the top of curved splint 113
The mode of chain connection is connected with connecting rod 115, and the tensioned spring 116 of the outer sheath of threaded rod 111 of the lower section of fairlead 114 is oriented to
The outside of threaded rod 111 of the top of set 114 is provided with the first nut 117 being engaged with threaded rod 111.
Riser 12, movable mechanism 13 and swing rope mechanism 14 are also included, the left end of sweep 2 top passes through what is be welded to connect
Mode is connected with riser 12, and the upper level of riser 12 is provided with movable mechanism 13, and movable mechanism 13 includes shell
Body 1301, the first motor 1302, rear bearing block 1303, screw mandrel 1304, the second nut 1305, guide rod 1306 and guide pad 1307,
The mode that housing 1301 is bolted is connected on riser 12, and the right side of housing 1301 is set for open, before housing 1301 is interior
The mode that side is bolted is provided with the first motor 1302, the mode that the trailing flank in housing 1301 is bolted
Rear bearing block 1303 is installed, screw mandrel 1304 is connected with by shaft coupling on the output shaft of the first motor 1302, screw mandrel 1304
Rear end is connected in the bearing of rear bearing block 1303 by way of interference is connected, and is provided with the housing 1301 on the right side of screw mandrel 1304
Guide rod 1306, the rear and front end of guide rod 1306 is respectively welded at the front and rear both sides in housing 1301, and screw mandrel 1304 is provided with second
Nut 1305, guide rod 1306 is provided with guide pad 1307, and guide pad 1307 is connected with the second nut 1305, guide pad 1307
Right side is provided with swing rope mechanism 14, and swing rope mechanism 14 includes U-shaped fixed plate 1401, the 3rd rotating shaft 1402, roller bearing 1403 and wedge shape
Plate 1404, the left end of U-shaped fixed plate 1401 is welded on the right side of guide pad 1307, front and rear the two of the inner side of U-shaped fixed plate 1401
Side is mounted on the 3rd rotating shaft 1402, and the outside of the 3rd rotating shaft 1402 is provided with roller bearing 1403 by way of interference is connected, and U-shaped is solid
The right-hand member of fixed board 1401 is welded with two pieces of clapboards 1404, symmetrical before and after two pieces of clapboards 1404.
Operation principle:When initial, moving beam 6 is contracted in the inner side of guide rail 4.When being transported to pile tube using the present invention,
Moving body 1 arrives the side for stacking pile tube.Start drive mechanism 5, drive mechanism 5 drives tooth bar 7 to move right, moving beam 6
Move right therewith, when inverted T shaped plate 8 moves to 4 right side of guide rail, close drive mechanism 5, start hoist engine 101 and turn counterclockwise
It is dynamic to be released around two steel wire ropes 103 thereon, after steel wire rope 103 is released, in the presence of the self gravitation of clamping device 11
Move down, after moving to correct position, close hoist engine 101.Then operation clamping device 11 clamps pile tube.After clamping again
Secondary startup hoist engine 101 is rotated clockwise rolls steel wire rope 103, and clamping device 11 and the pile tube for clamping thereon are moved up,
After pile tube is moved upwards up to correct position, hoist engine 101 is closed.Being again started up drive mechanism 5 drives tooth bar 7 to be moved to the left,
Clamping device 11 and the pile tube for clamping thereon are moved to the left therewith, when the left end of pile tube moves to the left end of sweep 2, close and drive
Motivation structure 5.Then it is again started up hoist engine 101 and rotates counterclockwise and will be released around two steel wire ropes 103 thereon, pile tube is downward
It is mobile, pile tube is placed on sweep 2, it is then shut off hoist engine 101.So just pile tube conveniently can be hung in into sweep
On 2, aforesaid operations are repeated, substantial amounts of pile tube can be loaded and unloaded, improve the operating efficiency of handling.
Because drive mechanism 5 includes casing 501, bearing 502, dividing plate 503, first rotating shaft 505, big sprocket wheel 506, gear
507th, motor 508, minor sprocket 509 and chain 510, the mode that casing 501 is bolted respectively with front side rail 4 and
Rear side rail 4 is connected, and the bottom of casing 501 is opening, is fitted with the front side rail 4 and rear side rail 4 in casing 501
Bearing 502, is provided with first rotating shaft 505 between two bearings 502, the middle part of first rotating shaft 505 is provided with gear 507, gear 507
Between two bearings 502, gear 507 is engaged with tooth bar 7, and the front end of first rotating shaft 505 is provided with big sprocket wheel 506, in casing 501
Middle part is welded with dividing plate 503, and the middle part of dividing plate 503 is provided with first through hole 504, and the mode that the top of dividing plate 503 is bolted is pacified
Equipped with motor 508, minor sprocket 509 is connected with by shaft coupling on the output shaft of motor 508, on minor sprocket 509 around
The other end for having chain 510, chain 510 passes through first through hole 504 and is wound in big sprocket wheel 506.When needing to make tooth bar 7 and mobile
When crossbeam 6 moves right, startup motor 508 rotates counterclockwise drive minor sprocket 509 and rotates, and minor sprocket 509 passes through chain
510 drive big sprocket wheels 506 rotate, the concomitant rotation of first rotating shaft 505, gear 507 is rotated counterclockwise therewith because gear 507 with
Tooth bar 7 is engaged, so gear 507 is rotated counterclockwise tooth bar 7 can be driven to move right.When need to make tooth bar 7 and moving beam 6 to
When moving left, start motor 508 and rotate counterclockwise, then tooth bar 7 and moving beam 6 can be driven to be moved to the left.
Because clamping device 11 includes threaded rod 111, the second rotating shaft 112, curved splint 113, fairlead 114, connection
Bar 115, the nut 117 of tension spring 116 and first, the top of threaded rod 111 are connected with steel wire rope 103, the bottom of threaded rod 111
Level is welded with the second rotating shaft 112, and the second rotating shaft 112 is provided with two pieces of curved splints 113, and two pieces of curved splints 113 symmetrically set
Put, threaded rod 111 is provided with the fairlead 114 that can be slid on, lead between fairlead 114 and the top of curved splint 113
Cross hinged mode and be connected with connecting rod 115, the tensioned spring 116 of the outer sheath of threaded rod 111 of the lower section of fairlead 114,
The outside of threaded rod 111 of the top of fairlead 114 is provided with the first nut 117 being engaged with threaded rod 111.When need clamp pile tube
When, first turning the first nut 117 with spanner and rotate counterclockwise, the first nut 117 is moved up on threaded rod 111, in tension force
In the presence of spring 116, the upward sliding of fairlead 114, connecting rod 115 pull two pieces of curved splints 113 around the second rotating shaft 112 to
Open in outside.Then two pieces of curved splints 113 are placed on the outside of pile tube, then to turn the first nut 117 with spanner clockwise
Rotate, the first nut 117 is moved down on threaded rod 111, compressed in tension spring 116, the slide downward of fairlead 114, even
Extension bar 115 promotes two pieces of curved splints 113 around the second rotating shaft 112 to medial movement, so as to pile tube be clamped, can be right after clamping
Pile tube is lifted by crane.The first nut 117 is turned with spanner to rotate counterclockwise, two pieces of curved splints 113 are opened, you can by pile tube
Unclamp.
Because also including riser 12, movable mechanism 13 and swing rope mechanism 14, the left end of sweep 2 top is by the company of welding
The mode for connecing is connected with riser 12, and the upper level of riser 12 is provided with movable mechanism 13, and movable mechanism 13 includes
There are housing 1301, the first motor 1302, rear bearing block 1303, screw mandrel 1304, the second nut 1305, guide rod 1306 and guide pad
1307, the mode that housing 1301 is bolted is connected on riser 12, and the right side of housing 1301 is set for open, housing 1301
The mode that interior leading flank is bolted is provided with the first motor 1302, what the trailing flank in housing 1301 was bolted
Mode is provided with rear bearing block 1303, and screw mandrel 1304, screw mandrel are connected with by shaft coupling on the output shaft of the first motor 1302
1304 rear end is connected in the bearing of rear bearing block 1303 by way of interference is connected, the housing 1301 on the right side of screw mandrel 1304
Guide rod 1306 is inside provided with, the rear and front end of guide rod 1306 is respectively welded at the front and rear both sides in housing 1301, is set on screw mandrel 1304
There is the second nut 1305, guide rod 1306 is provided with guide pad 1307, and guide pad 1307 is connected with the second nut 1305, guide pad
1307 right side is provided with swing rope mechanism 14, and swing rope mechanism 14 includes U-shaped fixed plate 1401, the 3rd rotating shaft 1402, roller bearing 1403
With clapboard 1404, the left end of U-shaped fixed plate 1401 is welded on the right side of guide pad 1307, the inner side of U-shaped fixed plate 1401
Front and rear both sides are mounted on the 3rd rotating shaft 1402, and the outside of the 3rd rotating shaft 1402 is provided with roller bearing by way of interference is connected
1403, the right-hand member of U-shaped fixed plate 1401 is welded with two pieces of clapboards 1404, symmetrical before and after two pieces of clapboards 1404.When clamping is filled
Put 11 and clamp pile tube, and when needing for pile tube to be placed on the side of sweep 2, start the first motor 1302, by screw mandrel
1304 the second nuts 1305 of driving move to the middle part of housing 1301, and swing rope mechanism 14 also moves.Then jack machinism is started
10 sling pile tube, restart drive mechanism 5 and drive tooth bar 7 and moving beam 6 to be moved to the left, before being moved to steel wire rope 103
Afterwards between the roller bearing 1403 of both sides.After moving beam 6 moves to correct position, drive mechanism 5 is closed.Then it is again started up first
Motor 1302, drives the second nut 1305 to move by screw mandrel 1304, and swing rope mechanism 14 moves, because steel wire rope 103 exists
Between the roller bearing 1403 of front and rear both sides, so roller bearing 1403 stirs a side oscillation of the steel wire rope 103 to sweep 2, clamping device 11
And the pile tube for clamping thereon also swings therewith, after after the correct position that pile tube moves to the top of sweep 2.Close the first motor
1302, starting jack machinism 10, pile tube is placed on sweep 2, the steel wire rope 103 on jack machinism 10 is on roller bearing 1403
Slide, enough reduce the abrasion of steel wire rope 103, effectively increase the service life of steel wire rope 103.Pile tube pendulum so can be just adjusted to exist
Position on sweep 2, improves flexibility of the invention and practicality.
Embodiment 2
A kind of pile for prestressed pipe transport vehicle with Multi Loading and Unloading Functions, as shown in figures 1-13, include car body 1, sweep 2, N shapes frame 3,
Guide rail 4, ball 401, drive mechanism 5, moving beam 6, tooth bar 7, inverted T shaped plate 8, wire guide 9, jack machinism 10 and clamping device
11, the rear portion of car body 1 is provided with sweep 2, and the mode that the top of sweep 2 is bolted is provided with multiple N shapes framves 3, the inner side of N shapes frame 3
The mode that crown center is bolted is connected with two guide rails 4, is symmetrical arranged before and after two guide rails 4, and two guide rails 4 it
Between leave gap, the inside top of guide rail 4 and bottom are provided with ball 401, driving are provided between two right hand tops of guide rail 4
Mechanism 5, moving beam 6 is provided between two inner sides of guide rail 4, and moving beam 6 is slidably matched with two guide rails 4, and moving beam 6 is pushed up
The mode that portion is bolted is connected with tooth bar 7, and the bottom of moving beam 6 is connected with inverted T-shaped by way of being welded to connect
Plate 8, the left and right sides of inverted T shaped plate 8 is provided with wire guide 9, and jack machinism 10 is provided with inverted T shaped plate 8, and jack machinism 10 includes
There are hoist engine 101, fixed pulley 102 and steel wire rope 103, the mode that hoist engine 101 is bolted is arranged on inverted T shaped plate 8
Crown center, the left and right sides of hoist engine 101 is equipped with fixed pulley 102, and the mode that fixed pulley 102 is bolted is arranged on
On inverted T shaped plate 8, fixed pulley 102 and be located at wire guide 9 top, two steel wire ropes 103 are wound with hoist engine 101, wherein one
Root bypasses left side fixed pulley 102 and through the wire guide 9 in left side, and another bypasses right side fixed pulley 102 and leading through right side
String holes 9, the tail end of two steel wire ropes 103 is respectively connected with clamping device 11.
Drive mechanism 5 include casing 501, bearing 502, dividing plate 503, first rotating shaft 505, big sprocket wheel 506, gear 507,
Motor 508, minor sprocket 509 and chain 510, the mode that casing 501 is bolted respectively with front side rail 4 and rear side
Guide rail 4 is connected, and the bottom of casing 501 is opening, and bearing is fitted with the front side rail 4 and rear side rail 4 in casing 501
502, first rotating shaft 505 is installed between two bearings 502, the middle part of first rotating shaft 505 is provided with gear 507, and gear 507 is located at two
Between bearing 502, gear 507 is engaged with tooth bar 7, and the front end of first rotating shaft 505 is provided with middle part in big sprocket wheel 506, casing 501
Dividing plate 503 is welded with, the middle part of dividing plate 503 is provided with first through hole 504, and the mode that the top of dividing plate 503 is bolted is provided with
Motor 508, minor sprocket 509 is connected with the output shaft of motor 508 by shaft coupling, and chain is wound with minor sprocket 509
Bar 510, the other end of chain 510 passes through first through hole 504 and is wound in big sprocket wheel 506.
Clamping device 11 includes threaded rod 111, the second rotating shaft 112, curved splint 113, fairlead 114, connecting rod
115th, the nut 117 of tension spring 116 and first, the top of threaded rod 111 is connected with steel wire rope 103, the bottom water of threaded rod 111
Downhand welding is connected to the second rotating shaft 112, and the second rotating shaft 112 is provided with two pieces of curved splints 113, and two pieces of curved splints 113 are symmetrical arranged,
Threaded rod 111 is provided with the fairlead 114 that can be slid on, by hinge between fairlead 114 and the top of curved splint 113
The mode of chain connection is connected with connecting rod 115, and the tensioned spring 116 of the outer sheath of threaded rod 111 of the lower section of fairlead 114 is oriented to
The outside of threaded rod 111 of the top of set 114 is provided with the first nut 117 being engaged with threaded rod 111.
Riser 12, movable mechanism 13 and swing rope mechanism 14 are also included, the left end of sweep 2 top passes through what is be welded to connect
Mode is connected with riser 12, and the upper level of riser 12 is provided with movable mechanism 13, and movable mechanism 13 includes shell
Body 1301, the first motor 1302, rear bearing block 1303, screw mandrel 1304, the second nut 1305, guide rod 1306 and guide pad 1307,
The mode that housing 1301 is bolted is connected on riser 12, and the right side of housing 1301 is set for open, before housing 1301 is interior
The mode that side is bolted is provided with the first motor 1302, the mode that the trailing flank in housing 1301 is bolted
Rear bearing block 1303 is installed, screw mandrel 1304 is connected with by shaft coupling on the output shaft of the first motor 1302, screw mandrel 1304
Rear end is connected in the bearing of rear bearing block 1303 by way of interference is connected, and is provided with the housing 1301 on the right side of screw mandrel 1304
Guide rod 1306, the rear and front end of guide rod 1306 is respectively welded at the front and rear both sides in housing 1301, and screw mandrel 1304 is provided with second
Nut 1305, guide rod 1306 is provided with guide pad 1307, and guide pad 1307 is connected with the second nut 1305, guide pad 1307
Right side is provided with swing rope mechanism 14, and swing rope mechanism 14 includes U-shaped fixed plate 1401, the 3rd rotating shaft 1402, roller bearing 1403 and wedge shape
Plate 1404, the left end of U-shaped fixed plate 1401 is welded on the right side of guide pad 1307, front and rear the two of the inner side of U-shaped fixed plate 1401
Side is mounted on the 3rd rotating shaft 1402, and the outside of the 3rd rotating shaft 1402 is provided with roller bearing 1403 by way of interference is connected, and U-shaped is solid
The right-hand member of fixed board 1401 is welded with two pieces of clapboards 1404, symmetrical before and after two pieces of clapboards 1404.
Insurance institution 15 is also included, clamping device 11 is provided with insurance institution 15, and insurance institution 15 includes retainer ring
1501st, link 1502, safety rope 1503 and hook 1504, retainer ring 1501 is welded on the top of one of curved splint 113,
Link 1502 is welded on another piece of top of curved splint 113, and safety rope 1503, safety rope 1503 are connected with retainer ring 1501
Tail end be connected with the hook 1504 that can be hung on link 1502.
Support meanss 16 are also included, support meanss 16 are symmetrically arranged on two with before and after the right part of sweep 2, support meanss 16 are wrapped
Guide block 1601, sliding sleeve 1604, support bar 1605, trapezoidal fixing tooth 1606, support block 1607, check lock lever 1608, handle are included
1609th, back-moving spring 1610 and fix bar 17, guide block 1601 are welded on sweep 2, and left side vertical is provided with first in guide block 1601
Guide hole 1602, is provided with support bar 1605 in the first guide hole 1602, sliding sleeve 1604 is welded with the sweep 2 of the lower section of guide block 1601, sliding
Set 1604 is slidably matched with support bar 1605, and the right flank of support bar 1605 is provided with multiple trapezoidal fixing tooths 1606, trapezoidal fixation
Tooth 1606 is uniformly distributed along the axial direction of support bar 1605, and the bottom of support bar 1605 is welded with support block 1607, guide block 1601
Right part level is provided with the second guide hole 1603, and the second guide hole 1603 is connected with the first guide hole 1602, and lock is provided with the second guide hole 1603
Tight bar 1608, the right-hand member of check lock lever 1608 is welded with handle 1609, is connected between 1609 left surfaces of handle and the right flank of guide block 1601
There is back-moving spring 1610, back-moving spring 1610 is simultaneously enclosed within the outside of check lock lever 1608.
Fix bar 17 is also included, two fix bars 17, two fix bars are connected between every two adjacent N shapes framves 3
17 intersect setting, and by rivet, the two ends of fix bar 17 are bolted two crossover locations of fix bar 17
Mode is connected with N shapes frame 3.
Electronic reel 18, drawstring 19 and travel switch 20 are also included, electronic reel 18 is provided with two, and two altogether
Electronic reel 18 is separately mounted to the top of both sides before and after rightmost side N shapes frame 3, and drawstring 19 is wound with electronic reel 18, draws
The tail end of rope 19 is connected to the top of support bar 1605, and travel switch 20, travel switch 20 are provided with below electronic reel 18
The mode being connected by screw is arranged on N shapes frame 3, has connection between travel switch 20 and electronic reel 18.
N shapes frame 3 is that H profile steel and channel-section steel are welded, and N shapes frame 3 is vertically channel-section steel, and the transverse direction of N shapes frame 3 is H profile steel, groove
The thickness of steel is at least 10mm, and the thickness of H profile steel is at least 12mm.
Operation principle:When initial, moving beam 6 is contracted in the inner side of guide rail 4.When being transported to pile tube using the present invention,
Moving body 1 arrives the side for stacking pile tube.Start drive mechanism 5, drive mechanism 5 drives tooth bar 7 to move right, moving beam 6
Move right therewith, when inverted T shaped plate 8 moves to 4 right side of guide rail, close drive mechanism 5, start hoist engine 101 and turn counterclockwise
It is dynamic to be released around two steel wire ropes 103 thereon, after steel wire rope 103 is released, in the presence of the self gravitation of clamping device 11
Move down, after moving to correct position, close hoist engine 101.Then operation clamping device 11 clamps pile tube.After clamping again
Secondary startup hoist engine 101 is rotated clockwise rolls steel wire rope 103, and clamping device 11 and the pile tube for clamping thereon are moved up,
After pile tube is moved upwards up to correct position, hoist engine 101 is closed.Being again started up drive mechanism 5 drives tooth bar 7 to be moved to the left,
Clamping device 11 and the pile tube for clamping thereon are moved to the left therewith, when the left end of pile tube moves to the left end of sweep 2, close and drive
Motivation structure 5.Then it is again started up hoist engine 101 and rotates counterclockwise and will be released around two steel wire ropes 103 thereon, pile tube is downward
It is mobile, pile tube is placed on sweep 2, it is then shut off hoist engine 101.So just pile tube conveniently can be hung in into sweep
On 2, aforesaid operations are repeated, substantial amounts of pile tube can be loaded and unloaded, improve the operating efficiency of handling.
Because drive mechanism 5 includes casing 501, bearing 502, dividing plate 503, first rotating shaft 505, big sprocket wheel 506, gear
507th, motor 508, minor sprocket 509 and chain 510, the mode that casing 501 is bolted respectively with front side rail 4 and
Rear side rail 4 is connected, and the bottom of casing 501 is opening, is fitted with the front side rail 4 and rear side rail 4 in casing 501
Bearing 502, is provided with first rotating shaft 505 between two bearings 502, the middle part of first rotating shaft 505 is provided with gear 507, gear 507
Between two bearings 502, gear 507 is engaged with tooth bar 7, and the front end of first rotating shaft 505 is provided with big sprocket wheel 506, in casing 501
Middle part is welded with dividing plate 503, and the middle part of dividing plate 503 is provided with first through hole 504, and the mode that the top of dividing plate 503 is bolted is pacified
Equipped with motor 508, minor sprocket 509 is connected with by shaft coupling on the output shaft of motor 508, on minor sprocket 509 around
The other end for having chain 510, chain 510 passes through first through hole 504 and is wound in big sprocket wheel 506.When needing to make tooth bar 7 and mobile
When crossbeam 6 moves right, startup motor 508 rotates counterclockwise drive minor sprocket 509 and rotates, and minor sprocket 509 passes through chain
510 drive big sprocket wheels 506 rotate, the concomitant rotation of first rotating shaft 505, gear 507 is rotated counterclockwise therewith because gear 507 with
Tooth bar 7 is engaged, so gear 507 is rotated counterclockwise tooth bar 7 can be driven to move right.When need to make tooth bar 7 and moving beam 6 to
When moving left, start motor 508 and rotate counterclockwise, then tooth bar 7 and moving beam 6 can be driven to be moved to the left.
Because clamping device 11 includes threaded rod 111, the second rotating shaft 112, curved splint 113, fairlead 114, connection
Bar 115, the nut 117 of tension spring 116 and first, the top of threaded rod 111 are connected with steel wire rope 103, the bottom of threaded rod 111
Level is welded with the second rotating shaft 112, and the second rotating shaft 112 is provided with two pieces of curved splints 113, and two pieces of curved splints 113 symmetrically set
Put, threaded rod 111 is provided with the fairlead 114 that can be slid on, lead between fairlead 114 and the top of curved splint 113
Cross hinged mode and be connected with connecting rod 115, the tensioned spring 116 of the outer sheath of threaded rod 111 of the lower section of fairlead 114,
The outside of threaded rod 111 of the top of fairlead 114 is provided with the first nut 117 being engaged with threaded rod 111.When need clamp pile tube
When, first turning the first nut 117 with spanner and rotate counterclockwise, the first nut 117 is moved up on threaded rod 111, in tension force
In the presence of spring 116, the upward sliding of fairlead 114, connecting rod 115 pull two pieces of curved splints 113 around the second rotating shaft 112 to
Open in outside.Then two pieces of curved splints 113 are placed on the outside of pile tube, then to turn the first nut 117 with spanner clockwise
Rotate, the first nut 117 is moved down on threaded rod 111, compressed in tension spring 116, the slide downward of fairlead 114, even
Extension bar 115 promotes two pieces of curved splints 113 around the second rotating shaft 112 to medial movement, so as to pile tube be clamped, can be right after clamping
Pile tube is lifted by crane.The first nut 117 is turned with spanner to rotate counterclockwise, two pieces of curved splints 113 are opened, you can by pile tube
Unclamp.
Because also including riser 12, movable mechanism 13 and swing rope mechanism 14, the left end of sweep 2 top is by the company of welding
The mode for connecing is connected with riser 12, and the upper level of riser 12 is provided with movable mechanism 13, and movable mechanism 13 includes
There are housing 1301, the first motor 1302, rear bearing block 1303, screw mandrel 1304, the second nut 1305, guide rod 1306 and guide pad
1307, the mode that housing 1301 is bolted is connected on riser 12, and the right side of housing 1301 is set for open, housing 1301
The mode that interior leading flank is bolted is provided with the first motor 1302, what the trailing flank in housing 1301 was bolted
Mode is provided with rear bearing block 1303, and screw mandrel 1304, screw mandrel are connected with by shaft coupling on the output shaft of the first motor 1302
1304 rear end is connected in the bearing of rear bearing block 1303 by way of interference is connected, the housing 1301 on the right side of screw mandrel 1304
Guide rod 1306 is inside provided with, the rear and front end of guide rod 1306 is respectively welded at the front and rear both sides in housing 1301, is set on screw mandrel 1304
There is the second nut 1305, guide rod 1306 is provided with guide pad 1307, and guide pad 1307 is connected with the second nut 1305, guide pad
1307 right side is provided with swing rope mechanism 14, and swing rope mechanism 14 includes U-shaped fixed plate 1401, the 3rd rotating shaft 1402, roller bearing 1403
With clapboard 1404, the left end of U-shaped fixed plate 1401 is welded on the right side of guide pad 1307, the inner side of U-shaped fixed plate 1401
Front and rear both sides are mounted on the 3rd rotating shaft 1402, and the outside of the 3rd rotating shaft 1402 is provided with roller bearing by way of interference is connected
1403, the right-hand member of U-shaped fixed plate 1401 is welded with two pieces of clapboards 1404, symmetrical before and after two pieces of clapboards 1404.When clamping is filled
Put 11 and clamp pile tube, and when needing for pile tube to be placed on the side of sweep 2, start the first motor 1302, by screw mandrel
1304 the second nuts 1305 of driving move to the middle part of housing 1301, and swing rope mechanism 14 also moves.Then jack machinism is started
10 sling pile tube, restart drive mechanism 5 and drive tooth bar 7 and moving beam 6 to be moved to the left, before being moved to steel wire rope 103
Afterwards between the roller bearing 1403 of both sides.After moving beam 6 moves to correct position, drive mechanism 5 is closed.Then it is again started up first
Motor 1302, drives the second nut 1305 to move by screw mandrel 1304, and swing rope mechanism 14 moves, because steel wire rope 103 exists
Between the roller bearing 1403 of front and rear both sides, so roller bearing 1403 stirs a side oscillation of the steel wire rope 103 to sweep 2, clamping device 11
And the pile tube for clamping thereon also swings therewith, after after the correct position that pile tube moves to the top of sweep 2.Close the first motor
1302, starting jack machinism 10, pile tube is placed on sweep 2, the steel wire rope 103 on jack machinism 10 is on roller bearing 1403
Slide, enough reduce the abrasion of steel wire rope 103, effectively increase the service life of steel wire rope 103.Pile tube pendulum so can be just adjusted to exist
Position on sweep 2, improves flexibility of the invention and practicality.
Because also including insurance institution 15, clamping device 11 is provided with insurance institution 15, and insurance institution 15 includes solid
Determine ring 1501, link 1502, safety rope 1503 and hook 1504, retainer ring 1501 is welded on one of curved splint 113
Top, link 1502 is welded on another piece of top of curved splint 113, and safety rope 1503 is connected with retainer ring 1501, insurance
The tail end of rope 1503 is connected with the hook 1504 that can be hung on link 1502.When clamping device 11 clamps pile tube, will insure
Rope 1503 is wound on pile tube lower section, and hook 1504 is hung on link 1502.Safety effect can be just so played, when in swing pipe stake
When clamping device 11 fails in work, safety rope 1503 can block pile tube, prevent pile tube from falling.Efficiently avoid pile tube quilt
Break, also improve security during swing pipe stake, prevent the pile tube for falling from injuring other people by a crashing object, trigger security incident.
Because also including support meanss 16, support meanss 16, support meanss are symmetrically arranged on two with before and after the right part of sweep 2
16 include guide block 1601, sliding sleeve 1604, support bar 1605, trapezoidal fixing tooth 1606, support block 1607, check lock lever 1608, drawing
Hand 1609, back-moving spring 1610 and fix bar 17, guide block 1601 are welded on sweep 2, and left side vertical is provided with guide block 1601
One guide hole 1602, is provided with support bar 1605 in the first guide hole 1602, sliding sleeve 1604 is welded with the sweep 2 of the lower section of guide block 1601,
Sliding sleeve 1604 is slidably matched with support bar 1605, and the right flank of support bar 1605 is provided with multiple trapezoidal fixing tooths 1606, trapezoidal solid
Fixed tooth 1606 is uniformly distributed along the axial direction of support bar 1605, and the bottom of support bar 1605 is welded with support block 1607, guide block 1601
Right part level be provided with the second guide hole 1603, the second guide hole 1603 is connected with the first guide hole 1602, is provided with the second guide hole 1603
Check lock lever 1608, the right-hand member of check lock lever 1608 is welded with handle 1609, connects between 1609 left surfaces of handle and the right flank of guide block 1601
Back-moving spring 1610 is connected to, back-moving spring 1610 is simultaneously enclosed within the outside of check lock lever 1608.Pile tube is sling when the present invention is needed to use
When, first pull handle 1609 to move right, check lock lever 1608 is moved right therewith, and back-moving spring 1610 is stretched.Work as check lock lever
When between 1608 two trapezoidal fixing tooths 1606 of pull-out, support bar 1605 slide downward, support block under self gravitation effect,
After 1607 contact with ground, handle 1609 is unclamped.Make check lock lever 1608 in the presence of back-moving spring 1610 to left movement, and insert
Enter between two trapezoidal fixing tooths 1606 in left side, support bar 1605 is locked.So support bar 1605 can be just allowed to bear lifting
When gravity, it is to avoid in lifting car body 1 vehicle head part tilt, improve stability of the invention.When pile tube completed loading
Afterwards, handle 1609 is pulled to move right again.Then support bar 1605 is promoted to move upwards, when support bar 1605 is moved upwards up to
Handle 1609 is unclamped after correct position, check lock lever 1608 is locked support bar 1605.
Because also including fix bar 17, two fix bars 17 are connected between every two adjacent N shapes framves 3, two solid
Fixed pole 17 is intersected setting, and two crossover locations of fix bar 17 are connected by rivet, the two ends of fix bar 17 by bolt
The mode for connecing is connected with N shapes frame 3.Fix bar 17 plays the effect consolidated mutually between N shapes frame 3, it is to avoid N shapes frame 3 is for a long time
Use rear flexural deformation.
Because also including electronic reel 18, drawstring 19 and travel switch 20, electronic reel 18 is provided with two altogether, and
Two electronic reels 18 are separately mounted to the top of both sides before and after rightmost side N shapes frame 3, and drawstring is wound with electronic reel 18
19, the tail end of drawstring 19 is connected to the top of support bar 1605, and travel switch 20 is provided with below electronic reel 18, and stroke is opened
Close 20 modes being connected by screw to be arranged on N shapes frame 3, have connection between travel switch 20 and electronic reel 18.
After pile tube completed loading, handle 1609 is pulled to move right again.Then start electronic reel 18 and rotate counterclockwise and will draw
Rope 19 is rolled, and drawstring 19 pulls support bar 1605 to move upwards, electronic after the top of support bar 1605 touches travel switch 20
Reel 18 stops.Then handle 1609 is unclamped, check lock lever 1608 is locked support bar 1605.When by support bar
1605 are lowered into when being contacted with ground, pull handle 1609 to move right, and start electronic reel 18 and rotate clockwise drawstring
19 release, and support bar 1605 can so slowly declined, it is to avoid the decline of the moment of support bar 1605 causes ground to be smashed.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.