CN108818912A - Prefabricated guide hole pervious concrete road pavement brick and its production system and technique - Google Patents

Prefabricated guide hole pervious concrete road pavement brick and its production system and technique Download PDF

Info

Publication number
CN108818912A
CN108818912A CN201810542784.9A CN201810542784A CN108818912A CN 108818912 A CN108818912 A CN 108818912A CN 201810542784 A CN201810542784 A CN 201810542784A CN 108818912 A CN108818912 A CN 108818912A
Authority
CN
China
Prior art keywords
area
mold
guide hole
pore
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810542784.9A
Other languages
Chinese (zh)
Inventor
姬永生
徐站站
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810542784.9A priority Critical patent/CN108818912A/en
Publication of CN108818912A publication Critical patent/CN108818912A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • B28B1/0873Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/48Producing shaped prefabricated articles from the material by removing material from solid section preforms for forming hollow articles, e.g. by punching or boring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/026Feeding the moulding material in measured quantities from a container or silo by using a movable hopper transferring the moulding material to the moulding cavities
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • B28B13/065Removing the shaped articles from moulds by applying electric current or other means of discharging, e.g. pneumatic or hydraulic discharging means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders

Landscapes

  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of prefabricated guide hole pervious concrete road pavement brick and its production systems and technique, belong to pervious concrete road pavement brick and its technical field of producing.Including the die treatment area for preparing mold(1), surface layer shaping area for making porous permeable surface layer(2), structure sheaf shaping area for making guide hole permeable structure layer(3), product conserve area(4), product stripping area(5)With mold cleaning area(6)Six working portions pass through mold delivery track between six parts(7)With mold delivery track(7)The circuit transfer trajectory at both ends(8)Form a closed circulation flow production line.The present invention is easy to make, can pouring molding using the technological process of production proposed by the present invention extensive, industrialized production may be implemented.

Description

Prefabricated guide hole pervious concrete road pavement brick and its production system and technique
Technical field
The present invention relates to a kind of prefabricated guide hole pervious concrete road pavement brick and its production technologies, belong to pervious concrete pavement Brick and its technical field of producing.
Background technique
The existing continuous aggravation with urbanization process, concrete road surface is also constantly being increased, is being brought to trip While convenience, a series of problems is also brought such as:(1)Urban waterlogging easily occurs;(2)Underground water cannot be mended timely It fills, level of ground water is caused to decline;(3)Generate " tropical island effect " etc..China GB/T50378-2006《Green building assessment standard》 In pervious surface area ratio outside public building room and house is set forth regulation not less than 40% and 45%.It is permeable mixed Solidifying soil surface not only solves the above problems, but also has the function of sound absorption, noise abatement.
In recent years pervious concrete road pavement brick obtains very big development, for solving the problems, such as that road surface is permeable, and achieves Certain effect.But traditional permeable pavement brick has that not good enough two of the low and permeable state of intensity, main cause are to pass System porous pavement permeability rate and intensity contradict, and present technology also cannot achieve the two while reach optimum state, this It is one of the most important reason for limiting permeable pavement brick development.
Summary of the invention
Place, the present invention provide a kind of prefabricated guide hole pervious concrete road pavement brick in order to overcome the above-mentioned deficiencies of the prior art And its production system and technique, this pervious concrete road pavement brick is by two parts of guide hole permeable structure layer and porous permeable surface layer Composition, guide hole permeable structure layer is by the way of artificial guide hole, with the primary load outside receiving;Surface layer is using traditional porous Pervious concrete structure primarily serves the effect for preventing blockage structure layer.This guide hole pervious concrete road pavement brick changes tradition The permeable mode of permeable pavement brick solves the problems, such as that intensity cannot mutually be taken into account with permeability rate.This invention also solves its industry The problem of metaplasia produces.
The present invention is achieved through the following technical solutions:A kind of prefabricated guide hole pervious concrete road pavement brick, spy is by leading Hole permeable structure layer and porous permeable surface layer two parts form, and have in guide hole permeable structure layer and penetrate guide hole permeable structure layer Artificial permeable guide hole, guide hole permeable structure layer account for the 80-90% of specimen thickness, are primarily subjected to the external loads of test specimen;Porous permeable Surface layer primarily serves the effect for preventing guide hole permeable structure layer from blocking.
Including the die treatment area for preparing mold(1), surface layer shaping area for making porous permeable surface layer(2), For making the structure sheaf shaping area of guide hole permeable structure layer(3), product conserve area(4), product stripping area(5)And mold cleaning Area(6)Six working portions pass through mold delivery track between six parts(7)With mold delivery track(7)The circuit at both ends turns It switches tracks(8)Form a closed circulation flow production line.
The mold delivery track(7)Two parallel circuits are formed, i.e. production circuit and demoulding circuit, the circuit turns It switches tracks(8)It is arranged vertically on the both ends in production circuit and demoulding circuit;The die treatment area(1), surface layer shaping area(2), Structure sheaf shaping area(3), product conserve area(4)It is sequentially arranged on production circuit, the product stripping area(5)And mold cleaning Area(6)It is sequentially arranged on demoulding circuit, the die device of formation(9)Mobile route be:Die device(9)First pass through mold Treatment region(1), using surface layer shaping area(2), using structure sheaf shaping area(3)It is saturating to prepare the guide hole with artificial permeable guide hole Water-bound layer conserves area using product(4), then die device(9)Circuit transfer trajectory through one end(8)It is moved to demoulding Circuit, then along mold delivery track(7)Into product stripping area(5)It is demoulded, finally enters mold cleaning area(6)It carries out clear Reason, forms a production cycle;Then die device(9)Circuit transfer trajectory through the other end(8)It is moved to production circuit, then It is secondary to enter die treatment area(1)Start next production cycle;
The structure sheaf shaping area(3)Have:For forming the pore-creating apparatus of artificial permeable guide hole in guide hole permeable structure layer, use In the lifting device of control pore-creating apparatus lifting, the structure sheaf distribution device of feeding into mold above pore-creating apparatus, Vibration device below die device, for controlling the lifting device of vibration device lifting;The pore-creating apparatus includes net The pore-creating bracket of trellis, pore-creating bracket lower part are equipped with the pore-creating needle of multiple needle points straight down.
The pore-creating apparatus pore-creating needle(3-9)It is uniformly distributed and is mounted on pore-creating bracket(3-8)One side directed downwardly, pore-creating dress It sets lower section and forms pore-creating shaping work area, the pore-creating bracket(1-1)Both ends the lifting tackle that connect with lifting device is housed (3-10);
The lifting device includes hoist engine(3-1)And by column(3-3)And top-support(3-12)The lifting support of composition, The hoist engine(3-1)It is connected and is located at the top of entire molding equipment with the top-support of two sides, lifting support top Both ends are equipped with fixed pulley(3-2), hoist engine passes through twisted rope(3-13)With fixed pulley(3-2)And lifting tackle(3-10)It is connected;
The structure sheaf distribution device is located above the pore-creating apparatus, and structure sheaf distribution device is included in lifting support two sides and sets The stringer set(3-6), stringer(3-6)It is upper that Crane Rail is housed(3-4), the Crane Rail of two sides(3-4)Between equipped with can be along row Track road(3-4)The driving of sliding(3-5), driving(3-5)It is upper that cloth bucket is housed(3-7);
The vibration device includes shake table(3-11), shake table(3-11)It is mounted directly on the ground, is located at die device(9) Underface, shake table and die device(9)There is lifting gap between bottom;
The mold delivery track(7)Including two rows by leading block(7-1)And hold-down support(7-2)The pulley guide rails of composition, Leading block(7-1)It is mounted on hold-down support(7-2)Upper end and and die device(9)Basal sliding contact, hold-down support(7- 2)It installs on the ground, the hold-down support in pore-creating shaping work area below the pore-creating apparatus(7-2)It replaces with very heavy Top(7-3).
The mold delivery track(7)Including two rows by leading block(7-1)And hold-down support(7-2)The pulley of composition is led Rail, two rows of pulley guide rails extend to the lower section of each working portion, the leading block(7-1)It is mounted on hold-down support(7-2) Upper end and and die device(9)Basal sliding contact, hold-down support(7-2)Installation is on the ground;
The circuit transfer trajectory(8)Including two rows of conversion guide rails vertical with pulley guide rails(8-2), convert guide rail(8-2)On Installation conversion slide plate(8-1), convert guide rail(8-2)There is support post in lower section(8-3), support post(8-3)It is mounted on fixed branch Seat(7-2)Between gap in, the conversion slide plate(8-1)With leading block(7-1)Height flushes or slightly above leading block (7-1).
The mold delivery track(7)Both ends and circuit transfer trajectory(8)The region of intersection is track transition zone, track Hold-down support in transition zone(7-2)Replace with jack(7-3).
The die device(9)Including by bottom plate(9-1)With bottom plate skeleton(9-8)The bed die of composition, by being located at bottom plate On lateral side form(9-2)With longitudinal side form(9-3)Side form made of enclosing;There is assembling area at the both ends of side form(9-4), assemble area (9-4)On be evenly equipped with assembly mouth(9-5), it is provided with laterally separated item in a crisscross manner in the side form(9-6)With longitudinally split item (9-7), the bottom plate skeleton(9-8)Bottom and mold delivery track(7)It is slidably connected.
The surface layer shaping area(2)Have by four columns(2-1)With the crane beam of two sides(2-4)The main support of composition, row Bicycle beam(2-4)On have Crane Rail(2-5), two crane beams(2-4)Crane Rail(2-5)It is upper to drive a vehicle equipped with surface material distribution (2-2), surface material distribution driving(2-2)The upper surface material distribution bucket equipped with the cloth into mold(2-3);
The product stripping area(5)Have by column(5-1)And crossbeam(5-2)The rack of composition, upper rack are equipped with hoist engine(5-3) With by hoist engine(5-3)Control the nut stud mechanism of lifting(5-5), nut stud mechanism(5-5)Stud lower end equipped with pressure Plate(5-7), the upper rack is also equipped with four jack(5-4), jack(5-4)Mould is connected to by demoulding lifting device On the side form for having four sides of device;
Product stripping area(5)Side have the finished product for piling up finished product conserve area(10).
A kind of prefabricated guide hole pervious concrete road pavement brick mass production processes of equipment conducive to any one of claim 1-8, It is characterized in that:Include the following steps:
Step 1, die treatment:In mold area in preparation to mould inner wall and bottom painted concrete release agent, then pass through bottom plate Downslide wheel track is moved to surface layer shaping area;
Step 2, surface layer molding:The surface layer of product is uniformly arranged in in surface layer shaping area by cloth bucket the bottom of mold, The mold that surface layer deploys is moved to guide hole structure layer pouring area by bottom plate downslide wheel track;
Step 3, structure formable layer:Jack in the case where structure sheaf pouring area is by track falls track, so that on track It is fallen on shake table under mold;Then pore-creating apparatus is fallen, and all pore-creating needles is made to be inserted into surface layer and and contacts baseplate;It pours It builds concrete and passes through the closely knit molding of shake table;Shaking device is closed after levelling is shaken in concrete upper surface, then fills pore-creating It sets and lifts, obtain guide hole permeable structure layer, pulley track is risen to by jack by initial height, and will by pulley track Band mould test specimen is moved to maintenance area and is conserved;
Step 4, product maintenance:Curing in the mold is used in maintenance area's test piece maintenance, after product reaches the intensity for capableing of demoulding, is led to Die tracks conversion equipment is crossed, die tracks are converted;Then product stripping area will be moved to by pulley track with mould product;
Step 5, product stripping:The pressing plate of mould upstream is dropped on product by hoist engine in product stripping area;It will be with thousand The lifting device that jin top is connected is moved to the bottom of formwork sides, and then starting jack completes mold and product disengaging de- Mould, the product of demoulding are moved to finished product maintenance area, and mold is moved to mold cleaning area by pulley track;
Step 6, mold cleaning:It is in mold cleaning area that mold cleaning is clean, the guide hole water-permeable brick production process of this circulation Terminate;
The die treatment of step 7, subsequent cycle:Mold is moved to mold area in preparation by track conversion equipment, is started next A production cycle.
The beneficial effects of the invention are as follows:
1)High-strength height is permeable
Traditional pervious concrete road pavement brick is a kind of celluar concrete as made of coarse aggregate, cement and water mixing, it is free of Fine aggregate is mutually bonded by coarse aggregate surface cladding a thin layer cement slurry and forms the equally distributed honeycomb structure in hole.This Kind honeycomb structure not only causes concrete strength low(Especially flexural strength is extremely low);And pore communication is poor, causes The permeable state of concrete is not good enough;There is also intensity and permeable incompatible problem simultaneously.
Guide hole pervious concrete road pavement brick of the invention is made using the technique of artificial guide hole, reduces invalid hole Generation, coutrolled porosity is up to 80-90%, much larger than traditional pervious concrete.Its guide hole permeable structure layer can be according to common Commerical ready-mixed concrete design, pouring construction molding, concrete substrate structure is closely knit, and resistance to compression and flexural strength are and general goods coagulation Native suitable, strength grade is adjustable;Thoroughly solves the problems, such as traditional pervious concrete intensity and permeable incompatible.
2)Molding mode is simple, it can be achieved that industrialized production
It is easy to make.It can pouring molding.Using the technological process of production proposed by the present invention, extensive, industrial metaplasia may be implemented It produces.
3) product multiplicity, use scope are wide
The present invention can not only produce guide hole water-permeable brick, but also can produce prefabricated guide hole porous pavement plate;It can be not only used for non-maneuver garage The roads such as the pavement sailed, cycle track, ground in community, garden landscape ground, city square, beside swimming pool and stadium Laying, it can also be used to have the outdoor parking lot of motor-driven vehicle going and the laying of weight grade road.
4) wearability is good
Porous permeable bituminous concrete uniform wearability seepy material can be used in surface layer, and the surface for improving the permeable test specimen of this guide hole is resistance to Grind performance.
Detailed description of the invention
Below according to drawings and examples, the present invention is further described.
Fig. 1 is production technological process of the present invention;
Fig. 2 is production system detail drawing of the present invention;
Fig. 3 is die device structural schematic diagram;
Fig. 4 is surface layer molding machine;
Fig. 5 is structure sheaf molding machine, pore-creating apparatus;
Fig. 6 is stripper apparatus figure;
Fig. 7 is the prefabricated guide hole pervious concrete road pavement brick structure chart of the present invention.
Specific embodiment
Below with reference to embodiment, the present invention is further described.
A kind of prefabricated guide hole pervious concrete road pavement brick as shown in Fig. 7, spy is by guide hole permeable structure layer(11)With Porous permeable surface layer(12)Two parts composition has in guide hole permeable structure layer and penetrates the artificial of guide hole permeable structure layer and permeable lead Hole(13), guide hole permeable structure layer accounts for the 80-90% of specimen thickness, is primarily subjected to the external loads of test specimen;Porous permeable surface layer master Play the role of preventing guide hole permeable structure layer from blocking.
Including the die treatment area for preparing mold(1), surface layer shaping area for making porous permeable surface layer(2), For making the structure sheaf shaping area of guide hole permeable structure layer(3), product conserve area(4), product stripping area(5)And mold cleaning Area(6)Six working portions pass through mold delivery track between six parts(7)With mold delivery track(7)The circuit at both ends turns It switches tracks(8)Form a closed circulation flow production line.
The mold delivery track(7)Two parallel circuits are formed, i.e. production circuit and demoulding circuit, the circuit turns It switches tracks(8)It is arranged vertically on the both ends in production circuit and demoulding circuit;The die treatment area(1), surface layer shaping area(2), Structure sheaf shaping area(3), product conserve area(4)It is sequentially arranged on production circuit, the product stripping area(5)And mold cleaning Area(6)It is sequentially arranged on demoulding circuit, the die device of formation(9)Mobile route be:Die device(9)First pass through mold Treatment region(1), using surface layer shaping area(2), using structure sheaf shaping area(3)It is saturating to prepare the guide hole with artificial permeable guide hole Water-bound layer conserves area using product(4), then die device(9)Circuit transfer trajectory through one end(8)It is moved to demoulding Circuit, then along mold delivery track(7)Into product stripping area(5)It is demoulded, finally enters mold cleaning area(6)It carries out clear Reason, forms a production cycle;Then die device(9)Circuit transfer trajectory through the other end(8)It is moved to production circuit, then It is secondary to enter die treatment area(1)Start next production cycle;
The structure sheaf shaping area(3)Have:For forming the pore-creating apparatus of artificial permeable guide hole in guide hole permeable structure layer, use In the lifting device of control pore-creating apparatus lifting, the structure sheaf distribution device of feeding into mold above pore-creating apparatus, Vibration device below die device, for controlling the lifting device of vibration device lifting;The pore-creating apparatus includes net The pore-creating bracket of trellis, pore-creating bracket lower part are equipped with the pore-creating needle of multiple needle points straight down.
The pore-creating apparatus pore-creating needle(3-9)It is uniformly distributed and is mounted on pore-creating bracket(3-8)One side directed downwardly, pore-creating dress It sets lower section and forms pore-creating shaping work area, the pore-creating bracket(1-1)Both ends the lifting tackle that connect with lifting device is housed (3-10);
The lifting device includes hoist engine(3-1)And by column(3-3)And top-support(3-12)The lifting support of composition, The hoist engine(3-1)It is connected and is located at the top of entire molding equipment with the top-support of two sides, lifting support top Both ends are equipped with fixed pulley(3-2), hoist engine passes through twisted rope(3-13)With fixed pulley(3-2)And lifting tackle(3-10)It is connected;
The structure sheaf distribution device is located above the pore-creating apparatus, and structure sheaf distribution device is included in lifting support two sides and sets The stringer set(3-6), stringer(3-6)It is upper that Crane Rail is housed(3-4), the Crane Rail of two sides(3-4)Between equipped with can be along row Track road(3-4)The driving of sliding(3-5), driving(3-5)It is upper that cloth bucket is housed(3-7);
The vibration device includes shake table(3-11), shake table(3-11)It is mounted directly on the ground, is located at die device(9) Underface, shake table and die device(9)There is lifting gap between bottom;
The mold delivery track(7)Including two rows by leading block(7-1)And hold-down support(7-2)The pulley guide rails of composition, Leading block(7-1)It is mounted on hold-down support(7-2)Upper end and and die device(9)Basal sliding contact, hold-down support(7- 2)It installs on the ground, the hold-down support in pore-creating shaping work area below the pore-creating apparatus(7-2)It replaces with very heavy Top(7-3).
The mold delivery track(7)Including two rows by leading block(7-1)And hold-down support(7-2)The pulley of composition is led Rail, two rows of pulley guide rails extend to the lower section of each working portion, the leading block(7-1)It is mounted on hold-down support(7-2) Upper end and and die device(9)Basal sliding contact, hold-down support(7-2)Installation is on the ground;
The circuit transfer trajectory(8)Including two rows of conversion guide rails vertical with pulley guide rails(8-2), convert guide rail(8-2)On Installation conversion slide plate(8-1), convert guide rail(8-2)There is support post in lower section(8-3), support post(8-3)It is mounted on fixed branch Seat(7-2)Between gap in, the conversion slide plate(8-1)With leading block(7-1)Height flushes or slightly above leading block (7-1).
The mold delivery track(7)Both ends and circuit transfer trajectory(8)The region of intersection is track transition zone, track Hold-down support in transition zone(7-2)Replace with jack(7-3).
The die device(9)Including by bottom plate(9-1)With bottom plate skeleton(9-8)The bed die of composition, by being located at bottom plate On lateral side form(9-2)With longitudinal side form(9-3)Side form made of enclosing;There is assembling area at the both ends of side form(9-4), assemble area (9-4)On be evenly equipped with assembly mouth(9-5), it is provided with laterally separated item in a crisscross manner in the side form(9-6)With longitudinally split item (9-7), the bottom plate skeleton(9-8)Bottom and mold delivery track(7)It is slidably connected.
The surface layer shaping area(2)Have by four columns(2-1)With the crane beam of two sides(2-4)The main support of composition, row Bicycle beam(2-4)On have Crane Rail(2-5), two crane beams(2-4)Crane Rail(2-5)It is upper to drive a vehicle equipped with surface material distribution (2-2), surface material distribution driving(2-2)The upper surface material distribution bucket equipped with the cloth into mold(2-3);
The product stripping area(5)Have by column(5-1)And crossbeam(5-2)The rack of composition, upper rack are equipped with hoist engine(5-3) With by hoist engine(5-3)Control the nut stud mechanism of lifting(5-5), nut stud mechanism(5-5)Stud lower end equipped with pressure Plate(5-7), the upper rack is also equipped with four jack(5-4), jack(5-4)Mould is connected to by demoulding lifting device On the side form for having four sides of device;
Product stripping area(5)Side have the finished product for piling up finished product conserve area(10).
A kind of prefabricated guide hole pervious concrete road pavement brick mass production processes of equipment conducive to any one of claim 1-8, It is characterized in that:Include the following steps:
Step 1, die treatment:In mold area in preparation to mould inner wall and bottom painted concrete release agent, then pass through bottom plate Downslide wheel track is moved to surface layer shaping area;
Step 2, surface layer molding:The surface layer of product is uniformly arranged in in surface layer shaping area by cloth bucket the bottom of mold, The mold that surface layer deploys is moved to guide hole structure layer pouring area by bottom plate downslide wheel track;
Step 3, structure formable layer:Jack in the case where structure sheaf pouring area is by track falls track, so that on track It is fallen on shake table under mold;Then pore-creating apparatus is fallen, and all pore-creating needles is made to be inserted into surface layer and and contacts baseplate;It pours It builds concrete and passes through the closely knit molding of shake table;Shaking device is closed after levelling is shaken in concrete upper surface, then fills pore-creating It sets and lifts, obtain guide hole permeable structure layer, pulley track is risen to by jack by initial height, and will by pulley track Band mould test specimen is moved to maintenance area and is conserved;
Step 4, product maintenance:Curing in the mold is used in maintenance area's test piece maintenance, after product reaches the intensity for capableing of demoulding, is led to Die tracks conversion equipment is crossed, die tracks are converted;Then product stripping area will be moved to by pulley track with mould product;
Step 5, product stripping:The pressing plate of mould upstream is dropped on product by hoist engine in product stripping area;It will be with thousand The lifting device that jin top is connected is moved to the bottom of formwork sides, and then starting jack completes mold and product disengaging de- Mould, the product of demoulding are moved to finished product maintenance area, and mold is moved to mold cleaning area by pulley track;
Step 6, mold cleaning:It is in mold cleaning area that mold cleaning is clean, the guide hole water-permeable brick production process of this circulation Terminate;
The die treatment of step 7, subsequent cycle:Mold is moved to mold area in preparation by track conversion equipment, is started next A production cycle.
The guide hole pervious concrete road pavement brick uses the method for artificial guide hole, has prevented the generation of invalid hole, aperture is big Small and distribution of pores can be adjusted freely and little to intensity effect, and intensity and the permeability rate for solving traditional pervious concrete be not simultaneous The problem of appearance;
The preparation process of the guide hole pervious concrete road pavement brick include die treatment, surface layer molding, structure formable layer, test specimen support 6 links such as shield, test specimen demoulding and mold cleaning, production technology horizontal layout respectively correspond die treatment area, surface layer molding Area, structure sheaf shaping area, test piece maintenance area, test specimen demould 6 production areas such as area and mold cleaning area.This 6 production areas Form a closed circulation Production line circuit by two parallel guide rails and the track converter device at guide rail both ends, i.e., from Die treatment area starts, and mold is successively moved to surface layer shaping area, structure sheaf shaping area, test piece maintenance area by track, then The mold for being loaded with test specimen is moved into another track by the track converter device of rail end, it is de- to be reversely successively moved to test specimen Mould area and mold cleaning area form a production cycle process;The mold cleared up is passed through into track converter device again and moves into the The die treatment area of one track starts next production cycle.

Claims (9)

1. a kind of prefabricated guide hole pervious concrete road pavement brick, it is characterised in that:By guide hole permeable structure layer and porous permeable surface layer Two parts composition, guide hole permeable structure layer is interior to have the artificial permeable guide hole for penetrating guide hole permeable structure layer, guide hole permeable structure Layer accounts for the 80-90% of specimen thickness, is primarily subjected to the external loads of test specimen;Porous permeable surface layer, which primarily serves, prevents guide hole permeable The effect of structure sheaf blocking.
2. a kind of prefabricated guide hole pervious concrete road pavement brick batch production systems, it is characterised in that:Including for preparing mold Die treatment area(1), surface layer shaping area for making porous permeable surface layer(2), knot for making guide hole permeable structure layer Structure formable layer area(3), product conserve area(4), product stripping area(5)With mold cleaning area(6)Six working portions, six parts it Between pass through mold delivery track(7)With mold delivery track(7)The circuit transfer trajectory at both ends(8)Form a closed circulation Flow production line.
3. prefabricated guide hole pervious concrete road pavement brick batch production systems according to claim 2, it is characterised in that:It is described Mold delivery track(7)Two parallel circuits are formed, i.e. production circuit and demoulding circuit, the circuit transfer trajectory(8)It hangs down Directly it is arranged in the both ends in production circuit and demoulding circuit;The die treatment area(1), surface layer shaping area(2), structure sheaf shaping area (3), product conserve area(4)It is sequentially arranged on production circuit, the product stripping area(5)With mold cleaning area(6)Successively cloth It sets on demoulding circuit, the die device of formation(9)Mobile route be:Die device(9)First pass through die treatment area(1), Using surface layer shaping area(2), using structure sheaf shaping area(3)The guide hole permeable structure layer with artificial permeable guide hole is prepared, Area is conserved using product(4), then die device(9)Circuit transfer trajectory through one end(8)It is moved to demoulding circuit, then edge Mold delivery track(7)Into product stripping area(5)It is demoulded, finally enters mold cleaning area(6)It is cleared up, forms one Secondary production cycle;Then die device(9)Circuit transfer trajectory through the other end(8)It is moved to production circuit, is again introduced into mould Has treatment region(1)Start next production cycle;
The structure sheaf shaping area(3)Have:For forming the pore-creating apparatus of artificial permeable guide hole in guide hole permeable structure layer, use In the lifting device of control pore-creating apparatus lifting, the structure sheaf distribution device of feeding into mold above pore-creating apparatus, Vibration device below die device, for controlling the lifting device of vibration device lifting;The pore-creating apparatus includes net The pore-creating bracket of trellis, pore-creating bracket lower part are equipped with the pore-creating needle of multiple needle points straight down.
4. prefabricated guide hole pervious concrete road pavement brick batch production systems according to claim 3, it is characterised in that:It is described Pore-creating apparatus pore-creating needle(3-9)It is uniformly distributed and is mounted on pore-creating bracket(3-8)One side directed downwardly, pore-creating apparatus lower section, which is formed, makes Hole forming workspace, the pore-creating bracket(1-1)Both ends the lifting tackle that connect with lifting device is housed(3-10);
The lifting device includes hoist engine(3-1)And by column(3-3)And top-support(3-12)The lifting support of composition, The hoist engine(3-1)It is connected and is located at the top of entire molding equipment with the top-support of two sides, lifting support top Both ends are equipped with fixed pulley(3-2), hoist engine passes through twisted rope(3-13)With fixed pulley(3-2)And lifting tackle(3-10)It is connected;
The structure sheaf distribution device is located above the pore-creating apparatus, and structure sheaf distribution device is included in lifting support two sides and sets The stringer set(3-6), stringer(3-6)It is upper that Crane Rail is housed(3-4), the Crane Rail of two sides(3-4)Between equipped with can be along row Track road(3-4)The driving of sliding(3-5), driving(3-5)It is upper that cloth bucket is housed(3-7);
The vibration device includes shake table(3-11), shake table(3-11)It is mounted directly on the ground, is located at die device(9) Underface, shake table and die device(9)There is lifting gap between bottom;
The mold delivery track(7)Including two rows by leading block(7-1)And hold-down support(7-2)The pulley guide rails of composition, Leading block(7-1)It is mounted on hold-down support(7-2)Upper end and and die device(9)Basal sliding contact, hold-down support(7- 2)It installs on the ground, the hold-down support in pore-creating shaping work area below the pore-creating apparatus(7-2)It replaces with very heavy Top(7-3).
5. prefabricated guide hole pervious concrete road pavement brick batch production systems according to claim 2 or 3, it is characterised in that:
The mold delivery track(7)Including two rows by leading block(7-1)And hold-down support(7-2)The pulley guide rails of composition, Two rows of pulley guide rails extend to the lower section of each working portion, the leading block(7-1)It is mounted on hold-down support(7-2)Upper end And and die device(9)Basal sliding contact, hold-down support(7-2)Installation is on the ground;
The circuit transfer trajectory(8)Including two rows of conversion guide rails vertical with pulley guide rails(8-2), convert guide rail(8-2)On Installation conversion slide plate(8-1), convert guide rail(8-2)There is support post in lower section(8-3), support post(8-3)It is mounted on fixed branch Seat(7-2)Between gap in, the conversion slide plate(8-1)With leading block(7-1)Height flushes or slightly above leading block (7-1).
6. prefabricated guide hole pervious concrete road pavement brick batch production systems according to claim 5, it is characterised in that:It is described Mold delivery track(7)Both ends and circuit transfer trajectory(8)The region of intersection is track transition zone, consolidating in track transition zone Determine support(7-2)Replace with jack(7-3).
7. prefabricated guide hole pervious concrete road pavement brick batch production systems, feature according to Claims 2 or 3 or 4 exist In:The die device(9)Including by bottom plate(9-1)With bottom plate skeleton(9-8)The bed die of composition, the cross by being located on bottom plate To side form(9-2)With longitudinal side form(9-3)Side form made of enclosing;There is assembling area at the both ends of side form(9-4), assemble area(9-4) On be evenly equipped with assembly mouth(9-5), it is provided with laterally separated item in a crisscross manner in the side form(9-6)With longitudinally split item(9-7), The bottom plate skeleton(9-8)Bottom and mold delivery track(7)It is slidably connected.
8. prefabricated guide hole pervious concrete road pavement brick batch production systems, feature according to Claims 2 or 3 or 4 exist In:The surface layer shaping area(2)Have by four columns(2-1)With the crane beam of two sides(2-4)The main support of composition, crane beam (2-4)On have Crane Rail(2-5), two crane beams(2-4)Crane Rail(2-5)It is upper to drive a vehicle equipped with surface material distribution(2-2), Surface material distribution driving(2-2)The upper surface material distribution bucket equipped with the cloth into mold(2-3);
The product stripping area(5)Have by column(5-1)And crossbeam(5-2)The rack of composition, upper rack are equipped with hoist engine(5-3) With by hoist engine(5-3)Control the nut stud mechanism of lifting(5-5), nut stud mechanism(5-5)Stud lower end equipped with pressure Plate(5-7), the upper rack is also equipped with four jack(5-4), jack(5-4)Mould is connected to by demoulding lifting device On the side form for having four sides of device;
Product stripping area(5)Side have the finished product for piling up finished product conserve area(10).
9. a kind of prefabricated guide hole pervious concrete road pavement brick mass production processes of equipment conducive to any one of claim 1-8, It is characterized in that:Include the following steps:
Step 1, die treatment:In mold area in preparation to mould inner wall and bottom painted concrete release agent, then pass through bottom plate Downslide wheel track is moved to surface layer shaping area;
Step 2, surface layer molding:The surface layer of product is uniformly arranged in in surface layer shaping area by cloth bucket the bottom of mold, The mold that surface layer deploys is moved to guide hole structure layer pouring area by bottom plate downslide wheel track;
Step 3, structure formable layer:Jack in the case where structure sheaf pouring area is by track falls track, so that on track It is fallen on shake table under mold;Then pore-creating apparatus is fallen, and all pore-creating needles is made to be inserted into surface layer and and contacts baseplate;It pours It builds concrete and passes through the closely knit molding of shake table;Shaking device is closed after levelling is shaken in concrete upper surface, then fills pore-creating It sets and lifts, obtain guide hole permeable structure layer, pulley track is risen to by jack by initial height, and will by pulley track Band mould test specimen is moved to maintenance area and is conserved;
Step 4, product maintenance:Curing in the mold is used in maintenance area's test piece maintenance, after product reaches the intensity for capableing of demoulding, is led to Die tracks conversion equipment is crossed, die tracks are converted;Then product stripping area will be moved to by pulley track with mould product;
Step 5, product stripping:The pressing plate of mould upstream is dropped on product by hoist engine in product stripping area;It will be with thousand The lifting device that jin top is connected is moved to the bottom of formwork sides, and then starting jack completes mold and product disengaging de- Mould, the product of demoulding are moved to finished product maintenance area, and mold is moved to mold cleaning area by pulley track;
Step 6, mold cleaning:It is in mold cleaning area that mold cleaning is clean, the guide hole water-permeable brick production process of this circulation Terminate;
The die treatment of step 7, subsequent cycle:Mold is moved to mold area in preparation by track conversion equipment, is started next A production cycle.
CN201810542784.9A 2018-05-31 2018-05-31 Prefabricated guide hole pervious concrete road pavement brick and its production system and technique Pending CN108818912A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810542784.9A CN108818912A (en) 2018-05-31 2018-05-31 Prefabricated guide hole pervious concrete road pavement brick and its production system and technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810542784.9A CN108818912A (en) 2018-05-31 2018-05-31 Prefabricated guide hole pervious concrete road pavement brick and its production system and technique

Publications (1)

Publication Number Publication Date
CN108818912A true CN108818912A (en) 2018-11-16

Family

ID=64145587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810542784.9A Pending CN108818912A (en) 2018-05-31 2018-05-31 Prefabricated guide hole pervious concrete road pavement brick and its production system and technique

Country Status (1)

Country Link
CN (1) CN108818912A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109531783A (en) * 2019-01-10 2019-03-29 淮安莱福模具科技有限公司 Compacting tool set is used in a kind of brick body production of surface with groove
CN111391106A (en) * 2020-06-04 2020-07-10 湖南三一快而居住宅工业有限公司 Pre-production treatment equipment, production line and production method for concrete prefabricated part
CN112976288A (en) * 2021-04-14 2021-06-18 展鹏(福建)工贸有限公司 Production method of automatic brick production line

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100999101A (en) * 2007-01-01 2007-07-18 李仁� Production method of concrete block for green
CN102416649A (en) * 2010-09-28 2012-04-18 北京仁创铸造有限公司 Production technology of composite water permeable brick
KR20130037927A (en) * 2011-10-07 2013-04-17 권운철 Combination of wpc and pervious concrete block
US20140272369A1 (en) * 2013-03-14 2014-09-18 Jonathan Todd King Pervious concrete permeable grout
CN105541373A (en) * 2016-03-01 2016-05-04 江苏万特福建筑构件有限公司 High-strength and permeable concrete brick
CN205501766U (en) * 2015-12-31 2016-08-24 江西贝融循环材料股份有限公司 Easy long -life porous disk who resumes and keep ability of permeating water
CN106363796A (en) * 2016-11-15 2017-02-01 山东电力管道工程公司 Vertical type flow-line forming method for PCCP cores

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100999101A (en) * 2007-01-01 2007-07-18 李仁� Production method of concrete block for green
CN102416649A (en) * 2010-09-28 2012-04-18 北京仁创铸造有限公司 Production technology of composite water permeable brick
KR20130037927A (en) * 2011-10-07 2013-04-17 권운철 Combination of wpc and pervious concrete block
US20140272369A1 (en) * 2013-03-14 2014-09-18 Jonathan Todd King Pervious concrete permeable grout
CN205501766U (en) * 2015-12-31 2016-08-24 江西贝融循环材料股份有限公司 Easy long -life porous disk who resumes and keep ability of permeating water
CN105541373A (en) * 2016-03-01 2016-05-04 江苏万特福建筑构件有限公司 High-strength and permeable concrete brick
CN106363796A (en) * 2016-11-15 2017-02-01 山东电力管道工程公司 Vertical type flow-line forming method for PCCP cores

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109531783A (en) * 2019-01-10 2019-03-29 淮安莱福模具科技有限公司 Compacting tool set is used in a kind of brick body production of surface with groove
CN111391106A (en) * 2020-06-04 2020-07-10 湖南三一快而居住宅工业有限公司 Pre-production treatment equipment, production line and production method for concrete prefabricated part
CN112976288A (en) * 2021-04-14 2021-06-18 展鹏(福建)工贸有限公司 Production method of automatic brick production line
CN112976288B (en) * 2021-04-14 2022-06-07 展鹏(福建)工贸有限公司 Production method of automatic brick production line

Similar Documents

Publication Publication Date Title
CN104260185B (en) Multifunctional concrete prefabricated components battery mould production equipment and production line
CN108818912A (en) Prefabricated guide hole pervious concrete road pavement brick and its production system and technique
CN108705654A (en) Guide hole pervious concrete test specimen and guide hole permeable structure formable layer device and method
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
CN108755337A (en) Guide hole water-permeable brick and the brick machine mold and method for preparing guide hole water-permeable brick
CN111304987A (en) High-speed foam light soil roadbed structure in mountain area
CN211104585U (en) Forming equipment of imitative stone material type curb of cement base
CN107938520A (en) Using the method for vertical drag-line construction steel reinforced concrete combination beam
CN87103091A (en) Brick panel
CN208586915U (en) More spray head foam concrete distribution devices
CN109910160A (en) A kind of bed die perforation guide hole water-permeable brick and preparation method thereof
CN206329145U (en) A kind of quick assembled type enclosure wall
CN201669783U (en) Bedplate basin type sanitary ceramics stripping equipment
CN201686953U (en) Novel wall fence used for road
CN212223490U (en) High-speed foam light soil roadbed structure in mountain area
CN201329613Y (en) Horizontal slide template
CN204098025U (en) A kind of vibration sinking tube siccative pours into special-shaped bag pile and precast pile tip thereof and construction steel immersed tube
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN1544378A (en) Preparation and using method of steel slag colorful pavement brick with water penetrating function
CN116021625A (en) Assembly type building element production line
CN112942154B (en) Culvert cover plate movable type support-free cast-in-place device and construction method thereof
CN109554975A (en) Cast-in-place guide hole pervious concrete and its preparation facilities and technique
CN106065565B (en) A kind of construction method of prefabricated architectural concrete pier column
CN107558606A (en) A kind of prefabricated construction construction method
CN212505796U (en) Municipal water supply and drainage green belt based on 3D printing technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116