CN206329145U - A kind of quick assembled type enclosure wall - Google Patents
A kind of quick assembled type enclosure wall Download PDFInfo
- Publication number
- CN206329145U CN206329145U CN201621404243.2U CN201621404243U CN206329145U CN 206329145 U CN206329145 U CN 206329145U CN 201621404243 U CN201621404243 U CN 201621404243U CN 206329145 U CN206329145 U CN 206329145U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- column
- enclosure wall
- assembled type
- type enclosure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种快速装配式围墙,其包括两个以上的预制柱、预制墙板,所述的预制柱为钢筋混凝土预制柱或者型钢预制柱,预制墙板的左右两侧分别与一个预制柱固定。本实用新型在工厂采用机械化生产,不受气候制约,构件精准,且批量模数化生产,制作过程中损耗低、产品质量更易得到有效控制。本实用新型在现场吊装速度快、对施工场地要求低、对周围的社会环境影响周期短、不造成环境污染、围墙抗裂优越的整体性能。
The utility model relates to a rapidly assembled enclosure, which comprises more than two prefabricated columns and prefabricated wall panels, the prefabricated columns are reinforced concrete prefabricated columns or section steel prefabricated columns, and the left and right sides of the prefabricated wall panels are connected with a prefabricated wall panel respectively. The column is fixed. The utility model adopts mechanized production in the factory, is not restricted by the climate, has precise components, and is mass-modulated to produce, with low loss in the production process and easier effective control of product quality. The utility model has fast hoisting speed on site, low requirements on the construction site, short period of influence on the surrounding social environment, no environmental pollution, and excellent overall performance of the enclosure wall against cracking.
Description
技术领域technical field
本实用新型属于绿色装配式建筑领域,更具体地说,涉及预制墙板、预制柱(含基础)、预制装饰线条造型、还可在顶部设置巡逻通道的快速装配式组合围墙。The utility model belongs to the field of green prefabricated buildings, and more specifically relates to a prefabricated wall panel, a prefabricated column (including foundation), a prefabricated decorative line shape, and a quick-assembled combined wall with a patrol passage on the top.
背景技术Background technique
目前,围墙材料主要有两种:一是以粘土砖、多孔砖、水泥砖、煤渣砖、加气块为主的砌体墙,二是以夹心板、金属护栏、金属围篱网等构成的围墙。At present, there are mainly two types of fence materials: one is masonry walls mainly composed of clay bricks, porous bricks, cement bricks, cinder bricks, and aerated blocks; the other is made of sandwich panels, metal guardrails, and metal fence nets. fence.
砌体围墙在施工过程中,属于半湿作业,劳动力需求密集,且施工过程中的产生扬尘影响环境,施工周期长且受阴雨天气影响等;而金属围墙需要日常防锈维护作业,防锈维护作业中多产生挥发性气体对环境及人类有害。During the construction process of the masonry wall, it is a semi-wet operation, the demand for labor is intensive, and the dust generated during the construction process affects the environment, the construction period is long and it is affected by rainy weather, etc.; while the metal wall needs daily anti-rust maintenance work, anti-rust maintenance The production of volatile gases during operation is harmful to the environment and human beings.
实用新型内容Utility model content
本实用新型的目的在于克服传统围墙的施工周期长、对周边环境有污染及围墙沉降不规则易产生裂痕等缺点,提供一种工厂制作、无污染、整体装配速度快、表面平整、可变形空间大的绿色装配式围墙。The purpose of this utility model is to overcome the disadvantages of the traditional wall, such as long construction period, pollution to the surrounding environment, irregular wall settlement and easy cracks, etc., and provide a factory-made, pollution-free, fast overall assembly speed, smooth surface, and deformable space. Large green prefabricated fence.
为了达到上述目的,本实用新型提供的技术方案为:In order to achieve the above object, the technical solution provided by the utility model is:
一种快速装配式围墙,其包括两个以上的预制柱、预制墙板,所述的预制柱为钢筋混凝土预制柱或者型钢预制柱,预制墙板的左右两侧分别与一个预制柱固定。A fast-assembled fence, which includes more than two prefabricated columns and prefabricated wall panels, the prefabricated columns are reinforced concrete prefabricated columns or section steel prefabricated columns, and the left and right sides of the prefabricated wall panels are respectively fixed to a prefabricated column.
作为优选,所述的预制墙板外挂在预制柱一侧,或者二者加以焊接或螺栓连接。Preferably, the prefabricated wall panel is hung on one side of the prefabricated column, or the two are welded or bolted.
作为优选,所述的预制柱左右两侧设有空槽,预制墙板两端设置在空槽内,或者二者加以焊接或螺栓连接。Preferably, the left and right sides of the prefabricated column are provided with empty grooves, and the two ends of the prefabricated wall panels are arranged in the empty grooves, or the two are welded or bolted.
作为优选,所述的钢筋混凝土预制柱内外侧面设有支撑预埋件或螺栓孔,顶部设置有吊装预埋件。本实用新型的支撑预埋件在安装时连接有临时支撑,临时支撑的另一端有效固定于地面。支撑预埋件可以是预埋螺栓套筒。吊装预埋件在吊装时与吊钩相扣,便于预制柱吊装。吊装预埋件可以是吊钉。Preferably, the inner and outer sides of the reinforced concrete prefabricated column are provided with support embedded parts or bolt holes, and the top is provided with hoisting embedded parts. The supporting embedded part of the utility model is connected with a temporary support during installation, and the other end of the temporary support is effectively fixed on the ground. The supporting embedded parts can be embedded bolt sleeves. The embedded parts for hoisting are buckled with the hook during hoisting, which is convenient for hoisting of prefabricated columns. The embedded parts for hoisting can be hanging nails.
作为优选,所述的预制柱包括基座和立柱,基座与立柱整体预制。Preferably, the prefabricated column includes a base and a column, and the base and the column are integrally prefabricated.
作为优选,所述的预制柱包括基座和型钢柱,型钢柱底端与基座顶端通过预埋件相连。Preferably, the prefabricated column includes a base and a shaped steel column, and the bottom end of the shaped steel column is connected with the top end of the base through embedded parts.
作为优选,所述的的预制柱采用钢筋混凝土矩形柱、异性柱或H型、T型型钢柱,基座采用钢筋混凝土制作,基座(或柱连基座)运输至现场吊装埋设于开挖回填并夯实好的基坑内。As a preference, the prefabricated column adopts reinforced concrete rectangular column, heterogeneous column or H-shaped, T-shaped steel column, the base is made of reinforced concrete, and the base (or column-connected base) is transported to the site for hoisting and embedding in the excavation Backfill and compact the foundation pit.
作为优选,所述的预制墙板采用预制钢筋混凝土墙板或蒸压轻质加气混凝土墙板或复合式墙板。轻质蒸压加气混凝土预制墙板每块高度为600mm,通过拼接达到围墙高度要求,轻质蒸压加气混凝土板密度较一般水泥质材料小,有效降低围墙基础要求;预制混凝土墙板高度按围墙高度要求整体预制。预制墙板可根据使用要求设置花格窗,轻质蒸压加气混凝土预制墙板面还可雕刻有纹路。Preferably, the prefabricated wall panels are prefabricated reinforced concrete wall panels or autoclaved lightweight aerated concrete wall panels or composite wall panels. The height of each lightweight autoclaved aerated concrete prefabricated wall panel is 600mm, which can meet the height requirements of the wall through splicing. The density of the lightweight autoclaved aerated concrete panel is lower than that of ordinary cement materials, which effectively reduces the foundation requirements of the wall; the height of the precast concrete wall panel The overall prefabrication is required according to the height of the wall. The prefabricated wall panels can be provided with lattice windows according to the requirements of use, and the surface of the lightweight autoclaved aerated concrete prefabricated wall panels can also be carved with lines.
作为优选,所述的围墙还设置有预制柱压顶和预制墙板压顶,预制柱压顶安装在预制柱的上方,预制墙板压顶安装在预制墙板上方,所述的预制柱压顶与预制柱之间焊接或螺栓连接;所述的预制墙板压顶与预制墙板之间采用销钉连接或焊接或螺栓连接,或者与两端预制柱连接。As a preference, the enclosure wall is also provided with prefabricated column topping and prefabricated wall panel topping, prefabricated column topping is installed above the prefabricated column, prefabricated wall panel topping is installed above the prefabricated wall panel, between the prefabricated column topping and prefabricated column The prefabricated wall panels are connected by pins, welded or bolts, or connected with the prefabricated columns at both ends.
作为优选,预制柱压顶及预制墙板压顶采用100mm~250mm厚轻质蒸压加气混凝土板,可也按美观需要采用钢筋混凝土预制多种形状压顶。As a preference, 100mm-250mm thick lightweight autoclaved aerated concrete slabs are used for prefabricated column topping and prefabricated wall panel topping, and reinforced concrete can be prefabricated in various shapes according to aesthetic requirements.
作为优选,所述的预制柱顶部安装有巡逻通道梁,巡逻通道梁上面安装预制巡逻通道板,预制巡逻通道板上方安装有预制巡逻通道护拦。Preferably, a patrol channel beam is installed on the top of the prefabricated column, a prefabricated patrol channel plate is installed on the patrol channel beam, and a prefabricated patrol channel barrier is installed above the prefabricated patrol channel plate.
作为优选,预制巡逻通道梁可采用钢筋混凝土预制梁或H型型钢梁。Preferably, the prefabricated patrol channel beam can be a reinforced concrete prefabricated beam or an H-shaped steel beam.
作为优选,预制巡逻通道板可采用钢筋混凝土预制板或蒸压加气混凝土板。Preferably, the prefabricated patrol channel slab can be a reinforced concrete prefabricated slab or an autoclaved aerated concrete slab.
作为优选,预制巡逻通道护栏可采用钢筋混凝土预制板或蒸压加气混凝土板或金属、玻璃护栏。As a preference, the prefabricated guardrail of the patrol passage can adopt reinforced concrete prefabricated slab or autoclaved aerated concrete slab or metal or glass guardrail.
作为优选,所述的预制墙板厚度为100mm~250mm,预制墙板宽度在3m~6m。厚度和宽度也可按需求预制。Preferably, the thickness of the prefabricated wallboard is 100mm-250mm, and the width of the prefabricated wallboard is 3m-6m. Thickness and width can also be prefabricated on demand.
本实用新型的吊装预埋件在吊装时与吊钩相扣,便于预制柱吊装。吊装预埋件可以是吊钉。The hoisting embedded part of the utility model is interlocked with the hook during hoisting, which is convenient for hoisting of the prefabricated column. The embedded parts for hoisting can be hanging nails.
本实用新型的各类预制构件自工厂制作后运输至现场,采用吊装方式装配后形成装配式围墙。具有对施工场地要求低、施工快速、不造成环境污染、节约劳动力并提高围墙抗裂的优势。All kinds of prefabricated components of the utility model are transported to the site after being produced in the factory, and assembled by hoisting to form a prefabricated enclosure wall. It has the advantages of low requirements on the construction site, fast construction, no environmental pollution, labor saving and improved crack resistance of the fence.
采用本实用新型提供的技术方案,与现有技术相比,具有如下有益效果:Compared with the prior art, the technical solution provided by the utility model has the following beneficial effects:
(1)本实用新型在工厂采用机械化生产,不受气候制约,构件精准,且批量模数化生产,制作过程中损耗低、产品质量更易得到有效控制。(1) The utility model adopts mechanized production in the factory, which is not restricted by the climate, and the components are accurate, and it is produced in batches, with low loss in the production process, and the product quality is more easily controlled effectively.
(2)本实用新型在现场吊装速度快、对施工场地要求低、对周围的社会环境影响周期短、不造成环境污染、围墙抗裂优越的整体性能。(2) The utility model has fast hoisting speed on site, low requirements on the construction site, short period of impact on the surrounding social environment, no environmental pollution, and excellent overall performance of the enclosure wall against cracking.
附图说明Description of drawings
图1是本实用新型实施例1快速装配式围墙的结构示意图;Fig. 1 is a schematic structural view of a quick-assembled enclosure in Example 1 of the present utility model;
图2是本实用新型实施例1预制柱的侧面图;Fig. 2 is the side view of the prefabricated column of the utility model embodiment 1;
图3是本实用新型实施例1预制墙板的纵向断面图;Fig. 3 is a longitudinal sectional view of the prefabricated wall panel of Embodiment 1 of the present utility model;
图4是本实用新型实施例1快速装配式围墙的横向断面图;Fig. 4 is a transverse cross-sectional view of a quick-assembled enclosure in Example 1 of the utility model;
图5是本实用新型实施例1预制柱基础的断面图;Fig. 5 is a sectional view of the prefabricated column foundation of Embodiment 1 of the present utility model;
图6是本实用新型实施例2-3预制柱基座的示意图;Fig. 6 is a schematic diagram of the prefabricated column base of Example 2-3 of the present invention;
图7是本实用新型实施例1预制柱压顶的断面图;Fig. 7 is a cross-sectional view of prefabricated column topping in Example 1 of the utility model;
图8是本实用新型实施例1预制墙板压顶的断面图;Fig. 8 is a cross-sectional view of prefabricated wall panel topping in Example 1 of the present utility model;
图9是本实用新型实施例2快速装配式围墙的结构示意图;Fig. 9 is a schematic structural diagram of a quick-assembled enclosure wall according to Embodiment 2 of the present utility model;
图10是本实用新型实施例2预制柱的侧面图;Fig. 10 is a side view of the prefabricated column of Embodiment 2 of the present utility model;
图11是本实用新型实施例2预制墙板的纵向断面图;Fig. 11 is a longitudinal sectional view of the prefabricated wall panel of Embodiment 2 of the present utility model;
图12是本实用新型实施例2快速装配式围墙的横向断面图;Fig. 12 is a transverse cross-sectional view of the quick-assembled enclosure wall of Example 2 of the present utility model;
图13是本实用新型实施例3快速装配式围墙的结构示意图;Fig. 13 is a schematic structural diagram of a quick-assembled enclosure wall according to Embodiment 3 of the present invention;
图14是本实用新型实施例3快速装配式围墙的纵向断面图;Fig. 14 is a longitudinal sectional view of a quick-assembled enclosure wall according to Embodiment 3 of the present utility model;
图15是本实用新型实施例3快速装配式围墙的横向断面图;Fig. 15 is a transverse cross-sectional view of a quick-assembled enclosure wall according to Embodiment 3 of the present utility model;
图16是本实用新型实施例3快速装配式围墙的预制巡逻通道板平面图。Fig. 16 is a plan view of the prefabricated patrol channel plate of the quick-assembled enclosure wall in Embodiment 3 of the present utility model.
示意图中的标注说明:1、基坑;2、预制柱;3、预制墙板;4、预制墙板压顶;5、预制柱压顶;6、支撑预埋件;7、预埋柱脚板;8、型钢柱;9、销钉;10、固定螺栓;11、吊装预埋件;12、基座;13、立柱;14、预制巡逻通道梁;15、预制巡逻通道板;16、预制巡逻通道护栏。Notes in the schematic diagram: 1. Foundation pit; 2. Prefabricated column; 3. Prefabricated wall panel; 4. Topping with prefabricated wallboard; 1. Steel column; 9. Pin; 10. Fixing bolt; 11. Embedded parts for hoisting; 12. Base; 13. Column; 14. Prefabricated patrol channel beam; 15. Prefabricated patrol channel plate; 16. Prefabricated patrol channel guardrail.
具体实施方式detailed description
为进一步了解本实用新型的内容,结合附图和实施例对本实用新型作详细描述,但本实用新型的实施方式不限于此。In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and examples, but the implementation of the utility model is not limited thereto.
实施例1Example 1
结合图1-5、7-8,本实施例涉及的一种快速装配式围墙,其包括预制柱2、预制墙板3、预制墙板压顶4及预制柱压顶5。预制柱2为H型预制钢筋混凝土异性柱,在回填埋深面以下为基座12(柱脚基础),基座与立柱13整体预制。预制柱顶部设置吊装预埋件11,供预制柱起吊装配用。预制柱内外侧面可设有支撑预埋件6,供装配时临时定位加固用。预制柱沿围墙方向两侧(或一侧)设有空槽,待每跨围墙两端预制柱装配就位后,依次采用吊装装入预制墙板3、预制墙板压顶4、预制柱压顶5,使得预制墙板3两端设置在空槽内,预制柱压顶5安装在预制柱2的上方,预制墙板压顶4安装在预制墙板3上方。吊装预埋件11采用吊钉。支撑预埋件6采用螺栓套筒。Referring to Figures 1-5, 7-8, this embodiment relates to a quick-assembled fence, which includes prefabricated columns 2, prefabricated wall panels 3, prefabricated wall panel tops 4 and prefabricated column tops 5. The prefabricated column 2 is an H-shaped prefabricated reinforced concrete heterogeneous column, and the base 12 (column foot foundation) is below the backfill depth, and the base and the column 13 are integrally prefabricated. A hoisting embedded part 11 is arranged on the top of the precast column for hoisting and assembling of the precast column. The inner and outer sides of the prefabricated column can be provided with supporting embedded parts 6 for temporary positioning and reinforcement during assembly. There are empty grooves on both sides (or one side) of the prefabricated columns along the direction of the fence. After the prefabricated columns at both ends of each span of the fence are assembled in place, they are sequentially hoisted into the prefabricated wall panel 3, the prefabricated wall panel topping 4, and the prefabricated column topping 5 , so that the two ends of the prefabricated wall panel 3 are arranged in the cavity, the prefabricated column top 5 is installed above the prefabricated column 2 , and the prefabricated wall panel top 4 is installed above the prefabricated wall panel 3 . Lifting embedded parts 11 adopt hanging nails. The support embedded part 6 adopts a bolt sleeve.
本实用新型的墙板面板的厚度为100mm~250mm,采用轻质蒸压加气混凝土条板,也可以为预制混凝土围墙板,每段装配式围墙间距3m~6m,围墙高度可按实际使用要求拼接或定制。The thickness of the wallboard panel of the utility model is 100mm-250mm, and the lightweight autoclaved aerated concrete slats are used, or it can be a prefabricated concrete wall panel. The distance between each section of the assembled wall is 3m-6m, and the height of the wall can be according to the actual use requirements. Spliced or customized.
本实施例的快速装配式围墙采用以下步骤进行装配:The quick-assembled fence of the present embodiment adopts the following steps to assemble:
(1)在模台上绑扎好柱钢筋,在预制柱2内外侧面模板上设置好临时支撑预埋螺栓套筒6,组装好模板,固定吊钉11后浇筑混凝土。(1) Bind the column reinforcement on the formwork platform, set the temporary support embedded bolt sleeve 6 on the inner and outer side formwork of the prefabricated column 2, assemble the formwork, fix the hanging nail 11 and then pour concrete.
(2)混凝土养护强度达到要求后拆模,通过吊钉11起吊运输至存放场地或施工现场,埋设于开挖回填并夯实好的基坑1内。(2) After the concrete curing strength meets the requirements, the formwork is removed, lifted by the lifting nail 11 and transported to the storage site or the construction site, and buried in the excavated, backfilled and compacted foundation pit 1.
(3)混凝土类的预制墙板3、预制墙板压顶4、预制柱压顶5制作做法同预制柱2。(3) Concrete prefabricated wall panel 3, prefabricated wall panel topping 4, and prefabricated column topping 5 are manufactured in the same way as prefabricated column 2.
实施例2Example 2
参照图6、9-12,本实施例的一种快速装配式围墙型钢柱型与实施例1基本类似,其不同之处在于:本实施例的预制柱2包括基座12和H型型钢柱8,基座12顶端与型钢柱8底端采用柱脚板7相连。采用固定螺栓10将预制墙板与预制柱固定连接。采用销钉9将预制墙板3与预制墙板压顶4固定连接。Referring to Figures 6, 9-12, a quick-assembled wall-shaped steel column of this embodiment is basically similar to that of Example 1, the difference being that the prefabricated column 2 of this embodiment includes a base 12 and an H-shaped steel column 8. The top of the base 12 is connected to the bottom of the shaped steel column 8 by the column foot plate 7. The prefabricated wall panels and the prefabricated columns are fixedly connected by fixing bolts 10 . The prefabricated wallboard 3 is fixedly connected with the prefabricated wallboard top 4 by pins 9 .
本实施例的快速装配式围墙采用以下步骤进行装配:本实施例的预制柱2的基座12与型钢柱8分开制作、装配;基座12采用钢筋混凝土制作;预制柱8采用型钢柱制作;基座12顶部预埋型钢柱柱脚板7;本实施例2每段装配式围墙柱间距3m~6m,也可设置更小间距。The fast-assembled fence of this embodiment is assembled using the following steps: the base 12 of the prefabricated column 2 of this embodiment is manufactured and assembled separately from the steel column 8; the base 12 is made of reinforced concrete; the prefabricated column 8 is made of a steel column; The base 12 has a pre-embedded steel column foot plate 7; the spacing between each section of the assembled fence column in Embodiment 2 is 3m to 6m, and a smaller spacing can also be set.
实施例3Example 3
参照图6、13-16,本实施例的一种快速装配式围墙型钢柱型与实施例2基本类似,其不同之处在于:本实施例的预制墙板3侧挂于型钢柱8一侧,本实施例不需设置墙板压顶4和预制柱压顶5,型钢柱8另一侧顶部安装预制巡逻通道梁14,预制巡逻通道梁14将两个预制柱连接,预制巡逻通道板15叠放于预制巡逻通道梁14上并通过预留栓钉孔或螺栓连接,预制巡逻通道板15上方安装有预制巡逻通道护拦16,预制巡逻通道护栏16通过预制巡逻通道板15上设置的埋件连接固定。Referring to Figures 6, 13-16, a quick-assembled wall-shaped steel column of this embodiment is basically similar to that of Example 2, the difference being that the side of the prefabricated wall panel 3 of this embodiment is hung on one side of the steel column 8 In this embodiment, there is no need to set up the wall panel top 4 and the prefabricated column top 5, and the other side of the steel column 8 is installed with a prefabricated patrol channel beam 14, the prefabricated patrol channel beam 14 connects two prefabricated columns, and the prefabricated patrol channel plate 15 is stacked On the prefabricated patrol channel beam 14 and connected by reserved peg holes or bolts, the prefabricated patrol channel barrier 16 is installed above the prefabricated patrol channel plate 15, and the prefabricated patrol channel guardrail 16 is connected by the embedded parts set on the prefabricated patrol channel plate 15 fixed.
本实施例的快速装配式围墙装配步骤同实施例2,并在后续步骤上依次增设装配预制巡逻通道梁14、预制巡逻通道板15、预制巡逻通道护栏16。The assembly steps of the quick-assembled fence in this embodiment are the same as those in Embodiment 2, and the prefabricated patrol channel beams 14, prefabricated patrol channel panels 15, and prefabricated patrol channel guardrails 16 are sequentially added in subsequent steps.
以上示意性的对本实用新型及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本实用新型的实施方案之一,实际的结构并不局限于此。所以本领域的普通技术人员受其启示,在不脱离本实用新型创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本实用新型的保护范围。The above schematically describes the utility model and its implementation, which is not restrictive, and what is shown in the accompanying drawings is only one of the implementations of the utility model, and the actual structure is not limited thereto. Therefore, those of ordinary skill in the art are inspired by it, and without departing from the purpose of the utility model, without creatively designing structural methods and embodiments similar to the technical solution, all should belong to the protection scope of the utility model .
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621404243.2U CN206329145U (en) | 2016-12-20 | 2016-12-20 | A kind of quick assembled type enclosure wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621404243.2U CN206329145U (en) | 2016-12-20 | 2016-12-20 | A kind of quick assembled type enclosure wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206329145U true CN206329145U (en) | 2017-07-14 |
Family
ID=59290389
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621404243.2U Expired - Fee Related CN206329145U (en) | 2016-12-20 | 2016-12-20 | A kind of quick assembled type enclosure wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206329145U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109209011A (en) * | 2018-09-14 | 2019-01-15 | 上海建工二建集团有限公司 | Prefabricated enclosing wall coping and manufacturing and construction method thereof |
| CN109667469A (en) * | 2018-12-29 | 2019-04-23 | 龙信集团江苏建筑产业有限公司 | A kind of prefabricated assembled recycling enclosure wall |
| CN110847699A (en) * | 2019-11-28 | 2020-02-28 | 松塔知识产权运营武汉有限公司 | High performance concrete prefabricated fence |
| CN110924743A (en) * | 2019-11-25 | 2020-03-27 | 江苏联卓建筑科技有限公司 | Prefabricated enclosure wall structure with prefabricated light partition plate |
-
2016
- 2016-12-20 CN CN201621404243.2U patent/CN206329145U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109209011A (en) * | 2018-09-14 | 2019-01-15 | 上海建工二建集团有限公司 | Prefabricated enclosing wall coping and manufacturing and construction method thereof |
| CN109667469A (en) * | 2018-12-29 | 2019-04-23 | 龙信集团江苏建筑产业有限公司 | A kind of prefabricated assembled recycling enclosure wall |
| CN110924743A (en) * | 2019-11-25 | 2020-03-27 | 江苏联卓建筑科技有限公司 | Prefabricated enclosure wall structure with prefabricated light partition plate |
| CN110847699A (en) * | 2019-11-28 | 2020-02-28 | 松塔知识产权运营武汉有限公司 | High performance concrete prefabricated fence |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107401217B (en) | A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method | |
| CN203213346U (en) | Connecting structure for assembling integral concrete frame and shear wall | |
| CN103243838A (en) | Connection structure of integrally assembled concrete frame and shear wall | |
| CN108222270B (en) | Assembling construction building method of prefabricated building | |
| CN105780964B (en) | A kind of light block filling wall and frame structure construction technique | |
| CN207749908U (en) | A kind of enclosure wall of full assembly lightweight steel construction | |
| CN211114066U (en) | Assembled lightweight concrete slab type house structure | |
| CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
| CN112227759B (en) | Repair, reinforcement and migration method for historic building clean water wall | |
| CN206329145U (en) | A kind of quick assembled type enclosure wall | |
| CN208023601U (en) | A kind of prefabricated pile foundation support table side form of mutual buckle type | |
| CN208251372U (en) | A kind of assembled steel reinforced concrete shear force wall | |
| CN108978713A (en) | A kind of prefabrication elevator shaft foundation pit and its installation method | |
| CN107989238A (en) | A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method | |
| CN110748077A (en) | Prestressed truss wallboard, wall body manufactured by using wallboard and manufacturing method of wall body | |
| CN104712086A (en) | Assembled type concrete hollow composite floor slab and manufacturing method thereof | |
| CN111519960A (en) | A fully assembled concrete low-voltage power distribution room and its manufacturing method | |
| CN111075101A (en) | A BM interlocking block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof | |
| CN204401844U (en) | Easy-to-install laminated floor slab | |
| JP2011069151A (en) | Concrete panel form | |
| CN103572874A (en) | Method for constructing reinforced concrete composite floor slab of steel frame house | |
| CN219033728U (en) | A new type of laminated floor slab based on UHPC | |
| CN204959963U (en) | Compound lightweight wall housing construction of assembled steel frame | |
| CN110593449A (en) | Assembly type light vertical bar plate type bearing wall structure and construction method thereof | |
| CN206396892U (en) | Building block and building structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 311419 Building No. 53, Yushan Village, Yushan Township, Fuyang City, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Hangjiazetong Building Energy Saving New Materials Co.,Ltd. Address before: 311419 Building No. 53, Yushan Village, Yushan Township, Fuyang City, Hangzhou City, Zhejiang Province Patentee before: HANGZHOU ZETONG BUILDING ENERGY SAVING NEW MATERIAL CO.,LTD. |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 311419 building 4, No. 53, zhumufan, Yushan village, Yushan Township, Fuyang District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Jinyuhang Jialvjian Technology Co.,Ltd. Country or region after: China Address before: 311400 building 4, No. 53, Zhumu fan, Yushan village, Yushan Township, Fuyang City, Hangzhou City, Zhejiang Province Patentee before: Zhejiang Hangjiazetong Building Energy Saving New Materials Co.,Ltd. Country or region before: China |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170714 |