CN108118807A - A steel frame concrete partition wall panel and its construction method - Google Patents

A steel frame concrete partition wall panel and its construction method Download PDF

Info

Publication number
CN108118807A
CN108118807A CN201810112547.9A CN201810112547A CN108118807A CN 108118807 A CN108118807 A CN 108118807A CN 201810112547 A CN201810112547 A CN 201810112547A CN 108118807 A CN108118807 A CN 108118807A
Authority
CN
China
Prior art keywords
steel
frame
concrete
partition wall
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810112547.9A
Other languages
Chinese (zh)
Inventor
刘晓强
郭大鹏
王志刚
王强
王俊川
司永波
张爱国
马恒勇
韩翠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Xinxing Construction Engineering Co ltd
Original Assignee
China Xinxing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Xinxing Construction Engineering Co ltd filed Critical China Xinxing Construction Engineering Co ltd
Priority to CN201810112547.9A priority Critical patent/CN108118807A/en
Publication of CN108118807A publication Critical patent/CN108118807A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/7407Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a steel frame concrete partition board and a construction method thereof, and the steel frame concrete partition board comprises a plurality of frames welded by steel pipes or channel steel, wherein the frames are arranged and welded, the frames comprise a plurality of vertical beams including the vertical beams at two sides and a plurality of cross beams including upper and lower cross beams, steel bars and steel wire meshes are laid between the steel pipes or the channel steel, concrete mortar is poured on the steel bars and the steel wire meshes between the steel pipes or the channel steel, the thickness of the concrete mortar is equal to that of the frames, two side surfaces of the steel pipes or the channel steel are exposed on the surface of the concrete mortar, the exposed surfaces of the concrete mortar and the steel pipes or the channel steel at two sides are respectively connected and provided with a layer of steel wire meshes through fixing nails, and decorative surface layers are arranged outside the steel. The invention can greatly improve the capability of the partition wall for bearing the weight of the surface layer, reduce the thickness of the partition wall to increase the using area of the building, accelerate the construction progress and save the construction cost.

Description

一种钢框混凝土隔墙板及其施工方法A steel frame concrete partition wall panel and its construction method

技术领域technical field

本发明涉及一种钢框混凝土隔墙板及其施工方法。The invention relates to a steel frame concrete partition wall board and a construction method thereof.

背景技术Background technique

随着我国经济的快速发展和人民物质文化需求的增长,对民用建筑的使用功能提出了更高的要求,越来越多的室内墙体采用粘贴墙面、石材等装饰面层以提升观感效果,满足人们的审美需求。另外,在满足使用功能的前提下,减少隔墙厚度,能够有效增加建筑物的使用面积,提升空间利用率。而加快施工速度,提高单位时间的工程产值,是降低施工成本,提升投资回报率的重要方法之一。这就要求采用一种即能满足承载较重的装饰层面,又能有效减小厚度,并可以进行预制和快速施工的隔墙种类。With the rapid development of my country's economy and the growth of people's material and cultural needs, higher requirements are put forward for the use of civil buildings. More and more indoor walls use decorative surfaces such as pasted walls and stones to enhance the visual effect. , to meet people's aesthetic needs. In addition, on the premise of satisfying the use function, reducing the thickness of the partition wall can effectively increase the usable area of the building and improve the space utilization rate. Accelerating the construction speed and improving the project output value per unit time is one of the important methods to reduce the construction cost and increase the return on investment. This requires the use of a type of partition wall that can meet the heavy load-bearing decorative layer, effectively reduce the thickness, and can be prefabricated and quickly constructed.

发明内容Contents of the invention

本发明的目的在于提供一种钢框混凝土隔墙板及其施工方法,通过在预先由槽钢或钢管制作的钢骨架中浇筑混凝土形成隔墙预制板,然后在将隔墙预制板现场支撑固定后涂抹上装饰层形成混凝土隔墙板。The object of the present invention is to provide a steel frame concrete partition wall panel and its construction method. The prefabricated partition wall panel is formed by pouring concrete in the steel skeleton made of channel steel or steel pipe in advance, and then the prefabricated panel of the partition wall is supported and fixed on site. Then apply the upper decorative layer to form a concrete partition wall.

为了实现上述目的,本发明的技术方案是:一种钢框混凝土隔墙板,钢框混凝土隔墙板支撑在地面楼板和顶板楼板之间,所述隔墙板包括由钢管或槽钢焊接的多个框架,多个框架排列焊接连接,其中,所述框架包括两侧竖梁在内的多个竖梁和包括上下横梁在内的多个横梁,在钢管或槽钢之间铺设有钢筋和钢丝网片,在钢管或槽钢之间的钢筋和钢丝网片上浇筑有混凝土砂浆,混凝土砂浆的厚度等于框架的厚度,钢管或槽钢的两侧面暴露在混凝土砂浆的表面,在两侧的混凝土砂浆和钢管或槽钢暴露的表面分别通过固定钉连接设置有一层钢丝网,在钢丝网外设置有装饰面层。In order to achieve the above object, the technical solution of the present invention is: a steel frame concrete partition wall panel, the steel frame concrete partition wall panel is supported between the ground floor and the roof floor, and the partition wall panel includes steel pipe or channel steel welded A plurality of frames, a plurality of frames are arranged and welded, wherein, the frame includes a plurality of vertical beams including vertical beams on both sides and a plurality of cross beams including upper and lower beams, and steel bars and channel steel are laid between steel pipes or channel steels. Steel mesh, concrete mortar is poured on the steel bars and steel mesh between the steel pipe or channel steel, the thickness of the concrete mortar is equal to the thickness of the frame, the two sides of the steel pipe or channel steel are exposed on the surface of the concrete mortar, the concrete on both sides The exposed surfaces of the mortar and the steel pipe or the channel steel are respectively connected by fixing nails and provided with a layer of steel wire mesh, and a decorative surface layer is arranged outside the steel mesh.

方案进一步是:所述框架的宽度不大于1000mm。The solution further is: the width of the frame is not greater than 1000mm.

方案进一步是:在所述装饰面层和钢丝网之间从内至外顺序设置有抹灰层和粘接层。The solution is further as follows: a plastering layer and an adhesive layer are sequentially arranged between the decorative surface layer and the steel wire mesh from inside to outside.

方案进一步是:框架上横梁与顶板楼板紧贴采用锚固连接,框架下横梁与框架竖梁下端面不在一个水平面上,框架竖梁下端面与地面楼板紧贴采用锚固连接,框架下横梁与地面楼板之间设置有混凝土防水墙体。The scheme is further: the upper beam of the frame is closely connected to the roof floor by anchoring, the lower beam of the frame is not on the same level as the lower end of the vertical beam of the frame, the lower end of the vertical beam of the frame is closely connected to the ground floor by anchoring, and the lower beam of the frame is connected to the ground floor Concrete waterproof walls are set in between.

方案进一步是:所述混凝土防水墙的高度至少是200mm。The solution further is: the height of the concrete waterproof wall is at least 200mm.

一种钢框混凝土隔墙板施工方法,在制作好的预制板表面铺设装饰面层,其中:预制板制作的方法步骤包括车间施工和现场施工:A construction method for a steel frame concrete partition wall panel, in which a decorative surface layer is laid on the surface of a prepared prefabricated panel, wherein: the method steps for making the prefabricated panel include workshop construction and on-site construction:

所述车间施工是:使用钢管或槽钢焊接焊起多个框架,框架包括两侧竖梁在内的多个竖梁和包括上下横梁在内的多个横梁,其中:框架的上端横梁与竖梁上端平齐连接,框架的下端横梁距离竖梁下端一段距离与竖梁连接,在竖梁与横梁之间焊接多条钢筋,钢筋上通过焊接或用钢丝捆扎铺设有钢丝网片,将框架平铺在地面,用混凝土砂浆浇筑在竖梁与横梁之间的钢筋和丝网片上展平、凝固,钢管或槽钢的两侧面暴露在混凝土砂浆的表面;The construction of the workshop is: using steel pipe or channel steel to weld and weld multiple frames, the frame includes multiple vertical beams including vertical beams on both sides and multiple beams including upper and lower beams, wherein: the upper beam of the frame and the vertical beam The upper ends of the beams are evenly connected, and the lower end of the frame is connected to the vertical beams at a distance from the lower end of the vertical beams. A number of steel bars are welded between the vertical beams and the beams, and steel mesh sheets are laid on the steel bars by welding or binding with steel wires to flatten the frame. Lay it on the ground, pour concrete mortar on the steel bar and wire mesh between the vertical beam and the beam to flatten and solidify, and the two sides of the steel pipe or channel steel are exposed on the surface of the concrete mortar;

所述施工现场施工是:将浇筑好混凝土的多个框架排列焊接在一起支撑在地面楼板和顶板楼板之间,框架上端横梁与顶板楼板紧贴采用锚固连接,框架竖梁下端面与地面楼板紧贴采用锚固连接,在地面楼板与框架的下端横梁之间的一段距离内两侧支撑模板,在模板内浇筑混凝土砂浆,待混凝土砂浆凝固后拆掉模板形成地面楼板与框架的下端横梁之间的防水墙。The construction on the construction site is as follows: a plurality of frames that have poured concrete are arranged and welded together to be supported between the ground floor and the roof floor, the beam at the upper end of the frame is closely attached to the roof floor and connected by anchors, and the lower end surface of the vertical beam of the frame is tightly connected to the ground floor. Anchor connection is adopted for pasting, the formwork is supported on both sides within a certain distance between the ground floor and the lower end beam of the frame, concrete mortar is poured in the formwork, and the formwork is removed after the concrete mortar solidifies to form a gap between the ground floor and the lower end beam of the frame waterproof wall.

方案进一步是:所述的一段距离是200mm至300mm。The solution further is: the distance is 200mm to 300mm.

方案进一步是:所述框架的包括两侧竖梁在内一共三根竖梁,框架的宽度不大于1000mm。The solution is further as follows: the frame has a total of three vertical beams including the vertical beams on both sides, and the width of the frame is not greater than 1000mm.

方案进一步是:在做好的预制板表面铺设装饰面层的步骤是:在两侧的混凝土砂浆表面、包括防水墙分别通过固定钉连接设置有一层钢丝网,固定钉的间距不大于300mm,固定钉距离钢管或槽钢不大于150mm,然后进行分层抹灰,最后在抹灰层上进行装饰面层的施工。The plan is further: the step of laying the decorative surface layer on the surface of the finished prefabricated slab is: a layer of steel wire mesh is installed on the concrete mortar surface on both sides, including the waterproof wall, respectively connected by fixing nails, and the distance between the fixing nails is not greater than 300mm. The distance between the nails and the steel pipe or channel steel is not greater than 150mm, and then plastered in layers, and finally the decorative surface layer is constructed on the plastered layer.

方案进一步是:所述装饰面层是贴面砖或石材,贴面砖或石材通过涂胶粘接在抹灰层表面。The solution is further as follows: the decorative surface layer is veneer brick or stone material, and the veneer brick or stone material is bonded to the surface of the plastering layer by applying glue.

本发明的有益效果是:本发明可以大大提高隔墙承载面层重量的能力,减少了隔墙厚度以增加建筑使用面积,加快施工进度,并节约施工成本。The beneficial effects of the invention are: the invention can greatly improve the ability of the partition wall to bear the weight of the surface layer, reduce the thickness of the partition wall to increase the building use area, speed up the construction progress, and save the construction cost.

下面结合附图和实施例对本发明进行详细描述。The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

附图说明Description of drawings

图1是本发明框架组装结构示意图;Fig. 1 is a schematic diagram of the frame assembly structure of the present invention;

图2是本发明框架结构示意图;Fig. 2 is a schematic diagram of the frame structure of the present invention;

图3是本发明框架与地面楼板之间含有混凝土防水墙体结构示意图;Fig. 3 is a schematic diagram of the structure of a concrete waterproof wall between the framework of the present invention and the floor slab;

图4是本发明锚接结构示意图,图1的A部放大示意图;Fig. 4 is a schematic diagram of the anchoring structure of the present invention, an enlarged schematic diagram of part A of Fig. 1;

图5是本发明框架中门框处理结构示意图。Fig. 5 is a schematic diagram of the frame processing structure in the framework of the present invention.

具体实施方式Detailed ways

实施例1:Example 1:

一种钢框混凝土隔墙板,如图1、图2、图3所示,所述钢框混凝土隔墙板支撑在地面楼板1和顶板楼板2之间,所述隔墙板包括由钢管或槽钢3焊接的多个框架4,由于钢管或槽钢的刚性好强度高,因此,隔墙板的厚度比传统的墙板薄,通常不大于100mm,可以是50mm;多个框架排列焊接连接在地面楼板1和顶板楼板2之间,其中,如图2所示,框架包括两侧竖梁在内的多个竖梁和包括上下横梁在内多个横梁,在钢管或槽钢之间焊接铺设有钢筋5和钢丝网片6,钢筋宜采用8mm-12mm的螺纹钢筋,钢筋间距宜为100-200mm;在钢管或槽钢之间的钢筋和钢丝网片上浇筑有混凝土砂浆7,混凝土砂浆的厚度等于框架的厚度,钢管或槽钢的两侧面暴露在混凝土砂浆的表面,在两侧的混凝土砂浆和钢管或槽钢暴露的表面分别通过固定钉连接设置有一层钢丝网,在钢丝网外设置有装饰面层。在框架中,钢管或槽钢的间距横向不大于500mm,高度方向不大于800mm,因此:所述框架的竖梁通常是3个,框架的宽度不大于1000mm。所述框架的横梁根据隔墙的高度而定,隔墙中的电线管8与接线盒9可以预先埋设在框架中。A steel frame concrete partition wall panel, as shown in Figure 1, Figure 2, and Figure 3, the steel frame concrete partition wall panel is supported between the ground floor 1 and the roof floor 2, and the partition wall panel is made of steel pipes or Multiple frames 4 welded by channel steel 3, due to the good rigidity and high strength of steel pipes or channel steel, the thickness of the partition wall is thinner than traditional wall panels, usually not more than 100mm, and can be 50mm; multiple frames are welded and connected Between the ground floor 1 and the roof floor 2, wherein, as shown in Figure 2, the frame includes multiple vertical beams including vertical beams on both sides and multiple beams including upper and lower beams, welded between steel pipes or channel steel Steel bars 5 and steel wire mesh sheets 6 are laid, and the steel bars should be threaded steel bars of 8mm-12mm, and the spacing between the steel bars should be 100-200mm; concrete mortar 7 is poured on the steel bars and steel mesh sheets between steel pipes or channel steels, and the concrete mortar The thickness is equal to the thickness of the frame. The two sides of the steel pipe or channel steel are exposed on the surface of the concrete mortar. The exposed surfaces of the concrete mortar on both sides and the steel pipe or channel steel are respectively connected by fixing nails. A layer of steel wire mesh is installed outside the steel mesh. With decorative finish. In the frame, the distance between the steel pipes or channel steels is not more than 500mm in the horizontal direction, and not more than 800mm in the height direction. Therefore: the vertical beams of the frame are usually 3, and the width of the frame is not more than 1000mm. The beams of the frame are determined according to the height of the partition wall, and the wire pipes 8 and junction boxes 9 in the partition wall can be pre-embedded in the frame.

其中:装饰面层可以是瓷砖或石材,在所述装饰面层和钢丝网之间从内至外顺序设置有抹灰层和粘接层;抹灰层用于找平。Wherein: the decorative surface layer can be ceramic tiles or stone materials, and a plaster layer and an adhesive layer are sequentially arranged between the decorative surface layer and the steel wire mesh from inside to outside; the plaster layer is used for leveling.

实施例中:如图1所示,框架上横梁401上端面与框架竖梁402上端面平齐与顶板楼板紧贴采用锚固连接;隔墙需要有防水防潮,因此,如图3所示,框架下横梁403与框架竖梁下端面不在一个水平面上,框架下横梁向上缩进一个距离,其余地面楼板固定是框架竖梁下端面与地面楼板紧贴采用锚固连接,框架下(最底)横梁与地面楼板之间设置混凝土防水墙体10。如图4所示,实施例中的所述锚接是通过在框架竖梁两侧设置的角铁11。其中,所述混凝土防水墙的高度至少是200mm。In the embodiment: as shown in Figure 1, the upper end surface of the upper beam 401 of the frame is flush with the upper end surface of the vertical beam 402 of the frame and is closely attached to the roof floor and is connected by anchoring; the partition wall needs to be waterproof and moisture-proof, therefore, as shown in Figure 3, the frame The lower beam 403 is not on the same level as the lower end of the vertical beam of the frame. The lower beam of the frame is indented upwards by a certain distance. Concrete waterproof walls 10 are arranged between the ground slabs. As shown in FIG. 4 , the anchor connection in the embodiment is through angle irons 11 provided on both sides of the vertical beam of the frame. Wherein, the height of the concrete waterproof wall is at least 200mm.

实施例中:当隔墙出现门框时,如图5所示,在门框两侧竖梁内和门框上横梁下分别增加设置槽钢12。In the embodiment: when there is a door frame on the partition wall, as shown in Figure 5, channel steel 12 is respectively added in the vertical beams on both sides of the door frame and under the upper beam of the door frame.

实施例2:Example 2:

一种钢框混凝土隔墙板施工方法,在制作好的预制板表面铺设装饰面层,是针对实施例1钢框混凝土隔墙板的施工方法,因此其实施例1的内容也应适合于本实施例。其中:预制板制作可以有部分在车间制作,将在车间制作的部分运到现场组装,因此可以大大加快施工的进度,以及保证墙的质量。因此,预制板制作的方法步骤包括车间施工和现场施工:A construction method for a steel frame concrete partition wall panel, in which a decorative surface layer is laid on the surface of a prepared prefabricated panel, is the construction method for the steel frame concrete partition wall panel in Example 1, so the content of Example 1 should also be suitable for this application Example. Among them: the production of prefabricated panels can be partly produced in the workshop, and the part produced in the workshop will be transported to the site for assembly, so the construction progress can be greatly accelerated and the quality of the wall can be guaranteed. Thus, the method steps for the manufacture of prefabricated panels include workshop construction and on-site construction:

其中,所述车间施工是:使用钢管或槽钢焊接焊起多个框架,框架包括两侧竖梁在内的多个竖梁和包括上下横梁在内的多个横梁,其中:框架的上端横梁上端面与竖梁上端平齐连接,框架的下端横梁距离竖梁下端一段距离与竖梁连接,在竖梁与横梁之间焊接多条钢筋,钢筋宜采用8mm-12mm的螺纹钢筋,钢筋间距宜为100-200mm;钢筋上通过焊接或用钢丝捆扎铺设有钢丝网片,将框架平铺在地面,用混凝土砂浆浇筑在竖梁与横梁之间的钢筋和丝网片上展平、振捣密实,抹平并经养护后凝固形成钢框混凝土条板;钢管或槽钢的两侧面暴露在混凝土砂浆的表面;Wherein, the workshop construction is: using steel pipe or channel steel to weld and weld multiple frames, the frame includes multiple vertical beams including vertical beams on both sides and multiple beams including upper and lower beams, wherein: the upper beam of the frame The upper end surface is flush with the upper end of the vertical beam, and the lower beam of the frame is connected with the vertical beam at a certain distance from the lower end of the vertical beam. Multiple steel bars are welded between the vertical beam and the horizontal beam. 100-200mm; steel wire mesh sheets are laid on the steel bars by welding or binding with steel wires, the frame is laid flat on the ground, and concrete mortar is poured on the steel bars and wire mesh sheets between the vertical beams and beams to flatten and vibrate compactly. Smoothed and solidified after curing to form a steel frame concrete slab; both sides of the steel pipe or channel steel are exposed on the surface of the concrete mortar;

所述施工现场施工是:将浇筑好混凝土的多个框架运抵施工现场,排列焊接在一起支撑在地面楼板和顶板楼板之间,框架上端横梁与顶板楼板紧贴采用锚固连接,框架竖梁下端面与地面楼板紧贴采用锚固连接,在地面楼板与框架的下端横梁之间的一段距离内两侧支撑模板,在模板内浇筑混凝土砂浆,待混凝土砂浆凝固后拆掉模板形成地面楼板与框架的下端横梁之间的防水墙;隔墙中的电线管8与接线盒9可以预先埋设在框架中。实施例中,当隔墙出现门框时,如图5所示,在门框两侧竖梁内和门框上横梁下分别增加设置槽钢12。The construction at the construction site is as follows: multiple frames that have poured concrete are transported to the construction site, arranged and welded together to support between the ground floor and the roof floor, the beams at the upper end of the frames are closely attached to the roof floor and connected by anchors, and the vertical beams of the frames are connected by anchors. The end face and the ground floor are closely connected by anchoring. The formwork is supported on both sides within a certain distance between the ground floor and the lower end beam of the frame, and concrete mortar is poured in the formwork. After the concrete mortar is solidified, the formwork is removed to form the connection between the ground floor and the frame. The waterproof wall between the lower end beams; the wire pipe 8 and the junction box 9 in the partition wall can be embedded in the frame in advance. In the embodiment, when there is a door frame on the partition wall, as shown in FIG. 5 , channel steel 12 is respectively added in the vertical beams on both sides of the door frame and under the upper beam of the door frame.

实施例中:所述的一段距离也就是防水墙的高度是200mm至300mm。并且:所述框架的包括两侧竖梁在内一共三根竖梁,框架的宽度不大于1000mm。In the embodiment: the distance, that is, the height of the waterproof wall is 200mm to 300mm. And: the frame has three vertical beams including the vertical beams on both sides, and the width of the frame is not greater than 1000mm.

实施例中:在做好的预制板表面铺设装饰面层的步骤是:在两侧的混凝土砂浆表面、包括防水墙分别通过固定钉连接设置有一层钢丝网,固定钉的间距不大于300mm,固定钉距离钢管或槽钢不大于150mm,然后进行分层抹灰,最后在抹灰层上进行装饰面层的施工。其中:所述装饰面层是贴面砖或石材,贴面砖或石材通过涂胶粘接在抹灰层表面。In the embodiment: the step of laying the decorative surface layer on the surface of the prefabricated slab is: on the concrete mortar surface on both sides, including the waterproof wall, a layer of steel wire mesh is respectively connected by fixing nails, and the spacing of the fixing nails is not greater than 300mm. The distance between the nails and the steel pipe or channel steel is not greater than 150mm, and then plastered in layers, and finally the decorative surface layer is constructed on the plastered layer. Wherein: the decorative surface layer is veneer brick or stone material, and the veneer brick or stone material is bonded to the surface of the plastering layer by applying glue.

Claims (10)

1.一种钢框混凝土隔墙板,钢框混凝土隔墙板支撑在地面楼板和顶板楼板之间,所述隔墙板包括由钢管或槽钢焊接的多个框架,多个框架排列焊接连接,其特征在于,所述框架包括两侧竖梁在内的多个竖梁和包括上下横梁在内的多个横梁,在钢管或槽钢之间铺设有钢筋和钢丝网片,在钢管或槽钢之间的钢筋和钢丝网片上浇筑有混凝土砂浆,混凝土砂浆的厚度等于框架的厚度,钢管或槽钢的两侧面暴露在混凝土砂浆的表面,在两侧的混凝土砂浆和钢管或槽钢暴露的表面分别通过固定钉连接设置有一层钢丝网,在钢丝网外设置有装饰面层。1. A steel frame concrete partition wall panel, the steel frame concrete partition wall panel is supported between the ground floor and the roof floor, and the partition wall panel includes a plurality of frames welded by steel pipes or channel steel, and the plurality of frames are arranged and welded , characterized in that the frame includes multiple vertical beams including vertical beams on both sides and multiple beams including upper and lower beams, steel bars and steel wire mesh sheets are laid between steel pipes or channel steels, and steel wire mesh sheets are laid between steel pipes or channel steel Concrete mortar is poured on the steel bars and steel wire mesh between the steel sheets, the thickness of the concrete mortar is equal to the thickness of the frame, the two sides of the steel pipe or channel steel are exposed on the surface of the concrete mortar, and the concrete mortar on both sides and the steel pipe or channel steel are exposed A layer of steel wire mesh is arranged on the surface respectively connected by fixing nails, and a decorative surface layer is arranged outside the steel mesh. 2.根据权利要求1所述的钢框混凝土隔墙板,其特征在于,所述框架的宽度不大于1000mm。2. The steel frame concrete partition wall panel according to claim 1, characterized in that the width of the frame is not greater than 1000mm. 3.根据权利要求1所述的钢框混凝土隔墙板,其特征在于,在所述装饰面层和钢丝网之间从内至外顺序设置有抹灰层和粘接层。3. The steel frame concrete partition wall panel according to claim 1, characterized in that, a plaster layer and an adhesive layer are sequentially arranged between the decorative surface layer and the steel wire mesh from inside to outside. 4.根据权利要求1所述的钢框混凝土隔墙板,其特征在于,框架上横梁与顶板楼板紧贴采用锚固连接,框架下横梁与框架竖梁下端面不在一个水平面上,框架竖梁下端面与地面楼板紧贴采用锚固连接,框架下横梁与地面楼板之间设置有混凝土防水墙体。4. The steel frame concrete partition wall panel according to claim 1, characterized in that, the upper beam of the frame and the roof slab are closely connected by anchoring, the lower beam of the frame and the lower end surface of the vertical beam of the frame are not on the same horizontal plane, and the lower end of the vertical beam of the frame is not on the same horizontal plane. The end face is close to the ground floor and connected by anchors, and a concrete waterproof wall is set between the lower beam of the frame and the ground floor. 5.根据权利要求4所述的钢框混凝土隔墙板,其特征在于,所述混凝土防水墙的高度至少是200mm。5. The steel frame concrete partition wall panel according to claim 4, wherein the concrete waterproof wall has a height of at least 200mm. 6.一种钢框混凝土隔墙板施工方法,在制作好的预制板表面铺设装饰面层,其特征在于:预制板制作的方法步骤包括车间施工和现场施工:6. A steel frame concrete partition wall panel construction method, laying a decorative surface layer on the surface of the prepared prefabricated panel, is characterized in that: the method steps of prefabricated panel production include workshop construction and on-site construction: 所述车间施工是:使用钢管或槽钢焊接焊起多个框架,框架包括两侧竖梁在内的多个竖梁和包括上下横梁在内的多个横梁,其中:框架的上端横梁与竖梁上端平齐连接,框架的下端横梁距离竖梁下端一段距离与竖梁连接,在竖梁与横梁之间焊接多条钢筋,钢筋上通过焊接或用钢丝捆扎铺设有钢丝网片,将框架平铺在地面,用混凝土砂浆浇筑在竖梁与横梁之间的钢筋和丝网片上展平、凝固,钢管或槽钢的两侧面暴露在混凝土砂浆的表面;The construction of the workshop is: using steel pipe or channel steel to weld and weld multiple frames, the frame includes multiple vertical beams including vertical beams on both sides and multiple beams including upper and lower beams, wherein: the upper beam of the frame and the vertical beam The upper ends of the beams are evenly connected, and the lower end of the frame is connected to the vertical beams at a distance from the lower end of the vertical beams. A number of steel bars are welded between the vertical beams and the beams, and steel mesh sheets are laid on the steel bars by welding or binding with steel wires to flatten the frame. Lay it on the ground, pour concrete mortar on the steel bar and wire mesh between the vertical beam and the beam to flatten and solidify, and the two sides of the steel pipe or channel steel are exposed on the surface of the concrete mortar; 所述施工现场施工是:将浇筑好混凝土的多个框架排列焊接在一起支撑在地面楼板和顶板楼板之间,框架上端横梁与顶板楼板紧贴采用锚固连接,框架竖梁下端面与地面楼板紧贴采用锚固连接,在地面楼板与框架的下端横梁之间的一段距离内两侧支撑模板,在模板内浇筑混凝土砂浆,待混凝土砂浆凝固后拆掉模板形成地面楼板与框架的下端横梁之间的防水墙。The construction on the construction site is as follows: a plurality of frames that have poured concrete are arranged and welded together to be supported between the ground floor and the roof floor, the beam at the upper end of the frame is closely attached to the roof floor and connected by anchors, and the lower end surface of the vertical beam of the frame is tightly connected to the ground floor. Anchor connection is adopted for pasting, the formwork is supported on both sides within a certain distance between the ground floor and the lower end beam of the frame, concrete mortar is poured in the formwork, and the formwork is removed after the concrete mortar solidifies to form a gap between the ground floor and the lower end beam of the frame waterproof wall. 7.根据权利要求6所述的钢框混凝土隔墙板施工方法,其特征在于,所述的一段距离是200mm至300mm。7. The construction method for steel frame concrete partition wall panels according to claim 6, characterized in that, the distance is 200mm to 300mm. 8.根据权利要求6所述的钢框混凝土隔墙板施工方法,其特征在于,所述框架的包括两侧竖梁在内一共三根竖梁,框架的宽度不大于1000mm。8. The construction method for steel frame concrete partition wall panels according to claim 6, characterized in that there are three vertical beams in the frame including the vertical beams on both sides, and the width of the frame is not greater than 1000mm. 9.根据权利要求6所述的钢框混凝土隔墙板施工方法,其特征在于,在做好的预制板表面铺设装饰面层的步骤是:在两侧的混凝土砂浆表面、包括防水墙分别通过固定钉连接设置有一层钢丝网,固定钉的间距不大于300mm,固定钉距离钢管或槽钢不大于150mm,然后进行分层抹灰,最后在抹灰层上进行装饰面层的施工。9. The construction method of steel frame concrete partition wall panels according to claim 6, characterized in that, the step of laying a decorative surface layer on the surface of the prefabricated panel is: the concrete mortar surfaces on both sides, including waterproof walls, pass through the There is a layer of steel wire mesh for the connection of the fixing nails, the distance between the fixing nails is not more than 300mm, and the distance between the fixing nails is not more than 150mm from the steel pipe or channel steel, and then plastering is carried out in layers, and finally the decorative surface layer is constructed on the plastering layer. 10.据权利要求6所述的钢框混凝土隔墙板施工方法,其特征在于,所述装饰面层是贴面砖或石材,贴面砖或石材通过涂胶粘接在抹灰层表面。10 . The construction method for steel frame concrete partition wall panels according to claim 6 , wherein the decorative surface layer is veneer brick or stone, and the veneer brick or stone is bonded to the surface of the plastering layer by applying glue. 11 .
CN201810112547.9A 2018-02-05 2018-02-05 A steel frame concrete partition wall panel and its construction method Pending CN108118807A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810112547.9A CN108118807A (en) 2018-02-05 2018-02-05 A steel frame concrete partition wall panel and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810112547.9A CN108118807A (en) 2018-02-05 2018-02-05 A steel frame concrete partition wall panel and its construction method

Publications (1)

Publication Number Publication Date
CN108118807A true CN108118807A (en) 2018-06-05

Family

ID=62233415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810112547.9A Pending CN108118807A (en) 2018-02-05 2018-02-05 A steel frame concrete partition wall panel and its construction method

Country Status (1)

Country Link
CN (1) CN108118807A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184209A (en) * 2018-08-31 2019-01-11 上海市建筑装饰工程集团有限公司 Reduce the construction method of the precast slab partition wall system of hollowing rate
CN109184051A (en) * 2018-08-31 2019-01-11 上海市建筑装饰工程集团有限公司 Reduce the precast slab partition wall system of hollowing rate
CN111186019A (en) * 2019-12-13 2020-05-22 西藏藏建科技股份有限公司 Production process of prefabricated composite wallboard
CN114293766A (en) * 2021-12-20 2022-04-08 中建四局土木工程有限公司 Self-adaptive mold sealing method for combining steel and aluminum templates

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0302564A2 (en) * 1987-08-06 1989-02-08 COOPSETTE S.c.r.l. Modular internal partition with fire-screening and like properties
CN203514570U (en) * 2013-10-08 2014-04-02 中国建筑装饰集团有限公司 Square bar keel partition wall
CN204609049U (en) * 2015-04-20 2015-09-02 中建三局东方装饰设计工程有限公司 The ultra-thin steelframe body of wall of stone veneer
CN106854913A (en) * 2017-01-22 2017-06-16 大美砼艺(天津)建筑科技发展有限公司 A kind of Multifunction environmental protection combined wall board

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0302564A2 (en) * 1987-08-06 1989-02-08 COOPSETTE S.c.r.l. Modular internal partition with fire-screening and like properties
CN203514570U (en) * 2013-10-08 2014-04-02 中国建筑装饰集团有限公司 Square bar keel partition wall
CN204609049U (en) * 2015-04-20 2015-09-02 中建三局东方装饰设计工程有限公司 The ultra-thin steelframe body of wall of stone veneer
CN106854913A (en) * 2017-01-22 2017-06-16 大美砼艺(天津)建筑科技发展有限公司 A kind of Multifunction environmental protection combined wall board

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184209A (en) * 2018-08-31 2019-01-11 上海市建筑装饰工程集团有限公司 Reduce the construction method of the precast slab partition wall system of hollowing rate
CN109184051A (en) * 2018-08-31 2019-01-11 上海市建筑装饰工程集团有限公司 Reduce the precast slab partition wall system of hollowing rate
CN111186019A (en) * 2019-12-13 2020-05-22 西藏藏建科技股份有限公司 Production process of prefabricated composite wallboard
CN111186019B (en) * 2019-12-13 2022-05-03 西藏藏建科技股份有限公司 Production process of prefabricated composite wallboard
CN114293766A (en) * 2021-12-20 2022-04-08 中建四局土木工程有限公司 Self-adaptive mold sealing method for combining steel and aluminum templates
CN114293766B (en) * 2021-12-20 2023-02-28 中建四局土木工程有限公司 Self-adaptive mold sealing method for combining steel and aluminum templates

Similar Documents

Publication Publication Date Title
CN114108917B (en) Height-adjustable assembly type composite floor slab construction method
CN103114663B (en) Assemble type multifunctional outer wall body and production and installation method thereof
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN100402765C (en) Box-type building model and its construction method
CN115534095B (en) A prefabricated reverse-flow component and its manufacturing process
CN114059699A (en) Precast concrete bottom plate integrated with truss steel bars and prestressed steel wire meshes
CN211229052U (en) Hoist and mount ALC wallboard with outer wall tile structure
CN108118807A (en) A steel frame concrete partition wall panel and its construction method
CN102808513A (en) Crack controlling construction method for lightweight wall
CN103255845B (en) Coated rock wool board heat-preservation system for building curtain walls
CN205024949U (en) Take steel bar truss gypsum board of heat preservation, novel -in -place mould
RU2336395C2 (en) Multilayer wall panel, method for its manufacturing and method for erection of monolithic-framed building outer wall made of multilayer wall panels
CN105019598B (en) A kind of cutting armored concrete surface layer strengthens light weight board
CN205857398U (en) Polystyrene foam light composite wallboard construction system
CN112982692A (en) One-way superimposed sheet joint connecting structure and construction method
CN218758102U (en) Energy-conserving integration assembled shear force wall
CN115807504A (en) Assembly type building construction method of laminated slab and prefabricated staircase
CN204609049U (en) The ultra-thin steelframe body of wall of stone veneer
CN104533012B (en) One can light load-bearing lumber and preparation method thereof, assembled wall board and house
CN207919819U (en) A steel frame concrete partition wall
CN208870274U (en) Concrete prefabricated board and concrete folding plate
CN108824810B (en) Laying construction process for steel skeleton composite building top plate
CN1122129C (en) Construction method of indoor decoration with light wall board
RU79120U1 (en) OVERLAPPING (OPTIONS)
TWM635433U (en) Truss floor slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180605