CN106065565B - A kind of construction method of prefabricated architectural concrete pier column - Google Patents

A kind of construction method of prefabricated architectural concrete pier column Download PDF

Info

Publication number
CN106065565B
CN106065565B CN201610501598.1A CN201610501598A CN106065565B CN 106065565 B CN106065565 B CN 106065565B CN 201610501598 A CN201610501598 A CN 201610501598A CN 106065565 B CN106065565 B CN 106065565B
Authority
CN
China
Prior art keywords
prefabricated
pier column
bridge
concrete
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610501598.1A
Other languages
Chinese (zh)
Other versions
CN106065565A (en
Inventor
陈浩
马建荣
李文章
朱伟
李玲玉
朱敏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Building Materials Technology Group Co Ltd
Original Assignee
Shanghai Jiangong Construction Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangong Construction Material Co Ltd filed Critical Shanghai Jiangong Construction Material Co Ltd
Priority to CN201610501598.1A priority Critical patent/CN106065565B/en
Publication of CN106065565A publication Critical patent/CN106065565A/en
Application granted granted Critical
Publication of CN106065565B publication Critical patent/CN106065565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of construction method of prefabricated architectural concrete pier column, comprise the following steps:Step(1), pier column with mould it is prefabricated with assembling, formed load-bearing inner core forming panel;Step(2), bridge pier and bridge connects bearing prefabricated, step(3), concrete pier column it is prefabricated, bridge pier and bridge connects bearing is suspended from after inner core steel reinforcement cage top, passed examination, the casting concrete into the surrounding edge mould of forming panel formation, formation concrete pier column;Step(4), concrete pier column lifting, remove upper operating platform, precast concrete pier column is lifted to stockyard erecting bed to be transported to loop wheel machine.Compared with prior art, beneficial effects of the present invention are:Construction method of the present invention is simple to operate, and pier column is easy to make, and product quality is effectively ensured, the problem of heavy civil prefabricated components for successfully solving belt surface molding decorative are difficult to integral prefabricated.

Description

A kind of construction method of prefabricated architectural concrete pier column
Technical field
The invention belongs to the construction field of pier column, and in particular to a kind of municipal administration for belt surface decorative model form The construction method of prefabricated architectural concrete pier column in bridge, Landscape Bridge.
Background technology
The main prefabrication for paying attention to the product forms such as box beam, floorings, bridge pier, beam sections of municipal administration industrialization, to production Whether product outward appearance still has the stages such as bubble, voids and pits, concrete color uniformity coefficient in surface, to different colours, The degree of concern of the moulding such as different lines textures is not high, and the heavy civil component for weight is big, volume is big, more than outer aobvious face Molding surface manufacture difficulty is big.So the correlative study of the municipal prefabricated components with molding decorative is few.
Certain lake bridge is the Landscape Bridge in the remote Hunan lake water domain of a leap, and bridge column uses the reinforced concrete of tyre stone moulding Native prefabricated rectangle terrace with edge bridge pier.Because bridge pier outer surface is moulding concrete(Stone), it is necessary to plastic cement mold forming is used, and plastic mold is Software mould, trapezoid stand column angle is 83 degree, and upright cast plastic mold can not be fixed on punching block, and handstand is poured due to column weight More than 140 tons are reached, crane gear can not be carried out standing up operation to it in factory, and inconvenience is brought to construction.
The content of the invention
For problems of the prior art, the present invention provides a kind of construction party of prefabricated architectural concrete pier column Method, can solve the problem that the heavy civil prefabricated components of belt surface molding decorative are difficult to entirety in advance by mould using the structure that lies low Processed the problem of.
To achieve the above object, the present invention uses following technical scheme:
A kind of construction method of prefabricated architectural concrete pier column, comprises the following steps:
Step(1), prefabricated and assembling of the pier column with mould, pier column band mould includes two pieces A prefabricated boards and two pieces of B prefabricated boards, are embedded with the first connector, the first connector, the B prefabricated boards on the A prefabricated boards On be embedded with the second connector, the second connector;
Two pieces of A prefabricated boards and two pieces of B prefabricated boards are assembled on the operating platform of bottom, the adjacent A prefabricated boards, Respectively by the first connector, the second connector and customization steel plate welding assembly between B prefabricated boards, with respect to two pieces A prefabricated boards lead to The tension of the first connector is crossed, with respect to two pieces B prefabricated boards are tensed by the second connector, A prefabricated boards and B the prefabricated boards interval point The fixed forming panel for forming load-bearing inner core of cloth assembling, the outer layer of the forming panel is decorative layer;
Step(2), bridge pier and bridge connects bearing it is prefabricated, the upper end of the good bar-mat reinforcement of colligation is welded on steel plate, Aid the border areas mould, if preformed hole, casting concrete, prefabricated bearing one end after shaping is the steel plate being connected with bridge, and one end is and bridge The reinforcing bar of pier connection;
Step(3), concrete pier column it is prefabricated, install top operating desk, hang in the good inner core steel reinforcement cage of colligation, on Two suspension hooks are respectively provided with two rack beams of portion's operating desk, two suspension hooks catch on pre- through bridge pier and bridge connects bearing respectively The two ends for the reinforcing bar boxed out, make bridge pier be suspended from bridge connects bearing after inner core steel reinforcement cage top, passed examination, toward forming panel Casting concrete in the surrounding edge mould of formation, forms concrete pier column;
Step(4), concrete pier column lifting, remove upper operating platform, precast concrete bridge pier is stood with loop wheel machine Post is lifted to stockyard erecting bed to be transported to.
The pier column band mould is prefabricated using concrete material.
The decorative layer is prefabricated or prefabricated using steel plate moulding mould using silica gel moulding mould.
The decorative layer makes work using counter, forms different colours, lines or texture structure.
The decorative layer beats paving formation decorating structure using stone material is counter.
The pier column band mould is using the frame mode making that lies low.
The inner core steel reinforcement cage is set using integrated hanging, to ensure protective layer thickness.
Compared with prior art, beneficial effects of the present invention are:Construction method of the present invention is simple to operate, and pier column makes It is convenient, product quality is effectively ensured, successfully solve belt surface molding decorative heavy civil prefabricated components be difficult to it is integral prefabricated The problem of.
Brief description of the drawings
Fig. 1 is precast pier column bottom schematic diagram of the present invention.
Fig. 2 is the front view of A prefabricated boards of the present invention.
Fig. 3 is the pre-buried schematic diagram of the connector of a regions first in Fig. 2.
Fig. 4 is the front view of B prefabricated boards of the present invention.
Fig. 5 is bridge pier and the structural representation of bridge connects bearing.
Fig. 6 is precast pier column prefabrication state structure chart of the present invention.
Embodiment
Come, to a kind of construction method of prefabricated architectural concrete pier column of the present invention, to do further below in conjunction with the accompanying drawings Describe in detail, in the hope of the apparent work progress for being expressly understood that the inventive method, but can not limit the present invention's with this Protection domain.
As shown in figures 1 to 6, the construction method of the prefabricated architectural concrete pier column of the present embodiment, comprises the following steps:
Step(1), prefabricated and assembling of the pier column with mould, pier column band mould includes two pieces A prefabricated boards 1 and two pieces of B prefabricated boards 2, are embedded with the first connector 3, the first connector 5, the B on the A prefabricated boards 1 The second connector 4, the second connector 6 are embedded with prefabricated board 2;
Two pieces of A prefabricated boards 1 and two pieces of B prefabricated boards are assembled on bottom operating platform 7, the adjacent A is prefabricated Respectively by the first connector 3, the second connector 4 and customization steel plate welding assembly between plate 1, B prefabricated boards 2, with respect to two pieces A are pre- Making sheet 1 is tensed by the first connector 5, and with respect to two pieces B prefabricated boards 2 are tensed by the second connector 6, the A prefabricated boards 1 and B Prefabricated board 2 is spaced apart the fixed forming panel 9 for forming load-bearing inner core 8 of assembling, and the outer layer of the forming panel 9 is decorative layer;
Step(2), bridge pier and bridge connects bearing it is prefabricated, the good bar-mat reinforcement 13-3 of colligation upper end is welded to steel plate On 13-1, mould of aiding the border areas, if preformed hole 13-4, casting concrete 13-2, one end of prefabricated bearing 13 after shaping is to be connected with bridge Steel plate 13-1, one end is the bar-mat reinforcement 13-3 that is connected with bridge pier;
Step(3), concrete pier column it is prefabricated, install top operating desk 11, hang in the good inner core steel reinforcement cage of colligation 10, two rack beams 12 of upper operating platform 11 were last to be provided with a suspension hook 15, and two suspension hooks are caught on through bridge pier and bridge respectively The two ends of the reinforcing bar of the preformed hole of beam connects bearing 13, make bridge pier be suspended from the top of inner core steel reinforcement cage 10 with bridge connects bearing, check After qualified(I.e. after acceptance of concealed work), the casting concrete into the surrounding edge mould of the formation of forming panel 9, formation concrete pier Column;
Step(4), concrete pier column lifting, upper operating platform 11 is removed, with loop wheel machine by precast concrete bridge pier Column is lifted to stockyard erecting bed to be transported to.
The present embodiment pier column band mould is prefabricated using concrete material.
Preferably, the present embodiment decorative layer is prefabricated or prefabricated using steel plate moulding mould using silica gel moulding mould, The decorative layer makes work using counter, forms different colours, lines or texture structure.
As further preferred, pier column band mould is using the frame mode making, institute of lying low described in the present embodiment Inner core steel reinforcement cage is stated to set using integrated hanging.
For the ease of carrying out installation operation up and down, upper operating platform 11 is provided with cat ladder 14.
Embodiment 2
Decorative layer is beaten in paving formation decorating structure, remaining technical scheme and embodiment 1 using stone material is counter in the present embodiment It is identical.
Although making specific descriptions to the present invention with reference to the above embodiments, for the ordinary skill people of this area For member, it should be appreciated that can be repaiied within the spirit and scope for not departing from the present invention based on present disclosure Change or improve, these modification and improvement are all within the spirit and scope of the present invention.

Claims (7)

1. a kind of construction method of prefabricated architectural concrete pier column, it is characterised in that comprise the following steps:
Step(1), prefabricated and assembling of the pier column with mould, it is pre- that pier column band mould includes two pieces of A Making sheet(1)With two pieces of B prefabricated boards(2), in the A prefabricated boards(1)On be embedded with the first connector(3), the first connector (5), the B prefabricated boards(2)On be embedded with the second connector(4), the second connector(6);
In bottom operating platform(7)On to two pieces of A prefabricated boards(1)With two pieces of B prefabricated boards(2)Assembled, adjacent A prefabricated boards (1), B prefabricated boards(2)Between pass through the first connector respectively(3), the second connector(4)With customizing steel plate welding assembly, relatively Two pieces of A prefabricated boards(1)Pass through the first connector(5)Tense, with respect to two pieces B prefabricated boards(2)Pass through the second connector(6)Tense, The A prefabricated boards(1)With B prefabricated boards(2)It is spaced apart assembling fixation and forms load-bearing inner core(8)Forming panel(9), it is described into Pattern plate(9)Outer layer be decorative layer;
Step(2), bridge pier and bridge connects bearing it is prefabricated, by the good bar-mat reinforcement of colligation(13-3)Upper end be welded to steel plate (13-1)On, mould of aiding the border areas, if preformed hole(13-4), casting concrete(13-2), bridge pier and bridge connects bearing after shaping (13)One end is the steel plate being connected with bridge(13-1), one end is the bar-mat reinforcement being connected with bridge pier(13-3);
Step(3), concrete pier column it is prefabricated, install top operating desk(11), hang in the good inner core steel reinforcement cage of colligation (10), upper operating platform(11)Two rack beams(12)On be respectively provided with two suspension hooks(15), two suspension hooks catch on respectively through Bridge pier and bridge connects bearing(13)The two ends of the reinforcing bar of preformed hole, make bridge pier be suspended from inner core steel reinforcement cage with bridge connects bearing (10)After top, passed examination, toward forming panel(9)Casting concrete in the surrounding edge mould of formation, forms concrete pier column;
Step(4), concrete pier column lifting, remove upper operating platform(11), with loop wheel machine by prefabricated concrete pier Column is lifted to stockyard erecting bed to be transported to.
2. according to the construction method of the prefabricated architectural concrete pier column described in claim 1, it is characterised in that the bridge pier is stood Post band mould is prefabricated using concrete material.
3. according to the construction method of the prefabricated architectural concrete pier column described in claim 1, it is characterised in that the decorative layer It is prefabricated or prefabricated using steel plate moulding mould using silica gel moulding mould.
4. according to the construction method of the prefabricated architectural concrete pier column described in claim 1, it is characterised in that the decorative layer Work is made using counter, different colours, lines or texture structure is formed.
5. according to the construction method of the prefabricated architectural concrete pier column described in claim 1, it is characterised in that the decorative layer Paving formation decorating structure is beaten using stone material is counter.
6. according to the construction method of the prefabricated architectural concrete pier column described in claim 1, it is characterised in that the bridge pier is stood Post band mould is using the frame mode making that lies low.
7. according to the construction method of the prefabricated architectural concrete pier column described in claim 1, it is characterised in that the inner core steel Muscle cage(10)Set using integrated hanging.
CN201610501598.1A 2016-06-30 2016-06-30 A kind of construction method of prefabricated architectural concrete pier column Active CN106065565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610501598.1A CN106065565B (en) 2016-06-30 2016-06-30 A kind of construction method of prefabricated architectural concrete pier column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610501598.1A CN106065565B (en) 2016-06-30 2016-06-30 A kind of construction method of prefabricated architectural concrete pier column

Publications (2)

Publication Number Publication Date
CN106065565A CN106065565A (en) 2016-11-02
CN106065565B true CN106065565B (en) 2017-10-31

Family

ID=57421139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610501598.1A Active CN106065565B (en) 2016-06-30 2016-06-30 A kind of construction method of prefabricated architectural concrete pier column

Country Status (1)

Country Link
CN (1) CN106065565B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142854A (en) * 2017-07-11 2017-09-08 中冶建工集团有限公司 Once it is cast-in-place shaping concrete bridge upper side combed decoration construction method
CN107160113A (en) * 2017-07-11 2017-09-15 中冶建工集团有限公司 A kind of preparation method of split blade type sizing combed decoration punching block version

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10140736A (en) * 1996-11-13 1998-05-26 Ohbayashi Corp Semi-precast concrete pole and manufacture thereof
CN2661819Y (en) * 2003-04-27 2004-12-08 韩国勇 Template for wall space decoration
CN101654926A (en) * 2009-08-31 2010-02-24 王泽飞 Building free-formwork and one-time compound forming construction method and structure of decorative cover
CN102031755B (en) * 2010-11-26 2012-06-06 哈尔滨工程大学 Multifunctional permanent template for girder bridge gravity type pier
CN202337946U (en) * 2011-11-17 2012-07-18 中铁十五局集团有限公司 Pier casting mold
KR101545649B1 (en) * 2013-07-05 2015-08-19 지에스건설 주식회사 Construction method for coping using permanent form preventing interference of reinforcing bar

Also Published As

Publication number Publication date
CN106065565A (en) 2016-11-02

Similar Documents

Publication Publication Date Title
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN106378861B (en) A kind of prefabricated assembled concrete stairway die and stair manufacturing method
CN106121145B (en) A kind of split blade type assembly stair and preparation method thereof and assembly method
CN108726348B (en) Horizontal prefabrication, overturning and hoisting method for pipe gallery segments
CN208072950U (en) A kind of combination set shaped steel formwork
CN103774561A (en) Streamline operation construction method of precast small box girders for highway in assembling mode
CN106065565B (en) A kind of construction method of prefabricated architectural concrete pier column
CN108560992A (en) The construction equipment and concrete placings construction method of towering structure
CN103306483A (en) Industrial construction method of building
CN208122461U (en) The construction equipment of towering structure
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN108560842A (en) With the precast concrete stair section of multipurpose hole and its preparation and application
CN205857697U (en) The anti-form bracing constructing device hanging template
CN207891904U (en) A kind of prefabricated basic component of additional elevator of existing building
CN110821163A (en) Construction method for preventing upward floating of elevator shaft hoisting formwork
CN205497749U (en) Prefabricated mould of prefabricated section
CN208267093U (en) A kind of Precast Concrete Frame
CN107859192A (en) A kind of warming plate, bearing wall, non-bearing wall body and assembled walling system
CN212176547U (en) Building floor bathroom falls board construction template device in building
CN107558604A (en) A kind of method for exempting from form removal raised table building
CN210011144U (en) Construction site fence prefabricated foundation
CN106948534A (en) Mesh sheet forms hollow dark contignation and technique with spacer bar cast-in-place concrete
CN105604263B (en) Large-scale GRPC decoration hangers and manufacture method
CN110965769A (en) Building floor bathroom falls board construction template device in building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200120 Southwest District, 2123 Pudong Road, Pudong New Area, Shanghai.

Patentee after: Shanghai Construction Engineering Building Materials Technology Group Co., Ltd

Address before: 200086 Siping Road 848, Shanghai, Hongkou District

Patentee before: SHANGHAI JIANGONG CONSTRUCTION MATERIAL Co.,Ltd.