CN101654926A - Building free-formwork and one-time compound forming construction method and structure of decorative cover - Google Patents

Building free-formwork and one-time compound forming construction method and structure of decorative cover Download PDF

Info

Publication number
CN101654926A
CN101654926A CN200910306399A CN200910306399A CN101654926A CN 101654926 A CN101654926 A CN 101654926A CN 200910306399 A CN200910306399 A CN 200910306399A CN 200910306399 A CN200910306399 A CN 200910306399A CN 101654926 A CN101654926 A CN 101654926A
Authority
CN
China
Prior art keywords
slabstone
building
decorative cover
iron wire
once
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910306399A
Other languages
Chinese (zh)
Inventor
王泽飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910306399A priority Critical patent/CN101654926A/en
Publication of CN101654926A publication Critical patent/CN101654926A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a building free-formwork and a one-time compound forming construction method and a structure of a decorative cover. The one-time compound forming construction method is characterized by comprising the following steps: processing stones into stone slabs, manufacturing a decorative pattern surface and then fixedly installing the stone slabs instead of concrete formwork; fixing reinforcing steel bars and iron wires between the stone slabs, wherein the reinforcing steel bars and the iron wires are connected with a main reinforcing steel bar; and casting concrete in the stone slabs, carrying out natural curing and obtaining one-time compound forming building. The stone slabs integrate the formwork, maintaining and decoration functions into a whole, cast the concrete andthen are compounded to form once. Compared with the prior art, 70 percent of time can be shortened and the construction cost is reduced by over 50 percent; and the invention selects the optimal construction process through the optimized combination design of materials and functions. With integral connection and one-time compound forming, the structure eliminates potential safety hazard and is firmer, durable, safe and attractive; and the occupied space is reduced, so the use area of the building can be enlarged and wood and steels can be saved.

Description

Once-combined molding construction method of building free template and decorative cover and structure
Technical field
The present invention relates to a kind of building free template and once-combined molding construction method of decorative cover and structure, belong to concrete, the outer decorative constructure technical field of stone material
Background technology
In the prior art, concrete structure is normally made concrete blinding earlier, behind assembling reinforcement and the iron wire, concreting, wait concrete curing to solidify after, carry out the cladding and wet combining construction of stone decoration face again at concrete surface.The amount of labour of whole engineering is big, and is long in time limit, the cost height, and poor stability, it is big to take up room.
Summary of the invention
The objective of the invention is to: provide a kind of easy construction, the duration is short, cost is low, safety is durable, attractive in appearance building free template and once-combined molding construction method of decorative cover and structure, to overcome the deficiencies in the prior art.
The present invention constitutes like this: comprise the steps: a, stone material is processed into slabstone by the long-pending size dimension of building contoured surface, produce the decorative pattern surface that designs on slabstone, then the slabstone alternate template of making is fixedly mounted on the reinforcing bar;
B, between slabstone fixedly reinforcing bar and iron wire, reinforcing bar is connected with main reinforcement with iron wire;
C, in slabstone concreting, natural curing obtains the building of once-combined moulding.
Among the step b, fixedly the method for reinforcing bar is inserted reinforcing bar for to bore a hole on the slabstone inner surface.
Among the step b, fixedly the method for iron wire leaves fixed leg for to have angle at the slabstone inner surface on the angle, binds iron wire on fixed leg, and iron wire is connected with main reinforcement again.
Is the thickness of slabstone 30? 00 millimeter.
Among the step c, described building is post, beam, wall, dam, bridge, tower, memorial archway, pond, silo, culvert tunnel or landscape sculpture, culture and arts facility.
The once-combined molding construction structure of building free template and decorative cover, structure comprises that slabstone, slabstone external surface are decorative cover, and slabstone is fixed into the concreting formwork structure, is provided with reinforcing bar and iron wire in slabstone, and iron wire and reinforcing bar interconnect.
On the slabstone inner surface, be provided with the hole, insert reinforcing bar in the hole.
Be provided with angle on the slabstone inner surface, angle is provided with fixed leg, connects iron wire on the fixed leg, and iron wire and concrete main reinforcement are connected and fixed.
The slabstone collection template that the present invention adopts, go along with sb. to guard him, decoration functions is one, once connects composite molding, completion behind the concreting.Reduced construction sequence, shortened the time,, added stone material exterior decoration construction technology with the existing concrete building and compare, can shorten for 70% time through experiment; Reduce cost more than 50%; The present invention selects best simple and easy construction technology for use by the optimum organization design to material function, structure.Safe steady trouble has been eliminated in the once-combined moulding of whole connection, and is more firm, durable, safe, attractive in appearance; Dwindled taking up room, can increase the building usable floor area, can save timber, steel in a large number again.
Description of drawings
Accompanying drawing 1 is the structural representation of slabstone of the present invention;
Accompanying drawing 2 is a structural representation of the present utility model.
The specific embodiment
Embodiments of the invention: work progress comprises the steps: a, lithotome is processed into slabstone 1 by the long-pending size dimension of building contoured surface, on slabstone 1, produce the decorative pattern surface that designs, then the slabstone of making 1 is substituted concrete blinding and fixedly mount the main reinforcement of in slabstone 1, using according to the good concreting of prior art colligation.
B, in slabstone 1 fixedly reinforcing bar 2 and iron wire 3.Concrete grammar is that drilling bore hole 4 on slabstone 1 inner surface inserts reinforcing bar 2 in the hole 4.Make corresponding angle 5 on slabstone 1 inner surface, leave fixed leg 6 on the angle 5, connect iron wire 3 on the fixed leg 6, reinforcing bar 2 and iron wire 3 are connected and fixed according to existing reinforcing bar, iron wire colligation mode with main reinforcement again.
C, in slabstone concreting, natural curing obtains the building of once-combined moulding.
Adopt technology of the present invention, can build post, beam, wall, dam, bridge, tower, memorial archway, pond, silo, culvert tunnel, reach in large-scale landscape sculpture, the culture and arts facility and use.
The thickness of slabstone 1 is 30~300 millimeters, and machine-shaping is convenient, and boring can not influence the intensity of slabstone 1.

Claims (8)

1. building free template and the once-combined molding construction method of decorative cover, it is characterized in that: comprise the steps: a, stone material is processed into slabstone by the long-pending size dimension of building contoured surface, on slabstone, produce the decorative pattern surface that designs, then the slabstone of making is substituted concrete blinding and fixedly mount;
B, between slabstone fixedly reinforcing bar and iron wire, reinforcing bar is connected with main reinforcement with iron wire;
C, in slabstone concreting, natural curing obtains the building of once-combined moulding.
2. building free template according to claim 1 and the once-combined molding construction method of decorative cover is characterized in that: among the step b, fixedly the method for reinforcing bar is inserted reinforcing bar for to bore a hole on the slabstone inner surface.
3. building free template according to claim 1 and the once-combined molding construction method of decorative cover, it is characterized in that: among the step b, fixedly the method for iron wire leaves fixed leg for to have angle at the slabstone inner surface on the angle, bind iron wire on fixed leg, iron wire is connected with main reinforcement again.
4. building free template according to claim 1 and the once-combined molding construction method of decorative cover is characterized in that: the thickness of slabstone is 30~300 millimeters.
5. building free template according to claim 1 and the once-combined molding construction method of decorative cover, it is characterized in that: among the step c, described building is post, beam, wall, dam, bridge, tower, memorial archway, pond, silo, culvert tunnel or landscape sculpture, culture and arts facility.
6. building free template and the once-combined molding construction structure of decorative cover, structure comprises slabstone (1), it is characterized in that: slabstone (1) external surface is a decorative cover, slabstone (1) is fixed into the concreting formwork structure, be provided with reinforcing bar (2) and iron wire (3) in slabstone (1), iron wire (3) and reinforcing bar (2) interconnect.
7. the once-combined molding construction structure of building free template according to claim 6 and decorative cover is characterized in that: be provided with hole (4) on slabstone (1) inner surface, insert reinforcing bar (2) in hole (4).
8. the once-combined molding construction structure of building free template according to claim 6 and decorative cover, it is characterized in that: on slabstone (1) inner surface, be provided with angle (5), angle (5) is provided with fixed leg (6), fixed leg (6) is gone up and is connected iron wire (3), and iron wire (3) is connected and fixed with concrete main reinforcement.
CN200910306399A 2009-08-31 2009-08-31 Building free-formwork and one-time compound forming construction method and structure of decorative cover Pending CN101654926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910306399A CN101654926A (en) 2009-08-31 2009-08-31 Building free-formwork and one-time compound forming construction method and structure of decorative cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910306399A CN101654926A (en) 2009-08-31 2009-08-31 Building free-formwork and one-time compound forming construction method and structure of decorative cover

Publications (1)

Publication Number Publication Date
CN101654926A true CN101654926A (en) 2010-02-24

Family

ID=41709364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910306399A Pending CN101654926A (en) 2009-08-31 2009-08-31 Building free-formwork and one-time compound forming construction method and structure of decorative cover

Country Status (1)

Country Link
CN (1) CN101654926A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213014A (en) * 2010-04-01 2011-10-12 江俊昇 Building method of building wall body and outer wall plate for building of building wall body
CN103526934A (en) * 2013-10-31 2014-01-22 曾寿喜 Synchronous construction method for decorative surfaces and wall without bricks
CN106065565A (en) * 2016-06-30 2016-11-02 上海建工材料工程有限公司 A kind of construction method of prefabricated architectural concrete pier column
CN106522422A (en) * 2016-11-01 2017-03-22 十九冶集团西昌设备结构有限公司 Grid mud filling wall and construction method thereof
CN109338893A (en) * 2018-11-17 2019-02-15 湖南金海钢结构有限公司 A kind of the sliding lifting device and method of steel structure bridge arc-shape decorative plate
CN111676900A (en) * 2020-06-22 2020-09-18 福建万山水利水电设计有限公司 Slope type seawall and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213014A (en) * 2010-04-01 2011-10-12 江俊昇 Building method of building wall body and outer wall plate for building of building wall body
CN103526934A (en) * 2013-10-31 2014-01-22 曾寿喜 Synchronous construction method for decorative surfaces and wall without bricks
CN106065565A (en) * 2016-06-30 2016-11-02 上海建工材料工程有限公司 A kind of construction method of prefabricated architectural concrete pier column
CN106522422A (en) * 2016-11-01 2017-03-22 十九冶集团西昌设备结构有限公司 Grid mud filling wall and construction method thereof
CN109338893A (en) * 2018-11-17 2019-02-15 湖南金海钢结构有限公司 A kind of the sliding lifting device and method of steel structure bridge arc-shape decorative plate
CN111676900A (en) * 2020-06-22 2020-09-18 福建万山水利水电设计有限公司 Slope type seawall and construction method thereof
CN111676900B (en) * 2020-06-22 2022-05-13 福建万山水利水电设计有限公司 Slope type seawall and construction method thereof

Similar Documents

Publication Publication Date Title
CN101654926A (en) Building free-formwork and one-time compound forming construction method and structure of decorative cover
CN201495768U (en) Non-dismantling formwork for pouring concrete construction
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN107178173B (en) A kind of concrete curtain wall plate being made of cellular board component and production method
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN103590515B (en) A kind of self-balancing precast surface, cast-in-place core filler wall
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN110331795B (en) Reverse construction method for arch coupon structure
CN204163266U (en) The large plate of hollow lath component building hollow wall
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN201495628U (en) One-time composite molding construction structure without molding plate and decoration surface for buildings
CN106381999A (en) Fair-faced concrete wall intaglio character die plate construction method
CN106320662B (en) Decorating outer wall of building ultra-wide concrete wire construction method
CN203729473U (en) Lightweight thermal-sound insulation support-free floor
CN205822632U (en) There are countersinking building free template and decorative cover once-combined molding construction structure
CN201554156U (en) Building structural post
CN204282528U (en) A kind of prefabricated balcony structure
CN201714003U (en) Precast concrete stair
CN202755532U (en) Pull-lay combination building fabricated wall plate
CN101210442B (en) Construction method for column and architrave cornice
CN202370172U (en) Prefabricated porous column
CN201771081U (en) Built-in core mould of cast-in-situ reinforced concrete anti-floating & positioning combination
CN204899034U (en) Prefabricated wall post
CN104563281A (en) Prefabricated balcony structure and construction method thereof
CN214220226U (en) Building brick capable of being positioned, assembled and forming internal framework

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100224