CN108805748A - A kind of structural steelwork fund pre-warning management system based on BIM - Google Patents

A kind of structural steelwork fund pre-warning management system based on BIM Download PDF

Info

Publication number
CN108805748A
CN108805748A CN201810465722.2A CN201810465722A CN108805748A CN 108805748 A CN108805748 A CN 108805748A CN 201810465722 A CN201810465722 A CN 201810465722A CN 108805748 A CN108805748 A CN 108805748A
Authority
CN
China
Prior art keywords
fund
module
data
warning
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810465722.2A
Other languages
Chinese (zh)
Inventor
何敏杰
刘中华
王强强
高良
孟玲霄
骆鹏飞
赵切
卢继
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201810465722.2A priority Critical patent/CN108805748A/en
Publication of CN108805748A publication Critical patent/CN108805748A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll

Landscapes

  • Business, Economics & Management (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Technology Law (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The present invention relates to a kind of structural steelwork fund pre-warning management system based on BIM, including data input module, data acquisition module, financial statistics module, central processing module, intelligent early-warning module and data disaply moudle, data input module is for providing BIM models and engineering foundation metadata typing;Data acquisition module is used for the transmission process of steel construction progress metadata;Financial statistics module is used to provide each progress paid money related data port for financial internal personnel;Central processing module is excavated and is analyzed for engineering foundation metadata;Intelligent early-warning module judges for financial risks early warning;Data disaply moudle is used for fund result of calculation poly group report display.The level of IT application of steel construction capital management at this stage is poor, data are difficult to ensure in order to solve by the present invention, to control construction fund risk, improves Benefits of Fund.

Description

A kind of structural steelwork fund pre-warning management system based on BIM
Technical field
The invention patent relates to Building Information Model and engineering funds to manage application field, and in particular to one kind being based on BIM Structural steelwork fund pre-warning management system.
Background technology
Technological revolution each time can all give society, industry to bring revolutionary change.BIM, Building Information Model (Building Information Modeling), it is a kind of multidimensional model information to grow up on the basis of original cad technique Integrated new technology is through in the overall process information aggregate in entire project construction period, and main purpose is to assist respective business Responsibility and decision-maker carry out fine chemistry industry thread management.
In recent years, being on the increase in construction project with structural steelwork, risk and the management pair of capital management Plan has been increasingly becoming many engineerings and enterprises pay attention emphasis.According to incompletely statistics, have three in current China's engineering project/ Two project quality control has met with challenge, and structural steelwork is usually larger, and the resource of input is again more, long in time limit, relates to And many links, various complicated intertextures nets are together so that capital management brings very big difficulty with control.Traditional steel Structural Engineering capital management has the following problems:
(1)The level of IT application is poor, and data are difficult to ensure.Traditional structural steelwork financial management is mainly by manually to different materials Type and weight data are for statistical analysis, and not only calculation procedure complexity is time-consuming, efficiency is low, but also project participant is respectively Political affairs, information sharing degree is low, easily forms " information island " each other, and data mode is transformed into " electronics " by " papery ", is easy to make At larger error.
(2)Fining degree is low, and fund proportioning is extensive.Since factory's projects real product data calculating is comparatively fallen Afterwards, analysis fineness is not achieved comparison and requires, and leads to not reasonably optimizing project funds resource proportioning, improves fund and blindly props up Go out the risk brought.
(3)Receivable management falls behind, and bills due bad credit increases.Current steel construction industry competition is extremely fierce, and paying for first becomes Building enterprise, processing enterprise catch a kind of means of engineering project, and it is excessive pay for first project funds can cause it is largely receivable The appearance of fund, but many enterprises do not have specific range and standard to the management for accounts receivable of coming and going, and add check-up system Formulation be also left to be desired, this has resulted in accounts receivable bills due and bad credit increases, cause constructional enterprises economic benefit by Loss.
(4)Mobilism application is few, lack of control early warning.Traditional steel construction capital management relies on passive type control, works as project Cash flow just takes control measure, capital management to lack early warning after there is payment imbalance.Most capital management controls are with fund The form of static map embodies use of funds, income process, cannot be satisfied current capital management dynamic, efficient requirement.
In view of this, the applicant provides a kind of structural steelwork fund pre-warning management system based on BIM, this case is thus It generates.
Invention content
The purpose of the present invention is using scientific management system, construction fund risk is controlled, Benefits of Fund is improved, is real The existing purpose of the present invention, the present invention specifically provide a kind of structural steelwork fund pre-warning management system based on BIM.
A kind of structural steelwork fund pre-warning management system based on BIM, including data input module, data acquisition module Block, financial statistics module, central processing module, intelligent early-warning module and data disaply moudle;
The data input module is for providing BIM models and engineering foundation metadata typing, including BIM model component basic numbers According to, different component Type Synthesis unit price data, plan for cargo demands and erection schedule data, data pass through virtual map technology correlation It is fitted on the BIM models respective members;
The data acquisition module is used for the transmission process of steel construction progress metadata, is generated based on BIM model basic metadatas Steel construction is delivered by wireless identification terminal and installation progress is first by the RFID movable labels of unique " identity " feature of steel member Data transmission is to central processing module;
The financial statistics module is used to provide each progress paid money related data port for financial internal personnel, is central processing Module transfer fund calculates metadata;
The central processing module is excavated and is analyzed for engineering foundation metadata, by data input module, data acquisition The basic metadata of module, financial statistics module transfer executes computations by pre-defined rule, and fund result of calculation is sent To intelligent early-warning module and data disaply moudle;
The intelligent early-warning module be used for according to target financial risks early warning mechanism to central processing module fund result of calculation into Row judges, and forms different early warning schemes;
The data disaply moudle is used to carry out exact classification poly group to central processing module fund result of calculation, is formed corresponding The real-time poly group report of fund.
The different component Type Synthesis unit price include processing comprehensive unit price, installation comprehensive unit price, the comprehensive unit price with Weight is according to calculating;The plan for cargo demands and erection schedule are project management department according to implementation phase target, in the BIM moulds provided It is formulated in type.
The paid money of each progress includes the paid money of factory process progress and the paid money of in-site installation progress;
Described to be divided into three classes by pre-defined rule execution computations, one kind is processing real product computation rule, and another kind of is peace Real product computation rule is filled, last one kind is erection schedule fund computation rule, wherein processing real product computation rule is It is multiplied by the processing comprehensive unit price corresponding to different component type according to delivery progress metadata;Installing real product computation rule is Installation progress metadata is multiplied by the installation comprehensive unit price corresponding to different component type;Erection schedule fund computation rule is basis The installation comprehensive unit price corresponding to different component type is multiplied by component erection schedule corresponding to current time.
The target financial risks early warning mechanism is that the safe fund of index formulated according to factory and construction site is controllably Number carries out safety ratio pair, if not up to described to practical delivery, installation receipt and processing real product, installation real product Capital management security restriction, then automatic trigger early warning event, corresponding factory stop production and processing, scene stopping construction.
The real-time poly group report includes factory's Fund-Application report and live Fund-Application report, and wherein factory's fund is transported Battalion's report is made of processing real product and factory practical gathering curve, live account due report by installation real product, install Practical gathering is formed with erection schedule gathering.
The beneficial effects of the present invention are:
1, efficient analysis ensures accuracy.System is based on BIM models, and computations are executed according to pre-defined rule, automatic complete in real time At different phase element type quantities fund operation.This not only changes the very complicated mode of fund calculating, has saved people Power material resources and time resource, and reduce the artificial mistake for calculating and generating, ensure that the accuracy of data, for it is objective reasonably It carries out Fund-Application assessment and provides data support, be convenient for fine-grained management.
2, dynamic manages, visualization tracking.Each participant of project obtains project processing at any time by system BIM models port And installation progress, using as account due foundation, while Fund-Application report in system can be checked at any time, can find that project is received in time Branch imbalance link analyzes Producing reason and takes preventive measures, is resolved before situation occurs in cash flow.
3, intelligent early-warning controls financial risks.Financial risks early warning mechanism is introduced, timely digitization manager is utilized Formula is reflected the risk sign that the analysis of financial data detail is found out by pre-warning signal, avoids or reduce unreasonable life Business activities are produced, and then monitors and adjusts application plan for the capital management of enterprise and scientific basis is provided, ensure capital chain balance.
Description of the drawings
Fig. 1 is the system pie graph of the present invention;Fig. 2 is the system flow chart of the present invention.
Specific implementation mode
Below in conjunction with attached drawing, the invention will be further described.
As shown in Figure 1, a kind of structural steelwork fund pre-warning management system based on BIM, including data input module, number According to acquisition module, financial statistics module, central processing module, intelligent early-warning module and data disaply moudle;
The data input module is for providing BIM models and engineering foundation metadata typing, including BIM model component basic numbers According to different component type processes comprehensive unit price, installation comprehensive unit price, and comprehensive unit price is according to calculating, also with good grounds reality with weight Phase targets are applied, formulated plan for cargo demands and erection schedule data, data pass through virtual map skill on the BIM models provided Art association is matched to the BIM models respective members;
The data acquisition module is used for the transmission process of steel construction progress metadata, is generated based on BIM model basic metadatas Steel construction is delivered by wireless identification terminal and installation progress is first by the RFID movable labels of unique " identity " feature of steel member Data transmission is to central processing module;
The financial statistics module is used to provide the paid money of factory process progress for financial internal personnel and in-site installation progress is real Related data of collecting money port transmits fund for central processing module and calculates metadata;
The central processing module is excavated and is analyzed for engineering foundation metadata, by data input module, data acquisition The basic metadata of module, financial statistics module transfer executes computations by pre-defined rule, and instruction is divided into three classes, Yi Leishi Real product computation rule is processed, another kind of is installation real product computation rule, and last one kind is that erection schedule fund calculates Rule, wherein processing real product computation rule is the processing being multiplied by according to delivery progress metadata corresponding to different component type Comprehensive unit price;Installation real product computation rule is that the installation that installation progress metadata is multiplied by corresponding to different component type integrates Unit price;Erection schedule fund computation rule is that different component type institute is multiplied by the component erection schedule corresponding to current time Corresponding installation comprehensive unit price, and result of calculation is sent to intelligent early-warning module and data disaply moudle;
The intelligent early-warning module be used for according to target financial risks early warning mechanism to central processing module fund result of calculation into Row judges, by the safe fund controllable factor of index according to factory and construction site formulation, to practical delivery, installation receipt Safety ratio pair is carried out with processing real product, installation real product, it is automatic to touch if the not up to described capital management security restriction Early warning event is sent out, and forms different early warning schemes, such as corresponding factory stops production and processing, and scene stops construction.
The data disaply moudle is used to carry out exact classification poly group, formation pair to central processing module fund result of calculation The real-time poly group report of fund answered, including factory's Fund-Application report and live Fund-Application report, wherein factory's Fund-Application Report is made of processing real product with factory practical gathering curve, and live account due report is real by installation real product, installation Border is collected money to be formed with erection schedule gathering.
In conjunction with shown in Fig. 2, a kind of structural steelwork fund pre-warning management system and method based on BIM, including walk as follows Suddenly:
The first step:Steel construction BIM models, and typing component master data are uploaded in systems;
Second step:Typing different component type processing comprehensive unit price, installation comprehensive unit price, comprehensive unit price are with weight in systems According to calculating;
Third walks:According to implementation phase target, project management department's formulated plan for cargo demands and erection schedule on the BIM models provided Data;
4th step:Factory produces steel member according to plan for cargo demands, and the RFID of unique " identity " feature is pasted on finished product member Movable label, scanning storage;
5th step:Steel construction shipment data is transmitted in CS central processing module by manufacture personnel by wireless identification terminal;
6th step:System executes computations to collected data of dispatching from the factory, according to target financial risks early warning mechanism, to reality Receipt of delivering carries out safety ratio pair with processing real product, if processing real product is more than practical delivery receipt and is multiplied by index Safe fund controllable factor then triggers early warning, stops processing;
7th step:When scene carries out Steel Structure Installation, field scan personnel are scanned simultaneously the label in different component type Upload installation progress data;
8th step:System pacifies actual installation receipt and installation real product according to target financial risks early warning mechanism It is complete to compare, if installation real product is multiplied by the safe fund controllable factor of index more than actual installation receipt, early warning is triggered, is stopped Only construct;
9th step:System carries out exact classification poly group according to system-computed result, forms the corresponding real-time poly group report of fund, wraps Include factory's Fund-Application report and live Fund-Application report.
The specific implementation of the present invention is described above, that is done all within the spirits and principles of the present invention is any Modification, equivalent replacement and improvement, should all be included in the protection scope of the present invention.

Claims (6)

1. a kind of structural steelwork fund pre-warning management system based on BIM, which is characterized in that including data input module, number According to acquisition module, financial statistics module, central processing module, intelligent early-warning module and data disaply moudle;
The data input module is for providing BIM models and engineering foundation metadata typing, including BIM model component basic numbers According to, different component Type Synthesis unit price data, plan for cargo demands and erection schedule data, data pass through virtual map technology correlation It is fitted on the BIM models respective members;
The data acquisition module is used for the transmission process of steel construction progress metadata, is generated based on BIM model basic metadatas Steel construction is delivered by wireless identification terminal and installation progress is first by the RFID movable labels of unique " identity " feature of steel member Data transmission is to central processing module;
The financial statistics module is used to provide each progress paid money related data port for financial internal personnel, is central processing Module transfer fund calculates metadata;
The central processing module is excavated and is analyzed for engineering foundation metadata, by data input module, data acquisition The basic metadata of module, financial statistics module transfer executes computations by pre-defined rule, and fund result of calculation is sent To intelligent early-warning module and data disaply moudle;
The intelligent early-warning module be used for according to target financial risks early warning mechanism to central processing module fund result of calculation into Row judges, and forms different early warning schemes;
The data disaply moudle is used to carry out exact classification poly group to central processing module fund result of calculation, is formed corresponding The real-time poly group report of fund.
2. a kind of structural steelwork fund pre-warning management system based on BIM according to claim 1, which is characterized in that The different component Type Synthesis unit price includes processing comprehensive unit price, installation comprehensive unit price, and the comprehensive unit price is single with weight Position calculates;The plan for cargo demands and erection schedule are project management department according to implementation phase target, made on the BIM models provided It is fixed.
3. a kind of structural steelwork fund pre-warning management system based on BIM according to claim 1, which is characterized in that The paid money of each progress includes the paid money of factory process progress and the paid money of in-site installation progress.
4. a kind of structural steelwork fund pre-warning management system based on BIM according to claim 1, which is characterized in that Described to be divided into three classes by pre-defined rule execution computations, one kind is processing real product computation rule, and another kind of is that installation is real Border output value computation rule, last one kind are erection schedule fund computation rules, wherein processing real product computation rule is basis Delivery progress metadata is multiplied by the processing comprehensive unit price corresponding to different component type;Installation real product computation rule is installation Progress metadata is multiplied by the installation comprehensive unit price corresponding to different component type;Erection schedule fund computation rule is according to current The installation comprehensive unit price corresponding to different component type is multiplied by component erection schedule corresponding to time.
5. a kind of structural steelwork fund pre-warning management system based on BIM according to claim 1, which is characterized in that The target financial risks early warning mechanism is the safe fund controllable factor of index formulated according to factory and construction site, to reality Delivery, installation receipt and processing real product, installation real product carry out safety ratio pair, if the not up to described capital management peace Full limitation, then automatic trigger early warning event, corresponding factory's stopping production and processing are live to stop construction.
6. a kind of structural steelwork fund pre-warning management system based on BIM according to claim 1, which is characterized in that The real-time poly group report includes factory's Fund-Application report and live Fund-Application report, wherein factory's Fund-Application report by Real product and the practical gathering curve composition of factory are processed, live account due report is by installation real product, the practical gathering of installation It collects money and forms with erection schedule.
CN201810465722.2A 2018-05-16 2018-05-16 A kind of structural steelwork fund pre-warning management system based on BIM Pending CN108805748A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810465722.2A CN108805748A (en) 2018-05-16 2018-05-16 A kind of structural steelwork fund pre-warning management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810465722.2A CN108805748A (en) 2018-05-16 2018-05-16 A kind of structural steelwork fund pre-warning management system based on BIM

Publications (1)

Publication Number Publication Date
CN108805748A true CN108805748A (en) 2018-11-13

Family

ID=64092434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810465722.2A Pending CN108805748A (en) 2018-05-16 2018-05-16 A kind of structural steelwork fund pre-warning management system based on BIM

Country Status (1)

Country Link
CN (1) CN108805748A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110232515A (en) * 2019-06-04 2019-09-13 中铁四局集团有限公司城市轨道交通工程分公司 A kind of BIM project real-time monitoring system and evaluation method
CN112785401A (en) * 2021-01-26 2021-05-11 宝钢工程技术集团有限公司 Contract receivables management method for engineering project
CN115169818A (en) * 2022-06-14 2022-10-11 武汉建科科技有限公司 Digital modeling-based technical engineering measurement and calculation method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory
CN106373000A (en) * 2016-08-29 2017-02-01 成都支付通卡友电子商务有限公司 Enterprise/ bank account integrated multifunctional management system
CN107038554A (en) * 2017-03-30 2017-08-11 浙江精工钢结构集团有限公司 Steel construction BIM informatization management methods and system based on Cloud Server
CN107545117A (en) * 2017-09-11 2018-01-05 中建安装工程有限公司 A kind of prefabricated processing management system and method based on BIM electromechanical models

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory
CN106373000A (en) * 2016-08-29 2017-02-01 成都支付通卡友电子商务有限公司 Enterprise/ bank account integrated multifunctional management system
CN107038554A (en) * 2017-03-30 2017-08-11 浙江精工钢结构集团有限公司 Steel construction BIM informatization management methods and system based on Cloud Server
CN107545117A (en) * 2017-09-11 2018-01-05 中建安装工程有限公司 A kind of prefabricated processing management system and method based on BIM electromechanical models

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
崔曙东: "基于施工阶段的BIM技术应用研究", 《建筑工程技术与设计》 *
胡二潘等: "基于建筑信息模型BIM的费用控制与进度控制", 《科技传播》 *
赵伯廷等: "施工企业资金风险及其预警控制探析――基于A公司资金管理工作的思考", 《中国市场》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110232515A (en) * 2019-06-04 2019-09-13 中铁四局集团有限公司城市轨道交通工程分公司 A kind of BIM project real-time monitoring system and evaluation method
CN112785401A (en) * 2021-01-26 2021-05-11 宝钢工程技术集团有限公司 Contract receivables management method for engineering project
CN115169818A (en) * 2022-06-14 2022-10-11 武汉建科科技有限公司 Digital modeling-based technical engineering measurement and calculation method and system

Similar Documents

Publication Publication Date Title
CN108805748A (en) A kind of structural steelwork fund pre-warning management system based on BIM
CN104850940A (en) Completion settlement making method and completion settlement making system based on project whole-process management
CN102955982A (en) System for managing construction project contracting
CN103020873B (en) A kind of turn money method and system automatically for electric system
CN106384189A (en) Enterprise management system based on sale management
CN105976165A (en) Information processing method for reimbursement system based work unit project budge full-process management
CN107705011A (en) Electricity market risk management system and method
CN108734567A (en) A kind of asset management system and its appraisal procedure based on big data artificial intelligence air control
CN108846645A (en) A kind of enterprise's flattened management method and system
CN111598496A (en) Reinforcing steel bar processing management system and processing management method
CN109559070A (en) The equipment production information management method and device of assembled architecture platform
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
Kern et al. A model for integrating cost management and production planning and control in construction
CN112434995A (en) Warehouse management system based on financial data
Gilbukh et al. Firm dynamics and pricing under customer capital accumulation
CN201721981U (en) Automatic vehicle loading system of tube cabin
CN110020825A (en) A kind of material is into marketing management method and device
CN114154862A (en) Engineering cost automatic allocation method and system based on engineering whole-process management
CN113935575A (en) Sheet inquiry benefit measuring and calculating system for iron and steel enterprise
Tianyou et al. The integrated automation system of iron & steel enterprise
CN108182535B (en) Material information management method
Jiang Risk Management and Supplier Selection in International Procurement--Taking International Engineering as an Example
Singh et al. MEASURING EFFICIENCY AND EFFECTIVENESS OF SUPPLY CHAIN: A CONTEXT TO INDIAN ORGANIZATIONS
CN201035614Y (en) Plan building management information device
Jahani Optimising financial performance measures in a supply chain network redesign

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination