Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200064742U
Other languages
Chinese (zh)
Inventor
罗丹
吴正江
李志群
吴添鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Fujitsu Communication Software Co Ltd
Original Assignee
Fujian Fujitsu Communication Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Fujitsu Communication Software Co Ltd filed Critical Fujian Fujitsu Communication Software Co Ltd
Priority to CNU2007200064742U priority Critical patent/CN201035614Y/en
Application granted granted Critical
Publication of CN201035614Y publication Critical patent/CN201035614Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model belongs to the telecom information technical field and relates to an engineering management device. The utility model provides a planning construction management information device which supports multiple-management and multi-project management. The utility model comprises an application server, a central exchanger, a database server, and a SAN (Storage Area Network, storage area network) exchanger, wherein, the application server is connected with the central exchanger, the central exchanger is connected with the database server, the database server is connected with the SAN exchanger, and the SAN exchanger is connected with a memory machine. The utility model better realizes the data sharing through a networking application, and speeds up the information transmission speed. The utility model realizes the timely long-distance data transmission and the information track of the headquarters and realizes the long-distance inquiry and supervision. The utility model supports two modes of the multiple management and the multi-project management, and assists an enterprise to effectively utilize and share the overall resources.

Description

Plan implementation management massaging device
[technical field]
The utility model belongs to the telecom information technical field, relates to the engineering management device.
[background technology]
Along with telecom operators' Engineering Project Construction scale constantly enlarges, more and more higher to the requirement that the management of each engineering project is controlled; As listed company, whether the standard of project management directly affects the performance in capital market; Need prevent overlapping investment, reduce the investment risk of enterprise, improve fund utilization rate.Aspect the IT system support, systemic-function is imperfect, has weakened the effect of project management and control; Generally lack and integrate, influenced the effect of enterprise-level application; Lack procedure supporting method easily, business reorganization is dumb; The general passivity of application system is stronger, lacks real-time; Effectively be combined with To be improved with information management with cooperation exchanges.
[summary of the invention]
Technical problem to be solved in the utility model is to provide a kind of plan implementation management massaging device of supporting multiple management and the management of multinomial order.
The utility model is by the following technical solutions:
Plan implementation management massaging device, comprise application server, center switch, database server, SAN (Storage Area Network, storage area network) switch, wherein application server links to each other with center switch, center switch links to each other with database server, database server links to each other with the SAN switch, and the SAN switch links to each other with memory machine.
Above hardware structure is equipped with the application of corresponding software by networking and better realizes data sharing, has accelerated the transmission speed of information.Realize the tracking of in good time teledata transmission and general headquarters, realize long-range inquiry and supervision information.Support two kinds of patterns of multiple management and multinomial order management, assist the high efficiency utilization of enterprise and share whole resource.
[description of drawings]
In conjunction with the embodiments the present invention is described in further detail with reference to the accompanying drawings.
Fig. 1 is the hardware physical connection figure of the utility model plan implementation management massaging device.
Fig. 2 is the used software execution flow journey of the utility model plan implementation management massaging device figure.
[embodiment]
As shown in Figure 1, plan implementation management massaging device, comprise application server, center switch, database server, SAN switch, memory machine, wherein application server links to each other with center switch, center switch links to each other with database server, database server links to each other with the SAN switch, and the SAN switch links to each other with memory machine.
As shown in Figure 2, be the used software execution flow journey of the utility model plan implementation management massaging device figure, this software execution flow journey is made up of the spend money modules such as management, engineering contract management, engineering procurement management, engineering special management, system management of rendering an account of Engineering Investment Management, management of engineering construction, engineering, and the feature and the mutual relationship of each ingredient are as follows:
Engineering Investment Management: the management that the formation of yearly budget investment structure and structure, amount are adjusted.The Engineering Project Construction of all capital expenditures of yearly budget plate management and control.Engineering Investment Management mainly comprises functions such as the formation, investment structure adjustment, gross investment adjustment of annual investment structure.
Management of engineering construction: project is solid from demand, project verification, design, engineering construction, examination, commentaries on classics, to the Whole Course Management of budget needed for the completion of projects.Functional modules such as management of engineering construction comprises demand, project verification, can grind, design, initial test, final acceptance inspection, budget needed for the completion of projects.
The engineering management of rendering an account of spending money: the management of every expenditure that engineering is taken place.
Engineering contract management: the management of all kinds of contracts that engineering is related to.
Engineering procurement management: to the management of the purchase behavior that takes place in the engineering construction process.
Engineering special management: to the management of the engineering troop that relates to of engineering management process.
System management: parameter of system etc. is carried out initial configuration, to the management of the setting of every authority.
Each several part adopts workflow to hold up, and integrated various types of business provide external cooperation with service.
This plan implementation management massaging device combines with above-mentioned software module, realizes engineering management by following flow process.
Client is connected on the application server by network, calls application service and obtains business information, returns client and represents.The service of application server is by center switch accessing database server, and database server connects storage by the SAN switch, reads related data in the storage, feeds back to application server through business logic processing.Contact is closely arranged between each module, drive by flow engine.
The annual year end, formulate flow process by annual capital expenditure, determine the total dish of rolling investment and the annual project scheduling of next year; By the engineering special management, determine the engineering troop that is shortlisted for every year; During the engineering project verification, by the approval process of approving and initiate a project, the definite project that will build being signed and issued the project verification reply; Determine designing unit by Project design and approval process, finish design after, output buying equipment list; By the bidding management flow process, determine the bid result; By contract signing and approval process, with supplier's sign contract; By payment process, all kinds of expenses are applied for and rendered an account; In engineering construction worker process, by the project construction management process, engineering construction manages to project; When the project initial test, output initial test result and pilot running report; During the project final acceptance inspection, solid assets inventory is changeed in output; By the asset management flow process, with final account of project information,, be sent to financial management system by interface, realize the integrated management of information such as, budget needed for the completion of projects solid to project estimates, project verification, design, project progress, fund, commentaries on classics.
This product has the following advantages: 1, be applicable to the cooperating engineering management of large enterprise, be all participations The people shares, and promotes effectively Information Sharing and communication. 2, by the standardization to project management method, repeat Reproduce, pass through simultaneously continuous measurement and improvement in the running, can greatly improve project in the tissue The maturity of management and information management. 3, greatly reduce working strength. 4, Improving Project management as seen Degree and transparency, the supervision mechanism of set up item management, thus promote reaching of project objective. The engineering pipe Reason changes to plan type, analytic type and forecasting type. 5, highly integrated finance stream in the process of engineering management Journey, the final accounts information of generation engineering in system.

Claims (1)

1. plan the implementation management massaging device, it is characterized in that: comprise application server, center switch, database server, storage area network switch, wherein application server links to each other with center switch, center switch links to each other with database server, database server links to each other with the storage area network switch, and the storage area network switch links to each other with memory machine.
CNU2007200064742U 2007-03-07 2007-03-07 Plan building management information device Expired - Fee Related CN201035614Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200064742U CN201035614Y (en) 2007-03-07 2007-03-07 Plan building management information device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200064742U CN201035614Y (en) 2007-03-07 2007-03-07 Plan building management information device

Publications (1)

Publication Number Publication Date
CN201035614Y true CN201035614Y (en) 2008-03-12

Family

ID=39196505

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200064742U Expired - Fee Related CN201035614Y (en) 2007-03-07 2007-03-07 Plan building management information device

Country Status (1)

Country Link
CN (1) CN201035614Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798476A (en) * 2017-10-25 2018-03-13 南京感动科技有限公司 A kind of virtual interactive interface process management system based on swim-lane diagram

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798476A (en) * 2017-10-25 2018-03-13 南京感动科技有限公司 A kind of virtual interactive interface process management system based on swim-lane diagram

Similar Documents

Publication Publication Date Title
Borenstein et al. Diagnosing market power in California's restructured wholesale electricity market
Atkinson et al. The digital road to recovery: a stimulus plan to create jobs, boost productivity and revitalize America
CN110334950B (en) Iron tower intelligent production and group management and control system
CN103631602A (en) Cloud support system suitable for ERP (Enterprise Resource Planning) software of middle and small-sized enterprises
CN109493003A (en) Item data management method and terminal device
Salant A primer on auction design, management, and strategy
Lundin Geographic price granularity and investments in wind power: Evidence from a Swedish electricity market splitting reform
KR102387318B1 (en) Cloud-based Power Generation Platform Sales System for Improving Energy Supply Efficiency
CN101901403A (en) Customer credit line information management platform system
CN201035614Y (en) Plan building management information device
Cham The Philippine power sector: issues and solutions
Kahrl et al. Policy and Regulatory Recommendations to Support a Least-Cost Pathway for India’s Power Sector
Poptawski et al. Blockchain-based smart contracts for sustainable power investments
Dahal A review of maintenance scheduling approaches in deregulated power systems
Hrga et al. Decentralized platform for investments and operation of energy communities
Jones et al. How Virtual Power Plants Can Advance Electrification and Mitigate Infrastructure Needs As We Race to Meet Our Climate Challenges
Vajdić et al. Development and impact of flow-based methodology in core region
Kinaci et al. Demand‐side management evolution: New roles and models for market participation and incentive alignment
KR102380659B1 (en) Cloud-based energy distribution platform and pre-sale method
Cleary et al. Experience with Competitive Procurements and Centralized Resource Planning to Advance Clean Electricity
Changbing et al. Research on productive efficiencies measurement based on three-stage super DEA model: a case of Chinese road and bridge enterprises
Spees et al. A Dynamic Clean Energy Market
Yang et al. Virtual production control system
Hurlbut et al. Regulatory Foundations for Cross-Border Electricity Trading: Bangladesh
Jones PhD et al. How Virtual Powers Plants Can Advance Electrification and Mitigate Infrastructure Needs As We Race to Meet Our Climate Challenges

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080312

Termination date: 20150307

EXPY Termination of patent right or utility model