CN108798190A - 电线杆、模具 - Google Patents
电线杆、模具 Download PDFInfo
- Publication number
- CN108798190A CN108798190A CN201810904612.1A CN201810904612A CN108798190A CN 108798190 A CN108798190 A CN 108798190A CN 201810904612 A CN201810904612 A CN 201810904612A CN 108798190 A CN108798190 A CN 108798190A
- Authority
- CN
- China
- Prior art keywords
- mold
- plate
- main reinforcement
- fixed
- inner core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000002787 reinforcement Effects 0.000 claims description 44
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 9
- 125000006850 spacer group Chemical group 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 5
- 238000003032 molecular docking Methods 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 230000037237 body shape Effects 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 7
- 239000002002 slurry Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/76—Moulds
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
本发明提供一种结构设计新颖、易于生产的电线杆、模具,电线杆包括由混凝土层和骨筋构成的本体,所述本体的直径由尾端至顶端渐缩,本体内为内腔,所述内腔中填充有内芯,模具包括截面均呈半圆形的上模具和下模具并通过穿过螺栓孔内的螺栓固定;所述上模具的侧壁上设有与上模具内部连通的进料管;所述上模具的侧壁上固定有震动泵。
Description
技术领域
本发明涉及一种电线杆生产技术领域,尤其涉及一种电线杆、模具。
背景技术
本发明涉及一种电线杆和用于生产该电线杆的模具。
发明内容
本发明的目的在于克服现有技术的不足,适应现实需要,提供一种结构设计新颖、易于生产的电线杆、模具。
为了实现本发明的目的,本发明所采用的技术方案为:
设计一种电线杆,包括由混凝土层和骨筋构成的本体,所述本体的直径由尾端至顶端渐缩,本体内为内腔,所述内腔中填充有内芯,内芯的外壁上设有若干个主筋固定组件单元,若干个主筋固定组件单元关于内芯外壁对称设置,主筋固定组件单元由若干个沿内芯长度方向等间隔设置的主筋固定组件组成;
相邻两个主筋固定组件单元之间设有主筋支撑组件单元,主筋支撑组件单元由若干个沿内芯长度方向等间隔设置的主筋支撑组件组成;
所述主筋固定组件包括两个间隔设置的限位突起,两个限位突起之间设有垫块,
所述主筋支撑组件包括支撑突起,支撑突起的顶端设有弧形凹槽;
当主筋位于内芯上时,主筋位于两个限位突起之间的垫块上,通过垫块使主筋与内芯外壁间隔设置,相邻两个主筋固定组件单元之间的主筋位于所述支撑突起顶端的凹槽内,所述限位突起突起的高度与本体上的混凝土层的厚度相同。
所述支撑突起、垫块与内芯一体化构成。
所述内芯由泡沫塑料制成。
本发明还公开一种模具,用于生产如上所述的电线杆,包括截面均呈半圆形的上模具和下模具,上模具和下模具对接后形成的内部空腔与本体形状匹配;其特征在于:上模具的两侧端部分别设有沿上模具长度方向设置的上耳板,下模具的两侧端部分别设有沿下模具长度方向设置的下耳板,当上模具和下模具上下对接后,上耳板和下耳板面接触,且上耳板和下耳板上分别设有一一对应的螺栓孔,所述上耳板和下耳板通过穿过螺栓孔内的螺栓固定;
所述上模具的侧壁上设有与上模具内部连通的进料管;
所述上模具的侧壁上固定有震动泵;
所述下模具的侧壁上设有两个对称设置的固定提升件,所述固定提升件包括环绕下模具周向设置并固定焊接在下模具上的环板,环绕环板外围设置并与环板焊接的环形卡板,所述环板与环形卡板构成的截面呈T形;
还包括分别设置于模具两端下方的支撑装置,所述支撑装置包括底座、设置于底座上的支撑柱,支撑柱的顶端固定有呈半圆状的支撑板,支撑板的开口向上,且支撑板的内侧壁上固定有柔性橡胶垫层;所述下模具的两端分别位于其中一个支撑装置上的橡胶垫层上;
所述底座上还设有拉紧和缓冲装置,所述拉紧和缓冲装置包括底端固定在底座上的若干个弹簧,若干个弹簧的顶部固定有由钢板支撑的箱体,箱体内的底部固定有油缸,油缸与外部的油泵对应连接,油缸上的伸缩轴端部上固定有拉板,拉板的两端分别铰接有挂钩,挂钩的主体呈倒置的L形,且挂钩的活动端端部设有与活动端端部垂直的钩体,所述钩体的端部为水平面;
所述油缸的两侧箱体底部上分别固定有一直立设置的导向管,导向管的上端开口,所述拉板的两端下侧壁上分别固定有一直立的导向杆,两个导向杆与两个导向管一一对应,且导向杆的下端插在导向管内,所述导向杆的长度小于导向管的长度;
位于环板左右两侧的环形卡板内侧壁上分别设有一环形卡槽,所述环形卡槽沿环形卡板的弧度方向设置;
当所述下磨具置于橡胶垫层上时,所述环形卡板位于所述拉板的正上方,拉板上的两个挂钩分别位于环形卡板下方的两侧,通过向上翻转挂钩可将挂钩端部上的钩体卡在环形卡槽内。
所述进料管为两个并左右对称设置。
所述震动泵为两个并左右对称设置。
本发明的有益效果在于:
本设计其结构设计新颖,现对于现有技术中的水泥电线杆,本设计与其具有较大区别,且本设计的电线杆在生产中可改变传统的通过旋转产生离心力生产的方式,相对于现有技术,生产将变得更加简单,适合规模化生产。
附图说明
图1为本发明中的内芯与骨筋配合后的截面结构示意图;
图2为本发明中的电线杆截面结构示意图;
图3为本发明中的内芯主视状态主要结构示意图;
图4为图3中A部放大结构示意图;
图5为本发明中的模具和内部的电线杆结构示意图;
图6为本发明中的模具主视状态主要结构示意图;
图7为本发明中的拉紧和缓冲装置剖面结构示意图;
图8为本发明中的支撑柱、支撑板及其上的柔性橡胶垫层结构示意图。
具体实施方式
下面结合附图和实施例对本发明进一步说明:
实施例:参见图1至图8。
一种电线杆,包括由混凝土层7和骨筋构成的本体,骨筋由主筋5和将主筋包围的圈筋6构成(现有技术),所述本体的直径由尾端至顶端渐缩,本体内为内腔。
本设计中,所述内腔中填充有内芯1,内芯1的外壁上设有若干个主筋固定组件单元,若干个主筋固定组件单元关于内芯1外壁对称设置,主筋固定组件单元由若干个沿内芯长度方向等间隔设置的主筋固定组件组成;具体的,所述主筋固定组件包括两个间隔设置的限位突起2,两个限位突起2之间设有垫块。
同时,相邻两个主筋固定组件单元之间设有主筋支撑组件单元,主筋支撑组件单元由若干个沿内芯长度方向等间隔设置的主筋支撑组件组成;具体的,所述主筋支撑组件包括支撑突起4,支撑突起4的顶端设有弧形凹槽。
如图所示,当主筋5位于内芯1上时,主筋5位于两个限位突起2之间的垫块上,通过垫块使主筋与内芯1外壁间隔设置,此时,相邻两个主筋固定组件单元之间的主筋5位于所述支撑突起4顶端的凹槽内,而所述限位突起突起的高度与本体上的混凝土层的厚度相同。
本设计中,所述限位突起2、支撑突起4、垫块与内芯一体化构成且由泡沫塑料制成。
一种模具,用于生产如上所述的电线杆,它包括截面均呈半圆形的上模具8和下模具9,上模具8和下模具9对接后形成的内部空腔与本体形状匹配。
本设计在上模具的两侧端部分别设有沿上模具长度方向设置的上耳板10,下模具9的两侧端部分别设有沿下模具9长度方向设置的下耳板11,当上模具8和下模具9上下对接后,上耳板10和下耳板11面接触,且上耳板10和下耳板11上分别设有一一对应的螺栓孔,所述上耳板和下耳板通过穿过螺栓孔内的螺栓12固定。
进一步的,所述上模具的侧壁上设有与上模具8内部连通的进料管13,所述进料管13为两个并左右对称设置,同时,所述上模具8的侧壁上固定有震动泵14,所述震动泵14为两个并左右对称设置。
进一步的,所述下模具9的侧壁上设有两个对称设置的固定提升件,单个所述固定提升件包括环绕下模具9周向设置并固定焊接在下模具上的环板27,环绕环板57外围设置并与环板27焊接的环形卡板15,所述环板27与环形卡板15构成的截面呈T形。
进一步的,还包括分别设置于模具两端下方的支撑装置,所述支撑装置包括底座21、设置于底座21上的支撑柱22,支撑柱22的顶端固定有呈半圆状的支撑板23,支撑板23的开口向上,且支撑板23的内侧壁上固定有柔性橡胶垫层36;所述下模具9的两端分别位于其中一个支撑装置上的橡胶垫层36上。
进一步的,所述底座上还设有拉紧和缓冲装置,所述拉紧和缓冲装置包括底端固定在底座21上的若干个弹簧24,若干个弹簧24的顶部固定有由钢板支撑的箱体25,箱体25内的底部固定有油缸32,油缸32与外部的油泵对应连接,油缸32上的伸缩轴33端部上固定有拉板31,拉板31的两端分别铰接有挂钩26,挂钩26通过铰接轴30与拉板铰接,挂钩26的主体呈倒置的L形,且挂钩的活动端端部设有与活动端端部垂直的钩体29,所述钩体29的端部为水平面。
进一步的,所述油缸32的两侧箱体底部上分别固定有一直立设置的导向管34,导向管34的上端开口,所述拉板31的两端下侧壁上分别固定有一直立的导向杆35,两个导向杆35与两个导向管34一一对应,且导向杆35的下端插在导向管34内,所述导向杆的长度小于导向管的长度。
还在位于环板27左右两侧的环形卡板15内侧壁上分别设有一环形卡槽28,所述环形卡槽28沿环形卡板的弧度方向设置;当所述下磨具9置于橡胶垫层上时,所述环形卡板15位于所述拉板31的正上方,拉板31上的两个挂钩26上的钩体29端部分别位于环形卡板下方的两侧,通过向上翻转挂钩26可将挂钩端部上的钩体29卡在环形卡槽28内。
通过本模具生产本发明的电线杆的方法如下:
1、按照本文所述内芯的结构,首先加工好内芯,而后将骨架上的主筋分别通过圈筋7固定在内芯上的主筋固定组件单元和主筋支撑组件单元中。
2、将捆绑好的骨架及内芯放置于下模具内,而后将上模具扣在下模具上并通过螺栓对两者进行固定,此时,限位突起和支撑突起的端部抵在上模具和下模具的内壁上,此时,骨筋与上模具和下模具内壁、与内芯外壁均间隔设置。
3、而后,以环形卡板15为受力点并通过吊车将固定后的上下模具吊运至支撑装置之上,此时,下模具的两端分别置于两侧的支撑板23上的柔性橡胶垫层36上。
4、向上翻转挂钩并将钩体钩在环形卡槽28内,而后启动油缸通过油缸将拉板向下拉动,在拉板向下移动的过程中,导向杆在导向管内移动,挂钩向下拉动并对环形卡板拉紧,停止油缸运动,此时,上下模具被固定,在油缸拉紧挂钩时,其底部的弹簧对其进行缓冲,避免用力过大或过猛对环形卡板拉坏,最终的状态可参见图7所示。
5、启动两台震动泵,并通过进料管向上下模具之间输送浆料,在浆料输送的过程中,震动泵对模具进行震动促使浆料在模具内腔中均匀分布,在此步骤中,浆料通过泵车定量输送,避免过多或过少的输送浆料。
6、浆料输送完毕后,油缸顶升促使挂钩对环形卡板的拉力解除,而后将挂钩翻转至侧部。
7、通过吊车将上下模具吊运至蒸汽池内促进其内部浆料进快凝固。
8、将上下模具从蒸汽池中吊出,而后,将固定上下模具的螺栓取下,使用吊车将上模具从下模具上移开,而后可将成型的电线杆从下模具内取出,至此,可完成本设计的电线杆的生产。
本发明的实施例公布的是较佳的实施例,但并不局限于此,本领域的普通技术人员,极易根据上述实施例,领会本发明的精神,并做出不同的引申和变化,但只要不脱离本发明的精神,都在本发明的保护范围内。
Claims (6)
1.一种电线杆,包括由混凝土层和骨筋构成的本体,所述本体的直径由尾端至顶端渐缩,本体内为内腔,其特征在于:所述内腔中填充有内芯,内芯的外壁上设有若干个主筋固定组件单元,若干个主筋固定组件单元关于内芯外壁对称设置,主筋固定组件单元由若干个沿内芯长度方向等间隔设置的主筋固定组件组成;
相邻两个主筋固定组件单元之间设有主筋支撑组件单元,主筋支撑组件单元由若干个沿内芯长度方向等间隔设置的主筋支撑组件组成;
所述主筋固定组件包括两个间隔设置的限位突起,两个限位突起之间设有垫块,
所述主筋支撑组件包括支撑突起,支撑突起的顶端设有弧形凹槽;
当主筋位于内芯上时,主筋位于两个限位突起之间的垫块上,通过垫块使主筋与内芯外壁间隔设置,相邻两个主筋固定组件单元之间的主筋位于所述支撑突起顶端的凹槽内,所述限位突起突起的高度与本体上的混凝土层的厚度相同。
2.如权利要求1所述的电线杆,其特征在于:所述支撑突起、垫块与内芯一体化构成。
3.如权利要求1所述的电线杆,其特征在于:所述内芯由泡沫塑料制成。
4.一种模具,用于生产如权利要求1所述的电线杆,包括截面均呈半圆形的上模具和下模具,上模具和下模具对接后形成的内部空腔与本体形状匹配;其特征在于:上模具的两侧端部分别设有沿上模具长度方向设置的上耳板,下模具的两侧端部分别设有沿下模具长度方向设置的下耳板,当上模具和下模具上下对接后,上耳板和下耳板面接触,且上耳板和下耳板上分别设有一一对应的螺栓孔,所述上耳板和下耳板通过穿过螺栓孔内的螺栓固定;
所述上模具的侧壁上设有与上模具内部连通的进料管;
所述上模具的侧壁上固定有震动泵;
所述下模具的侧壁上设有两个对称设置的固定提升件,所述固定提升件包括环绕下模具周向设置并固定焊接在下模具上的环板,环绕环板外围设置并与环板焊接的环形卡板,所述环板与环形卡板构成的截面呈T形;
还包括分别设置于模具两端下方的支撑装置,所述支撑装置包括底座、设置于底座上的支撑柱,支撑柱的顶端固定有呈半圆状的支撑板,支撑板的开口向上,且支撑板的内侧壁上固定有柔性橡胶垫层;所述下模具的两端分别位于其中一个支撑装置上的橡胶垫层上;
所述底座上还设有拉紧和缓冲装置,所述拉紧和缓冲装置包括底端固定在底座上的若干个弹簧,若干个弹簧的顶部固定有由钢板支撑的箱体,箱体内的底部固定有油缸,油缸与外部的油泵对应连接,油缸上的伸缩轴端部上固定有拉板,拉板的两端分别铰接有挂钩,挂钩的主体呈倒置的L形,且挂钩的活动端端部设有与活动端端部垂直的钩体,所述钩体的端部为水平面;
所述油缸的两侧箱体底部上分别固定有一直立设置的导向管,导向管的上端开口,所述拉板的两端下侧壁上分别固定有一直立的导向杆,两个导向杆与两个导向管一一对应,且导向杆的下端插在导向管内,所述导向杆的长度小于导向管的长度;
位于环板左右两侧的环形卡板内侧壁上分别设有一环形卡槽,所述环形卡槽沿环形卡板的弧度方向设置;
当所述下磨具置于橡胶垫层上时,所述环形卡板位于所述拉板的正上方,拉板上的两个挂钩分别位于环形卡板下方的两侧,通过向上翻转挂钩可将挂钩端部上的钩体卡在环形卡槽内。
5.如权利要求4所述的模具,其特征在于:所述进料管为两个并左右对称设置。
6.如权利要求4所述的模具,其特征在于:所述震动泵为两个并左右对称设置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810904612.1A CN108798190B (zh) | 2018-08-09 | 2018-08-09 | 电线杆、模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810904612.1A CN108798190B (zh) | 2018-08-09 | 2018-08-09 | 电线杆、模具 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108798190A true CN108798190A (zh) | 2018-11-13 |
CN108798190B CN108798190B (zh) | 2023-12-05 |
Family
ID=64079662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810904612.1A Active CN108798190B (zh) | 2018-08-09 | 2018-08-09 | 电线杆、模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108798190B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113846892A (zh) * | 2021-10-15 | 2021-12-28 | 江西荣仁电力器材有限公司 | 一种分段组合式混凝土电线杆及其制管成型机构 |
CN114000760A (zh) * | 2021-12-07 | 2022-02-01 | 浙江双新预构件有限公司 | 一种高抗碰撞性抗冻型混凝土电杆 |
CN114012865A (zh) * | 2021-11-11 | 2022-02-08 | 江西荣仁电力器材有限公司 | 一种便于分离的混凝土电线杆生产用浇筑装置 |
Citations (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB400200A (en) * | 1932-04-11 | 1933-10-11 | Alexander Sanderson | Improvements in and relating to moulding articles of concrete or other plastic material |
GB1113438A (en) * | 1964-07-03 | 1968-05-15 | Mono Concrete Ltd | Reinforced concrete pipe |
US4040597A (en) * | 1975-07-25 | 1977-08-09 | M&T Mfg. Co. | Core holding structure for molds |
SU1315329A1 (ru) * | 1985-10-22 | 1987-06-07 | Минский Филиал Конструкторско-Технологического Бюро "Стройиндустрия" | Форма дл изготовлени центрифугированных трубчатых изделий из бетонных смесей |
WO1998009042A1 (de) * | 1996-08-28 | 1998-03-05 | Sacac Schleuderbetonwerk Ag | Rohr- und/oder stabförmige faserverstärkte konstruktionen |
CN2362937Y (zh) * | 1998-07-16 | 2000-02-09 | 同济大学 | 钢筋混凝土结构中钢筋的定位夹具 |
CN1333410A (zh) * | 2001-08-30 | 2002-01-30 | 刘春江 | 复合型环保电杆及其生产工艺 |
US20030157281A1 (en) * | 2002-02-15 | 2003-08-21 | Hiroyasu Minayoshi | Concrete electric pole, reinforcement member arrangement jig therefor and method of reinforcing the same |
CN1445066A (zh) * | 2003-03-11 | 2003-10-01 | 綦玉良 | 现浇砼空心楼板用薄壁管的生产方法及专用设备 |
CN1671935A (zh) * | 2002-08-14 | 2005-09-21 | 佛蒙特工业股份有限公司 | 混凝土填充杆 |
CN1683133A (zh) * | 2005-02-25 | 2005-10-19 | 杨健辉 | 人工预制任意规格与形状的混凝土管的生产方法及模具 |
US20060138688A1 (en) * | 2002-11-18 | 2006-06-29 | Hume Graeme R | Moulding of concrete articles |
JP2007007978A (ja) * | 2005-06-30 | 2007-01-18 | National Institute Of Advanced Industrial & Technology | 中空部をもつコンクリート製品の成形用型 |
KR20070029532A (ko) * | 2005-09-10 | 2007-03-14 | 양원동 | 돌기가 형성된 공공 구조물 |
CN101181802A (zh) * | 2006-11-14 | 2008-05-21 | 聂磊 | 一种水泥渗水管的成型模具及成型工艺 |
CN101468489A (zh) * | 2004-07-28 | 2009-07-01 | 邱则有 | 一种砼填充空心薄壁构件成型用槽形模具 |
CN201456211U (zh) * | 2009-08-08 | 2010-05-12 | 齐新明 | 制造梁板预应力孔用简易充气模具 |
CN101718149A (zh) * | 2009-11-06 | 2010-06-02 | 常熟风范电力设备股份有限公司 | 一种复合材料杆塔及其制造工艺 |
CN201581557U (zh) * | 2009-12-09 | 2010-09-15 | 宋义 | 水泥制品用钢筋固定卡扣 |
KR20110019051A (ko) * | 2009-08-19 | 2011-02-25 | 류준수 | 보강수단을 구비한 빔 |
CN202572610U (zh) * | 2012-05-19 | 2012-12-05 | 中铁十局集团第二工程有限公司 | 一种泡沫芯模预制空心板梁的模具 |
AU2012243430A1 (en) * | 2011-04-11 | 2013-04-18 | Vijay Investments Pty Ltd | Method and system for forming a support structure |
US9062662B1 (en) * | 2013-03-27 | 2015-06-23 | Ebert Composites Corporation | Hybrid pole structure and method of assembly |
CN104802301A (zh) * | 2015-04-30 | 2015-07-29 | 华南理工大学 | 一种制备超高性能混凝土管道的模具及方法 |
US20160046039A1 (en) * | 2013-04-12 | 2016-02-18 | Vertech Hume Pty Ltd | Method and System for Fabrication of Elongate Concrete Articles |
CN205046923U (zh) * | 2015-09-10 | 2016-02-24 | 浙江金力风力发电设备有限公司 | 一种新型电线杆 |
CN205502710U (zh) * | 2016-04-14 | 2016-08-24 | 马鞍山宏泰建材股份有限公司 | 一种分离式电杆 |
CN205777110U (zh) * | 2016-05-30 | 2016-12-07 | 安徽天煌机械制造有限公司 | 一种柱形钢筋骨架保护层卡圈 |
CN107035214A (zh) * | 2017-05-17 | 2017-08-11 | 德阳松涛科技有限公司 | 一种抗风性能好的旗杆 |
CN109109153A (zh) * | 2018-08-09 | 2019-01-01 | 江西荣仁电力器材有限公司 | 用于水泥电线杆内的卡件结构 |
CN208792864U (zh) * | 2018-08-09 | 2019-04-26 | 江西荣仁电力器材有限公司 | 电线杆、模具 |
CN211007875U (zh) * | 2019-10-30 | 2020-07-14 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | 一种frp筋混凝土电杆 |
CN213471601U (zh) * | 2020-05-22 | 2021-06-18 | 横店集团东磁股份有限公司 | 一种各异向性永磁铁径向多级磁环磁路模具 |
-
2018
- 2018-08-09 CN CN201810904612.1A patent/CN108798190B/zh active Active
Patent Citations (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB400200A (en) * | 1932-04-11 | 1933-10-11 | Alexander Sanderson | Improvements in and relating to moulding articles of concrete or other plastic material |
GB1113438A (en) * | 1964-07-03 | 1968-05-15 | Mono Concrete Ltd | Reinforced concrete pipe |
US4040597A (en) * | 1975-07-25 | 1977-08-09 | M&T Mfg. Co. | Core holding structure for molds |
SU1315329A1 (ru) * | 1985-10-22 | 1987-06-07 | Минский Филиал Конструкторско-Технологического Бюро "Стройиндустрия" | Форма дл изготовлени центрифугированных трубчатых изделий из бетонных смесей |
WO1998009042A1 (de) * | 1996-08-28 | 1998-03-05 | Sacac Schleuderbetonwerk Ag | Rohr- und/oder stabförmige faserverstärkte konstruktionen |
CN2362937Y (zh) * | 1998-07-16 | 2000-02-09 | 同济大学 | 钢筋混凝土结构中钢筋的定位夹具 |
CN1333410A (zh) * | 2001-08-30 | 2002-01-30 | 刘春江 | 复合型环保电杆及其生产工艺 |
US20030157281A1 (en) * | 2002-02-15 | 2003-08-21 | Hiroyasu Minayoshi | Concrete electric pole, reinforcement member arrangement jig therefor and method of reinforcing the same |
CN1671935A (zh) * | 2002-08-14 | 2005-09-21 | 佛蒙特工业股份有限公司 | 混凝土填充杆 |
US20060138688A1 (en) * | 2002-11-18 | 2006-06-29 | Hume Graeme R | Moulding of concrete articles |
CN1445066A (zh) * | 2003-03-11 | 2003-10-01 | 綦玉良 | 现浇砼空心楼板用薄壁管的生产方法及专用设备 |
CN101468489A (zh) * | 2004-07-28 | 2009-07-01 | 邱则有 | 一种砼填充空心薄壁构件成型用槽形模具 |
CN1683133A (zh) * | 2005-02-25 | 2005-10-19 | 杨健辉 | 人工预制任意规格与形状的混凝土管的生产方法及模具 |
JP2007007978A (ja) * | 2005-06-30 | 2007-01-18 | National Institute Of Advanced Industrial & Technology | 中空部をもつコンクリート製品の成形用型 |
KR20070029532A (ko) * | 2005-09-10 | 2007-03-14 | 양원동 | 돌기가 형성된 공공 구조물 |
CN101181802A (zh) * | 2006-11-14 | 2008-05-21 | 聂磊 | 一种水泥渗水管的成型模具及成型工艺 |
CN201456211U (zh) * | 2009-08-08 | 2010-05-12 | 齐新明 | 制造梁板预应力孔用简易充气模具 |
KR20110019051A (ko) * | 2009-08-19 | 2011-02-25 | 류준수 | 보강수단을 구비한 빔 |
CN101718149A (zh) * | 2009-11-06 | 2010-06-02 | 常熟风范电力设备股份有限公司 | 一种复合材料杆塔及其制造工艺 |
CN201581557U (zh) * | 2009-12-09 | 2010-09-15 | 宋义 | 水泥制品用钢筋固定卡扣 |
AU2012243430A1 (en) * | 2011-04-11 | 2013-04-18 | Vijay Investments Pty Ltd | Method and system for forming a support structure |
US20140054820A1 (en) * | 2011-04-11 | 2014-02-27 | Vijay Investments Pty Ltd. | Method and system for forming a support structure |
CN202572610U (zh) * | 2012-05-19 | 2012-12-05 | 中铁十局集团第二工程有限公司 | 一种泡沫芯模预制空心板梁的模具 |
US9062662B1 (en) * | 2013-03-27 | 2015-06-23 | Ebert Composites Corporation | Hybrid pole structure and method of assembly |
US20160046039A1 (en) * | 2013-04-12 | 2016-02-18 | Vertech Hume Pty Ltd | Method and System for Fabrication of Elongate Concrete Articles |
CN104802301A (zh) * | 2015-04-30 | 2015-07-29 | 华南理工大学 | 一种制备超高性能混凝土管道的模具及方法 |
CN205046923U (zh) * | 2015-09-10 | 2016-02-24 | 浙江金力风力发电设备有限公司 | 一种新型电线杆 |
CN205502710U (zh) * | 2016-04-14 | 2016-08-24 | 马鞍山宏泰建材股份有限公司 | 一种分离式电杆 |
CN205777110U (zh) * | 2016-05-30 | 2016-12-07 | 安徽天煌机械制造有限公司 | 一种柱形钢筋骨架保护层卡圈 |
CN107035214A (zh) * | 2017-05-17 | 2017-08-11 | 德阳松涛科技有限公司 | 一种抗风性能好的旗杆 |
CN109109153A (zh) * | 2018-08-09 | 2019-01-01 | 江西荣仁电力器材有限公司 | 用于水泥电线杆内的卡件结构 |
CN208792864U (zh) * | 2018-08-09 | 2019-04-26 | 江西荣仁电力器材有限公司 | 电线杆、模具 |
CN211007875U (zh) * | 2019-10-30 | 2020-07-14 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | 一种frp筋混凝土电杆 |
CN213471601U (zh) * | 2020-05-22 | 2021-06-18 | 横店集团东磁股份有限公司 | 一种各异向性永磁铁径向多级磁环磁路模具 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113846892A (zh) * | 2021-10-15 | 2021-12-28 | 江西荣仁电力器材有限公司 | 一种分段组合式混凝土电线杆及其制管成型机构 |
CN113846892B (zh) * | 2021-10-15 | 2022-11-18 | 江西荣仁电力器材有限公司 | 一种分段组合式混凝土电线杆及其制管成型机构 |
CN114012865A (zh) * | 2021-11-11 | 2022-02-08 | 江西荣仁电力器材有限公司 | 一种便于分离的混凝土电线杆生产用浇筑装置 |
CN114000760A (zh) * | 2021-12-07 | 2022-02-01 | 浙江双新预构件有限公司 | 一种高抗碰撞性抗冻型混凝土电杆 |
Also Published As
Publication number | Publication date |
---|---|
CN108798190B (zh) | 2023-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108798190A (zh) | 电线杆、模具 | |
CN104772820B (zh) | 一种带底座的混凝土检查井成型装置 | |
CN205601195U (zh) | 玻璃钢筒体制造装置 | |
CN208792864U (zh) | 电线杆、模具 | |
CN104742250A (zh) | 一种带底座的混凝土检查井成型模具 | |
CN101579890A (zh) | 内衬式预应力钢筒混凝土管立式振动成型工艺 | |
CN104742248A (zh) | 一种带底座的混凝土筒形制品生产方法 | |
KR101050493B1 (ko) | 수직 거푸집 지지용 거푸집지지 조립체를 설치하기 위한 매립 콘 장치, 이를 이용한 거푸집지지 조립체의 설치구조, 및 이를 이용한 수직 콘크리트 부재의 시공방법 | |
CN109176840A (zh) | 隧道口字形预制构件的模具及其浇筑方法 | |
CN203697415U (zh) | 一种脱模工装 | |
CN201566041U (zh) | 内外模即脱卸混凝土制管机 | |
CN205466673U (zh) | 一种混凝土浮箱成型模具 | |
CN101480706B (zh) | 一种简易脱模机 | |
CN207465476U (zh) | 大型方涵内模自动缩放装置 | |
CN214644655U (zh) | 一种混凝土预制件拆模辅助装置 | |
CN213593188U (zh) | 一种便于快速组装的装配式楼梯生产模具 | |
CN213613994U (zh) | 一种可以减轻振幅的蜗壳生产用造型机 | |
CN210754977U (zh) | 风电产品铸造用冒口圈的脱模装置 | |
CN210025765U (zh) | 箱梁整体成型钢筋笼吊装系统 | |
CN212350296U (zh) | 一种支架成形模具 | |
CN202539305U (zh) | 弯管用内芯模 | |
CN217858678U (zh) | 防断裂大型砂芯芯骨结构 | |
CN107859066B (zh) | 综合管廊快拆支模结构及其施工方法 | |
CN207498986U (zh) | 综合管廊快拆支模结构 | |
CN207105209U (zh) | 一种预制楼梯模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |