CN108797992A - A kind of climbing frame for assembled architecture - Google Patents

A kind of climbing frame for assembled architecture Download PDF

Info

Publication number
CN108797992A
CN108797992A CN201710301491.7A CN201710301491A CN108797992A CN 108797992 A CN108797992 A CN 108797992A CN 201710301491 A CN201710301491 A CN 201710301491A CN 108797992 A CN108797992 A CN 108797992A
Authority
CN
China
Prior art keywords
guide rail
rail
climbing frame
mechanical arm
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710301491.7A
Other languages
Chinese (zh)
Inventor
沈海晏
张维贵
李青平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Techen Technology Co Ltd
Original Assignee
Shenzhen Techen Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techen Technology Co Ltd filed Critical Shenzhen Techen Technology Co Ltd
Priority to CN201710301491.7A priority Critical patent/CN108797992A/en
Publication of CN108797992A publication Critical patent/CN108797992A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to building fields, specifically, it is related to a kind of climbing frame for assembled architecture, including lifting rail, the construction frame body being fixed on the lifting rail, for making the lifting rail be attached to the wall-attaching equipment on building wall and driving device for driving the lifting rail to move up and down, wherein, the construction frame body includes one or two layers operation platform, and the distance between two layers of operation platform and the floor height of assembled architecture match.Frame climbing structure provided by the invention is simple, easy to use, has the advantages that lighter, easier to operate, cost of manufacture is lower compared to traditional climbing frame, is suitable for assembled architecture, can greatly reduce assembled architecture outer wall construction cost and the construction intensity of worker;Have the function of automatic lifting, adhere to automatically, can move up and down, be remarkably improved construction efficiency, save labor cost.

Description

A kind of climbing frame for assembled architecture
Technical field
The present invention relates to building fields, in particular to a kind of climbing frame for assembled architecture.
Background technology
Assembled architecture is built made of assemble in site with prefabricated component component.It is construction side to develop assembled architecture The major transformation of formula is the important measure for promoting supply side structural reform and novel Urbanization Progress, is conducive to economize on resources The energy reduces construction pollution, promotes labor productivity and quality safety level, may advantageously facilitate construction industry and information chemical industry Change depth integration, cultivates the new kinetic energy of NPD projects, pushes neutralizing superfluous production capacity.Assembled architecture is adaptable, simple production process, Easy construction, cost is relatively low, also using local material and industrial waste, additionally has construction speed fast, climate condition It restricts small, saves labour and the characteristics of construction quality can be improved.Traditional climbing frame is usually provided with multilayer, to adapt to external wall Large area operation, but the peripheral element of assembled architecture outer wall has been constructed substantially, needs the process for carrying out operation smaller, therefore The operation that assembled architecture outer wall is carried out using traditional climbing frame is often resulted in waste of resources, and increases construction cost and construction is difficult Degree, and some climbing frames that can be used for assembled architecture use the desk-top climbing frame of overhanging now, need to be promoted using tower crane, it is time-consuming Arduously, construction cost height and low construction efficiency, therefore, it is really necessary to provide a kind of special climbing frame suitable for assembled architecture.
Invention content
In order to solve the above technical problems, the present invention provides a kind of climbing frame for assembled architecture, simple in structure, operation side Just, it is adapted to the outer wall operation of assembled architecture, has the characteristics that lightness, miniaturization.
Technical solution of the present invention is:A kind of climbing frame for assembled architecture, including lifting rail, fixation Construction frame body on the lifting rail, for making the lifting rail be attached to the wall-attaching equipment on building wall and use In the driving device for driving the lifting rail to move up and down, wherein the construction frame body includes one or two layers operation platform, The distance between two layers of operation platform and the floor height of assembled architecture match.
In climbing frame of the present invention, the construction frame body further includes the upright bar for connecting upper layer and lower layer operation platform, left It is connected by horizontal truss between the right adjacent upright bar.
In climbing frame of the present invention, the construction frame body further includes mesh sheet, the mesh sheet by connector with it is described Upright bar is fixedly linked, and the mesh sheet height is one and half story heights.
In climbing frame of the present invention, the lifting rail includes the first guide rail and the second guide rail, first guide rail Be that sliding sleeve connect with second guide rail, second guide rail and first guide rail can mutually together with sliding sleeve and it is mutual above and below Sliding.
In climbing frame of the present invention, first guide rail and second guide rail are sliding sleeve connection type, described the One guide rail is equipped with quad straight cavity, and the second guide rail is the sliding rail to match with the quad straight cavity, and described second leads Rail is assemblied in the quad straight cavity and can be slided up and down in the quad straight cavity.
In climbing frame of the present invention, first guide rail and second guide rail are sliding sleeve connection type, described the One guide rail is equipped with c-type straight line cavity, and the second guide rail is the T-shaped slide rail to match with the c-type straight line cavity, and described second leads The T-shaped slide rail of rail is assemblied in the c-type straight line cavity and can be slided up and down in the c-type cavity.
In climbing frame of the present invention, the lifting rail under elongation state is first floor or the high length of two floors Degree.
In climbing frame of the present invention, match added with the building structure high with first floor below the construction frame body Inclination prevention structure is equipped with the top wheel or sliding rail being in contact with the building structure of climbing frame lower part on the inclination prevention structure.
In climbing frame of the present invention, the driving device is arranged between the first guide rail and the second guide rail, can distinguish First guide rail and the second guide rail is driven to move up and down, first guide rail and the second guide rail can be in the drives of the driving device Dynamic lower alternating is climbed upwards.
In climbing frame of the present invention, the wall-attaching equipment includes the first machinery being mounted on first guide rail Arm, the second mechanical arm on the second guide rail and it is fixedly connected on the attached wall handgrip built on different floors, described the One mechanical arm and second mechanical arm are resilient mechanical arm, and the attached wall handgrip is equipped with for first mechanical arm and the second machinery The support platform of arm support.
In climbing frame of the present invention, the first mechanical arm and second mechanical arm are made of ferromagnetic material, institute State to be additionally provided on the first guide rail and the second guide rail attracts the first mechanical arm and second mechanical arm to be inwardly compressed by magnetic force Electromagnet apparatus.
In climbing frame of the present invention, the driving device is to be lifted on the electric block of architectural top, and electronic calabash The suspension hook of reed is connected with the lifting rail, and the lifting rail and the construction frame body can hanging above and below lower in electric block It is mobile.
In climbing frame of the present invention, the wall-attaching equipment is the guide bracket on the different floor walls of building, on Position between lower guide bracket at a vertical straight line, guide bracket be equipped with it is matching with the lifting rail cross-sectional shape, on Under the through-hole that communicates, the lifting rail is arranged in the through-hole and can be moved up and down in through-hole.
In climbing frame of the present invention, one or two layers construction is also equipped at the top of the construction frame body or bottom Platform, the distance between each operation platform and the floor height of assembled architecture match.
Frame climbing structure provided by the invention is simple, easy to use, has lighter, easier to operate, system compared to traditional climbing frame Make the lower advantage of cost, be suitable for assembled architecture, applying for assembled architecture outer wall construction cost and worker can be greatly reduced Work intensity;Have the function of automatic lifting, adhere to automatically, can move up and down, be remarkably improved construction efficiency, save labour Cost.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the structural schematic diagram at one a certain visual angle of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram at one another visual angle of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the first guide rail and the second track cross-section in the embodiment of the present invention one;
Fig. 4 is the cross-sectional structure schematic diagram of the first guide rail and another embodiment of the second guide rail in the present invention;
Fig. 5 is the cross-sectional structure schematic diagram of the first guide rail and second guide rail the third embodiment in the present invention;
Fig. 6 is the external structure schematic diagram of the first guide rail and the second guide rail in the embodiment of the present invention one;
Fig. 7 is the structural schematic diagram of the embodiment of the present invention two;
Fig. 8 is the structural schematic diagram of inclination prevention structure in the embodiment of the present invention three.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Embodiment one
As shown in Figure 1 to Figure 2, while refering to Fig. 3 and Fig. 4, what the embodiment of the present invention one provided is used for assembled architecture Climbing frame, including lifting rail, be fixed on lifting rail construction frame body 11, for making lifting rail be attached to building wall Wall-attaching equipment and driving device 3 for driving lifting rail to move up and down.Lifting rail includes the first guide rail 1 and second Guide rail 2 can relatively move between first guide rail 1 and the second guide rail 2, be contraction-like when the second guide rail 2 is located in the first guide rail 1 State is elongation state, climbing under elongation state when the second guide rail 2 stretches out to greatest extent from 1 upper end of the first guide rail or lower end Guide rail generally first floor or the high length of two floors pass through limit length, reduce the volume of climbing frame entirety, one side as far as possible The characteristics of not influencing the normal use of climbing frame, on the other hand accomplishing lightweight, miniaturization.Wall-attaching equipment includes being led mounted on first First mechanical arm 4 on rail 1, the second mechanical arm 5 on the second guide rail 2, the attached wall on different architecture storeys Handgrip 6, driving device 3 can respectively drive the first guide rail 1 and the second guide rail 2 moves up and down.In the present embodiment, construction frame body 11 with First guide rail 1 is fixedly linked, and construction frame body 11 is constructed for worker and stacking material, and construction frame body 11 includes two in the present embodiment Layer operation platform 12, the distance between neighbouring operation platform 12 are identical as the floor floor height of assembled architecture.Due to upper Layer operation platform needs to put more construction machineries and material in construction operation compared to lower layer's operation platform, is main apply Therefore work operating platform is constructed, in the present embodiment to ensure that upper layer operation platform will not be interfered in construction by lifting rail The first guide rail 1 and the top of the second guide rail 2 be all disposed within the lower section of upper layer operation platform 12;To make the second guide rail 2 climb When be not blocked, the through-hole that is passed through for the second guide rail 2 is set on upper layer operation platform 12, is hinged with and turns near through-hole Plate, turnover panel can cover through-hole in construction, through-hole can be made to be completely exposed when climbing completely.To keep construction frame body 11 more firm, It is connected by upright bar 13 between upper layer and lower layer operation platform 12, is connected by horizontal truss 14 between the adjacent upright bar 13 in left and right; For the safety for ensureing when constructing, construction frame body 11 further includes mesh sheet 15, and mesh sheet 15 is fixedly linked by connector and upright bar 13, net Piece height is one and half story heights, can protect the safety of construction personnel and material on upper layer and lower layer operation platform 12 simultaneously.First Mechanical arm 4 and second mechanical arm 5 are mutually isostructural resilient mechanical arm, under natural conditions in outwardly opening state, by External force can be compressed inwards when squeezing.The generally L-shaped of attached wall handgrip 6, vertical one side are fixedly linked by bolt and building, water Flat one side is equipped with for the support platform of first mechanical arm 4 and the support of second mechanical arm 5 in opened condition, the first guide rail 1 It is supported on attached wall handgrip 6 by first mechanical arm 4 or second mechanical arm 5 respectively with the second guide rail 2, and passes through driving device 3 Driven the first guide rail 1 and the second guide rail 2 climb first mechanical arm 4 and second mechanical arm 5 is driven alternately to be supported on phase upwards It answers and is climbed upwards on the attached wall handgrip 6 of floor to realize that climbing frame is whole.As shown in figure 3, the first guide rail 1 and the second guide rail 2 Between be connected by the way of sliding sleeve connection, be internally provided with bayonet on the first guide rail 1, the second guide rail 2 is equipped with and bayonet phase The screens matched makes the first guide rail 1 and the second guide rail 2 that can mutually slide over by making the screens of the second guide rail 2 be buckled in bayonet It slides up and down together and mutually.As shown in figure 4, Fig. 4 is another preferred embodiment of the first guide rail 1 and the second guide rail 2, the One guide rail 1 is equipped with c-type linear type cavity, and the second guide rail 2 is the T-shaped slide rail to match with above-mentioned cavity, and T-shaped slide rail is assemblied in It can slide up and down in cavity and in cavity, make mutual sliding sleeve cooperation between the first guide rail 1 and the second guide rail 2.As shown in figure 5, Fig. 5 is the third preferred embodiment of the first guide rail 1 and the second guide rail 2, and cunning also can be used in the first guide rail 1 and the second guide rail 2 Connection type connection is covered, the first guide rail 1 is equipped with quad straight cavity, and the second guide rail 2 matches with quad straight cavity Rectangular sliding rail, the second guide rail 2 are assemblied in quad straight cavity and can be slided up and down in quad straight cavity.First guide rail 1 Be connected using sliding sleeve cooperation with the second guide rail 2, make the two during climbing can guide bracket and guide rail each other, between realizing Guiding on mutually supporting and being vertical, to strengthen stability when climbing frame moves integrally.As shown in Figure 3 and Figure 6, this implementation First mechanical arm 4 is mounted on 1 both sides of the first guide rail in example, and second mechanical arm 5 is mounted among the second guide rail 2, first mechanical arm 4 It is arranged in the same side and mutually staggers with second mechanical arm 5, the first machinery when the first guide rail 1 and the second guide rail 2 being made to be promoted respectively Arm 4 and second mechanical arm 5 can not interfere with each other.Rectangular guide groove is equipped on attached wall handgrip 6, the first guide rail 1 is equipped with and guide groove phase Matched T-type chimb, chimb are assemblied in guide groove, to make the first guide rail 1 and attached wall handgrip 6 connect, strengthen climbing frame Whole stability, avoiding can the shaking of the first guide rail 1 and the second guide rail 2 in the horizontal direction.Due to first mechanical arm 4 and Stress point when two mechanical arms 5 are directly connected with the first guide rail 1 or the second guide rail 2 is smaller, is unfavorable for power transmission, therefore lead first Rail 1 and the second guide rail 2 are equipped with fixedly connected part, and first mechanical arm 4 and second mechanical arm 5 are led by fixedly connected part and first Rail 1 or the second guide rail 2 are fixedly linked.Fixedly connected part is fixedly mounted on the first guide rail 1 and the second guide rail 2 by multiple bolts On, the groove that can accommodate first mechanical arm 4 and second mechanical arm 5, first mechanical arm 4 and the second machine are equipped in fixedly connected part Tool arm 5 is installed in a groove by bolt.
The present embodiment can first lift the first guide rail 1 or the second guide rail 2, be first to lift the second guide rail 2 when being promoted Example, driving mechanism 3 lift the second guide rail 2, and the first guide rail 1 is fixed during promotion, play the role of bearing positioning, Serve as guide bracket effect;Second guide rail 2 stretches out upper layer operation platform 12 and second mechanical arm 5 is driven to move up to last layer upwards Lou Bingyu is mounted on 6 phase of the attached wall handgrip touching on corresponding floor, continues to lift up the second guide rail 2, second mechanical arm 5 is grabbed in attached wall Hand 6 squeezes lower will compress inwards and passes through attached wall handgrip 6 and climb upwards, outward by second mechanical arm 5 after attached wall handgrip 6 Rebound, and be supported in the support platform of respective storey attached wall handgrip 6, stop the second guide rail 2 of lifting, at this point, driving driving machine Structure 3 lifts the first guide rail 1, and the second guide rail 2 is fixed, plays the role of bearing positioning, until first on the first guide rail 1 Mechanical arm 4 moves to the attached wall handgrip 6 of top and is supported in support platform, to realize the first guide rail 1 and coupled Construction frame body 11 climbs the height of first floor upwards.The second guide rail 2 comes back to 12 lower section of upper layer operation platform simultaneously, makes upper layer 12 top of operation platform is not hindered by guide rail, convenient for mechanical execution and stacks material.
To make climbing frame have the function of declining, first mechanical arm 4 and second mechanical arm 5 in the present embodiment use ferromagnetism Substance makes, and is additionally provided with electromagnet apparatus on the first guide rail 1 and the second guide rail 2, electromagnet apparatus can produce in the case of energization Magnetisation gravitational attraction first mechanical arm 4 and second mechanical arm 5 are inwardly compressed, and no power does not generate magnetic force then.When be located above When two guide rails 2 need to decline, starts driving device 3 and drive the second guide rail 2 to move downward and while starting the electricity on the second guide rail 2 Magnet arrangement makes second mechanical arm 5 compress inwards so that by the attached wall handgrip 6 in respective storey, second mechanical arm 5 passes through attached wall After handgrip 6, the electromagnet apparatus closed on the second guide rail 2 makes second mechanical arm 5 spring back, and continues the fortune downwards of the second guide rail of driving 2 The dynamic attached wall handgrip 6 that lower first floor is supported on up to second mechanical arm 5, recycles the decline that climbing frame can be realized successively.This implementation Example is alternateed by the first guide rail 1 and the second guide rail 2 climbs or declines the promotion or decline that realize operation platform, reduces The carrying of construction lifting platform guide bracket does not need building and dismantling for scaffold, improve assembled architecture construction mechanization and Automatization level reduces labor intensity, and improves construction efficiency, has saved a large amount of labours.
Embodiment two
As shown in fig. 7, the driving device 3 in embodiment two is to be lifted on the electric block of architectural top, electric block Hoist point is arranged on lifting rail, and construction frame body 11 is fixedly connected on lifting rail, and construction frame body 11 is applied including two layers Work platform 12 can drive lifting rail and 11 entirety of construction frame body to move up and down by electric block;To ensure frame body 11 of constructing With the stability of lifting rail entirety, the top half in lifting rail is arranged in construction frame body 11 in the present embodiment, makes to climb and lead 11 1 sections of frame body of construction is stretched out in rail lower end, whole balance and stabilization when reinforcing construction frame body 11 and lifting rail construction Property.To ensure to shake during climbing frame moves up and down, enhance the guidance quality of guide rail, wall-attaching equipment is set as being mounted on building Guide bracket on different floor walls, the position between upper and lower guide bracket is at a vertical straight line, and guide bracket is equipped with and lifting rail is cut Through-hole that face shape matches, communicating up and down, lifting rail is limited in by activity in above-mentioned through-hole, to keep lifting rail Stability when climbing up and down;To reinforce the safety of climbing frame entirety, the present embodiment is additionally provided with star-wheel falling proof device.This is climbed Frame is dynamic entirely through electric gourd hang when climbing and moves up and down, during being moved up and down by guide bracket holding and work progress In balance, pass through star-wheel falling proof device ensure safety, simple in structure, easy to use, low manufacture cost.
Embodiment three
Embodiment three compared with embodiment one, the difference is that:To ensure construction frame body 11 in construction or extreme weather Under stability, be equipped with the high inclination prevention structure 16 of first floor below construction frame body 11, the shape of inclination prevention structure 16 it is whole with build The shape of building structure matches.As shown in figure 8, inclination prevention structure 16 is supported on the bottom of construction frame body 11 by the way of gusseted End, inclination prevention structure 16 are also in contact by pushing up wheel 17 with the building structure of climbing frame lower part, and inclination prevention structure 16 is made on the one hand to climb Frame plays the role of supporting anti-dumping during constructing, and on the other hand can reduce its friction generated during climbing frame moves Resistance makes the movement of climbing frame entirety not influenced by inclination prevention structure 16.
In other preferred embodiments, to keep climbing frame provided by the invention more adaptable, application surface is wider, in scaffold The top or bottom of body are also equipped with one or two layers operation platform, the layer of the distance between each operation platform and assembled architecture Height matches.More extended columns are added by PUSH NUT FASTENERS specially on the column of former operation platform, extended vertical New operation platform is fixed on column by Quick connection part, this operation platform has the characteristics that quick release and installation, with suitable The construction of nonstandard high-storey, while the construction surface of expansible climbing frame are answered, the availability of climbing frame is increased.
The embodiment of the present invention is described above in association with attached drawing, but the invention is not limited in above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (14)

1. a kind of climbing frame for assembled architecture, which is characterized in that including lifting rail, be fixed on the lifting rail Construct frame body, for making the lifting rail be attached to the wall-attaching equipment on building wall and for driving the lifting rail The driving device moved up and down, wherein the construction frame body includes one or two layers operation platform, between two layers of operation platform Distance and the floor height of assembled architecture match.
2. climbing frame as described in claim 1, which is characterized in that the construction frame body further includes connection upper layer and lower layer operation platform Upright bar, between the adjacent upright bar in left and right by horizontal truss be connected.
3. climbing frame as claimed in claim 2, which is characterized in that the construction frame body further includes mesh sheet, and the mesh sheet passes through company Fitting is fixedly linked with the upright bar, and the mesh sheet height is one and half story heights.
4. climbing frame as described in claim 1, which is characterized in that the lifting rail includes the first guide rail and the second guide rail, institute It is that sliding sleeve connect to state the first guide rail and second guide rail, and second guide rail and first guide rail can be together with mutual sliding sleeves And it mutually slides up and down.
5. climbing frame as claimed in claim 4, which is characterized in that first guide rail is sliding sleeve connection side with second guide rail Formula, first guide rail are equipped with quad straight cavity, and the second guide rail is the sliding rail to match with the quad straight cavity, institute The second guide rail is stated to be assemblied in the quad straight cavity and can slide up and down in the quad straight cavity.
6. climbing frame as claimed in claim 4, which is characterized in that first guide rail is sliding sleeve connection side with second guide rail Formula, first guide rail are equipped with c-type straight line cavity, and the second guide rail is the T-shaped slide rail to match with the c-type straight line cavity, The T-shaped slide rail of second guide rail is assemblied in the c-type straight line cavity and can be slided up and down in the c-type cavity.
7. climbing frame as claimed in claim 4, which is characterized in that the lifting rail under elongation state is first floor or two layers The high length in building.
8. climbing frame as described in claim 1, which is characterized in that added with the building knot high with first floor below the construction frame body The inclination prevention structure that structure matches is equipped with the top wheel or sliding being in contact with the building structure of climbing frame lower part on the inclination prevention structure Rail.
9. climbing frame as claimed in claim 4, which is characterized in that driving device setting the first guide rail and the second guide rail it Between, first guide rail can be respectively driven and the second guide rail moves up and down, first guide rail and the second guide rail can be in the drives It alternately climbs upwards under the driving of dynamic device.
10. climbing frame as claimed in claim 9, which is characterized in that the wall-attaching equipment includes being mounted on first guide rail First mechanical arm, the second mechanical arm on the second guide rail and be fixedly connected on the attached wall built on different floors and grab Hand, the first mechanical arm and second mechanical arm are resilient mechanical arm, and the attached wall handgrip is equipped with for first mechanical arm With the support platform of second mechanical arm support.
11. climbing frame as claimed in claim 10, which is characterized in that the first mechanical arm and second mechanical arm use ferromagnetism Substance makes, and is additionally provided on first guide rail and the second guide rail and attracts the first mechanical arm and second mechanical arm by magnetic force The electromagnet apparatus being inwardly compressed.
12. climbing frame as described in claim 1, which is characterized in that the driving device is to be lifted on the electronic calabash of architectural top Reed, and the suspension hook of electric block is connected with the lifting rail, the lifting rail and the construction frame body can be in electric blocks Hang under move up and down.
13. climbing frame as claimed in claim 12, which is characterized in that the wall-attaching equipment is floor walls different mounted on building On guide bracket, the position between upper and lower guide bracket is at a vertical straight line, and guide bracket is equipped with and the lifting rail cross-sectional shape Through-hole matching, communicating up and down, the lifting rail are arranged in the through-hole and can be moved up and down in through-hole.
14. climbing frame as described in claim 1, which is characterized in that be also equipped with one at the top of the construction frame body or bottom Layer or two layers of operation platform, the distance between each operation platform and the floor height of assembled architecture match.
CN201710301491.7A 2017-05-02 2017-05-02 A kind of climbing frame for assembled architecture Pending CN108797992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710301491.7A CN108797992A (en) 2017-05-02 2017-05-02 A kind of climbing frame for assembled architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710301491.7A CN108797992A (en) 2017-05-02 2017-05-02 A kind of climbing frame for assembled architecture

Publications (1)

Publication Number Publication Date
CN108797992A true CN108797992A (en) 2018-11-13

Family

ID=64053945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710301491.7A Pending CN108797992A (en) 2017-05-02 2017-05-02 A kind of climbing frame for assembled architecture

Country Status (1)

Country Link
CN (1) CN108797992A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259094A (en) * 2019-06-10 2019-09-20 中国建筑第八工程局有限公司 Integrated form operating platform and its construction method for curtain wall installation
CN111576835A (en) * 2020-04-23 2020-08-25 深圳市特辰科技股份有限公司 Climbing frame with aluminum alloy horizontal cross beam
CN112227694A (en) * 2020-10-12 2021-01-15 厦门安科科技有限公司 Integrated climbing frame system and assembling method thereof
CN112443152A (en) * 2019-09-02 2021-03-05 广东博智林机器人有限公司 Climbing frame system
CN112443135A (en) * 2019-09-02 2021-03-05 广东博智林机器人有限公司 Outer wall surface construction robot operation system and use method thereof
CN113605711A (en) * 2021-09-09 2021-11-05 中铁建工集团有限公司 Construction method of building structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1724829A (en) * 2004-07-19 2006-01-25 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN103669818A (en) * 2012-09-07 2014-03-26 深圳市特辰科技股份有限公司 Sealing type integrated climbing frame and use method thereof
CN205591521U (en) * 2015-06-29 2016-09-21 武汉天蝎建筑装备有限公司 Rock climbing formula robot protective screen
CN106150059A (en) * 2015-03-23 2016-11-23 深圳市特辰科技股份有限公司 A kind of stair climbing robot

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1724829A (en) * 2004-07-19 2006-01-25 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN103669818A (en) * 2012-09-07 2014-03-26 深圳市特辰科技股份有限公司 Sealing type integrated climbing frame and use method thereof
CN106150059A (en) * 2015-03-23 2016-11-23 深圳市特辰科技股份有限公司 A kind of stair climbing robot
CN205591521U (en) * 2015-06-29 2016-09-21 武汉天蝎建筑装备有限公司 Rock climbing formula robot protective screen

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259094A (en) * 2019-06-10 2019-09-20 中国建筑第八工程局有限公司 Integrated form operating platform and its construction method for curtain wall installation
CN110259094B (en) * 2019-06-10 2021-06-11 中建八局科技建设有限公司 Integrated operating platform for curtain wall installation and construction method thereof
CN112443152A (en) * 2019-09-02 2021-03-05 广东博智林机器人有限公司 Climbing frame system
CN112443135A (en) * 2019-09-02 2021-03-05 广东博智林机器人有限公司 Outer wall surface construction robot operation system and use method thereof
CN112443152B (en) * 2019-09-02 2022-05-20 广东博智林机器人有限公司 Climbing frame system
CN111576835A (en) * 2020-04-23 2020-08-25 深圳市特辰科技股份有限公司 Climbing frame with aluminum alloy horizontal cross beam
CN112227694A (en) * 2020-10-12 2021-01-15 厦门安科科技有限公司 Integrated climbing frame system and assembling method thereof
CN113605711A (en) * 2021-09-09 2021-11-05 中铁建工集团有限公司 Construction method of building structure

Similar Documents

Publication Publication Date Title
CN108797992A (en) A kind of climbing frame for assembled architecture
WO2011048275A1 (en) Method in the manufacture of an elevator
CN106241618A (en) A kind of curtain wall profiles boom hoisting
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN102777048A (en) Vertical transportation device
JPH0978839A (en) Fitting method and device of panel
JP2000313578A (en) Elevator for construction
CN202441045U (en) Rail-type electric attached lifting scaffold
CN209353734U (en) For installing the double-track device of curtain wall
CN203767802U (en) Special device for elevator installation
CN216613852U (en) Tool for mounting high and ultrahigh ALC (autoclaved lightweight concrete) wallboard
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN103879860A (en) Device special for elevator installation
JPH06263369A (en) Elevator
CN210559078U (en) Small-size material lifting machine
CN204524341U (en) Lift top plate punching device
CN110980549A (en) Tower crane inner climbing machine and mounting method thereof
CN221587805U (en) Wallboard lifting machine
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
JP3920527B2 (en) Elevator for construction
JP2008063873A (en) Transfer mechanism of ceiling and execution method
CN108729675A (en) A kind of hanger device and steel reinforcement cage binding and installation method
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN219826065U (en) Hanging basket hanging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113

RJ01 Rejection of invention patent application after publication