CN103359625A - Automatic construction equipment for building hoisting and platform elevating of new rural construction - Google Patents

Automatic construction equipment for building hoisting and platform elevating of new rural construction Download PDF

Info

Publication number
CN103359625A
CN103359625A CN 201210102895 CN201210102895A CN103359625A CN 103359625 A CN103359625 A CN 103359625A CN 201210102895 CN201210102895 CN 201210102895 CN 201210102895 A CN201210102895 A CN 201210102895A CN 103359625 A CN103359625 A CN 103359625A
Authority
CN
China
Prior art keywords
hill
building
lifting
horizontal
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210102895
Other languages
Chinese (zh)
Inventor
王永昌
王红显
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201210102895 priority Critical patent/CN103359625A/en
Publication of CN103359625A publication Critical patent/CN103359625A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides automatic construction equipment for building hoisting and platform elevating of new rural construction. The patent of the invention is characterized in that upper and lower cross beams are widened according to a factory line hoisting principle so that the upper and lower cross beams are designed at the outer side of a building foundation. A square-shaped large framework is formed at the top end of each one of four stand columns; and vertical and transverse operation of a hoisted object is formed by the two cross beams and a vertical hoisting operation beam. An operation wheel and a motor are arranged at the lower side of two transverse ground beams and are not detached when entering one set of construction. A hoisting walking motor is started to operate the next construction point along a rail. The four stand columns are all arranged outside the building foundation and slide rods are vertical along the four stand columns, so that the two ends of a hoisting platform are clamped on the slide rods through slide sleeves or idler wheels; and a hoisting platform motor works to pull the hoisting platform to move up and down.

Description

The lifting of new countryside construction building and lifting platform automated construction equipment
Technical field:
Patent of the present invention relates to a kind of lifting and automatic scaffold of new rural area float room construction, is specifically related to the full automaticity combinatorial association body of a kind of full automaticity lifting and scaffold.
Technical background:
Building and dwelling house Xiao Lou are built in the rural area at present, mostly adopt small-sized lifting portal frame, can only pull on desired height to the brick of various construction usefulness, cement wash and cement prefab by portal frame, must be manually to push away on the up-and-down movement slide plate of portal frame, push away again or be transported to required place after reaching a certain height, also have part simply up to lift material with cranemobile, speed is slow, efficient is low, poor stability.If it is unworthwhile that tower crane is installed, small building team also cannot afford, standing once needs units up to ten thousand, just use tower crane so only have large-scale tall buildings, besides build the building, and laid bricks by artificial base Yang, need to build shelf with steel pipe, the people stands in the on base one section very trouble that also need raise of shelf, has wasted a large amount of labour powers.Also need more than 200 yuan so a sq m house is built in the rural area at present, it is a larger investment of the person of building a house, in order to adapt to present Labor is expensive, the needs of the whole shotgun houses of New Countryside Construction, we have invented a kind of automation building equipment that scaffold makes up full one that lifts, and lifting scaffold no longer in layer improves work efficiency greatly, reduce cost, the construction in new rural area can be realized fast.
Summary of the invention:
The purpose of patent of the present invention is to be to overcome to build a house originally in the construction that to build benefit low for lifting material and scaffold, and dangerous and provide a kind of can omnidirectional hoisting and scaffold automatic lifting, do not cause shut-down, get off to increase again the novel building equipment of scaffold.
The purpose of patent of the present invention is achieved like this, the row that is used in a large number in the factory on original market hangs, just widen the distance of the column at capable two of hanging, prolong two vertical hills at two ends, four columns are all erected according to the outside that will build four angles of building.For safety links up four horizontal indulging in column upper end.Form a more stable top frame.And all use two horizontal hills of upper end the I-beam section top to reinforce flower stand, can bear certain load-carrying capacity, utilize the groove on the both sides of two I-beam sections, be stuck on the I-beam section with the road wheel of electric block at two ends simultaneously, on road wheel, vertically connect the flower stand with I steel composite, be stuck on the I-beam section of both sides, no matter can not fall down to the from left to right walking because vertically can bear the two ends of the I steel composite body of pressure and be by hoist ceiling crane card wheel.
An electric block is installed on the described large hill of vertical lifting I-beam section that is stuck on the horizontal hill of two I-beam sections just can have been lifted.Also can outwards lengthen a part according to actual needs two of building building, be convenient to lift the various article of depositing beyond the building.Originally making the capable four wheels that hangs bottom still is stuck on the track of laying.When building building, do not need to move, because the top has been combined into the work of can be laterally, can vertically move again.The wheel of lower edge track is only done to build up when building is backward to be moved with another building direction of row and is used, for conveniently moving, vertical connection hill of following four columns is equipped with and is detouchable, when having this seat mobile to another, remove the mobile vertical hill of a side of impact, be installed in again original position after shifting to another seat, make its safe ready.Fast capable the hanging of the big frame that has formed, can be the material that is placed on the building both sides, the building desired position is transported in the lifting of safety rapidly, then utilize the inboard of four columns all to erect slide bar perpendicular to ground, the upper end of slide bar connects with upper flat horizontal hill and vertical hill respectively, and the lower end connects with horizontal hill and vertical hill respectively.Install sliding sleeve at slide bar, sliding sleeve again respectively and made, the platform of pressing the design of house length and width connects, little hoist ceiling crane is installed respectively in upper end at slide bar, or the rope of motor and rope sheave hoist ceiling crane ties up to respectively the two ends of each lifting table, when the two ends hoist ceiling crane is worked, lifting table is pulled on or sent down, the build labourer stands on the slide platform and works, base Yang needs have from low to high just been finished when building a house at any time lifting, all utilize bottom rail hill and vertical hill to set up vertical rod and lifting table on four limits of building like this, make the construction in whole house all save the trouble of original artificial tower building and bench board, thereby improve a large amount of work efficiency.
The present invention reaches the vertical and horizontal operation by the original up and down framework that hangs of going of expansion, lifts main large hill by electric block commonly used with lengthening, and can finish the purpose of building building lifting material.And indulging up and down the slide bar that erects between hill and the horizontal hill and be furnished with sliding sleeve, and roller is with little hoist ceiling crane or motor and rope sheave pull-up lifting table, namely safe and efficient, save again a large amount of towers and build the man-hour of workman's platform, adding present new countryside construction is shotgun house, installing once with regard to the whole shotgun house of continuously-running, is the novel device that saving of work and time reduces labour intensity.
Fig. 1 is that the present invention faces constructional drawing
Fig. 2 is the crow of the present invention constructional drawing of looking down from a height
The specific embodiment:
As shown in Figure 1 in the both sides, front and back of building building, smooth good ground lays the track 1 on both sides, then the laterally hill 3 of both sides with row handling road wheel 3 is placed on the track 1, connects two in length and breadth hills, forming one can be at the ground upper frame of track 1 walking.Respectively four columns 5 are stood in respectively the laterally two ends of hill 2, both sides, so just form one and built four corner posts 5 at Lou Si angle, position according to four columns 5, connect respectively two horizontal hills 6 of operation and two vertical hills 16 that connect at the top of four columns 5, so just formed a square shape framework at the top of four columns 5, this square shape framework matches with building building wall basis 17.Then respectively card operation wheel and motor 7 in the I-shaped steel tank of two of the glyph framework suitable for reading horizontal hills 6 of operation, lower end at two ends operation wheel and motor 7, be connected with bolt two with vertical I-beam section operation lifting hill 8, if this moment two is operation wheel and motor 7 synchronized equidirectional work laterally, the vertical I-beam section operation lifting hill 8 that is connected to lateral wheel and motor 7 lower ends will run parallel to the left or to the right along the horizontal hill of two operations.Run to always with two on vertically connect hill 16 parallel contacts and namely will stop.And in the I-shaped steel tank of vertical I-beam section operation lifting hill 8 that can laterally move, installation is with the electric block 9 of operation wheel, the electricity operation wheel work of hoist ceiling crane, hoist ceiling crane 9 is the along the longitudinal direction operation of I-beam section operation lifting hill 8 just, so above building building basis 17, get final product laterally again the framework that the vertical equity direction is moved but just formed one.If electric block 9 work, i.e. Liftable lifting thing moves about above the building building wall basis 18, can fall everywhere.To satisfy the needs of required material everywhere that build a building.And the row that operates on the track 1 of installing in the lower end of the horizontal hill 2 in both sides hangs lower operation wheel, need not move when building a building, because the mouth word framework 17 that consists of up and down just in time is around building building wall basis 18.The above moves horizontal hill 6 by both sides and vertical I-beam section operation lifts the running that hill 8 can satisfy left-right and front-back.But twice laterally four operation wheels 3 installing of hill lower end be after building up for a building, the wherein vertical lower link hill of an end of dismantling, by laying the track 1 that prolongs, just can run to this combined hanging equipment on next position of overlapping building and reduce the trouble that removes and installs.Improve working efficiency, save effort and time.
After described this lifting and operation frame form, each inboard at four limits, four corner posts 5, vertical ground is erect four pairs of slide bars 13, every pair of slide bar 13 is all installed sliding sleeve or pulley 15, connect between the every pair of pulley sliding sleeve 15 one basically identical and be parallel to the lifting table 16 on body of wall basis with basic 18 length of building building wall, be fixed with respectively motor and rope-winding wheel 12 in the upper end of slide bar 13, the end of rope 14 is connected with a section of lifting table 16 respectively, so just formed in the outside on building building wall basis 18 and surrounded all building wall bases 18 by four lifting tables 16, when the people stands in when working on the lifting table 16, when needing rising or decline, start lifting table motor 12, by rope-winding wheel and rope 14, can be being enclosed within lifting table 16 pull-ups on the two ends slide bar 13 or falling.Because all with same method lifting table 16 being installed all around, so the building of whole building has just been saved tower and built scaffold, easily lifting has greatly reduced trouble and the recruitment of construction, and safe and efficient, be the best preparation of construction of present China's new countryside construction shotgun house buildingization.Especially building in a row is more suitable, a row of buildings only need be installed once, only need remove wherein lower vertical connection hill of an end and the lifting table of an end when entering next by upper one, lay the track toward next building, start movable motor 4, a few minutes can reach the building basis that next cover will be built.Then one of them lifting table 16 that installs lower vertical connection hill and dismantled, this complete equipment just again can comprehensive work.But be a good equipment of benefiting the nation and the people, more be conducive to the enforcement of new countryside construction and carry out.

Claims (4)

1. building lifting and trick platform apparatus for automatically lifting are built in a new rural area, comprise that bilateral laterally is equipped with four root posts 5 that row hangs lower operation wheel 3 and erects above below the two ends of hill 2, have again at the top of four root posts 5 two horizontal hills 6 of operation and two vertically connect hills 17 be combined into one around greater than the square shape framework on building building wall basis 18, below the horizontal hill 6 of two operations, block motor and operation wheel 7 in the I-beam section trough, I-beam section upper end following and vertically I-beam section operation lifting hill 8 the Bolt Connection of motor operation wheel 7.Make it the two ends of vertical I-beam section operation lifting hill 8, horizontal card is on the horizontal hill 6 of two operations, and when laterally moving wheel and motor 7 work, vertically the I-beam section operation lifts hill 8 maintenance levels and does laterally operation along the horizontal hill of upper operation.In the I-shaped steel tank of vertical I-beam section operation lifting hill 8, the electric block 10 with road wheel is installed, can be 8 operations of longitudinally I-beam section lifting of the weight that has lifted hill, needs according to the lifting place, laterally operation wheel and motor 7 work, object can be done vertically operation along horizontal operation hill 6 again, namely vertically walk crosswise again after so the object of lifting just can be sling and move, can be transported to desired location to object.And then in the inboard of four root posts 5, vertical ground erects quadruplet slide bar 13, be enclosed within sliding sleeve or the roller 15 on the slide bar 13 and be placed on the building wall basis 18 of building, two of the quadruplet lifting table 16 in the outside connects respectively, be fixed on lifting table motor and rope sheave 12 work on four corner posts 5 or top rail hill 6 and the upper vertical connection hill 17, by lifting table stay cord 14, pull-up is distributed in the lifting table 16 in 18 outsides, body of wall basis, just can move up and down along slide bar 13, the people stands on the lifting table and works, up and down freely, reduce the trouble of building the frequent building platform of building, thereby saved labor the raising work efficiency, and after a building builds up, remove wherein vertical connection ground hill and the lifting table of an end, start descending hanging wheel 3 and movable motor 4, this whole series lifting and automatic rising-sinking platform, can be along track 1 operation of laying, arrive rapidly on the basis of next cover building, save a cover one and tear the trouble that a cover one is installed open, improve work efficiency.
2. building lifting and lifting operatorless device are built in new rural area according to claim 1, it is characterized in that two laterally hill 2 vertically connect hill ground and all design the outside on building building wall basis 18 with being connected, four root posts 5 all stand in 18 outsides, body of wall basis, outside on body of wall basis 18, form a top frame that has upper horizontal operation hill 6 and upper vertical connection hill 17 to be combined into, card has motor and operation wheel 7 respectively on two horizontal operation hills of framework, the bottom of operation wheel 7 connects with two of vertical I-beam section lifting hill 8, vertically on the I-beam section operation lifting hill 8 hoist ceiling crane 10 that can move is installed again, hoist ceiling crane 10 weight of when work, slinging, longitudinally I-beam section operation of operation machine operation, object lifting hill 8 is done vertically operation.Vertically horizontal operation motor 7 work on the I-beam section operation lifting hill 8, can make again vertical I-beam section lifting hill 8 along upper horizontal operation hill 6 operations, so not only can be vertically but also operation that can be horizontal, just finished having lifted object when building is built and material is done omnibearing transportation and lifting.
3. described according to claim 1, top at two four root posts 5 that laterally erect above the two ends of hill 2, there are respectively the two horizontal hills 6 of operation and two vertically to connect hill, be stuck in addition motor and operation wheel 7 in the I-shaped steel tank of the horizontal hill 6 of two operations, lower end at motor and operation wheel 7 is connected with the two ends of vertical I-beam section operation lifting hill 8 respectively again, in the I-shaped steel tank of vertical I-beam section operation lifting hill 8 operation wheel and motor and hoist ceiling crane 10 is installed again and is integrated.When hoist ceiling crane is worked, just can by vertical I-beam section operation lifting hill 8 and horizontal operation hill 6, make object and the material of lifting object and the material sling do the vertical and horizontal operation, just can arrive required place to material delivery by the portraitlandscape operation.The needs that building is built have been finished.For after being built up by a cover to the continuous working of next cover, do not tear open and do not unload, few trouble no longer is installed, two laterally hill 2 two ends below, four row are installed hang lower operation wheel 3, and movable motor 4 drives are arranged.In architectural process, do not need this device work, and cover into next cover during building site finishing one, lay first track 1, remove wherein the ground of a side and vertically connect hill and the lifting table 16 of an end wherein, in case of necessity also can be the highest lifting table 16 pull-ups, the startup movable motor, this integral body just can run on the Yang body basis of the building of trapping along track 1, begin new work, saved the trouble that removes and installs, greatly improve work efficiency.
4. it is described according to claim 1: because two laterally hill 2 and four root posts 5 and at the top of four root posts 5 being arranged, be combined into the large shape mouth word framework of top by the two horizontal hills 6 of operation and upper vertical connection hill 17, because of this mouthful word framework all greater than the outside on building building Yang body basis, so, erect quadruplet slide bar 13 in the inboard of four root posts 5, sliding sleeve or roller 15 are housed on the slide bar 13, sliding sleeve or roller are connected with the two ends of placement with the quadruplet automatic rising-sinking platform 16 in the outside, building building wall basis, when lifting table motor and rope sheave 12 work, by being connected to the lifting table stay cord 14 on the lifting table 16, lifting table 16 pull-ups or decline, the people stands on the lifting table 16 and works, up and down freely, light speed again can rise to the required extreme higher position of building always, alleviated so a large amount of building, the manpower and materials of platform and the waste of material are that the construction building is the most efficient, the good method that take the most reduce man hour.And the building of the row of building up only need be built once and use for a long time, does not tear uneasiness open, is the best facility of a New Countryside Construction shotgun house.
CN 201210102895 2012-04-10 2012-04-10 Automatic construction equipment for building hoisting and platform elevating of new rural construction Pending CN103359625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210102895 CN103359625A (en) 2012-04-10 2012-04-10 Automatic construction equipment for building hoisting and platform elevating of new rural construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210102895 CN103359625A (en) 2012-04-10 2012-04-10 Automatic construction equipment for building hoisting and platform elevating of new rural construction

Publications (1)

Publication Number Publication Date
CN103359625A true CN103359625A (en) 2013-10-23

Family

ID=49362024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210102895 Pending CN103359625A (en) 2012-04-10 2012-04-10 Automatic construction equipment for building hoisting and platform elevating of new rural construction

Country Status (1)

Country Link
CN (1) CN103359625A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103935901A (en) * 2014-05-12 2014-07-23 陈建光 Automatic high-rise wall plate hoisting system
CN107060785A (en) * 2017-06-18 2017-08-18 王志明 A kind of vertical structure shield machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103935901A (en) * 2014-05-12 2014-07-23 陈建光 Automatic high-rise wall plate hoisting system
CN107060785A (en) * 2017-06-18 2017-08-18 王志明 A kind of vertical structure shield machine

Similar Documents

Publication Publication Date Title
CN202000646U (en) Self-lifting construction platform integrating vertical transportation device and mould frame
CN205713147U (en) A kind of quick positioning apparatus of precast floor slab
CN105672673A (en) Quick locating device and method for prefabricated floor slabs
CN104847098A (en) Multi-guide-rail attachment type electric ascending and descending scaffold
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN202324662U (en) Installation device for foam cement composites
CN111877728A (en) Lifting type movable operation platform for steel structure overhanging construction
CN108483190B (en) Intelligent aluminum alloy template material conveying device and operation method thereof
CN111058609A (en) Construction and protection integrated portable operation platform and method
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN203257106U (en) Multifunctional power-driven walking type walking system
CN206693641U (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building
CN113175222B (en) Method for installing embedded prefabricated external wall panel component
CN216108092U (en) Construction system for installing steel bar formwork of building pier column
CN205653104U (en) Walking crane of cell board curtain installation
CN205575534U (en) Lattice formula groined type support body lifting means
CN211713715U (en) Synchronous dislocation method construction hanging basket device for corrugated steel web suspension casting bridge
CN204982776U (en) A plurality of large -scale concrete buttress synchronous construction slipform systems
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN103291078B (en) A kind of steel girder erection equipment
CN202689494U (en) Elevator shaft template support
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131023