CN113175222B - An installation method of an embedded prefabricated exterior wall panel component - Google Patents
An installation method of an embedded prefabricated exterior wall panel component Download PDFInfo
- Publication number
- CN113175222B CN113175222B CN202110362117.4A CN202110362117A CN113175222B CN 113175222 B CN113175222 B CN 113175222B CN 202110362117 A CN202110362117 A CN 202110362117A CN 113175222 B CN113175222 B CN 113175222B
- Authority
- CN
- China
- Prior art keywords
- exterior wall
- wall panel
- prefabricated exterior
- floor structure
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
- E04G21/168—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements used for tilting, e.g. from horizontal to vertical position or vice versa
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/26—Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明是一种内嵌式预制外墙板构件的安装方法,利用起吊设备或立板架以一定的倾斜角度进入上下楼层结构后立直预制外墙板构件,然后再将其固定起来,解决了目前预制外墙板构件,特别是PC和AAC外墙大板预制构件在主体结构施工后内嵌安装的难题,大大简化了建筑工程施工工艺及提高施工效率。
The present invention is an installation method of built-in prefabricated exterior wall panel components, which uses lifting equipment or vertical panels to enter the upper and lower floor structures at a certain inclination angle, erects the prefabricated exterior wall panel components, and then fixes them up, solving the problem of At present, the prefabricated exterior wall panel components, especially the prefabricated components of PC and AAC exterior wall panels, are difficult to install after the construction of the main structure, which greatly simplifies the construction process of construction projects and improves construction efficiency.
Description
技术领域technical field
本发明属于建筑工程领域,具体是一种内嵌式预制外墙板构件的安装方法。The invention belongs to the field of construction engineering, in particular to an installation method of an embedded prefabricated exterior wall panel component.
背景技术Background technique
预制装配式建筑符合建筑工业化及绿色环保的要求,特别是我国绿色建筑与建筑工业化的产业政策,对预制装配式建筑其需求越来越大。预制外墙板安装是预制装配式建筑施工的主要内容之一,现有预制外墙板普遍采用内嵌安装设计。PC及AAC板等大型预制外墙板构件施工安装由于构件大、重量重,只能借助大型机械设备施工,在内嵌设计的情况下,由于预制外墙板构件上端有梁板,目前尚无方法做到将预制外墙板塞到梁下,故目前普遍采用于在上部楼层施工前安装预制外墙板构件(即主体结构同步施工),但这一方法严重干扰主体结构施工的既有工序和工作面,造成工期延长,工效降低。因此急需一种可在主体结构施工后可内嵌安装预制外墙板构件的方法。Prefabricated buildings meet the requirements of building industrialization and green environmental protection, especially the industrial policy of green buildings and building industrialization in my country, and the demand for prefabricated buildings is increasing. The installation of prefabricated external wall panels is one of the main contents of prefabricated building construction, and the existing prefabricated external wall panels generally adopt the embedded installation design. The construction and installation of large prefabricated exterior wall panels such as PC and AAC panels can only be carried out with the help of large machinery and equipment due to the large size and weight of the components. In the case of embedded design, there is currently no The method is to stuff the prefabricated exterior wall panels under the beams, so it is generally used to install prefabricated exterior wall panels before the construction of the upper floors (that is, the main structure is constructed simultaneously), but this method seriously interferes with the existing process of the main structure construction And the working surface, resulting in extended construction period and reduced work efficiency. Therefore be badly in need of a kind of method that can be embedded and installed prefabricated exterior wall panel member after main structure construction.
发明内容Contents of the invention
预制外墙板构件内嵌式安装是标准的建筑工程述语,指预制外墙板构件安装于上下楼层的梁和柱围合的空间内。有时预制外墙板板构件的侧边并不是柱,而是其它墙体;上下可能是梁,也可能是楼板。Embedded installation of prefabricated exterior wall panels is a standard construction term, which refers to the installation of prefabricated exterior wall panels in the space enclosed by beams and columns on the upper and lower floors. Sometimes the sides of the prefabricated exterior wall panels are not columns, but other walls; the upper and lower sides may be beams or floors.
本发明的目的在于提供一种内嵌式预制外墙板构件的安装方法,以解决上述背景技术中提出的问题。The object of the present invention is to provide a method for installing an embedded prefabricated exterior wall panel component, so as to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
方案一Option One
一种内嵌式预制外墙板构件的安装方法,包括上楼层结构、下楼层结构、预制外墙板构件、连接件,所述上楼层结构是梁或楼板,所述的下楼层结构是楼板或梁,预制外墙安装方法包括以下步骤,A method for installing an embedded prefabricated exterior wall panel component, comprising an upper floor structure, a lower floor structure, a prefabricated exterior wall panel component, and connectors, the upper floor structure is a beam or a floor slab, and the lower floor structure is a floor slab or beam, prefabricated exterior wall installation method includes the following steps,
步骤一:利用起吊设备将预制外墙板构件吊起,并使其与垂直方向成倾斜一定角度下落到下楼层结构的上方;其中起吊设备上的吊带固定于预制外墙板构件的两侧,并有一侧吊带可调节长度;起吊设备可以是工程塔吊、汽车吊等,通常每侧用两根吊带(也可用一根吊带),通常采用一侧的吊带上接入葫芦,方便调整吊带长度。为方便操作通常将靠近上楼层结构梁或板边缘的一侧吊带作为可调整长度的吊带。Step 1: Use the lifting equipment to lift the prefabricated exterior wall panel components, and make it fall to the top of the lower floor structure at an angle inclined to the vertical direction; wherein the lifting straps on the lifting equipment are fixed on both sides of the prefabricated exterior wall panel components, And there is a sling on one side to adjust the length; lifting equipment can be engineering tower cranes, car cranes, etc., usually two slings are used on each side (one sling can also be used), and the hoist is usually connected to the sling on one side to facilitate adjustment of the length of the sling. For the convenience of operation, the side sling close to the edge of the structural beam or slab on the upper floor is usually used as an adjustable length sling.
步骤二:将预制外墙板构件下端引导到下楼层结构预制外墙板构件的安装位置上方;下降预制外墙板构件并落在下楼层结构上;将外墙板预制构件下端引导入下楼层结构时可采用人拉、缆风绳、葫芦、拉钩等辅助措施。引导入时需要预制外墙板构件下端脱离下楼层结构。Step 2: Guide the lower end of the prefabricated exterior wall panel components above the installation position of the prefabricated exterior wall panel components of the lower floor structure; lower the prefabricated exterior wall panel components and drop them on the lower floor structure; guide the lower end of the prefabricated exterior wall panel components into the lower floor structure Auxiliary measures such as people pulling, wind ropes, hoists, and pull hooks can be used. When leading in, the lower end of the prefabricated exterior wall panel components needs to be separated from the structure of the lower floor.
步骤三:调节吊带长度,取下靠近上楼层结构边缘一侧的吊带;利用起吊设备提起未取下的吊带调整预制外墙构件到垂直位置;在预制外墙板构件下端搁置在下楼层结构上的时候,如果接入吊带的是葫芦,可利用葫芦调整吊带长度,配合起吊设备,可让靠近上楼层结构边缘的吊带放松,然后取下该吊带,而同时保持另一侧吊带受力。取下一侧吊带后,利用起吊设备提起一侧的吊带,可将预制外墙板构件立垂直或接近垂直。这一过程中预制外墙板构件下端通常与下结构楼层接触。在取下靠近上楼层结构边缘一侧的吊带前可将板下端与连接临时连接,以方便立板。Step 3: Adjust the length of the sling, remove the sling near the edge of the upper floor structure; use the lifting device to lift the unremoved sling to adjust the prefabricated exterior wall component to a vertical position; place the lower end of the prefabricated exterior wall panel on the lower floor structure At this time, if the hoist is connected to the sling, the hoist can be used to adjust the length of the sling, and with the lifting equipment, the sling close to the edge of the upper floor structure can be relaxed, and then the sling is removed while keeping the other side of the sling under stress. After removing one side of the sling, use the lifting device to lift the one side of the sling, and the prefabricated exterior wall panel can be vertical or nearly vertical. During this process, the lower ends of the prefabricated exterior wall panel elements are usually in contact with the lower structural floors. Before removing the sling near the edge of the upper floor structure, the lower end of the board can be temporarily connected to the connection to facilitate the riser.
步骤四:将连接件与预制外墙板构件连接固定,并移除起吊设备完成安装。将预制外墙板构件上下端与固定于下楼层结构或上下楼层结构的连接件连接固定。在步骤三取下一侧吊带前可先将预制外墙板构件下端与连接件初步连接,以方便预制外墙板构件立直和保证安全。如果步骤三中预制外墙板构件未完全垂直,此时可结合辅助手段将预制外墙板构件调整垂直。一般将预制外墙板与连接件固定后,再移除起吊设备。Step 4: Connect and fix the connectors with the prefabricated exterior wall panel components, and remove the lifting equipment to complete the installation. The upper and lower ends of the prefabricated exterior wall panels are connected and fixed with the connectors fixed on the lower floor structure or the upper and lower floor structures. Before removing one side of the sling in step 3, the lower end of the prefabricated exterior wall panel component can be initially connected with the connector, so as to facilitate the erection of the prefabricated exterior wall panel component and ensure safety. If the prefabricated exterior wall panel components are not completely vertical in step 3, the prefabricated exterior wall panel components can be adjusted to be vertical by combining auxiliary means at this time. Generally, the prefabricated exterior wall panels and connectors are fixed, and then the lifting equipment is removed.
作为优选,所述的连接件是分别固定于上楼层结构及下楼层结构的连接板或预埋件;或所述的连接件是固定于下楼层结构的临时斜撑。固定于上楼层结构和下楼层结构的连接板或预埋件的该连接件的作用就是固定立着后的预制外墙板构件,预制外墙板构件上下端均与该连接件分别连接。临时斜撑是装配式建筑竖向预制构件通用工具,是一种可调节长度的支撑杆,一般一段固定于下楼层结构楼板,另一端与预制外墙板构件连接。需要连接预制外墙板构件上端和下端两组支撑杆。Preferably, the connecting piece is a connecting plate or an embedded part respectively fixed to the structure of the upper floor and the structure of the lower floor; or the connecting piece is a temporary brace fixed to the structure of the lower floor. The role of the connecting piece fixed on the connecting plate or embedded part of the upper floor structure and the lower floor structure is to fix the standing prefabricated exterior wall panel component, and the upper and lower ends of the prefabricated exterior wall panel component are respectively connected with the connecting piece. Temporary bracing is a general tool for vertical prefabricated components of prefabricated buildings. It is a support rod with adjustable length. Generally, one section is fixed to the structural floor of the lower floor, and the other end is connected to the prefabricated exterior wall panel components. It is necessary to connect two sets of support rods at the upper and lower ends of the prefabricated exterior wall panel components.
方案二Option II
一种内嵌式预制外墙板构件的安装方法,包括上楼层结构、下楼层结构、预制外墙板构件、连接件,所述上楼层结构是梁或楼板,所述的下楼层结构是楼板或梁,预制外墙安装方法包括以下步骤,这种安装方法可同时适用于从室外一侧安装,或室内楼板未施工时从室内一侧安装。A method for installing an embedded prefabricated exterior wall panel component, comprising an upper floor structure, a lower floor structure, a prefabricated exterior wall panel component, and connectors, the upper floor structure is a beam or a floor slab, and the lower floor structure is a floor slab Or beam, the prefabricated exterior wall installation method includes the following steps, this installation method can be applied to install from the outdoor side at the same time, or install from the indoor side when the indoor floor slab is not constructed.
步骤一:利用起吊设备将预制外墙板构件吊起,并使其与垂直方向成倾斜一定角度起吊,直到预制外墙板构件的顶部接近并低于上楼层结构的底部位置;当预制外墙板以一定角度起吊,主要目的是方便步骤二将上端伸过上楼层结构梁,如果是从室内一侧安装,预制墙板倾斜角度后其垂直方向的高度还需要保证比上楼层结构梁和下楼层结构顶的净空要小。Step 1: Use lifting equipment to lift the prefabricated exterior wall panel components, and lift them at a certain angle with the vertical direction until the top of the prefabricated exterior wall panel components is close to and lower than the bottom of the upper floor structure; when the prefabricated exterior wall panels The panel is lifted at a certain angle, the main purpose is to facilitate step 2 to extend the upper end over the upper floor structural beam. If it is installed from the indoor side, the vertical height of the prefabricated wall panel after the inclination angle needs to be higher than the upper floor structural beam and the lower floor. The headroom at the top of the floor structure should be small.
步骤二:将预制外墙板构件的上端引导伸入或伸过到上楼层结构下方梁内;根据需要提升预制外墙板构件,直到预制外墙板构件下端高于下楼层结构顶面;Step 2: Guide the upper end of the prefabricated exterior wall panel member into or over the lower beam of the upper floor structure; lift the prefabricated outer wall panel member until the lower end of the prefabricated outer wall panel member is higher than the top surface of the lower floor structure;
步骤三:将预制外墙板构件下端引导入下楼层结构内的安装位置上方;下降预制外墙板构件并落在下楼层结构上;继续下降预制外墙构件,并调整预制预制外墙板构件,使其处于垂直状态;将预制外墙板构件下端引导到安装位置时,起吊吊带会位于预制外墙板构件的另一侧,并与上楼层结构接触受力,可借助该力将预制外墙板构件拉正拉垂直。Step 3: guide the lower end of the prefabricated exterior wall panel components into the lower floor structure above the installation position; lower the prefabricated exterior wall panel components and drop them on the lower floor structure; continue to lower the prefabricated exterior wall components, and adjust the prefabricated prefabricated exterior wall panel components, Make it in a vertical state; when the lower end of the prefabricated exterior wall panel component is guided to the installation position, the lifting strap will be located on the other side of the prefabricated exterior wall panel component, and will be in contact with the upper floor structure to bear the force, and the prefabricated exterior wall can be pulled The plate members are pulled vertically.
步骤四:将连接件与预制外墙板构件连接固定,并移除起吊设备。Step 4: Connect and fix the connectors with the prefabricated exterior wall panel components, and remove the lifting equipment.
所述的连接件是固定于上楼层结构及下的连接板或预埋件;或所述的连接件为固定在下楼层结构上的连接板或预埋件;或所述的连接件是固定于下楼层结构的临时斜撑。The connecting piece is a connecting plate or embedded part fixed on the upper floor structure and the lower one; or the connecting piece is a connecting plate or embedded part fixed on the lower floor structure; or the connecting piece is fixed on the Temporary braces for the lower story structure.
方案三third solution
一种内嵌式预制外墙板构件的安装方法,包括上楼层结构、下楼层结构、预制外墙板构件、连接件,还包括立板架,所述上楼层结构是楼板或梁,所述的下楼层结构是楼板或梁,预制外墙安装方法包括以下步骤,A method for installing an embedded prefabricated exterior wall panel component, comprising an upper floor structure, a lower floor structure, a prefabricated exterior wall panel component, connectors, and a vertical plate frame, the upper floor structure is a floor slab or a beam, and the The lower floor structure is a slab or a beam, and the prefabricated exterior wall installation method includes the following steps,
步骤一:利用起吊设备将预制外墙板构件与垂直方向成倾斜一定角度放置于立板架上;到楼层的垂直运输可利用起吊设备,也可以采用物料电梯运输到指定楼层。Step 1: Use the lifting equipment to place the prefabricated exterior wall panel components on the vertical frame at a certain angle with the vertical direction; the vertical transportation to the floor can use the lifting equipment, or use the material elevator to transport to the designated floor.
步骤二:在下楼层结构上将立板架和预制外墙板构件运输至安装位置;可辅助水平运输工具将立板架运输到需要安装预制外墙板构件的位置。Step 2: Transport the vertical panel frame and the prefabricated exterior wall panel components to the installation location on the structure of the lower floor; the horizontal transport tool can be assisted to transport the vertical panel frame to the position where the prefabricated external wall panel components need to be installed.
步骤三:利用顶升设备顶起立板架,使立板架绕立板架下端旋转起立到垂直位置;通常顶升设备采用千斤顶,立板架下端顶到下楼层结构或下端安装可转动轴,顶升设备将立板架靠近上端顶起立板架,通过立板架带动预制外墙板构件起立垂直。Step 3: Use jacking equipment to lift up the vertical frame, so that the vertical frame rotates around the lower end of the vertical frame to a vertical position; usually the jacking device uses a jack, and the lower end of the vertical frame is pushed to the lower floor structure or a rotatable shaft is installed at the lower end. The jacking equipment lifts the vertical panel frame close to the upper end, and drives the prefabricated exterior wall panel components to stand vertically through the vertical panel frame.
步骤四:将连接件与预制外墙板构件连接固定,并移除立板架。Step 4: Connect and fix the connecting piece with the prefabricated exterior wall panel components, and remove the stand frame.
所述的连接件是固定于上楼层结构的连接板或预埋件;或所述的连接件为固定在下楼层结构上的连接板或预埋件;或所述的连接件是固定于下楼层结构的临时斜撑。The connecting piece is a connecting plate or embedded part fixed on the structure of the upper floor; or the connecting piece is a connecting plate or embedded part fixed on the structure of the lower floor; or the connecting piece is fixed on the lower floor Temporary braces for structures.
所述的立板架包括活动架、底盘和千斤顶,所述的活动架与水平面成倾斜角度,所述的底盘水平放置,所述的活动架下端和底盘的一侧通过可转动轴连接,所述的千斤顶,两端分别和活动架和底盘通过可转动轴连接,所述活动架、底盘、千斤顶围合成三角形,当改变千斤顶长度时可调整活动架与水平面的夹角,达到调整放置于活动架上的所述预制外墙板起立角度的目的。所述的立板架底盘下安装有方便移动的活动轮,以达到方便移动的目的。活动架和底盘采用型钢和钢板制作。活动架和底盘均是一个平面结构(通常外轮廓为矩型):活动架宽1.0~3.0m,高度1.0~2.0m,底盘宽与活动架宽度接近匹配,长度1.0~2.0m。活动架下端两侧和底盘通过转动轴连接。千斤顶可采用一个或两个,采用一个千斤顶时布置在活动架和底盘宽度的中部,两个时布置在两侧。The vertical board frame includes a movable frame, a chassis and a jack, the movable frame is inclined at an angle to the horizontal plane, the chassis is placed horizontally, and the lower end of the movable frame is connected to one side of the chassis through a rotatable shaft. The two ends of the jack described above are respectively connected to the movable frame and the chassis through a rotatable shaft. The movable frame, the chassis, and the jack form a triangle. The purpose of the erection angle of the prefabricated exterior wall panels on the rack. Movable wheels for easy movement are installed under the chassis of the stand frame to achieve the purpose of easy movement. The movable frame and chassis are made of section steel and steel plate. Both the movable frame and the chassis are a plane structure (usually the outer contour is rectangular): the movable frame is 1.0-3.0m wide, 1.0-2.0m high, the chassis width closely matches the movable frame width, and the length is 1.0-2.0m. Both sides of the lower end of the movable frame are connected with the chassis through a rotating shaft. One or two jacks can be used. When one jack is used, it is arranged in the middle of the movable frame and the width of the chassis, and when two jacks are used, it is arranged on both sides.
本发明的有益效果是:本发明解决了目前预制外墙板构件特别是 PC和AAC外墙大板预制构件在主体结构施工后内嵌安装的难题。大大简化了建筑工程施工工艺及提高施工效率。The beneficial effects of the present invention are: the present invention solves the difficult problem of embedded installation of prefabricated exterior wall panel components, especially PC and AAC exterior wall slab prefabricated components after the construction of the main structure. It greatly simplifies the construction process of construction engineering and improves the construction efficiency.
附图说明Description of drawings
图1为本发明实施例1的示意图;Fig. 1 is the schematic diagram of embodiment 1 of the present invention;
图2为本发明实施例2的示意图;Fig. 2 is the schematic diagram of embodiment 2 of the present invention;
图3为本发明实施例3的示意图;Fig. 3 is the schematic diagram of embodiment 3 of the present invention;
图4为本发明实施例4的结构示意图。Fig. 4 is a schematic structural diagram of Embodiment 4 of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
实施例1Example 1
请参阅图1,本发明实施例中,一种内嵌式预制外墙板构件的安装方法,包括设置有上楼层结构2、下楼层结构3、预制外墙板构件 1、固定于上楼层结构下的上连接件7、固定于下楼层结构上的下连接件8,所述上楼层结构2是梁,所述的下楼层结构是楼板面或梁顶。上连接件7和连接件8为预埋连接板,预埋连接板通过连接螺栓9将其与预制外墙板构件连接固定。Please refer to Fig. 1, in an embodiment of the present invention, a method for installing an embedded prefabricated exterior wall panel component includes an upper floor structure 2, a lower floor structure 3, a prefabricated exterior wall panel component 1, and a structure fixed on the upper floor structure The lower upper connecting piece 7 and the lower connecting piece 8 fixed on the lower floor structure, the upper floor structure 2 is a beam, and the lower floor structure is a floor surface or a beam top. The upper connecting piece 7 and the connecting piece 8 are pre-embedded connecting plates, and the pre-embedded connecting plates are connected and fixed to the prefabricated exterior wall panel components through connecting bolts 9 .
本实施列预制外墙板构件1从室外一侧安装。安装按以下步骤和方法实施:In this embodiment, the prefabricated exterior wall panel member 1 is installed from the outdoor side. The installation is implemented according to the following steps and methods:
第1步:参考图1中①,首先利用起吊设备将预制外墙板构件 1与垂直方向成倾斜一定角度从室外一侧下落到下楼层结构3的上方;其中起吊设备上的第一吊带5、第二吊带6固定于预制外墙板构件1的两侧,每侧用两根吊带,室内一侧两根吊带6顶部接入倒链葫芦一个。起吊设备为工程塔吊。Step 1: Referring to ① in Figure 1, first use the lifting equipment to drop the prefabricated exterior wall panel member 1 from the outdoor side to the top of the lower floor structure 3 at an angle inclined to the vertical direction; wherein the first suspension belt 5 on the lifting equipment , The second suspenders 6 are fixed on both sides of the prefabricated exterior wall panel member 1, each side uses two suspenders, and the top of two suspenders 6 on one side of the room is connected to one upside-down chain hoist. The lifting equipment is engineering tower crane.
第2步:参考图1中②,将预制外墙板构件1的下端用拉钩10 勾住后引导到下楼层结构3上预制外墙板构件1的安装位置上方;然后控制塔吊下降预制外墙板构件1并落在下楼层结构3上。拉钩 10采用钢筋制作。Step 2: Referring to ② in Figure 1, hook the lower end of the prefabricated exterior wall panel component 1 with the hook 10 and guide it to the upper part of the installation position of the prefabricated exterior wall panel component 1 on the lower floor structure 3; then control the tower crane to lower the prefabricated exterior wall The plate member 1 falls on the lower floor structure 3 . Drag hook 10 adopts steel bar to make.
第3步:参考图1中③,用倒链葫芦下放,使室内一侧第二吊带6放松;然后利用起吊设备提起外侧第一吊带5调整预制外墙构件1接近垂直位置,安装预制外墙板构件1下端连接螺栓9。取下室内一侧第二吊带6,利用起吊设备继续提起室外一侧的第一吊带 5,根据需要利用拉钩10配合预制外墙板构件1立起至垂直状态。Step 3: Referring to ③ in Figure 1, use the inverted chain hoist to lower the second sling 6 on the indoor side; then use the lifting device to lift the first sling 5 on the outside to adjust the prefabricated exterior wall component 1 to a vertical position, and install the prefabricated exterior wall Bolts 9 are connected to the lower end of the plate member 1 . Take off the second sling 6 on the indoor side, utilize the hoisting device to continue to mention the first sling 5 on the outdoor side, and utilize the pull hook 10 to cooperate with the prefabricated exterior wall panel member 1 to stand up to the vertical state as required.
第4步:参考图1中④,将上连接件7和下连接件分别与预制外墙板构件1用螺栓9固定,然后摘除室外一侧第一吊带5完成安装。Step 4: Referring to ④ in Figure 1, fix the upper connector 7 and the lower connector to the prefabricated exterior wall panel member 1 respectively with bolts 9, and then remove the first strap 5 on the outdoor side to complete the installation.
实施例2Example 2
请参阅图2,本发明实施例中,包括设置有上楼层结构2、下楼层结构3、预制外墙板构件1、固定于下楼层结构3上的连接件,所述上楼层结构2是梁或楼板,所述的下楼层结构3是楼板面或梁顶。所述的连接件是临时斜撑杆11。本实施例从室外一侧安装。安装按以下步骤和方法实施:Please refer to Fig. 2, in the embodiment of the present invention, comprise and be provided with upper floor structure 2, lower floor structure 3, prefabricated exterior wall panel member 1, the connector that is fixed on the lower floor structure 3, described upper floor structure 2 is beam Or the floor, the lower floor structure 3 is a floor surface or a beam top. The connecting piece is a temporary diagonal brace 11 . This embodiment is installed from the outdoor side. The installation is implemented according to the following steps and methods:
第1步:参考图2中①,利用起吊设备将预制外墙板构件1与垂直方向成倾斜一定角度起吊,直到预制外墙板构件1的上端处于上楼层结构2的下方位置。起吊设备为塔吊。Step 1: Referring to ① in Figure 2, use the lifting equipment to lift the prefabricated exterior wall panel component 1 at an angle inclined to the vertical direction until the upper end of the prefabricated exterior wall panel component 1 is located below the upper floor structure 2. The lifting equipment is a tower crane.
第2步:参考图2中②,将预制外墙板构件1的上端用拉钩10 拉入并伸过到上楼层结构梁2内;然后提升预制外墙板构件1,直到预制外墙板构件1下端高于下楼层结构3顶面。Step 2: Referring to ② in Figure 2, pull the upper end of the prefabricated exterior wall panel member 1 into the upper floor structural beam 2 with the pull hook 10; then lift the prefabricated exterior wall panel component 1 until the prefabricated exterior wall panel component 1 The lower end is higher than the top surface of the lower floor structure 3 .
第3步:参考图2中③,将预制外墙板构件1下端用拉钩10 拉入下楼层结构3内的安装位置上方;下降预制外墙板构件1并落在下楼层结构3上;继续下降预制外墙构件1,并调整预制外墙板构件1角度使其处于垂直状态。将预制外墙板构件1下端引导到安装位置上方时,起吊第一吊带5会位于预制外墙板构件1的另一侧,并与上楼层结构2接触受力,可借助该力将预制外墙板构件1拉正拉垂直。Step 3: Referring to ③ in Figure 2, pull the lower end of the prefabricated exterior wall panel member 1 into the upper part of the installation position in the lower floor structure 3 with the pull hook 10; lower the prefabricated outer wall panel member 1 and drop it on the lower floor structure 3; continue to descend Prefabricate the exterior wall component 1, and adjust the angle of the prefabricated exterior wall panel component 1 so that it is in a vertical state. When the lower end of the prefabricated exterior wall panel component 1 is guided above the installation position, the first hoisting strap 5 will be located on the other side of the prefabricated exterior wall panel component 1, and will be in contact with the upper floor structure 2 to bear force, and the prefabricated exterior wall panel component can be lifted by this force. The wall panel member 1 is pulled straight and vertically.
第4步:参考图2中④,将连接件临时斜撑杆11分别与预制外墙板构件1上下端连接固定;然后移除起吊第一吊带5,完成安装。Step 4: Referring to ④ in Figure 2, connect and fix the temporary diagonal braces 11 of the connectors to the upper and lower ends of the prefabricated exterior wall panel member 1 respectively; then remove the first lifting strap 5 to complete the installation.
实施例3Example 3
请参阅图3,本发明实施例中,一种内嵌式预制外墙板构件的安装方法,包括设置有上楼层结构2、下楼层结构3、预制外墙板构件 1、固定于下楼层结构上的连接件,还包括立板架4。所述上楼层结构2是楼板或梁,所述的下楼层结构3是楼板或梁。所述的连接件是临时斜撑杆11。Please refer to Fig. 3 , in an embodiment of the present invention, a method for installing an embedded prefabricated exterior wall panel component includes an upper floor structure 2, a lower floor structure 3, a prefabricated exterior wall panel component 1, and a structure fixed on the lower floor structure. The connector on the top also includes the stand frame 4. The upper floor structure 2 is a floor slab or a beam, and the lower floor structure 3 is a floor slab or a beam. The connecting piece is a temporary diagonal brace 11 .
本实施例从室内一侧安装。安装按以下步骤和方法实施:This embodiment is installed from the indoor side. The installation is implemented according to the following steps and methods:
第1步:参考图3中①,利用起吊设备将预制外墙板构件1与垂直方向成倾斜一定角度放置于立板架4上。立板架4预先放置于要安装楼层的卸料平台上,起吊设备为工程塔吊。Step 1: Referring to ① in Fig. 3, use the lifting equipment to place the prefabricated exterior wall panel member 1 on the vertical panel frame 4 at an angle inclined to the vertical direction. Riser 4 is pre-placed on the unloading platform of the floor to be installed, and the hoisting equipment is an engineering tower crane.
第2步:参考图3中②,在下楼层结构3上利用电动叉车将立板架4连同预制外墙板构件1运输至所需安装位置,并定位准确。Step 2: Referring to ② in Figure 3, use an electric forklift to transport the vertical panel frame 4 together with the prefabricated exterior wall panel member 1 to the required installation position on the lower floor structure 3, and position it accurately.
第3步:参考图3中③,利用顶升设备顶起立板架4,使立板架4绕立板架4下端旋转起立到垂直位置。顶升设备采用千斤顶,立板架4下端顶到下楼层结构3,顶升设备将立板架4靠近上端部位顶起立板架4,通过立板架4带动预制外墙板构件1立起至垂直状态。Step 3: Referring to ③ in Figure 3, use the jacking device to jack up the vertical frame 4, so that the vertical frame 4 rotates around the lower end of the vertical frame 4 and stands up to a vertical position. The jacking equipment adopts a jack, and the lower end of the vertical panel frame 4 is pushed to the lower floor structure 3. The jacking equipment lifts the vertical panel frame 4 near the upper end, and the vertical panel frame 4 drives the prefabricated exterior wall panel member 1 to stand up to vertical state.
第4步:参考图3中④,将连预制外墙板构件1上下端用临时斜支撑杆11连接固定,然后移除立板架4。Step 4: Referring to ④ in Figure 3, connect and fix the upper and lower ends of the prefabricated exterior wall panel components 1 with temporary inclined support rods 11, and then remove the vertical panel frame 4.
请参阅图4,本实施例中所述的立板架包括活动架12、底盘13 和千斤顶14。所述的活动架12与水平面成倾斜角度,所述的活动架 12下端和底盘13的一侧通过可转动轴连接。所述的千斤顶14两端分别和活动架12和底盘13通过可转动轴连接。所述活动架12、底盘13、千斤顶14围合成三角形,当改变千斤顶14长度时可调整活动架12与水平面的夹角,达到调整放置于活动架12上的所述预制外墙板构件起立角度的目的。活动架12和底盘13采用槽钢和钢板制作。活动架12和底盘13均为矩型平面结构,并沿对角设置槽钢。活动架宽1.4m,高度1.8m,底盘宽1.5m,长度1.5m。活动架12下端两侧和底盘通13过可转动轴连接。采用一个千斤顶14,千斤顶14一端与活动架12对角设置槽钢交叉点通过钢板与活动轴连接,另一端通过钢板和活动轴与底盘13外侧槽钢中部连接。所述的立板架底盘下13 安装活动轮15,以达到方便移动的目的。Please refer to FIG. 4 , the stand frame described in this embodiment includes a movable frame 12 , a chassis 13 and a jack 14 . Described movable frame 12 is inclined angle with horizontal plane, and described movable frame 12 lower ends and one side of chassis 13 are connected by rotatable shaft. The two ends of the jack 14 are respectively connected with the movable frame 12 and the chassis 13 through rotatable shafts. The movable frame 12, the chassis 13, and the jack 14 form a triangle. When the length of the jack 14 is changed, the angle between the movable frame 12 and the horizontal plane can be adjusted to achieve the adjustment of the standing angle of the prefabricated exterior wall panel components placed on the movable frame 12. the goal of. Movable frame 12 and chassis 13 adopt channel steel and steel plate to make. Both the movable frame 12 and the chassis 13 are rectangular planar structures, and channel steel is arranged along the diagonal. The movable frame is 1.4m wide, 1.8m high, the chassis is 1.5m wide, and 1.5m long. Both sides of movable frame 12 lower ends are connected with chassis by 13 rotatable shafts. Adopt a jack 14, jack 14 one end and movable frame 12 diagonally set channel steel cross point to be connected with movable shaft by steel plate, the other end is connected with chassis 13 outer channel steel middle parts by steel plate and movable shaft. Movable wheels 15 are installed under the described stand frame chassis 13, so as to reach the purpose of moving easily.
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (2)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110362117.4A CN113175222B (en) | 2021-04-02 | 2021-04-02 | An installation method of an embedded prefabricated exterior wall panel component |
| CN202310589692.7A CN117306732B (en) | 2021-04-02 | 2021-04-02 | Method for installing embedded prefabricated external wall panel component |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110362117.4A CN113175222B (en) | 2021-04-02 | 2021-04-02 | An installation method of an embedded prefabricated exterior wall panel component |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310589692.7A Division CN117306732B (en) | 2021-04-02 | 2021-04-02 | Method for installing embedded prefabricated external wall panel component |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN113175222A CN113175222A (en) | 2021-07-27 |
| CN113175222B true CN113175222B (en) | 2023-08-15 |
Family
ID=76922768
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310589692.7A Active CN117306732B (en) | 2021-04-02 | 2021-04-02 | Method for installing embedded prefabricated external wall panel component |
| CN202110362117.4A Active CN113175222B (en) | 2021-04-02 | 2021-04-02 | An installation method of an embedded prefabricated exterior wall panel component |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310589692.7A Active CN117306732B (en) | 2021-04-02 | 2021-04-02 | Method for installing embedded prefabricated external wall panel component |
Country Status (1)
| Country | Link |
|---|---|
| CN (2) | CN117306732B (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115613732A (en) * | 2022-11-07 | 2023-01-17 | 北京达诺筑工科技发展有限公司 | Embedded integrated wall installation method |
| CN116641565B (en) * | 2023-07-26 | 2023-09-22 | 成都建工装饰装修有限公司 | Installation clamping device suitable for assembled decoration and heat preservation integrated wallboard |
| CN117703106B (en) * | 2024-01-08 | 2026-07-10 | 山东历控建设发展有限公司 | A construction device and construction process for building insulation in cold regions |
| CN118029710B (en) * | 2024-03-14 | 2026-02-17 | 中建科工集团有限公司 | An auxiliary installation device and an installation method for rock wool sandwich color steel panels. |
| CN118241883A (en) * | 2024-05-17 | 2024-06-25 | 山西三建集团有限公司 | Assembly trolley for transferring and positioning exterior wall panels on the floor |
Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1313104A (en) * | 1969-07-24 | 1973-04-11 | Elcon Ag | Prefabricated buildings |
| JPH06322989A (en) * | 1993-05-18 | 1994-11-22 | Showa Denko Kenzai Kk | Outer wall board setting method and outer wall board hoisting heavy jig |
| JPH08209940A (en) * | 1995-01-31 | 1996-08-13 | Nippon Steel Metal Prod Co Ltd | Exterior wall panel construction method |
| JPH09310501A (en) * | 1996-05-21 | 1997-12-02 | Kumagai Gumi Co Ltd | Suspended load retractor |
| JPH10266573A (en) * | 1997-03-28 | 1998-10-06 | Taisei Corp | PC plate mounting device and method |
| JP2004346601A (en) * | 2003-05-22 | 2004-12-09 | Shimizu Corp | Hanging equipment for unit panel and unit panel method |
| CN103603460A (en) * | 2013-11-25 | 2014-02-26 | 浙江省建设投资集团有限公司 | Embedded prefabricated concrete external wall panel and hoisting method thereof |
| CN104895335A (en) * | 2015-05-15 | 2015-09-09 | 中建钢构有限公司 | Method for mounting hanging pillar |
| CN106121259A (en) * | 2016-08-19 | 2016-11-16 | 杭州铁木辛柯钢结构设计有限公司 | The hanging apparatus of embedded integrated outer wall plate and hanging method thereof |
| CN107503519A (en) * | 2017-08-31 | 2017-12-22 | 中国二十二冶集团有限公司 | Three layers of composite steel column sandwich heat preservation Side fascia hanging method of assembling type steel structure house |
| CN107934778A (en) * | 2017-12-22 | 2018-04-20 | 中国核工业第二二建设有限公司 | The lifting erecting device and method of AP1000 nuclear island super large shield doors |
| KR20180069458A (en) * | 2016-12-15 | 2018-06-25 | 삼성물산 주식회사 | Installation Equipment for Assembly Wall |
| CN110344525A (en) * | 2019-07-25 | 2019-10-18 | 广东世纪达建设集团有限公司 | A kind of super large plate apleuria full glass curtain wall construction method of installation |
| CN110616900A (en) * | 2019-10-16 | 2019-12-27 | 深圳广田集团股份有限公司 | Large-scale curtain wall large panel material and turning method of unit plate |
| CN112227736A (en) * | 2020-09-30 | 2021-01-15 | 中冶建工集团有限公司 | Aerated concrete wallboard transporting and installing method |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0673892A (en) * | 1992-08-27 | 1994-03-15 | Nippon Sheet Glass Co Ltd | Method for attaching exterior plate material of building and device used therefor |
| JP3792383B2 (en) * | 1998-01-05 | 2006-07-05 | 鹿島建設株式会社 | Reinforcing bar assembly method and reinforced concrete structure |
| US10544583B2 (en) * | 2010-10-15 | 2020-01-28 | Constructive, L.L.C. | Prefabricated masonry walls |
| CN104652807B (en) * | 2014-12-31 | 2016-08-24 | 中国建筑一局(集团)有限公司 | Self-circulation construction system and method for internal climbing tower supporting steel beam in hydraulic climbing formwork system |
| CN106545171A (en) * | 2016-10-31 | 2017-03-29 | 浙江省东阳第三建筑工程有限公司 | One kind is without pre-buried external hanging type discharging platform |
-
2021
- 2021-04-02 CN CN202310589692.7A patent/CN117306732B/en active Active
- 2021-04-02 CN CN202110362117.4A patent/CN113175222B/en active Active
Patent Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1313104A (en) * | 1969-07-24 | 1973-04-11 | Elcon Ag | Prefabricated buildings |
| JPH06322989A (en) * | 1993-05-18 | 1994-11-22 | Showa Denko Kenzai Kk | Outer wall board setting method and outer wall board hoisting heavy jig |
| JPH08209940A (en) * | 1995-01-31 | 1996-08-13 | Nippon Steel Metal Prod Co Ltd | Exterior wall panel construction method |
| JPH09310501A (en) * | 1996-05-21 | 1997-12-02 | Kumagai Gumi Co Ltd | Suspended load retractor |
| JPH10266573A (en) * | 1997-03-28 | 1998-10-06 | Taisei Corp | PC plate mounting device and method |
| JP2004346601A (en) * | 2003-05-22 | 2004-12-09 | Shimizu Corp | Hanging equipment for unit panel and unit panel method |
| CN103603460A (en) * | 2013-11-25 | 2014-02-26 | 浙江省建设投资集团有限公司 | Embedded prefabricated concrete external wall panel and hoisting method thereof |
| CN104895335A (en) * | 2015-05-15 | 2015-09-09 | 中建钢构有限公司 | Method for mounting hanging pillar |
| CN106121259A (en) * | 2016-08-19 | 2016-11-16 | 杭州铁木辛柯钢结构设计有限公司 | The hanging apparatus of embedded integrated outer wall plate and hanging method thereof |
| KR20180069458A (en) * | 2016-12-15 | 2018-06-25 | 삼성물산 주식회사 | Installation Equipment for Assembly Wall |
| CN107503519A (en) * | 2017-08-31 | 2017-12-22 | 中国二十二冶集团有限公司 | Three layers of composite steel column sandwich heat preservation Side fascia hanging method of assembling type steel structure house |
| CN107934778A (en) * | 2017-12-22 | 2018-04-20 | 中国核工业第二二建设有限公司 | The lifting erecting device and method of AP1000 nuclear island super large shield doors |
| CN110344525A (en) * | 2019-07-25 | 2019-10-18 | 广东世纪达建设集团有限公司 | A kind of super large plate apleuria full glass curtain wall construction method of installation |
| CN110616900A (en) * | 2019-10-16 | 2019-12-27 | 深圳广田集团股份有限公司 | Large-scale curtain wall large panel material and turning method of unit plate |
| CN112227736A (en) * | 2020-09-30 | 2021-01-15 | 中冶建工集团有限公司 | Aerated concrete wallboard transporting and installing method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN113175222A (en) | 2021-07-27 |
| CN117306732B (en) | 2026-02-06 |
| CN117306732A (en) | 2023-12-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113175222A (en) | Installation method of embedded prefabricated external wall panel component | |
| CN110562868B (en) | Hoisting construction method for unit type glass curtain wall of super high-rise building | |
| CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
| CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
| CN112357749B (en) | A lifting device for construction and handling of electrical cabinets | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| WO2023184882A1 (en) | Material lifting device | |
| CN119122250A (en) | A hanging basket device and construction method for large-area inclined glass curtain wall | |
| CN110670879A (en) | A kind of high-rise hoisting method for large equipment | |
| CN115043343A (en) | Light partition board installation construction device and construction method thereof | |
| CN221855301U (en) | A double-girder bridge erecting machine for assembling and carrying brackets | |
| CN111502293A (en) | Method and system for hoisting single peripheral component of assembly type building | |
| CN204401999U (en) | Climbing scaffolding with unloading platform | |
| CN219031629U (en) | Lifting equipment for indoor plate installation | |
| CN205346600U (en) | Big plate -girder hoist and mount specialized tool | |
| CN103556837B (en) | A kind of method realizing steel column at annex place and install | |
| CN116575723A (en) | Unit curtain wall hoisting process | |
| CN217054270U (en) | Automatic elevator shaft construction platform that climbs | |
| CN110790132A (en) | Device capable of simultaneously solving vertical and horizontal transportation of materials | |
| CN213865193U (en) | A kind of small and medium equipment lifting device | |
| CN116513953A (en) | Lifting tool for installing autoclaved aerated concrete slab inner wall | |
| CN101446118A (en) | Curtain-wall board-shifting support | |
| CN220033780U (en) | Hoisting equipment | |
| CN111661768A (en) | Method and system for hoisting multiple peripheral components of assembly type building | |
| CN114278108B (en) | Construction lifter canopy and construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20230719 Address after: No. 6, Xingye Street, Sanmen Industrial Park, Hairun Street, Sanmen County, Taizhou City, Zhejiang Province, 318000 Applicant after: Taizhou Youjiang Construction Technology Co.,Ltd. Address before: 310000 Room 101, unit 4, building 3, hemeijia, ningwei street, Xiaoshan District, Hangzhou City, Zhejiang Province Applicant before: Zhao Dongxin |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant |