CN108796412A - Facilitate the internal circulation method in the workshop and hanger that are recycled in galvanizing tooling hanger - Google Patents

Facilitate the internal circulation method in the workshop and hanger that are recycled in galvanizing tooling hanger Download PDF

Info

Publication number
CN108796412A
CN108796412A CN201810530586.0A CN201810530586A CN108796412A CN 108796412 A CN108796412 A CN 108796412A CN 201810530586 A CN201810530586 A CN 201810530586A CN 108796412 A CN108796412 A CN 108796412A
Authority
CN
China
Prior art keywords
hanger
station
double
closing
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810530586.0A
Other languages
Chinese (zh)
Other versions
CN108796412B (en
Inventor
戴海峰
李高峰
尚文端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Ruima Intelligent Technology Co ltd
Original Assignee
Xuzhou Ruima Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Ruima Intelligent Technology Co Ltd filed Critical Xuzhou Ruima Intelligent Technology Co Ltd
Priority to CN201810530586.0A priority Critical patent/CN108796412B/en
Publication of CN108796412A publication Critical patent/CN108796412A/en
Application granted granted Critical
Publication of CN108796412B publication Critical patent/CN108796412B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Intermediate Stations On Conveyors (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention discloses a kind of internal circulation methods in the workshop and hanger for facilitating and being recycled in galvanizing tooling hanger, corresponding pre-treatment bridging area, galvanizing area and post processing zone are respectively equipped with driving I, driving II, driving III above workshop ontology, it is equipped between closing in area between closing, inlet is equipped with double-station and feeds ground track vehicle between closing, outlet is equipped with double-station discharging ground track vehicle between closing, is equipped with boom hoisting between closing above area;The both ends that double-station feeds the bottom vehicle frame of ground track vehicle and double-station discharging ground track vehicle are equipped with walking support portion, and walking support portion includes storage box and bracket, and bracket is divided into heavily loaded station and unloaded station by the demarcation strip in the middle part of bracket surface.The present invention using between each process cooperation, realize using the transporting mode of backtracking galvanizing tooling hanger and recycled in the inside of zinc-plated workshop;It avoids and is transported between the long range of tooling hanger, standdle carrier, improve the turnover rate and production efficiency of hanger, decrease cost, reduce security risk.

Description

Facilitate the internal circulation method in the workshop and hanger that are recycled in galvanizing tooling hanger
Technical field
The present invention relates to a kind of workshop and the internal circulation method of hanger, specifically a kind of facilitate follows in galvanizing tooling hanger The workshop of ring and the internal circulation method of hanger.
Background technology
In discontinuous batch galvanizing processing treatment industry, to ensure the smooth implementation of galvanizing production, it usually needs make With the dedicated tooling hanger of galvanizing, workpiece to be processed is hung on tooling hanger and galvanizing is directly transferred by driving Region is handled.Because of the requirement of manufacturing cost and Reusability, need that tooling hanger is made constantly to follow in zinc-plated production process Ring in time transports empty tooling hanger back and hangs new workpiece to be processed.Tooling hanger is produced currently, industry generally uses The mode of line outer circulation, i.e. tooling hanger are used in zinc-plated workshop, then auxiliary by being added outside zinc-plated workshop It helps workshop to branch back to zinc-plated workshop to reuse, have the following defects in this manner:Tooling hanger need through Transhipment between long-distance, standdle carrier, backhaul distance is very long, turnover rate is very low;Since turnover rate is very low, production effect is directly reduced Rate;And the auxiliary shop added increases workshop construction cost input, and widened production area increases production management input Prodigious security risk is brought in cost, the region that backhaul distance is long, tooling hanger passes through compared with conference.
Invention content
In view of the above-mentioned problems of the prior art, facilitating in galvanizing tooling hanger the object of the present invention is to provide a kind of The workshop of cycle and the internal circulation method of hanger, the tooling hanger in workshop need not move through transhipment over long distances, between standdle carrier, can To promote turnover rate and production efficiency;And workshop can be reduced and build and manage input cost, reduce security risk.
To achieve the above object, the technical solution adopted by the present invention is:It is a kind of to facilitate cycle in galvanizing tooling hanger Workshop, including workshop ontology, the workshop ontology include area between the pre-treatment bridging area being sequentially arranged, closing, Galvanizing area and post processing zone, the workshop ontology top corresponding pre-treatment bridging area, galvanizing area and post-processing are distinguished She You not drive a vehicle I, driving II, driving III, be equipped between closing in area between the closing, inlet is equipped with double-station between the closing Ground track vehicle is fed, exit is equipped with double-station discharging ground track vehicle between closing, and is equipped with boom hoisting between closing above area;It is described double Station feeds ground track vehicle and the structure of double-station discharging ground track vehicle is identical, including bottom vehicle frame, the both ends pair of the bottom vehicle frame Claim to be equipped with walking support portion, each support portion of walking includes a storage box and a bracket, set side by side in the storage box there are two Ground running wheel, described two ground running wheels are in the same plane and axis is mutually parallel, and the bracket passes through support construction It is fixed on above storage box;The support construction includes support column and crossbeam, and the bottom end of the support column is fixed on storage box The top on surface, support column is fixed on the lower surface of crossbeam, and the bracket is mounted on crossbeam, and is equipped with and is divided in the middle part of bracket surface Bracket is divided into heavily loaded station arranged side by side and unloaded station by partition board, the demarcation strip.
Further, between the closing in be equipped with empty hanger area, the boom hoisting includes IV He of driving being set up in parallel Driving V.Empty hanger area facilitates being centrally placed for unloaded hanger, and driving V discharges unloaded hanger ground track vehicle from double-station Unloaded station is placed on after removing in sky hanger area, then is transferred to double-station by driving IV and is fed on the unloaded station of ground track vehicle, Finally it is transmitted back to the bridging again of pre-treatment bridging area.
Preferably, the workshop ontology is rectangle, and the both ends for driving a vehicle I, II, driving III of driving a vehicle are erected at life It produces on the track above the ontology of workshop.Such design facilitates construction, saves construction cost, and drive a vehicle I, driving II, driving III can share a track, whole more succinct.
Preferably, the ground running wheel is driven by direct current generator.Open direct current generator, the output shaft rotation of direct current generator The rotation of ground running wheel can be driven in ground running.
Further, in order to ensure that stability of strutting system, the support construction further include inclined shore bar, the inclined shore Bar one end is fixed on storage box upper surface, and the other end is fixed on the support columns.
The invention also discloses a kind of internal circulation methods of hanger, include the following steps:
A. it is loaded with the conveying of the tooling hanger of workpiece:
Become loading hanger after preceding processing bridging area hangs over workpiece to be processed on the hanging position of tooling hanger, at this time Double-station is placed on using I extraction loading hanger of driving to feed on the heavily loaded station of symmetrically arranged two brackets of ground track vehicle, driving I In lifting, suspension hook can directly hook the lifting lug of loading hanger and be lifted and be directly placed on two brackets, makes load The both ends of object hanger are respectively placed on the heavily loaded station of two brackets, and two brackets hold the loading extension for being hung with workpiece jointly Tool;
Double-station is fed between the loading hanger for being loaded with workpiece is delivered to closing by ground track vehicle, and what is be equipped with above area between closing rises Processing control operation before device for hoisting is completed by the hanged transfer of loading hanger and between closing, then it is placed into double-station discharging ground track vehicle Heavily loaded station be delivered to it is external between closing;While the heavily loaded station that loading hanger is fed to ground track vehicle from double-station is hanged Unloaded hanger in empty hanger area can be placed on its unloaded station, loading hanger is made double-station charging ground after hanged immediately The reversed backhaul of rail vehicle is unloaded unloaded hanger in preceding processing bridging area while being lifted again between new loading hanger is delivered to closing;
Driving II above galvanizing area will go out heavily loaded station of the loading hanger between closing from double-station discharging ground track vehicle After removing, through secondary impaling, galvanizing operation is carried out in galvanizing area;
Loading hanger is positioned over the Water-cooled work station between galvanizing area and post processing zone after galvanizing, will be carried by driving III Object hanger, which is hung, goes to post processing zone finishing processing;
B. the return trend of unloaded hanger:
Loading hanger becomes unloaded hanger after workpiece is unloaded in post processing zone, by unloaded hanger by driving III, driving II according to Secondary to hang the unloaded station for turning and being put in double-station discharging ground track vehicle, between going to closing by double-station discharging ground track vehicle, driving V will Unloaded hanger from double-station discharge ground track vehicle unloaded station remove after be placed in sky hanger area, then be transferred to by driving IV double Station is fed on the unloaded station of ground track vehicle;Unloaded hanger be delivered to by double-station charging ground track vehicle it is external between closing, by row Vehicle I is hanged spare to pre-treatment bridging area.
Compared with the existing technology, the present invention has following advantage:
(1) present invention realizes galvanizing tooling using the cooperation between each process, the transporting mode using backtracking Hanger is recycled in the inside of zinc-plated workshop;The tooling hanger for being loaded with workpiece is fulfiled assignment using equipment such as drivings, is conveyed After action, empty tooling hanger is directly brought back into initial position bridging again by double-station ground track vehicle in return stroke.Work Dress hanger directly returns in the production line, substantially reduces the backhaul distance of hanger, avoids long range, the standdle carrier of tooling hanger Between transport, improve the turnover rate of hanger, and then solve because of the problems such as having enough to meet the need under the low production efficiency brought not in time, improve Production efficiency;
(2) due to inside zinc-plated workshop can loop jump hanger, need not pass through auxiliary shop transfer hang Tool reduces because of the increased workshop construction cost input of the backhaul of tooling hanger;
(3) since whole production area is reduced, the input of production management is reduced on the whole;Reduce tooling hanger process Region, reduce because tooling hanger turn round to transport process the security risk brought by region;
(4) in the present invention due to double-station feed ground track vehicle and double-station discharging ground track vehicle all include heavily loaded station and The placement of unloaded work station and double working position, loading hanger and unloaded hanger does not influence between each other, and ground track vehicle is being fed from double-station Or in double-station discharging ground track vehicle the same time of hanged loading hanger unloaded hanger can be placed on its unloaded station, loading Hanger is made after hanged double-station charging ground track vehicle or double-station discharge the reversed backhaul of ground track vehicle immediately, to take full advantage of weight The time that the workpiece on hanger carries out galvanizing processing in workshop is carried, during workpiece carries out follow-up galvanizing processing just Unloaded hanger is transported back, the time is further saved, improves production efficiency.
Description of the drawings
Fig. 1 is the workshop integral layout structural schematic diagram of the present invention;
Fig. 2 is that loading hanger is hung the schematic diagram on bracket by the driving I in the present invention;
Fig. 3 is the left view of Fig. 2 middle rolling cars I;
Fig. 4 is the front view of the double-station charging ground track vehicle placement loading hanger (omitting workpiece to be processed) in the present invention;
Fig. 5 is the vertical view of Fig. 4;
Fig. 6 is the left view of Fig. 4;
Fig. 7 is that the double-station charging ground track vehicle in the present invention places loading hanger (omitting workpiece to be processed) and unloaded hanger Dimensional structure diagram;
In figure, 11. pre-treatment bridging areas, area between 12. closings, between 12-1. closings, 12-1a. sky hangers area, 13. galvanizings Area, 14. post processing zones, 20. tracks, 21. driving I, 21a. suspension hooks, 22-1. IV, 22-2. of driving drivings V, 23. drivings II, 24. driving III, 31. double-stations charging ground track vehicle, 32. double-stations discharging ground track vehicle,
100. bottom vehicle frame, 110. walking support portions, 111. storage boxes, 112. ground running wheels, 112-1. direct current generators, 113. bracket, 113-1. demarcation strips, 113a. heavy duty stations, 113b. zero load stations, 114. support columns, 115. crossbeams, 116. incline Inclined support bar, 210. loading hangers, 211. hanging positions, 212. lifting lugs, 220. unloaded hangers.
Specific implementation mode
Invention is further described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of facilitating the workshop recycled in galvanizing tooling hanger, including workshop ontology, the life Production workshop ontology includes area 12, galvanizing area 13 and post processing zone 14 between the pre-treatment bridging area 11 being sequentially arranged, closing, institute It states corresponding pre-treatment bridging area 11, galvanizing area 13 and post processing zone 14 above workshop ontology and is respectively equipped with driving I 21, row Vehicle II 23, driving III 24, equipped with 12-1 between closing in area 12 between the closing, the inlet 12-1 is equipped with double-station between the closing Ground track vehicle 31 is fed, exit is equipped with double-station discharging ground track vehicle 32 between closing, and 12 top of area is equipped with boom hoisting between closing; The structure of the double-station charging ground track vehicle 31 and double-station discharging ground track vehicle 32 is identical, as shown in Figures 4 to 7, including bottom The both ends of vehicle frame 100, the bottom vehicle frame 100 are arranged with walking support portion 110, and each support portion 110 of walking includes an appearance Case 111 and a bracket 113 are set, is set side by side in the storage box 111 there are two ground running wheel 112, described two ground runnings Wheel 112 is in the same plane and axis is mutually parallel, and the bracket 113 is fixed on 111 top of storage box by support construction;Institute It includes support column 114 and crossbeam 115 to state support construction, and the bottom end of the support column 114 is fixed on 111 upper surface of storage box, branch The top of dagger 114 is fixed on the lower surface of crossbeam 115, and the bracket 113 is mounted on crossbeam 115, and in 113 surface of bracket Portion is equipped with demarcation strip 113-1, the demarcation strip 113-1 and divides bracket 113 for heavily loaded station 113a arranged side by side and unloaded station 113b。
In specific production process, the tooling hanger conveying trend for being loaded with workpiece is as follows:
After preceding processing bridging area 11 hangs over workpiece (not shown) to be processed on the hanging position 211 of tooling hanger As loading hanger 210, it is symmetrically arranged that double-station charging ground track vehicle 31 is placed on by I 21 extraction loading hanger 210 of driving at this time On the heavily loaded station 113a of two brackets 113, it is specific as shown in Figures 2 and 3, in lifting, suspension hook 21a can be with for driving I 21 It directly hooks the lifting lug 212 of loading hanger 210 and is lifted and be directly placed on two brackets 113, make loading hanger 210 Both ends are respectively placed on the heavily loaded station 113a of two brackets 113, and two brackets 113 hold the loading extension for being hung with workpiece jointly Tool 210;The lifting method such as driving I 21 all can be used in other drivings in the present invention.
Double-station feeds ground track vehicle 31 and the loading hanger 210 for being loaded with workpiece is delivered to 12-1 between closing together, between closing The boom hoisting that 12 top of area is equipped with handles control operation before 12-1 is completed by the hanged transfer of loading hanger 210 and between closing, The heavily loaded station 113a for being placed into double-station discharging ground track vehicle 32 again is delivered between closing outside 12-1;
Drive a vehicle II 23 by go out closing between 12-1 loading hanger 210 by double-station discharge ground track vehicle 32 heavily loaded station 113a After removing, through secondary impaling, galvanizing operation is carried out in galvanizing area 13;
Loading hanger 210 is positioned over the Water-cooled work station between galvanizing area 13 and post processing zone 14 after galvanizing, by going Vehicle III 24, which hangs loading hanger 210, goes to post processing zone 14 finishing processing.
The return of unloaded hanger is moved towards:
Loading hanger 210 becomes unloaded hanger 220 after workpiece is unloaded in post processing zone 14, by unloaded hanger 220 by driving a vehicle III 24, the unloaded station 113b for turning and being put in double-station discharging ground track vehicle 32 is hung in driving II 23 successively, is discharged track by double-station Vehicle 32 goes to 12-1 between closing, and the boom hoisting being equipped with by 12 top of area between closing is transferred to double-station and feeds ground track vehicle 31 On unloaded station 113b;It is delivered to by double-station charging ground track vehicle 31 between closing outside 12-1, by I 21 hanged to preceding places of driving It is spare to manage bridging area 11.
All include in the present invention heavily loaded station since double-station feeds ground track vehicle 31 and double-station discharging ground track vehicle 32 113a and unloaded station 113b double-stations, the placement of loading hanger 210 and unloaded hanger 220 do not influence between each other, from The same time that double-station feeds hanged loading hanger 210 in ground track vehicle 31 or double-station discharging ground track vehicle 32 can hang zero load Tool 220 is placed on its unloaded station 113b, and loading hanger 210 is made double-station charging ground track vehicle 31 or double-station after hanged immediately Discharge 32 reversed backhaul of ground track vehicle, to achieve the purpose that improving production efficiency.
Further, empty hanger area 12-1a is equipped between the closing in 12-1, the boom hoisting includes being set up in parallel Drive a vehicle V 22-2 of IV 22-1 and driving.Unloaded hanger 220 can be centrally placed by empty hanger area 12-1a, and V 22-2 of driving will be empty It carries after hanger 220 is removed from the unloaded station 113b of double-station discharging ground track vehicle 32 and is placed in sky hanger area 12-1a, then by going IV 22-1 of vehicle is transferred on the unloaded station 113b of double-station charging ground track vehicle 31, is finally transmitted back to 11 weight of pre-treatment bridging area New bridging.
Preferably, the workshop ontology is rectangle, two end-rack of drive a vehicle I 21, the driving II 22, driving III 23 It is located on the track 20 above workshop ontology.Such design facilitates construction, saves construction cost, and I 21, row of driving a vehicle Vehicle II 22, driving III 23 can share a track 20, whole more succinct.
Preferably, the ground running wheel 112 is driven by direct current generator 112-1.Open direct current generator 112-1, direct current The output shaft rotation of machine 112-1 can drive ground running wheel 112 to rotate in ground running.
Further, in order to ensure that stability of strutting system, the support construction further include inclined shore bar 116, the inclination 116 one end of supporting rod is fixed on 111 upper surface of storage box, and the other end is fixed on support column 114.

Claims (6)

  1. Facilitate the workshop recycled in galvanizing tooling hanger, including workshop ontology 1. a kind of, in the workshop ontology Including be sequentially arranged pre-treatment bridging area (11), closing between area (12), galvanizing area (13) and post processing zone (14), feature It is, corresponding pre-treatment bridging area (11), galvanizing area (13) and post processing zone (14) difference above the workshop ontology Equipped with I (21) of driving, II (23) of driving, III (24) of driving, equipped with (12-1) between closing, the envelope in area (12) between the closing The inlet (12-1) is equipped with double-station charging ground track vehicle (31) between closing, and exit is equipped with double-station discharging ground track vehicle between closing (32), boom hoisting and between closing is equipped with above area (12);The double-station charging ground track vehicle (31) and double-station discharging track The structure of vehicle (32) is identical, including bottom vehicle frame (100), and the both ends of the bottom vehicle frame (100) are arranged with walking support portion (110), each walking support portion (110) includes a storage box (111) and a bracket (113), in the storage box (111) side by side If there are two ground running wheels (112), described two ground running wheels (112) are in the same plane and axis is mutually parallel, institute Bracket (113) is stated to be fixed on above storage box (111) by support construction;The support construction includes support column (114) and cross The bottom end of beam (115), the support column (114) is fixed on storage box (111) upper surface, and the top of support column (114) is fixed on The lower surface of crossbeam (115), the bracket (113) are mounted on crossbeam (115), and bracket (113) surface middle part is equipped with and separates Bracket (113) is divided into heavily loaded station (113a) arranged side by side and unloaded station by plate (113-1), the demarcation strip (113-1) (113b)。
  2. 2. according to claim 1 facilitate the workshop recycled in galvanizing tooling hanger, which is characterized in that between the closing Empty hanger area (12-1a) is equipped in (12-1), the boom hoisting includes the driving IV (22-1) being set up in parallel and driving V (22-2)。
  3. 3. according to claim 1 facilitate the workshop recycled in galvanizing tooling hanger, which is characterized in that the production vehicle Between ontology be rectangle, it is described driving I (21), driving II (22), drive a vehicle III (23) both ends be erected on workshop ontology On the track (20) of side.
  4. 4. according to claim 1 facilitate the workshop recycled in galvanizing tooling hanger, which is characterized in that the ground row Wheel (112) is walked to be driven by direct current generator (112-1).
  5. 5. according to claim 1 facilitate the workshop recycled in galvanizing tooling hanger, which is characterized in that the support knot Structure further includes inclined shore bar (116), and described inclined shore bar (116) one end is fixed on storage box (111) upper surface, the other end It is fixed on support column (114).
  6. 6. a kind of internal circulation method of hanger, which is characterized in that include the following steps:
    A. it is loaded with the conveying of the tooling hanger of workpiece:
    Become loading hanger after preceding processing bridging area (11) hangs over workpiece to be processed on the hanging position (211) of tooling hanger (210), double-station charging ground track vehicle (31) symmetrically arranged two is placed on using driving I (21) extraction loading hanger (210) at this time On the heavily loaded station (113a) of a bracket (113), for I (21) of driving in lifting, suspension hook (21a) can directly hook loading extension Have the lifting lug (212) of (210) and is lifted the both ends point for being directly placed on two brackets (113), making loading hanger (210) It is not placed on the heavily loaded station (113a) of two brackets (113), two brackets (113) hold the loading extension for being hung with workpiece jointly Have (210);
    Double-station charging ground track vehicle (31) by the loading hanger (210) for being loaded with workpiece be delivered to closing between (12-1), area between closing (12) by the hanged transfer of loading hanger (210) and between closing, (12-1) completes pre-treatment control work to the boom hoisting that top is equipped with Industry, then be placed into double-station discharging ground track vehicle (32) heavily loaded station (113a) be delivered to closing between (12-1) it is external;It will carry The heavily loaded station (113a) of object hanger (210) from double-station charging ground track vehicle (31) can be by empty hanger area (12- while hanged Unloaded hanger (220) in 1a) is placed on its unloaded station (113b), and loading hanger (210) is made double-station after hanged immediately Ground track vehicle (31) reversed backhaul is fed, unloaded hanger (220) is unloaded in preceding processing bridging area (11) while lifting new load again Object hanger (210) is delivered between closing (12-1);
    The loading hanger (210) that driving II (23) above galvanizing area (13) will go out (12-1) between closing discharges ground from double-station After the heavily loaded station (113a) of rail vehicle (32) is removed, through secondary impaling, galvanizing operation is carried out in galvanizing area (13);
    Loading hanger (210) is positioned over the Water-cooled work station between galvanizing area (13) and post processing zone (14) after galvanizing, by Loading hanger (210) is hung in III (24) of driving goes to post processing zone (14) finishing processing;
    B. the return trend of unloaded hanger:
    Loading hanger (210) becomes unloaded hanger (220) after post processing zone (14) unload workpiece, by unloaded hanger (220) by The unloaded station (113b) for turning and being put in double-station discharging ground track vehicle (32) is hung in III (24) of driving, II (23) of driving successively, by double Station discharging ground track vehicle (32) is gone between closing (12-1), and unloaded hanger (220) is discharged ground by V (22-2) of driving from double-station The unloaded station (113b) of rail vehicle (32) is placed on after removing in sky hanger area (12-1a), then is transferred to by IV (22-1) that drive a vehicle Double-station is fed on the unloaded station (113b) of ground track vehicle (31);Unloaded hanger (220) is defeated by double-station charging ground track vehicle (31) It send to the outside (12-1) between closing, it is hanged spare to pre-treatment bridging area (11) by I (21) of driving.
CN201810530586.0A 2018-05-29 2018-05-29 Workshop convenient for internal circulation of hot galvanizing tooling hanger and internal circulation method of hanger Active CN108796412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810530586.0A CN108796412B (en) 2018-05-29 2018-05-29 Workshop convenient for internal circulation of hot galvanizing tooling hanger and internal circulation method of hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810530586.0A CN108796412B (en) 2018-05-29 2018-05-29 Workshop convenient for internal circulation of hot galvanizing tooling hanger and internal circulation method of hanger

Publications (2)

Publication Number Publication Date
CN108796412A true CN108796412A (en) 2018-11-13
CN108796412B CN108796412B (en) 2024-03-08

Family

ID=64090764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810530586.0A Active CN108796412B (en) 2018-05-29 2018-05-29 Workshop convenient for internal circulation of hot galvanizing tooling hanger and internal circulation method of hanger

Country Status (1)

Country Link
CN (1) CN108796412B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110938792A (en) * 2019-12-31 2020-03-31 杭州华佳标准件有限公司 Hot galvanizing treatment device
CN112251693A (en) * 2020-09-08 2021-01-22 徐州瑞马智能技术有限公司 Vertical blowing type hot galvanizing device for foundation bolts only plated in partial length
CN114561609A (en) * 2022-03-08 2022-05-31 徐州瑞马智能技术有限公司 Automatic logistics device capable of automatically returning suspenders for steel pipe hot galvanizing pretreatment
CN115247245A (en) * 2021-11-05 2022-10-28 徐州瑞马智能技术有限公司 Automatic hanging device that trades of material is washed in steel pipe pretreatment
CN115725919A (en) * 2021-09-01 2023-03-03 常熟风范电力设备股份有限公司 Method for controlling zinc in acid-containing wastewater in workpiece hot galvanizing process

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB163051A (en) * 1920-05-11 1922-06-01 Paskal Pacciani Improvements in galvanizing apparatus
FR1225216A (en) * 1959-04-30 1960-06-29 Riedel & Co Lifting and transport device for supporting frames of galvanizing plants operating automatically
GB854712A (en) * 1957-12-06 1960-11-23 Udylite Res Corp Improvements relating to work handling apparatus for use with plating machines
DE2329249A1 (en) * 1973-06-08 1975-01-02 Koerner Kg Walter Rotating hoists for hot-galvanising - using two power-driven arms and air-cylinders as hoists
CN201436535U (en) * 2008-12-22 2010-04-07 中国汽车工业工程公司 Sand core storage 3D warehouse and conveying device
CN103600969A (en) * 2013-11-08 2014-02-26 国家电网公司 Method for optimizing connection of workpiece detection flow line by aid of transfer cases which are used as carriers
CN106244964A (en) * 2016-08-29 2016-12-21 海盐宝利机械有限公司 Galvanizing continuous process system
CN107557708A (en) * 2017-10-13 2018-01-09 徐州瑞马科宝自动化技术有限公司 A kind of closed loop galvanization production line and control method
CN107572450A (en) * 2017-09-25 2018-01-12 沈阳蓝英工业自动化装备股份有限公司 A kind of high-speed buck stacker for half steel fetus storehouse
KR101819165B1 (en) * 2016-11-30 2018-01-17 (주)영진산업 Zinc hot-dip galvanizing plating automatic apparatus and method using thereof for fastener
CN207258687U (en) * 2017-09-11 2018-04-20 昆山安拓达自动化技术有限公司 A kind of carrier return-flow structure
CN208532908U (en) * 2018-05-29 2019-02-22 徐州瑞马智能技术有限公司 Facilitate the workshop recycled in hot galvanizing tooling hanger

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB163051A (en) * 1920-05-11 1922-06-01 Paskal Pacciani Improvements in galvanizing apparatus
GB854712A (en) * 1957-12-06 1960-11-23 Udylite Res Corp Improvements relating to work handling apparatus for use with plating machines
FR1225216A (en) * 1959-04-30 1960-06-29 Riedel & Co Lifting and transport device for supporting frames of galvanizing plants operating automatically
DE2329249A1 (en) * 1973-06-08 1975-01-02 Koerner Kg Walter Rotating hoists for hot-galvanising - using two power-driven arms and air-cylinders as hoists
CN201436535U (en) * 2008-12-22 2010-04-07 中国汽车工业工程公司 Sand core storage 3D warehouse and conveying device
CN103600969A (en) * 2013-11-08 2014-02-26 国家电网公司 Method for optimizing connection of workpiece detection flow line by aid of transfer cases which are used as carriers
CN106244964A (en) * 2016-08-29 2016-12-21 海盐宝利机械有限公司 Galvanizing continuous process system
KR101819165B1 (en) * 2016-11-30 2018-01-17 (주)영진산업 Zinc hot-dip galvanizing plating automatic apparatus and method using thereof for fastener
CN207258687U (en) * 2017-09-11 2018-04-20 昆山安拓达自动化技术有限公司 A kind of carrier return-flow structure
CN107572450A (en) * 2017-09-25 2018-01-12 沈阳蓝英工业自动化装备股份有限公司 A kind of high-speed buck stacker for half steel fetus storehouse
CN107557708A (en) * 2017-10-13 2018-01-09 徐州瑞马科宝自动化技术有限公司 A kind of closed loop galvanization production line and control method
CN208532908U (en) * 2018-05-29 2019-02-22 徐州瑞马智能技术有限公司 Facilitate the workshop recycled in hot galvanizing tooling hanger

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110938792A (en) * 2019-12-31 2020-03-31 杭州华佳标准件有限公司 Hot galvanizing treatment device
CN110938792B (en) * 2019-12-31 2024-05-17 杭州华佳标准件有限公司 Hot galvanizing treatment device
CN112251693A (en) * 2020-09-08 2021-01-22 徐州瑞马智能技术有限公司 Vertical blowing type hot galvanizing device for foundation bolts only plated in partial length
CN112251693B (en) * 2020-09-08 2023-09-01 徐州瑞马智能技术有限公司 Perpendicular blowing type hot galvanizing device for foundation bolt with only part of length being plated
CN115725919A (en) * 2021-09-01 2023-03-03 常熟风范电力设备股份有限公司 Method for controlling zinc in acid-containing wastewater in workpiece hot galvanizing process
CN115247245A (en) * 2021-11-05 2022-10-28 徐州瑞马智能技术有限公司 Automatic hanging device that trades of material is washed in steel pipe pretreatment
CN115247245B (en) * 2021-11-05 2024-02-02 徐州瑞马智能技术有限公司 Automatic hanging device that trades of steel pipe preliminary treatment material of washing
CN114561609A (en) * 2022-03-08 2022-05-31 徐州瑞马智能技术有限公司 Automatic logistics device capable of automatically returning suspenders for steel pipe hot galvanizing pretreatment

Also Published As

Publication number Publication date
CN108796412B (en) 2024-03-08

Similar Documents

Publication Publication Date Title
CN108796412A (en) Facilitate the internal circulation method in the workshop and hanger that are recycled in galvanizing tooling hanger
CN105174072B (en) Solve handling method and the gantry crane that automated container terminal AGV mutually waits with gantry crane
CN105292980B (en) A kind of induction system and its suspender, conveying device
CN208532908U (en) Facilitate the workshop recycled in hot galvanizing tooling hanger
CN207479012U (en) A kind of double sheets sorting device
CN206665478U (en) Hang inventory management system
CN113697453A (en) Polar plate conveying system
CN108045826A (en) A kind of Material Sorting system and Material Sorting method
CN206255506U (en) A kind of Z-type continuous hoist
CN108341206A (en) A kind of coil of strip transport system
CN105712023A (en) Wall and floor brick warehousing system convenient for realizing automatic storage and taking
CN112371410B (en) Mixed flow coating line and mixed flow coating method for standard compartment and van vehicle
CN104828100A (en) Rail type flat transporting vehicle for rail construction
US2048938A (en) Elevator for conveyer systems
US3887094A (en) Conveyance of electrodes for electrolytic cells in electrorefining
CN105501921A (en) Conveying system capable of automatically dumping rubber blocks and conveying method thereof
CN105290976A (en) Movable roller hoisting continuous or intermittent shot blasting cleaning production line
CN108128612B (en) Novel mixed material conveying system for automatic casting polishing and application method thereof
CN206494974U (en) A kind of anode carbon block depot
CN108163679A (en) A kind of heavy vertical lift plane conveying reciprocation cycle all-in-one machine
CN210557379U (en) Carrier convenient for loading and unloading
CN207811791U (en) A kind of electric arc furnaces steel scrap stock ground automatical feeding system
CN103407748B (en) Material coating automatic transporting line lifting appliance idle station returning technological method
CN208531485U (en) The double-station ground track vehicle for facilitating hot galvanizing workshop workpiece and hanger to transport
CN202704356U (en) Intelligent physical distribution loading and unloading transport system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 35 Chuangye Road, Economic and Technological Development Zone, Xuzhou City, Jiangsu Province, 221122

Patentee after: Xuzhou Ruima Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: 221000 Qianwang Village, Daneneneba Huangshan Sub district Office, Xuzhou Economic and Technological Development Zone, Xuzhou City, Jiangsu Province

Patentee before: XUZHOU REMARKABLE INTELLIGENT TECHNOLOGY CO.,LTD.

Country or region before: China

CP03 Change of name, title or address