CN108756195A - Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it - Google Patents
Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it Download PDFInfo
- Publication number
- CN108756195A CN108756195A CN201810610100.4A CN201810610100A CN108756195A CN 108756195 A CN108756195 A CN 108756195A CN 201810610100 A CN201810610100 A CN 201810610100A CN 108756195 A CN108756195 A CN 108756195A
- Authority
- CN
- China
- Prior art keywords
- hanging
- scaffold
- stones
- laying bricks
- build
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
Hanging-connecting scaffold of the present invention and the method for building anode carbon block roaster by laying bricks or stones with it belong to scaffold and anode carbon block roaster building technical field;Technical problem to be solved is convenient, fast to set up, and steel pipe dosage is small;The technical solution used for:Hanging-connecting scaffold, two horizontal steel pipes of support are arranged in parallel, and the both ends of two horizontal steel pipes of support are inserted at the horizontal connection end of four reinforcing bars hook respectively, and across being overlapped on two horizontal steel pipes of support, multiple scaffold boards are laid on flitch more flitches;The method for building anode carbon block roaster by laying bricks or stones, it is the first step, levelling with castable in civil engineering transition face;Second step, unwrapping wire build bottom brick;Third step, unwrapping wire, build the side wall of surrounding;4th step, unwrapping wire build cross wall and flue wall;5th step, furnace roof installation;6th step, other conveyance systems build by laying bricks or stones, install;In 4th step, hanging-connecting scaffold is hung over and builds flue wall by laying bricks or stones on the cross wall of both sides;The present invention is highly suitable for building anode carbon block roaster by laying bricks or stones.
Description
Technical field
Hanging-connecting scaffold of the present invention and the method for building anode carbon block roaster by laying bricks or stones with it, belong to scaffold and anode carbon block
Roaster building technical field.
Background technology
Anode carbon block the more does the more big with the development of electrolytic cell, and the volume of anode carbon block roaster is also with increase.Roasting
The problems in stove building process is also more and more prominent, and especially roaster cross wall and flue wall is built by laying bricks or stones, cross wall and flue wall
Height will generally be built to 6 meters or so, and traditional method is always to set up conventional scaffold according to standard in hopper space, then
Spread scaffold board, it is many with steel pipe amount, in addition, due to hopper narrow space, generally only 800mm wide, set up scaffold also compared with
For difficulty, and steel pipe must be blocked to adapt to the size of hopper width, generally 750mm or so, steel pipe loss is larger.
Invention content
It is to provide one kind to set up conveniently, soon that the present invention, which overcomes the shortcomings of the prior art, technical problem to be solved,
The method that victory small hanging-connecting scaffold at steel pipe dosage and builds anode carbon block roaster by laying bricks or stones with it.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:Hanging-connecting scaffold, including reinforcing bar are hung
Hook, the horizontal steel pipe of support, flitch and scaffold board, it is hook end that reinforcing bar, which links up with one end, and the other end is horizontal connection end, and two supports are horizontal
Steel pipe is arranged in parallel, and the both ends of two horizontal steel pipes of support, more flitch cross are inserted into the horizontal connection end of four reinforcing bars hook respectively
Across being overlapped on two horizontal steel pipes of support, multiple scaffold boards are laid on flitch.
Angle between the flitch and the horizontal steel pipe of support is 30 ° -90 °.
The stage casing of the horizontal steel pipe of two supports is supported by one or more intermediate support beams.
The structure of the intermediate support beam is:By more hyphen fastener for connection, two perpendicular steel pipes point between two perpendicular steel pipes
Not Wei Yu two horizontal steel pipes of support both sides, wherein a hyphen steel pipe support lives two horizontal steel pipes of support.
It is additionally provided with inclined support bar between two perpendicular steel pipes.
Described two support between horizontal steel pipes and two perpendicular steel pipes, between more hyphen steel pipes and two perpendicular steel pipes by buckleing
Part is attached.
The method for building anode carbon block roaster by laying bricks or stones with hanging-connecting scaffold carries out as follows:
It is the first step, levelling with castable in civil engineering transition face;
Second step, unwrapping wire build bottom brick;
Third step, unwrapping wire, build the side wall of surrounding;
4th step, unwrapping wire build cross wall and flue wall;
5th step, furnace roof installation;
6th step, other conveyance systems build by laying bricks or stones, install;
In 4th step, when cross wall and flue wall are built by laying bricks or stones when needing to build scaffold, at this point, cross wall should be higher than flue wall,
It will integrally be hung in each hopper in external mounted multiple hanging-connecting scaffolds, the reinforcing bar hook mounting of hanging-connecting scaffold
On cross wall, adjustment intermediate support beam makes its support ground, and then worker station continues to build flue wall, quirk by laying bricks or stones on hanging-connecting scaffold
After wall builds height, worker leaves hanging-connecting scaffold, and hanging-connecting scaffold is integrally hung out hopper, continues to build cross wall by laying bricks or stones, cross wall is built
Gao Hou, then hanging-connecting scaffold is hung in into hopper, it builds flue wall by laying bricks or stones, so recycles, until cross wall and flue wall build rule by laying bricks or stones
Fixed height.
In 4th step, flitch can will be removed when external mounted hanging-connecting scaffold is integrally hung in hopper
And scaffold board re-lays flitch and scaffold board after mounting and adjusting is good in hopper in hanging-connecting scaffold.
In 4th step, when hanging-connecting scaffold is hung in hopper, lateral separation is hung in, and worker is in a hanging-connecting
Build the flue wall of both sides on scaffold by laying bricks or stones simultaneously.
The present invention has the advantages that compared with prior art.
Hanging-connecting scaffold in the present invention, it is innovative to use reinforcing bar hook, it is built traditional from low to high
Scaffold becomes that the scaffold aloft constructed can be mounted, and has saved steel pipe dosage, and is especially suitable for anode carbon block roasting
When stove builds cross wall and flue wall by laying bricks or stones the case where narrow space, takes and tear open convenient and efficient, convenient for integral hoisting and set up.
Description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural schematic diagram of hanging-connecting scaffold in the present invention.
Fig. 2 is that hanging-connecting scaffold removes the structural schematic diagram after scaffold board in the present invention
Fig. 3 is that hanging-connecting scaffold installs the schematic diagram after anode carbon block roaster.
In figure:1 links up with for reinforcing bar, and 2 is support horizontal steel pipe, and 3 be flitch, and 4 be scaffold board, and 5 be intermediate support beam, and 6 be perpendicular
Steel pipe, 7 be hyphen steel pipe, and 8 be inclined support bar, and 9 be cross wall, and 10 be flue wall, and 11 be hopper.
Specific implementation mode
As shown in Figure 1 and Figure 2, hanging-connecting scaffold of the present invention, including reinforcing bar hook 1, the horizontal steel pipe 2 of support, flitch 3 and foot
Palm 4, which is characterized in that it is hook end that reinforcing bar, which links up with 1 one end, and the other end is horizontal connection end, and two horizontal steel pipes 2 of support are parallel
Two both ends for supporting horizontal steel pipe 2 are inserted at the horizontal connection end of setting, four reinforcing bar hooks 1 respectively, and more flitches 3 are across overlap joint
It is supported on horizontal steel pipe 2 at two, multiple scaffold boards 4 are laid on flitch 3.
Angle between the flitch 3 and the horizontal steel pipe of support 2 is 30 ° -90 °.
Described two support the stage casing of horizontal steel pipe 2 to be supported by one or more intermediate support beams 5.
The structure of the intermediate support beam 5 is:It is connected by more hyphen steel pipes 7 between two perpendicular steel pipes 6, two perpendicular steel pipes
6 are located at two both sides for supporting horizontal steel pipe 2, wherein a hyphen steel pipe 7, which supports two, supports horizontal steel pipe 2.
It is additionally provided with inclined support bar 8 between two perpendicular steel pipes 6.
Described two support between horizontal steel pipes 2 and two perpendicular steel pipes 6, between more hyphen steel pipes 7 and two perpendicular steel pipes 6
It is attached by fastener.
As shown in figure 3, the method that the present invention builds anode carbon block roaster by laying bricks or stones with hanging-connecting scaffold, as follows into
Row:
It is the first step, levelling with castable in civil engineering transition face;
Second step, unwrapping wire build bottom brick;
Third step, unwrapping wire, build the side wall of surrounding;
4th step, unwrapping wire build cross wall 9 and flue wall 10;
5th step, furnace roof installation;
6th step, other conveyance systems build by laying bricks or stones, install;
In 4th step, when cross wall 9 and flue wall 10 are built by laying bricks or stones when needing to build scaffold, at this point, cross wall 9 should compare flue wall
10 is high, will integrally be hung in each hopper 11 in external mounted multiple hanging-connecting scaffolds, the reinforcing bar of hanging-connecting scaffold
Hook 1 is articulated on cross wall 9, and adjustment intermediate support beam 5 makes its support ground, and then worker station continues to build by laying bricks or stones on hanging-connecting scaffold
Flue wall 10, after flue wall 10 builds height, worker leaves hanging-connecting scaffold, and hanging-connecting scaffold is integrally hung out hopper 11, after
It is continuous to build cross wall 9 by laying bricks or stones, after cross wall 9 builds height, then hanging-connecting scaffold hung in into hopper 11, builds flue wall 10 by laying bricks or stones, so recycle, until
Cross wall 9 and flue wall 10 build specified altitude by laying bricks or stones.
In 4th step, wood can will be removed when external mounted hanging-connecting scaffold is integrally hung in hopper 11
Side 3 and scaffold board 4 re-lay flitch 3 and scaffold board 4 after mounting and adjusting is good in hopper 11 in hanging-connecting scaffold.
In 4th step, when hanging-connecting scaffold is hung in hopper 11, lateral separation is hung in, and worker mounts at one
Build the flue wall 10 of both sides on formula scaffold by laying bricks or stones simultaneously.
The building by laying bricks or stones of other conveyance systems is installed to be interspersed in the first step to the 5th step and is carried out.
When building anode carbon block roaster by laying bricks or stones, to prevent reinforcing bar from linking up with the brick of Le Huai cross walls top layers, can on cross wall reinforcing bar
Underlay lastblock brick is linked up with, withdraws when scaffold builds cross wall by laying bricks or stones and removes the brick of pad.
The embodiment of the present invention is explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations
Example, within the knowledge of a person skilled in the art, can also make without departing from the purpose of the present invention
Go out various change.Such as in building the 4th step of method of anode carbon block roaster by laying bricks or stones with hanging-connecting scaffold, due to the extension used
Formula scaffold and little is connect, overall weight is also little, and is all detachably connected, so, it can also be dismantled by worker
It is artificial afterwards to carry and assemble.
Claims (9)
1. hanging-connecting scaffold, including reinforcing bar hook(1), the horizontal steel pipe of support(2), flitch(3)And scaffold board(4), feature exists
In reinforcing bar hook(1)One end is hook end, and the other end is horizontal connection end, two horizontal steel pipes of support(2)It is arranged in parallel, four
Reinforcing bar is linked up with(1)Horizontal connection end be inserted into two horizontal steel pipes of support respectively(2)Both ends, more flitches(3)Across being overlapped on
Two horizontal steel pipes of support(2)On, multiple scaffold boards(4)It is laid on flitch(3)On.
2. hanging-connecting scaffold according to claim 1, it is characterised in that:The flitch(3)With the horizontal steel pipe of support(2)It
Between angle be 30 ° -90 °.
3. hanging-connecting scaffold according to claim 1, it is characterised in that:The horizontal steel pipe of two supports(2)Stage casing
By one or more intermediate support beams(5)Support.
4. hanging-connecting scaffold according to claim 3, it is characterised in that:The intermediate support beam(5)Structure be:Two
Root erects steel pipe(6)Between by more hyphen steel pipes(7)Connection, two perpendicular steel pipes(6)It is located at two horizontal steel pipes of support(2)'s
Both sides, wherein a hyphen steel pipe(7)Support two horizontal steel pipes of support(2).
5. hanging-connecting scaffold according to claim 4, it is characterised in that:Two perpendicular steel pipes(6)Between also set up
There is inclined support bar(8).
6. hanging-connecting scaffold according to claim 4 or 5, it is characterised in that:The horizontal steel pipe of two supports(2)With two
Root erects steel pipe(6)Between, more hyphen steel pipes(7)With two perpendicular steel pipes(6)Between be attached by fastener.
7. the method for building anode carbon block roaster by laying bricks or stones with the hanging-connecting scaffold as described in claim 1-5 any one, special
Sign is to carry out as follows:
It is the first step, levelling with castable in civil engineering transition face;
Second step, unwrapping wire build bottom brick;
Third step, unwrapping wire, build the side wall of surrounding;
4th step, unwrapping wire build cross wall(9)And flue wall(10);
5th step, furnace roof installation;
6th step, other conveyance systems build by laying bricks or stones, install;
In 4th step, work as cross wall(9)And flue wall(10)It builds by laying bricks or stones when needing to build scaffold, at this point, cross wall(9)Should compare
Flue wall(10)Height will integrally hang in each hopper in external mounted multiple hanging-connecting scaffolds(11)It is interior, hanging-connecting foot
The reinforcing bar of hand cradle is linked up with(1)It is articulated in cross wall(9)On, adjust intermediate support beam(5)Make its support ground, then worker station is in hanging-connecting
Continue to build flue wall by laying bricks or stones on scaffold(10), flue wall(10)After building height, worker leaves hanging-connecting scaffold, by hanging-connecting foot hand
Frame integrally hangs out hopper(11), continue to build cross wall by laying bricks or stones(9), cross wall(9)Build it is high after, then hanging-connecting scaffold hung in into hopper
(11), build flue wall by laying bricks or stones(10), so recycle, until cross wall(9)And flue wall(10)Build specified altitude by laying bricks or stones.
8. the method for building anode carbon block roaster by laying bricks or stones with hanging-connecting scaffold as claimed in claim 7, it is characterised in that:It is described
In 4th step, hopper will be integrally hung in external mounted hanging-connecting scaffold(11)When interior, flitch is removed(3)And scaffold board
(4), in hanging-connecting scaffold in hopper(11)After interior mounting and adjusting is good, flitch is re-layed(3)And scaffold board(4).
9. the method for building anode carbon block roaster by laying bricks or stones with hanging-connecting scaffold as claimed in claim 7 or 8, it is characterised in that:
In 4th step, hanging-connecting scaffold is hung in into hopper(11)When middle, lateral separation is hung in, and worker is in a hanging-connecting foot hand
Build the flue wall of both sides on frame by laying bricks or stones simultaneously(10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810610100.4A CN108756195A (en) | 2018-06-13 | 2018-06-13 | Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810610100.4A CN108756195A (en) | 2018-06-13 | 2018-06-13 | Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108756195A true CN108756195A (en) | 2018-11-06 |
Family
ID=64021700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810610100.4A Pending CN108756195A (en) | 2018-06-13 | 2018-06-13 | Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108756195A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204960269U (en) * | 2015-06-29 | 2016-01-13 | 陆军 | Integral pylon |
CN205027124U (en) * | 2015-09-28 | 2016-02-10 | 中国二冶集团有限公司 | Ann tears convenient foot hand tool open |
CN107642225A (en) * | 2017-09-21 | 2018-01-30 | 广西壮族自治区冶金建设公司 | A kind of hanging scaffold and its assembly and method for dismounting |
CN108019034A (en) * | 2017-11-27 | 2018-05-11 | 中国二冶集团有限公司 | Carbon baking furnace flame path wall foot hand stent erection method |
CN108118883A (en) * | 2016-11-29 | 2018-06-05 | 五冶集团上海有限公司 | A kind of hanging cage frame for high-altitude large volume flue babinet heat preservation construction |
-
2018
- 2018-06-13 CN CN201810610100.4A patent/CN108756195A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204960269U (en) * | 2015-06-29 | 2016-01-13 | 陆军 | Integral pylon |
CN205027124U (en) * | 2015-09-28 | 2016-02-10 | 中国二冶集团有限公司 | Ann tears convenient foot hand tool open |
CN108118883A (en) * | 2016-11-29 | 2018-06-05 | 五冶集团上海有限公司 | A kind of hanging cage frame for high-altitude large volume flue babinet heat preservation construction |
CN107642225A (en) * | 2017-09-21 | 2018-01-30 | 广西壮族自治区冶金建设公司 | A kind of hanging scaffold and its assembly and method for dismounting |
CN108019034A (en) * | 2017-11-27 | 2018-05-11 | 中国二冶集团有限公司 | Carbon baking furnace flame path wall foot hand stent erection method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649325B (en) | The adjustable tripod support system of assembly concrete shear wall structure and method | |
CN107558723B (en) | Method for manufacturing and installing hanging bracket of hanging basket for inclined roof | |
CN101397844B (en) | Construction method of special section steel concrete composite structure inclined wall mould base engineering | |
CN105484502A (en) | Combination installation method for steel structure roofing purlins and support bars of industrial factory building | |
CN102108784B (en) | Special attached lifting scaffold | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN205477339U (en) | A cage ladder that is used for steel construction factory building shingle nail to install | |
CN205314519U (en) | High altitude operation platform based on truss | |
CN111663758A (en) | Suspended scaffold and construction method | |
CN210857774U (en) | Roof light framework plate installation device | |
CN108756195A (en) | Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it | |
CN209568688U (en) | A kind of elevating construction platform | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN207878907U (en) | Elevator shaft operating platform | |
CN108708541A (en) | A kind of suspension platform and its construction method for skybridge construction | |
CN104878933A (en) | Construction method for setting up over roof curtain wall hanging basket support scaffolding | |
CN204282788U (en) | Assembled fixed scaffold | |
CN207878893U (en) | Springboard platform frame structure | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN208123629U (en) | Outdoor overhead lifting pipeline equipment | |
CN207226943U (en) | A kind of double crossbeam synchronous hoisting devices | |
CN201991206U (en) | Irregularly-shaped attached lifting scaffold | |
CN205894662U (en) | Modular triangle steel truss template | |
CN215055177U (en) | Protection dress is built to irregular facade building scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |