CN102108784B - Special attached lifting scaffold - Google Patents

Special attached lifting scaffold Download PDF

Info

Publication number
CN102108784B
CN102108784B CN2011100651564A CN201110065156A CN102108784B CN 102108784 B CN102108784 B CN 102108784B CN 2011100651564 A CN2011100651564 A CN 2011100651564A CN 201110065156 A CN201110065156 A CN 201110065156A CN 102108784 B CN102108784 B CN 102108784B
Authority
CN
China
Prior art keywords
scaffold
vertical main
horizontal supporting
horizontal
main frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100651564A
Other languages
Chinese (zh)
Other versions
CN102108784A (en
Inventor
王安立
曹兴平
陈红
袁勇
符云钢
彭开义
王亚宁
栗泽军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nornova Group Co ltd
Original Assignee
Nornova Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nornova Group Co ltd filed Critical Nornova Group Co ltd
Priority to CN2011100651564A priority Critical patent/CN102108784B/en
Publication of CN102108784A publication Critical patent/CN102108784A/en
Application granted granted Critical
Publication of CN102108784B publication Critical patent/CN102108784B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a scaffold supported by a house structure and provides a special attached lifting scaffold. The horizontal supporting trusses of the two scaffold bodies of the special attached lifting scaffold can be interconnected and fixed under a condition of different distances. The special attached lifting scaffold comprises vertical main frames, a horizontal supporting frame, an attached supporting device and the scaffold bodies, wherein at least two vertical main frames are horizontally arranged at equal intervals; the horizontal supporting frame is connected below the vertical main frames; the vertical main frames are also connected with the attached supporting device on a building; the scaffold bodies are supported on the horizontal supporting frame and are connected with the vertical main frames; the horizontal supporting frame comprises a horizontal membrane which has an expansion section that comprises a horizontal rod piece and a positioning device in sliding sleeve fit; and two special attached lifting scaffolds are connected by the expansion sections. The invention is characterized in that: the horizontal supporting trusses of adjacent scaffolds are fixed at different distance intervals; and thus the scaffold bodies are fixed.

Description

Special-shaped attached lift scaffold
Technical field
The present invention relates to a kind of scaffold by the building structure supporting.
Background technology
The build process of the post in highrise building, beam all be unable to do without scaffold; The outer scaffold of building body is that building provides whole protection; In protection workman work safety, also prevent the generation that foreign matter falls; And building by laying bricks or stones with ornamental work of exterior wall also can carry out on scaffold, and the safety of its use and installing/dismounting speed have become the very important factor that influences the integral construction progress.
A kind of attached lift scaffold is arranged in the prior art, and support body is fixed on the building outer wall through adhering to bracing or strutting arrangement, is fixed together through the horizontal supporting truss between two horizontal support bodys.Attached lift scaffold can promote under the effect of lifting appliance or descends with construction requirement.Because it need not wholely cover building body, can promote according to construction speed, only the floor that needs protection is provided and covers, and can practice thrift wide variety of materials, has promoted at present building field and has come.
But on the building of some special constructions; Typical attached lift scaffold is also because some structural characteristics are difficult to carry out; For example in the constructure construction procedure of taper, because its building structure is with highly increasing and progressively interior the receipts, if adopt typical attached lift scaffold; Distance between the horizontal supporting truss of two support bodys can constantly change along with the variation of height, and typical support body can't carry out the horizontal supporting truss under such condition connection is fixed.
Summary of the invention
The technical problem that the present invention will solve is: a kind of special-shaped attached lift scaffold is provided, and the horizontal supporting truss of its two support bodys can carry out mutual connection under the situation of different spacing fixes.
The object of the invention can reach through following measure: it comprises vertical main frame, horizontal supporting framework, adheres to bracing or strutting arrangement and support body; At least two vertical main frames are equidistantly and are horizontally disposed with; Vertical main frame below connects the horizontal supporting framework, vertical main frame also be arranged on building on the bracing or strutting arrangement that adheres to be connected, said support body is bearing on the horizontal supporting framework and with vertical main frame and is connected; Said horizontal supporting framework comprises horizontal member; Said horizontal member is provided with telescopic section, and described telescopic section comprises horizontal bars and the positioner that sliding sleeve cooperates, and connects through described telescopic section between two special-shaped attached lift scaffolds.
The characteristics of technique scheme are: when on the building of special-shaped facade, setting up the multi-disc scaffold; Distance during differing heights between scaffold is not wait; The spacing of horizontal supporting truss also changes at any time; The horizontal bars that said telescopic section comprises can be fixed on the horizontal supporting truss of adjacent scaffold on the different spacings with positioner, thereby realizes the crosswise fixed of whole frame body.
Further: said detachable connection mechanism is a U bolt, and slightly loosening U bolt can carry out the adjusting of scaffold spacing, regulates the fastening good U bolt in back that puts in place and gets final product, and adopt U bolt to draw materials also more convenient.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further detailed explanation:
Fig. 1 is two interconnected sketch mapes of scaffold in the embodiment of the invention.
The specific embodiment
Known concrete structure and characteristic are no longer set forth at this in this programme.As shown in Figure 1: it comprises two attached lift scaffolds, and each sheet scaffold comprises four equally spaced vertical main frames, and the bottom is the horizontal supporting framework, and support body is bearing on the horizontal supporting framework and with vertical main frame and is connected.In the attached lift scaffold in left side; The horizontal member of horizontal supporting framework is provided with extension 1 to the right; Said left scaffold horizontal member extension 1 forms telescopic section through U bolt 2 and horizontal bars 3 sockets, and horizontal bars 3 has also formed telescopic section simultaneously through U bolt 2 and right side scaffold horizontal member extension socket; When the spacing of both sides scaffold need be adjusted; Earlier loosening U bolt 2 makes said telescopic section be in active state, carries out the adjustment of scaffold position then, and last fastening good U bolt 2 gets final product.
Above-described only is preferred implementation of the present invention; Should be understood that; For a person skilled in the art, under the prerequisite that does not break away from structure of the present invention, can also make some distortion and improvement; These also should be regarded as protection scope of the present invention, and these can not influence effect and practical applicability that the present invention implements.

Claims (2)

1. special-shaped attached lift scaffold; Comprise vertical main frame, horizontal supporting framework, adhere to bracing or strutting arrangement and support body; At least two vertical main frames are equidistantly and are horizontally disposed with, and vertical main frame below connects the horizontal supporting framework, vertical main frame also be arranged on building on the bracing or strutting arrangement that adheres to be connected; Said support body is bearing on the horizontal supporting framework and with vertical main frame and is connected; It is characterized in that: said horizontal supporting framework comprises horizontal member, and said horizontal member is provided with telescopic section, and described telescopic section comprises horizontal bars and the positioner that sliding sleeve cooperates.
2. special-shaped attached lift scaffold according to claim 1 is characterized in that: described positioner is a U-bolt.
CN2011100651564A 2011-03-18 2011-03-18 Special attached lifting scaffold Expired - Fee Related CN102108784B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100651564A CN102108784B (en) 2011-03-18 2011-03-18 Special attached lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100651564A CN102108784B (en) 2011-03-18 2011-03-18 Special attached lifting scaffold

Publications (2)

Publication Number Publication Date
CN102108784A CN102108784A (en) 2011-06-29
CN102108784B true CN102108784B (en) 2012-05-30

Family

ID=44173055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100651564A Expired - Fee Related CN102108784B (en) 2011-03-18 2011-03-18 Special attached lifting scaffold

Country Status (1)

Country Link
CN (1) CN102108784B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195233B (en) * 2013-02-06 2015-11-11 江苏江中集团有限公司 One can translation attachment type raise scaffold
CN109797958A (en) * 2019-02-26 2019-05-24 彭绍华 Intelligent and safe elevating scaffold
CN110359695A (en) * 2019-07-25 2019-10-22 广州市第二建筑工程有限公司 A kind of splicing attachment type raise scaffold
CN110593547B (en) * 2019-09-24 2021-10-15 陕西百斯特工程技术有限公司 Frame body structure based on attached lifting scaffold and construction method thereof
CN113882648A (en) * 2021-10-26 2022-01-04 中建三局第一建设工程有限责任公司 All-steel attached lifting scaffold equipment and construction method thereof
CN114232968B (en) * 2021-12-09 2024-03-26 中国一冶集团有限公司 Attached lifting scaffold device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2370150A1 (en) * 1976-11-03 1978-06-02 Desbarats Jean Climbing working platform for building construction - has wall bracket support transferred as new floor is added and platform lifted
EP0032959A1 (en) * 1980-01-18 1981-08-05 Emil Steidle GmbH. & Co. Method and falsework for constructing bridges of prestressed concrete
CN2832994Y (en) * 2005-09-20 2006-11-01 姚康华 Dedicated protection frame for construction of main structure
CN2853976Y (en) * 2005-12-13 2007-01-03 北京市建筑工程研究院 Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction
CN201991206U (en) * 2011-03-18 2011-09-28 北城致远集团有限公司 Irregularly-shaped attached lifting scaffold

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5119678B2 (en) * 1971-11-15 1976-06-18

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2370150A1 (en) * 1976-11-03 1978-06-02 Desbarats Jean Climbing working platform for building construction - has wall bracket support transferred as new floor is added and platform lifted
EP0032959A1 (en) * 1980-01-18 1981-08-05 Emil Steidle GmbH. & Co. Method and falsework for constructing bridges of prestressed concrete
CN2832994Y (en) * 2005-09-20 2006-11-01 姚康华 Dedicated protection frame for construction of main structure
CN2853976Y (en) * 2005-12-13 2007-01-03 北京市建筑工程研究院 Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction
CN201991206U (en) * 2011-03-18 2011-09-28 北城致远集团有限公司 Irregularly-shaped attached lifting scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开昭48-57395A 1973.08.11

Also Published As

Publication number Publication date
CN102108784A (en) 2011-06-29

Similar Documents

Publication Publication Date Title
CN102108784B (en) Special attached lifting scaffold
JP2012503116A5 (en)
MY167504A (en) A formwork system
CN204126230U (en) Assembly scaffold unit
CN202810173U (en) Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant
WO2011002271A3 (en) A slab formwork system
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN204715722U (en) A kind of all steel attachment type raise scaffold
CN104343234A (en) Simple steel operation platform for civil residential elevator shaft and manufacturing method
CN201991206U (en) Irregularly-shaped attached lifting scaffold
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN103790376A (en) Wall framework applied to hyperboloid building construction and wall construction method
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN203977833U (en) A kind of wall-attached builder's jack
CN207003972U (en) A kind of portable construction operation platform
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN203257080U (en) Adjustable overhang supporting device for building construction
CN203034914U (en) Demountable rail structure
CN202745351U (en) Bailey truss supporting structure
CN203867167U (en) Attached lifting scaffold bottom truss
CN206814241U (en) A kind of steel construction elevator ready-package corridor
CN205077697U (en) Reverse support system structure of block mount formula furred ceiling
CN107010517A (en) A kind of steel construction elevator uses ready-package corridor
CN215564317U (en) Novel stores pylon for assembly type structure
CN203867175U (en) Adjustable partition assembling support formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20190318

CF01 Termination of patent right due to non-payment of annual fee