CN108019034A - Carbon baking furnace flame path wall foot hand stent erection method - Google Patents

Carbon baking furnace flame path wall foot hand stent erection method Download PDF

Info

Publication number
CN108019034A
CN108019034A CN201711220544.9A CN201711220544A CN108019034A CN 108019034 A CN108019034 A CN 108019034A CN 201711220544 A CN201711220544 A CN 201711220544A CN 108019034 A CN108019034 A CN 108019034A
Authority
CN
China
Prior art keywords
foot hand
stones
laying bricks
wall
hand stent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711220544.9A
Other languages
Chinese (zh)
Inventor
康新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201711220544.9A priority Critical patent/CN108019034A/en
Publication of CN108019034A publication Critical patent/CN108019034A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • E04G5/048Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls with hooks to be attached on the wall's crown

Abstract

The present invention relates to a kind of carbon baking furnace flame path wall foot hand stent erection method, it is characterized in that:Foot hand stent is made first, and foot hand stent includes rack body and suspension member, and every root long pipe both ends of rack body connect a suspension member respectively;When roaster cross wall is built by laying bricks or stones to design height, four suspension members of foot hand stent are hung at the top of roaster twice cross wall, just complete setting up for foot hand stent, then wooden springboard is laid with rack body, first of flue wall of progress is built by laying bricks or stones, and first of flue wall does not tear foot hand stent open after the completion of building by laying bricks or stones, only wooden springboard is removed, foot hand stent is manually integrally lifted to the position of second flue wall, re-lay wooden springboard and build second flue wall by laying bricks or stones, and so on complete N road flue walls and build by laying bricks or stones.Its advantage is:Quirk foundation hand supporting structure is simple, and it is convenient to install, conveniently moving, saves the time for setting up, removing scaffold, improves construction speed, reduces construction cost.

Description

Carbon baking furnace flame path wall foot hand stent erection method
Technical field
The present invention relates to a kind of carbon baking furnace flame path wall foot hand stent erection method, is built for carbon baking furnace flame path wall Engineering is built, belongs to building field.
Background technology
Carbon baking furnace has X (X is even number) a furnace chamber, and each furnace chamber has N (N is positive integer) road flue wall, flue wall one As a length of 5.7m of design, width 0.53m, furnace chamber width be 0.78m.Roaster building program is:Masonry of well → side wall builds by laying bricks or stones → 1-N roads flue wall is built → built by laying bricks or stones successively to cross wall by laying bricks or stones.Flue wall tradition is built program by laying bricks or stones and is built to set up scaffold → first of flue wall Build and → remove scaffold, set up scaffold and → build second flue wall → remove, set up scaffold →... ... → by laying bricks or stones and build N roads by laying bricks or stones Flue wall, builds N roads flue wall by laying bricks or stones, sets up, removes N-1 scaffold.The method is time-consuming, laborious, the material turnaround time is long, especially Influence construction speed.
The content of the invention
It need not repeat to set up, remove scaffold the object of the present invention is to provide one kind, but design a kind of dedicated foot hand Stent, is built by laying bricks or stones by moving integrally scaffold to complete multiple tracks flue wall, not only saves material cost, but also improve the carbon of construction speed Calcining quirk foundation hand stent erection method.
The present invention solves the problems, such as that this technical solution is as follows:
Foot hand stent is made first, and foot hand stent includes rack body and suspension member, what rack body was arranged in parallel by two Long tube and the evenly spaced strut that is connected between two root long pipes are formed, and suspension member is made by metal round rod, metal round rod it is straight Footpath is less than the major tube inner diameter of rack body, and suspension member main body is one section of straight-bar, and one end folding of straight-bar has rectangle hook, and other end folding has The stull section vertical with straight-bar, every root long pipe both ends of rack body connect a suspension member respectively, and connection mode is by suspension member In stull section insertion long tube;When roaster cross wall is built by laying bricks or stones to design height, four suspension members of foot hand stent are hung in roasting At the top of stove twice cross wall, setting up for foot hand stent is just completed, wooden springboard is then laid with rack body, carries out first of fire Road wall is built by laying bricks or stones, and first of flue wall does not tear foot hand stent open after the completion of building by laying bricks or stones, only removes wooden springboard, manually that foot hand stent is whole Body lifts to the position of second flue wall, re-lays wooden springboard and builds second flue wall by laying bricks or stones, and so on complete N roads flue wall Build by laying bricks or stones.
Rack body flexural deformation in order to prevent, when construction, can install T-shaped post member in the lower part among rack body.
It is an advantage of the invention that:Quirk foundation hand supporting structure is simple, and it is convenient to install, conveniently moving, saved manpower and Material resources, without buying or leasing scaffold, save the time for setting up, removing scaffold, improve construction speed, reduce and apply Work cost.
Brief description of the drawings
Fig. 1 is the structure diagram of suspension member;
Fig. 2 is the structure diagram of rack body;
Fig. 3 is the structure diagram of T-shaped post member;
Fig. 4 is the front view that carbon baking furnace flame path wall foot hand stent is set up;
Fig. 5 is the top view that carbon baking furnace flame path wall foot hand stent is set up.
Embodiment
Referring to the drawings, foot hand stent is made first, and foot hand stent includes rack body 9 and suspension member 8, and rack body is by two The long tube 1 and the evenly spaced strut 2 being connected between two root long pipes being arranged in parallel are formed, and rack body uses diameter 55mm Scaffold tube make, the length of long tube is 55000mm;Suspension member is made by the spiral of diameter 32mm, and suspension member main body is one Section straight-bar 3, one end folding of straight-bar have rectangle to link up with 4, and the other end, which is rolled over, the stull section 5 vertical with straight-bar, every of rack body Long tube both ends connect a suspension member respectively, and connection mode is in the stull section insertion long tube by suspension member.
Roaster has X (X is even number) a furnace chamber, and each furnace chamber has N (N is positive integer) road flue wall, the height of each furnace chamber 1.2 meters of degree difference.First furnace chamber is highly 1.2 meters, and scaffold need not be set up when building by laying bricks or stones, and since the second furnace chamber, roaster is horizontal Wall is built by laying bricks or stones to 2.4m high, as shown in Figure 4,5, four suspension members of foot hand stent is hung in the top of roaster twice cross wall 7, Setting up for foot hand stent is just completed, to prevent rack body flexural deformation, T-shaped post member 6, T-shaped are installed under centre Post member is made of 50mm × 100mm flitches and 20mm × 50mm planks, and the wood of 50mm thickness is then laid with rack body Springboard 11, first of flue wall 10 of progress are built by laying bricks or stones, and first of flue wall does not tear foot hand stent open after the completion of building by laying bricks or stones, only by wooden springboard Removed with T-shaped post member, foot hand stent is manually integrally lifted to the position of second flue wall, re-layed wooden springboard and install T-shaped post member builds second flue wall by laying bricks or stones, and so on complete the N roads flue wall of the second furnace chamber and build by laying bricks or stones;Then the 3rd is built by laying bricks or stones The cross wall of furnace chamber, then in the way of the second furnace chamber flue wall is built by laying bricks or stones foot hand stent is set and moved to build each road of the 3rd furnace chamber by laying bricks or stones Flue wall;The 4th furnace chamber is built by laying bricks or stones with the method, be finally completed building by laying bricks or stones for all furnace chambers again.
The present invention is applied in the carbon baking furnace construction that my unit is contracted in recent years, significant effect.

Claims (1)

1. a kind of carbon baking furnace flame path wall foot hand stent erection method, it is characterized in that:Foot hand stent, foot hand stent are made first Including rack body and suspension member, rack body is by two long tubes being arranged in parallel and evenly spaced is connected between two root long pipes Strut form, suspension member makes by metal round rod, and the diameter of metal round rod is less than the major tube inner diameter of rack body, and suspension member main body is One section of straight-bar, one end folding of straight-bar have rectangle hook, and other end folding has the stull section vertical with straight-bar, every root long of rack body Pipe both ends connect a suspension member respectively, and connection mode is in the stull section insertion long tube by suspension member;Roaster cross wall is built by laying bricks or stones to setting When counting height, four suspension members of foot hand stent are hung at the top of roaster twice cross wall, just complete taking for foot hand stent If being then laid with wooden springboard on rack body, carry out building by laying bricks or stones for first flue wall, first of flue wall build by laying bricks or stones after the completion of not Tear foot hand stent open, only wooden springboard is removed, foot hand stent is manually integrally lifted to the position of second flue wall, re-lays wooden jump Plate builds second flue wall by laying bricks or stones, and so on complete N road flue walls and build by laying bricks or stones.
CN201711220544.9A 2017-11-27 2017-11-27 Carbon baking furnace flame path wall foot hand stent erection method Pending CN108019034A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711220544.9A CN108019034A (en) 2017-11-27 2017-11-27 Carbon baking furnace flame path wall foot hand stent erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711220544.9A CN108019034A (en) 2017-11-27 2017-11-27 Carbon baking furnace flame path wall foot hand stent erection method

Publications (1)

Publication Number Publication Date
CN108019034A true CN108019034A (en) 2018-05-11

Family

ID=62077402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711220544.9A Pending CN108019034A (en) 2017-11-27 2017-11-27 Carbon baking furnace flame path wall foot hand stent erection method

Country Status (1)

Country Link
CN (1) CN108019034A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756195A (en) * 2018-06-13 2018-11-06 山西建筑工程有限公司 Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2191900Y (en) * 1994-04-14 1995-03-15 北京市第二建筑工程公司 Cradle triangle support
CN1374495A (en) * 2002-03-26 2002-10-16 贵州铝厂 Building method of flame path wall of roaster
CN201400995Y (en) * 2009-04-28 2010-02-10 林州建总建筑工程有限公司 Simple scaffold
CN201874226U (en) * 2010-11-09 2011-06-22 王浩贵 Simple and easy scaffold
CN103386667A (en) * 2013-07-18 2013-11-13 济南海川投资集团有限公司 Miniature straightening device for flame path wall of baking furnace
CN104089481A (en) * 2014-07-04 2014-10-08 贵州莱利斯机械设计制造有限责任公司 Method and device for constructing indoor flue wall of roasting furnace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2191900Y (en) * 1994-04-14 1995-03-15 北京市第二建筑工程公司 Cradle triangle support
CN1374495A (en) * 2002-03-26 2002-10-16 贵州铝厂 Building method of flame path wall of roaster
CN201400995Y (en) * 2009-04-28 2010-02-10 林州建总建筑工程有限公司 Simple scaffold
CN201874226U (en) * 2010-11-09 2011-06-22 王浩贵 Simple and easy scaffold
CN103386667A (en) * 2013-07-18 2013-11-13 济南海川投资集团有限公司 Miniature straightening device for flame path wall of baking furnace
CN104089481A (en) * 2014-07-04 2014-10-08 贵州莱利斯机械设计制造有限责任公司 Method and device for constructing indoor flue wall of roasting furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756195A (en) * 2018-06-13 2018-11-06 山西建筑工程有限公司 Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it

Similar Documents

Publication Publication Date Title
CN205153572U (en) Device of anti ability of collapsing of reinforcing cave dwelling
CN105672638B (en) A kind of scaffold and rack installation method of band support sliding
CN108019034A (en) Carbon baking furnace flame path wall foot hand stent erection method
CN106948514A (en) A kind of superelevation masonry wall anti-seismic construction and its construction method
CN204001779U (en) A kind of built with ribbed bricks wall construction reinforced bar guiding device
CN206667529U (en) A kind of superelevation masonry wall anti-seismic construction
CN206625401U (en) A kind of blue bricks exterior wall heat preservation water proof construction
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN206071077U (en) A kind of new masonry pointer
CN204435675U (en) A kind of lattice salomonica structure
CN207362872U (en) A kind of earth-retaining wall bracket for conveniently building dismounting
CN205134980U (en) Whole anti -seismic performance's of reinforcing adobe wall bearing local -style dwelling houses device
CN207847053U (en) Built-in fitting and scaffold connecting structure
CN106907022A (en) A kind of high-altitude cable-stayed type shaped steel operating platform form bracing system construction technology
CN104878933A (en) Construction method for setting up over roof curtain wall hanging basket support scaffolding
CN209469034U (en) A kind of building strengthening model
CN205027124U (en) Ann tears convenient foot hand tool open
CN207407675U (en) A kind of frame structure for roller kiln bottom
CN207419688U (en) Assembled cave dwelling
CN205664679U (en) Step -by -step brickwork steel structure
CN205935597U (en) Segmental timbering system
CN206829603U (en) A kind of device for quick and precisely installing flue arch top template
CN205676411U (en) Build system based on the Three dimensions control of coking furnace shaft building construction by laying bricks or stones
CN206083063U (en) Portable adjustable leaks sieve
US2642163A (en) Arch form for furnace roofs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180511