CN108019034A - Carbon baking furnace flame path wall foot hand stent erection method - Google Patents
Carbon baking furnace flame path wall foot hand stent erection method Download PDFInfo
- Publication number
- CN108019034A CN108019034A CN201711220544.9A CN201711220544A CN108019034A CN 108019034 A CN108019034 A CN 108019034A CN 201711220544 A CN201711220544 A CN 201711220544A CN 108019034 A CN108019034 A CN 108019034A
- Authority
- CN
- China
- Prior art keywords
- foot hand
- stones
- laying bricks
- wall
- hand stent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/20—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
- E04G5/048—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls with hooks to be attached on the wall's crown
Abstract
The present invention relates to a kind of carbon baking furnace flame path wall foot hand stent erection method, it is characterized in that:Foot hand stent is made first, and foot hand stent includes rack body and suspension member, and every root long pipe both ends of rack body connect a suspension member respectively;When roaster cross wall is built by laying bricks or stones to design height, four suspension members of foot hand stent are hung at the top of roaster twice cross wall, just complete setting up for foot hand stent, then wooden springboard is laid with rack body, first of flue wall of progress is built by laying bricks or stones, and first of flue wall does not tear foot hand stent open after the completion of building by laying bricks or stones, only wooden springboard is removed, foot hand stent is manually integrally lifted to the position of second flue wall, re-lay wooden springboard and build second flue wall by laying bricks or stones, and so on complete N road flue walls and build by laying bricks or stones.Its advantage is:Quirk foundation hand supporting structure is simple, and it is convenient to install, conveniently moving, saves the time for setting up, removing scaffold, improves construction speed, reduces construction cost.
Description
Technical field
The present invention relates to a kind of carbon baking furnace flame path wall foot hand stent erection method, is built for carbon baking furnace flame path wall
Engineering is built, belongs to building field.
Background technology
Carbon baking furnace has X (X is even number) a furnace chamber, and each furnace chamber has N (N is positive integer) road flue wall, flue wall one
As a length of 5.7m of design, width 0.53m, furnace chamber width be 0.78m.Roaster building program is:Masonry of well → side wall builds by laying bricks or stones →
1-N roads flue wall is built → built by laying bricks or stones successively to cross wall by laying bricks or stones.Flue wall tradition is built program by laying bricks or stones and is built to set up scaffold → first of flue wall
Build and → remove scaffold, set up scaffold and → build second flue wall → remove, set up scaffold →... ... → by laying bricks or stones and build N roads by laying bricks or stones
Flue wall, builds N roads flue wall by laying bricks or stones, sets up, removes N-1 scaffold.The method is time-consuming, laborious, the material turnaround time is long, especially
Influence construction speed.
The content of the invention
It need not repeat to set up, remove scaffold the object of the present invention is to provide one kind, but design a kind of dedicated foot hand
Stent, is built by laying bricks or stones by moving integrally scaffold to complete multiple tracks flue wall, not only saves material cost, but also improve the carbon of construction speed
Calcining quirk foundation hand stent erection method.
The present invention solves the problems, such as that this technical solution is as follows:
Foot hand stent is made first, and foot hand stent includes rack body and suspension member, what rack body was arranged in parallel by two
Long tube and the evenly spaced strut that is connected between two root long pipes are formed, and suspension member is made by metal round rod, metal round rod it is straight
Footpath is less than the major tube inner diameter of rack body, and suspension member main body is one section of straight-bar, and one end folding of straight-bar has rectangle hook, and other end folding has
The stull section vertical with straight-bar, every root long pipe both ends of rack body connect a suspension member respectively, and connection mode is by suspension member
In stull section insertion long tube;When roaster cross wall is built by laying bricks or stones to design height, four suspension members of foot hand stent are hung in roasting
At the top of stove twice cross wall, setting up for foot hand stent is just completed, wooden springboard is then laid with rack body, carries out first of fire
Road wall is built by laying bricks or stones, and first of flue wall does not tear foot hand stent open after the completion of building by laying bricks or stones, only removes wooden springboard, manually that foot hand stent is whole
Body lifts to the position of second flue wall, re-lays wooden springboard and builds second flue wall by laying bricks or stones, and so on complete N roads flue wall
Build by laying bricks or stones.
Rack body flexural deformation in order to prevent, when construction, can install T-shaped post member in the lower part among rack body.
It is an advantage of the invention that:Quirk foundation hand supporting structure is simple, and it is convenient to install, conveniently moving, saved manpower and
Material resources, without buying or leasing scaffold, save the time for setting up, removing scaffold, improve construction speed, reduce and apply
Work cost.
Brief description of the drawings
Fig. 1 is the structure diagram of suspension member;
Fig. 2 is the structure diagram of rack body;
Fig. 3 is the structure diagram of T-shaped post member;
Fig. 4 is the front view that carbon baking furnace flame path wall foot hand stent is set up;
Fig. 5 is the top view that carbon baking furnace flame path wall foot hand stent is set up.
Embodiment
Referring to the drawings, foot hand stent is made first, and foot hand stent includes rack body 9 and suspension member 8, and rack body is by two
The long tube 1 and the evenly spaced strut 2 being connected between two root long pipes being arranged in parallel are formed, and rack body uses diameter 55mm
Scaffold tube make, the length of long tube is 55000mm;Suspension member is made by the spiral of diameter 32mm, and suspension member main body is one
Section straight-bar 3, one end folding of straight-bar have rectangle to link up with 4, and the other end, which is rolled over, the stull section 5 vertical with straight-bar, every of rack body
Long tube both ends connect a suspension member respectively, and connection mode is in the stull section insertion long tube by suspension member.
Roaster has X (X is even number) a furnace chamber, and each furnace chamber has N (N is positive integer) road flue wall, the height of each furnace chamber
1.2 meters of degree difference.First furnace chamber is highly 1.2 meters, and scaffold need not be set up when building by laying bricks or stones, and since the second furnace chamber, roaster is horizontal
Wall is built by laying bricks or stones to 2.4m high, as shown in Figure 4,5, four suspension members of foot hand stent is hung in the top of roaster twice cross wall 7,
Setting up for foot hand stent is just completed, to prevent rack body flexural deformation, T-shaped post member 6, T-shaped are installed under centre
Post member is made of 50mm × 100mm flitches and 20mm × 50mm planks, and the wood of 50mm thickness is then laid with rack body
Springboard 11, first of flue wall 10 of progress are built by laying bricks or stones, and first of flue wall does not tear foot hand stent open after the completion of building by laying bricks or stones, only by wooden springboard
Removed with T-shaped post member, foot hand stent is manually integrally lifted to the position of second flue wall, re-layed wooden springboard and install
T-shaped post member builds second flue wall by laying bricks or stones, and so on complete the N roads flue wall of the second furnace chamber and build by laying bricks or stones;Then the 3rd is built by laying bricks or stones
The cross wall of furnace chamber, then in the way of the second furnace chamber flue wall is built by laying bricks or stones foot hand stent is set and moved to build each road of the 3rd furnace chamber by laying bricks or stones
Flue wall;The 4th furnace chamber is built by laying bricks or stones with the method, be finally completed building by laying bricks or stones for all furnace chambers again.
The present invention is applied in the carbon baking furnace construction that my unit is contracted in recent years, significant effect.
Claims (1)
1. a kind of carbon baking furnace flame path wall foot hand stent erection method, it is characterized in that:Foot hand stent, foot hand stent are made first
Including rack body and suspension member, rack body is by two long tubes being arranged in parallel and evenly spaced is connected between two root long pipes
Strut form, suspension member makes by metal round rod, and the diameter of metal round rod is less than the major tube inner diameter of rack body, and suspension member main body is
One section of straight-bar, one end folding of straight-bar have rectangle hook, and other end folding has the stull section vertical with straight-bar, every root long of rack body
Pipe both ends connect a suspension member respectively, and connection mode is in the stull section insertion long tube by suspension member;Roaster cross wall is built by laying bricks or stones to setting
When counting height, four suspension members of foot hand stent are hung at the top of roaster twice cross wall, just complete taking for foot hand stent
If being then laid with wooden springboard on rack body, carry out building by laying bricks or stones for first flue wall, first of flue wall build by laying bricks or stones after the completion of not
Tear foot hand stent open, only wooden springboard is removed, foot hand stent is manually integrally lifted to the position of second flue wall, re-lays wooden jump
Plate builds second flue wall by laying bricks or stones, and so on complete N road flue walls and build by laying bricks or stones.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711220544.9A CN108019034A (en) | 2017-11-27 | 2017-11-27 | Carbon baking furnace flame path wall foot hand stent erection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711220544.9A CN108019034A (en) | 2017-11-27 | 2017-11-27 | Carbon baking furnace flame path wall foot hand stent erection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108019034A true CN108019034A (en) | 2018-05-11 |
Family
ID=62077402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711220544.9A Pending CN108019034A (en) | 2017-11-27 | 2017-11-27 | Carbon baking furnace flame path wall foot hand stent erection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108019034A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756195A (en) * | 2018-06-13 | 2018-11-06 | 山西建筑工程有限公司 | Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2191900Y (en) * | 1994-04-14 | 1995-03-15 | 北京市第二建筑工程公司 | Cradle triangle support |
CN1374495A (en) * | 2002-03-26 | 2002-10-16 | 贵州铝厂 | Building method of flame path wall of roaster |
CN201400995Y (en) * | 2009-04-28 | 2010-02-10 | 林州建总建筑工程有限公司 | Simple scaffold |
CN201874226U (en) * | 2010-11-09 | 2011-06-22 | 王浩贵 | Simple and easy scaffold |
CN103386667A (en) * | 2013-07-18 | 2013-11-13 | 济南海川投资集团有限公司 | Miniature straightening device for flame path wall of baking furnace |
CN104089481A (en) * | 2014-07-04 | 2014-10-08 | 贵州莱利斯机械设计制造有限责任公司 | Method and device for constructing indoor flue wall of roasting furnace |
-
2017
- 2017-11-27 CN CN201711220544.9A patent/CN108019034A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2191900Y (en) * | 1994-04-14 | 1995-03-15 | 北京市第二建筑工程公司 | Cradle triangle support |
CN1374495A (en) * | 2002-03-26 | 2002-10-16 | 贵州铝厂 | Building method of flame path wall of roaster |
CN201400995Y (en) * | 2009-04-28 | 2010-02-10 | 林州建总建筑工程有限公司 | Simple scaffold |
CN201874226U (en) * | 2010-11-09 | 2011-06-22 | 王浩贵 | Simple and easy scaffold |
CN103386667A (en) * | 2013-07-18 | 2013-11-13 | 济南海川投资集团有限公司 | Miniature straightening device for flame path wall of baking furnace |
CN104089481A (en) * | 2014-07-04 | 2014-10-08 | 贵州莱利斯机械设计制造有限责任公司 | Method and device for constructing indoor flue wall of roasting furnace |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756195A (en) * | 2018-06-13 | 2018-11-06 | 山西建筑工程有限公司 | Hanging-connecting scaffold and the method for building anode carbon block roaster by laying bricks or stones with it |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205153572U (en) | Device of anti ability of collapsing of reinforcing cave dwelling | |
CN105672638B (en) | A kind of scaffold and rack installation method of band support sliding | |
CN108019034A (en) | Carbon baking furnace flame path wall foot hand stent erection method | |
CN106948514A (en) | A kind of superelevation masonry wall anti-seismic construction and its construction method | |
CN204001779U (en) | A kind of built with ribbed bricks wall construction reinforced bar guiding device | |
CN206667529U (en) | A kind of superelevation masonry wall anti-seismic construction | |
CN206625401U (en) | A kind of blue bricks exterior wall heat preservation water proof construction | |
CN206554500U (en) | Steel structure concrete, which is poured, uses adjustable transverse support bar | |
CN206071077U (en) | A kind of new masonry pointer | |
CN204435675U (en) | A kind of lattice salomonica structure | |
CN207362872U (en) | A kind of earth-retaining wall bracket for conveniently building dismounting | |
CN205134980U (en) | Whole anti -seismic performance's of reinforcing adobe wall bearing local -style dwelling houses device | |
CN207847053U (en) | Built-in fitting and scaffold connecting structure | |
CN106907022A (en) | A kind of high-altitude cable-stayed type shaped steel operating platform form bracing system construction technology | |
CN104878933A (en) | Construction method for setting up over roof curtain wall hanging basket support scaffolding | |
CN209469034U (en) | A kind of building strengthening model | |
CN205027124U (en) | Ann tears convenient foot hand tool open | |
CN207407675U (en) | A kind of frame structure for roller kiln bottom | |
CN207419688U (en) | Assembled cave dwelling | |
CN205664679U (en) | Step -by -step brickwork steel structure | |
CN205935597U (en) | Segmental timbering system | |
CN206829603U (en) | A kind of device for quick and precisely installing flue arch top template | |
CN205676411U (en) | Build system based on the Three dimensions control of coking furnace shaft building construction by laying bricks or stones | |
CN206083063U (en) | Portable adjustable leaks sieve | |
US2642163A (en) | Arch form for furnace roofs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180511 |