CN204001779U - A kind of built with ribbed bricks wall construction reinforced bar guiding device - Google Patents
A kind of built with ribbed bricks wall construction reinforced bar guiding device Download PDFInfo
- Publication number
- CN204001779U CN204001779U CN201420481999.1U CN201420481999U CN204001779U CN 204001779 U CN204001779 U CN 204001779U CN 201420481999 U CN201420481999 U CN 201420481999U CN 204001779 U CN204001779 U CN 204001779U
- Authority
- CN
- China
- Prior art keywords
- guiding
- guiding tube
- built
- iron chains
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
A kind of built with ribbed bricks wall construction reinforced bar guiding device, it relates to a kind of block masonry wall construction equipment, to solve the construction technology more complicated of the built with ribbed bricks shear wall of existing integral body, need to build hollow block wall sheet by laying bricks or stones, configuration level reinforcing bar, mortar, clean out need be set separately and remove, the connection of reinforcing bar also need to be carried out in clean out, the problem that operating space is narrow and small, difficulty is large, operation is more.Two hangers of the present utility model are arranged on the upper surface of guiding crossbeam, the two ends of wire rope are connected with two hangers respectively, several iron chains are packed in the lower surface of guiding crossbeam successively, a guiding tube end socket is installed in the upper end of each guiding tube, the upper end of each guiding tube end socket connects a buckle, the corresponding iron chains of each guiding tube, and the buckle on guiding tube is connected with iron chains.The utility model is for the construction of built with ribbed bricks wall.
Description
Technical field
The utility model relates to a kind of block masonry wall construction equipment, particularly relates to a kind of built with ribbed bricks wall construction reinforced bar guiding device.
Background technology
Built with ribbed bricks house, the feature of the green building such as have low-carbon (LC), environmental protection, cost is low, performance is good has stronger competitiveness in current construction market.Built with ribbed bricks body of wall is a kind of like this body of wall, first concrete small size hollow building block is built by laying bricks or stones and become hole to hole, the hollowed-block masonry body of wall of rib to rib, configuration level reinforcing bar in the horizontal hole hole forming at binder piece groove in the process of building by laying bricks or stones, after having built by laying bricks or stones, insert vertical reinforcement from top to bottom, and complete and be connected with the vertical reinforcement of stretching place on collar tie beam at the hole place of skin clean-out hatch piece at the bottom of body of wall, can adopt single-point colligation or squash type straight screw sleeve to connect, finally build core grouted concrete, form inside and there is concrete band and in length and breadth steel mesh reinforcement in length and breadth, building block, mortar, reinforcing bar, core grouted concrete is combined into whole built with ribbed bricks shear wall.
Yet, the wall construction technique more complicated of this form of structure.Need to first build hollow block wall sheet by laying bricks or stones, due to the needs of arrangement of reinforcement, piece type is many, selects piece workload larger while building by laying bricks or stones, and this brings huge difficulty to site operation.While building by laying bricks or stones, also need configuration level reinforcing bar, drop on the mortar in hole, will assemble in bottom, clean out need be set separately and remove, clean out also needs shutoff before concrete perfusion.The connection of reinforcing bar also need to be carried out in clean out, narrow space, and difficulty is large.So operation is many, the popularization to this form of structure, brings very large obstacle.
Utility model content
The utility model is for solving the construction technology more complicated of the built with ribbed bricks shear wall of existing integral body, need to build hollow block wall sheet by laying bricks or stones, configuration level reinforcing bar, mortar, clean out need be set separately to be removed, the connection of reinforcing bar also need to be carried out in clean out, the problem that operating space is narrow and small, difficulty is large, operation is more, and a kind of built with ribbed bricks wall construction reinforced bar guiding device is provided.
A kind of built with ribbed bricks wall construction reinforced bar guiding device of the present utility model comprises guiding crossbeam, wire rope, two hangers, several iron chains, several guiding tubes, several guiding tube end sockets and several buckle, two hangers are arranged on the upper surface of guiding crossbeam, the two ends of wire rope are connected with two hangers respectively, several iron chains are packed in the lower surface of guiding crossbeam successively, a guiding tube end socket is installed in the upper end of each guiding tube, the upper end of each guiding tube end socket connects a buckle, the corresponding iron chains of each guiding tube, and the buckle on guiding tube is connected with iron chains.
The utility model compared with prior art has following beneficial effect:
One, utilize the utility model that reinforcing bar in place is pierced in the wall sheet in lifting, and then reinforcing bar guiding device of the present utility model is hung away.The utility model does not need to arrange separately clean out, the utility model has solved the problem that operating space is narrow and small, difficulty is large, operation is more, particularly solve the reinforcing bar of body of wall in fabricated construction problem has been set, made to adopt assemblingization technology construction reinforced masonry to become possibility.
Two, the utility model is simple in structure easy to operate, safe and reliable.
Accompanying drawing explanation
Fig. 1 is overall structure front view of the present utility model;
Fig. 2 is while utilizing the utility model to construct, and guiding tube 5 is inserted separately to the schematic diagram in wall sheet 8;
Fig. 3 is after guiding tube 5 installs, the schematic diagram that guiding tube 5 tops are connected with iron chains 4 use buckles 7;
Fig. 4 is the schematic diagram that wire rope 2 is all connected with suspension hook 2 with wall sheet 8;
Fig. 5 pierces into the schematic diagram in corresponding guiding tube 5 by every reinforcing bar 10;
Fig. 6 is that reinforcing bar 10 pierces into the schematic diagram in wall sheet 8 along guiding tube 5;
Fig. 7 is the schematic diagram that suspension hook 9 hangs away reinforcing bar guiding device.
The specific embodiment
The specific embodiment one: present embodiment is described in conjunction with Fig. 1, present embodiment comprises guiding crossbeam 1, wire rope 2, two hangers 3, several iron chains 4, several guiding tubes 5, several guiding tube end sockets 6 and several buckle 7, two hangers 3 are arranged on the upper surface of guiding crossbeam 1, the two ends of wire rope 2 are connected with two hangers 3 respectively, several iron chains 4 are packed in the lower surface of guiding crossbeam 1 successively, a guiding tube end socket 6 is installed in the upper end of each guiding tube 5, the upper end of each guiding tube end socket 6 connects a buckle 7, the corresponding iron chains 4 of each guiding tube 5, and the buckle on guiding tube 57 is connected with iron chains 4.Guiding tube 5 adopts PVC plastic pipe to make.Buckle 7 is connected or is not connected with the iron chains 4 on crossbeam, and guiding tube 5 can be moved separately (inserting in the hole in body of wall), also can move together with whole reinforcing bar guiding device.Iron chains 4 allows single guiding to enter in the process of guiding tube 5 wearing reinforcing bar, and guiding tube can move arbitrarily, to facilitate reinforcing bar to enter pipe.
During construction, first each guiding tube 5 is inserted in the hole of wall sheet 8 separately, and the lower end of guiding tube 5 exceeds wall sheet 8 certain lengths, see Fig. 2; Because guiding tube 5 is plastic material, in the process of through walls 8, can occur micro-curvedly, to facilitate it to pass, be provided with the hole of horizontal multiple tracks reinforcing bar; After guiding tube 5 installs, guiding tube 5 tops are connected with iron chains 4 use buckles 7, see Fig. 3; The suspension hook of crane 9 is moved to precalculated position, wire rope 2 is connected with the suspension hook 2 of crane, wall sheet 8 is also hung on suspension hook 9 simultaneously, see Fig. 4; Now need reinforcing bar guiding device to arrive construction part together with 8 handlings of wall sheet.Wall sheet 8 is aligned to position aloft, with guider, every reinforcing bar 10 is pierced in corresponding guiding tube 5, see Fig. 5, then transfer wall sheet 8, reinforcing bar 10 pierces in wall sheet 8 along guiding tube 5, sees Fig. 6; Wall sheet 8 fall firm fixed after, suspension hook 9 hangs away reinforcing bar guiding device, sees Fig. 7.
The specific embodiment two: in conjunction with Fig. 1, present embodiment is described, several iron chains 4 of present embodiment are along the uniform setting of same straight line.Other composition and annexation are identical with the specific embodiment one.
Claims (2)
1. a built with ribbed bricks wall construction reinforced bar guiding device, it is characterized in that: described a kind of built with ribbed bricks wall construction reinforced bar guiding device comprises guiding crossbeam (1), wire rope (2), two hangers (3), several iron chains (4), several guiding tubes (5), several guiding tube end sockets (6) and several buckle (7), two hangers (3) are arranged on the upper surface of guiding crossbeam (1), the two ends of wire rope (2) are connected with two hangers (3) respectively, several iron chains (4) are packed in the lower surface of guiding crossbeam (1) successively, a guiding tube end socket (6) is installed in the upper end of each guiding tube (5), the upper end of each guiding tube end socket (6) connects a buckle (7), the corresponding iron chains (4) of each guiding tube (5), and the buckle (7) on guiding tube (5) is connected with iron chains (4).
2. a kind of built with ribbed bricks wall construction reinforced bar guiding device according to claim 1, is characterized in that: described several iron chains (4) are along the uniform setting of same straight line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420481999.1U CN204001779U (en) | 2014-08-25 | 2014-08-25 | A kind of built with ribbed bricks wall construction reinforced bar guiding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420481999.1U CN204001779U (en) | 2014-08-25 | 2014-08-25 | A kind of built with ribbed bricks wall construction reinforced bar guiding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204001779U true CN204001779U (en) | 2014-12-10 |
Family
ID=52041802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420481999.1U Active CN204001779U (en) | 2014-08-25 | 2014-08-25 | A kind of built with ribbed bricks wall construction reinforced bar guiding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204001779U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790675A (en) * | 2015-04-15 | 2015-07-22 | 哈尔滨达城绿色建筑技术开发股份有限公司 | Reinforced concrete block masonry structure assemblage construction method |
CN106193607A (en) * | 2016-08-31 | 2016-12-07 | 哈尔滨达城绿色建筑技术开发股份有限公司 | A kind of glomeration building prefabricated construction wall sheet is worn muscle method and is worn muscle instrument |
CN106193616A (en) * | 2016-08-31 | 2016-12-07 | 哈尔滨达城绿色建筑技术开发股份有限公司 | The sizing of a kind of glomeration building limit is worn muscle device and uses what this wore muscle device to wear muscle method |
CN106592985A (en) * | 2016-12-08 | 2017-04-26 | 哈尔滨达城绿色建筑技术开发股份有限公司 | Binding system for concrete hollow building block wall piece in agglomeration building and binding method thereof |
CN114197296A (en) * | 2021-11-29 | 2022-03-18 | 中建八局第二建设有限公司 | Prestressed steel pier column foot with reaction frame in bearing platform and construction method thereof |
-
2014
- 2014-08-25 CN CN201420481999.1U patent/CN204001779U/en active Active
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790675A (en) * | 2015-04-15 | 2015-07-22 | 哈尔滨达城绿色建筑技术开发股份有限公司 | Reinforced concrete block masonry structure assemblage construction method |
CN104790675B (en) * | 2015-04-15 | 2017-02-22 | 哈尔滨达城绿色建筑技术开发股份有限公司 | Reinforced concrete block masonry structure assemblage construction method |
CN106193607A (en) * | 2016-08-31 | 2016-12-07 | 哈尔滨达城绿色建筑技术开发股份有限公司 | A kind of glomeration building prefabricated construction wall sheet is worn muscle method and is worn muscle instrument |
CN106193616A (en) * | 2016-08-31 | 2016-12-07 | 哈尔滨达城绿色建筑技术开发股份有限公司 | The sizing of a kind of glomeration building limit is worn muscle device and uses what this wore muscle device to wear muscle method |
CN106193607B (en) * | 2016-08-31 | 2018-06-08 | 哈尔滨达城绿色建筑技术开发股份有限公司 | A kind of glomeration building prefabricated construction wall piece wears muscle method and wears muscle tool |
CN106193616B (en) * | 2016-08-31 | 2018-06-12 | 哈尔滨达城绿色建筑技术开发股份有限公司 | A kind of glomeration building limit type wears muscle device and wears muscle method using what this wore muscle device |
CN106592985A (en) * | 2016-12-08 | 2017-04-26 | 哈尔滨达城绿色建筑技术开发股份有限公司 | Binding system for concrete hollow building block wall piece in agglomeration building and binding method thereof |
CN106592985B (en) * | 2016-12-08 | 2019-02-01 | 哈尔滨达城绿色建筑技术开发股份有限公司 | A kind of glomeration building concrete hollow block wall piece banding system and its binding method |
CN114197296A (en) * | 2021-11-29 | 2022-03-18 | 中建八局第二建设有限公司 | Prestressed steel pier column foot with reaction frame in bearing platform and construction method thereof |
CN114197296B (en) * | 2021-11-29 | 2023-10-20 | 中建八局第二建设有限公司 | Prestressed steel pier column foot with reaction frame in bearing platform and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204001779U (en) | A kind of built with ribbed bricks wall construction reinforced bar guiding device | |
CN104153587B (en) | A kind of built with ribbed bricks body of wall assembly construction method | |
CN203603930U (en) | Device for preventing tunnel secondary lining vault from disengaging | |
CN203394582U (en) | Grouting type filling retaining wall and goaf filling system | |
CN204738538U (en) | Different strength grade concrete construction block a batch week and turn round stupefiedly | |
CN203756230U (en) | Mold bag type sealed retaining wall capable of being quickly formed | |
CN205530815U (en) | Vertical connection structure of assembled shear force wall | |
CN204357127U (en) | The monolateral formwork erecting structure of a kind of ultra-deep pre-buried Screw arbor with nut at both-ends of outer wall of basement narrow space | |
CN204040515U (en) | Cat ladder | |
CN206299396U (en) | A kind of device for laying Anchor Agent | |
CN203701432U (en) | Positioning clamp for horizontal steel reinforcements of shearing wall | |
CN103821559A (en) | Mould bag type rapidly-formed hermetic retaining wall | |
CN204098508U (en) | A kind of concrete prefabricated board special hanger with T-shaped rib | |
CN103822026A (en) | Mine self-rooting cable hook device | |
CN204282391U (en) | A kind of heel foundation formwork erecting structure | |
CN104196249B (en) | A kind of concrete slab special hanger with T-shaped rib | |
CN204282551U (en) | A kind of rubber fastening band installation and positioning structure | |
CN104533092A (en) | Truss roof ceiling construction method | |
CN213062094U (en) | Ground storehouse roof reservation entrance to a cave retaining wall convenient to demolish | |
CN204510845U (en) | A kind of hydraulically extensible tubular type masonry wall construction guiding device | |
CN204679074U (en) | A kind of novel surface observation pier structure | |
CN203795824U (en) | Suspension type fastener scaffold erecting device | |
CN203795871U (en) | Hooping bundling operation frame for structural columns | |
CN204122650U (en) | Tension rib bending tool | |
CN208633311U (en) | A kind of wall body structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |