CN203756230U - Mold bag type sealed retaining wall capable of being quickly formed - Google Patents

Mold bag type sealed retaining wall capable of being quickly formed Download PDF

Info

Publication number
CN203756230U
CN203756230U CN201420064758.7U CN201420064758U CN203756230U CN 203756230 U CN203756230 U CN 203756230U CN 201420064758 U CN201420064758 U CN 201420064758U CN 203756230 U CN203756230 U CN 203756230U
Authority
CN
China
Prior art keywords
mould
barricade
airtight
mould bag
rapid shaping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420064758.7U
Other languages
Chinese (zh)
Inventor
王俊杰
田锦州
赵茂平
刘鹏亮
曹建波
张刚艳
孙贺军
徐乃忠
王明
颜丙双
申培文
孙凯华
申进波
孙万明
王成真
祝琨
崔锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI JINCHENG ANTHRACITE MINING GROUP TECHNOLOGY RESEARCH INSTITUTE Co Ltd
Tiandi Science and Technology Co Ltd
Original Assignee
SHANXI JINCHENG ANTHRACITE MINING GROUP TECHNOLOGY RESEARCH INSTITUTE Co Ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI JINCHENG ANTHRACITE MINING GROUP TECHNOLOGY RESEARCH INSTITUTE Co Ltd, Tiandi Science and Technology Co Ltd filed Critical SHANXI JINCHENG ANTHRACITE MINING GROUP TECHNOLOGY RESEARCH INSTITUTE Co Ltd
Priority to CN201420064758.7U priority Critical patent/CN203756230U/en
Application granted granted Critical
Publication of CN203756230U publication Critical patent/CN203756230U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model relates to the field of sealed retaining walls of roadways of working sites, and particularly discloses a mold bag type sealed retaining wall capable of being quickly formed. The mold bag type sealed retaining wall comprises a cuboid-shaped mold bag and filling slurry. The mold bag is filled with the filling slurry. The mold bag type sealed retaining wall has the advantages that the mold bag type sealed retaining wall can be quickly formed after the mold bag is filled with the filling slurry, flexible braces are arranged in the mold bag, and structures such reinforcing rib holes are reserved in the mold bag, so that the retaining wall is safe and reliable and is high in strength and applicability, and a good sealing effect can be realized; the mold bag type sealed retaining wall is simple in construction operation, can be quickly formed and is high in stability, quick connection between mining and filling can be promoted, elapsed time during labor operation can be greatly shortened, the labor operation intensity can be greatly reduced, and the labor operation cost can be greatly lowered.

Description

The airtight barricade of mould pocket type rapid shaping
Technical field
The utility model relates to airtight barricade field, mining roadway termination, relates in particular to the airtight barricade of a kind of mould pocket type rapid shaping.
Background technology
At present, the brick barricade of the airtight common employing in mining roadway termination that high-water material pillar or strip-type filling mining relate to, is mostly common brick and foamed bricks mixing is built by laying bricks or stones, and airtight brick wall can adapt to various types of mining roadway sections, and universality is strong.But, airtight brick wall exists that material usage is large, cost of transportation is high, build long, loaded down with trivial details, the problem such as cost is high and efficiency is low of constructing in man-hour by laying bricks or stones, cause larger pressure with being connected of filling to transport of materials and the coal mining of work plane, restrict the progress of filling mining, affected the raising of production efficiency and the lifting of production capacity.
Utility model content
(1) technical problem that will solve
The purpose of this utility model is to provide the airtight barricade of a kind of mould pocket type rapid shaping, and to overcome, airtight brick wall material usage of the prior art is large, cost of transportation is high, build long, loaded down with trivial details, the problem such as cost is high and efficiency is low of constructing in man-hour by laying bricks or stones.
(2) technical scheme
In order to solve the problems of the technologies described above, the utility model provides the filling slurry of a kind of mould bag inside.
Preferably, the front and back facade of described mould bag is made and is formed by high strength fibre woven cloth, and its size is corresponding with the size of entrance to a lane section.
Preferably, between the front and back facade of described mould bag, be provided with many equally distributed soft drawn muscle.
Preferably, the front and back facade of described mould bag evenly weaves many walings and horizontal reinforcing band, and many walings are along laterally evenly arranging and being vertically interwoven in horizontal reinforcing band, and the place of interweaving forms mould bag front and back facade lacing wire point.
Preferably, the front facade of described mould bag is provided with two mould bag filling mouths, two elongated mining roadway pack holes, two steam vents and multiple equally distributed silk hole of facade direction before and after described mould bag inside is provided with.
Preferably, the top of described mould bag is provided with hanging ear.
Preferably, described mould bag is through fire-resistant antistatic processing.
Preferably, it is characterized in that, described filling slurry is fly ash base high-water expansion material.
Preferably, in described filling slurry, be added with fast coagulating early strength agent.
(3) beneficial effect
The airtight barricade of mould pocket type rapid shaping of the present utility model comprises the filling slurry of mould bag and mould bag inside, and filling slurry is filled into after mould bag can rapid shaping, is provided with the structure such as soft drawn muscle reserved strong muscle hole to ensure the intensity of barricade in mould bag, this barricade is not only safe and reliable, intensity is high, and obturation effect is good, and applicability is strong, and, constructing operation is simple, can rapid shaping, and stability is high, promote exploitation and the quick joining of filling, consuming time, intensity and the cost of labor operation all reduce greatly.
Brief description of the drawings
Fig. 1 is the stereogram of the airtight barricade of mould pocket type rapid shaping of the utility model embodiment;
Fig. 2 is the vertical view cutaway drawing of the airtight barricade of mould pocket type rapid shaping of the utility model embodiment;
Fig. 3 is the front cross-section view of the front facade soft drawn muscle node of the airtight barricade of mould pocket type rapid shaping of the utility model embodiment;
Fig. 4 is the vertical view cutaway drawing of facade soft drawn muscle before and after the airtight barricade of the mould pocket type rapid shaping of the utility model embodiment;
Fig. 5 is the work schematic diagram of the airtight barricade hanging of the mould pocket type rapid shaping of the utility model embodiment in mining roadway termination slotting place.
In figure, 1: hanging ear; 2: mining roadway steam vent; 3: mould bag filling mouth; 4: mining roadway pack hole; 5: bar silk hole; 6: waling; 7: laterally reinforcing band; 8: soft drawn muscle; 9: hanging anchor pole; 10: some post; 11: wire lath; 12: horizontal backboard.
Detailed description of the invention
Below in conjunction with drawings and Examples, embodiment of the present utility model is described in further detail.Following examples are used for illustrating the utility model, but can not be used for limiting scope of the present utility model.
As Figure 1-5, the airtight barricade of mould pocket type rapid shaping of the present embodiment comprises mould bag and the filling slurry that is filled in mould bag inside.
Described filling slurry is fly ash base high-water expansion slip, adds a certain amount of fast coagulating early strength agent in filling simultaneously, like this can be after mould bag be full of, and filling slurry is that solidifiable forms airtight barricade in a short time.
Described mould bag is cuboid, and before and after it, the size of facade is corresponding with the size of entrance to a lane section, and the front and back facade of mould bag is made and formed by high strength fibre woven cloth, and its cloth is through fire-resistant antistatic processing, and the width of mould bag end face is 1.3 times of its bottom width, the inside of mould bag is provided with the soft drawn muscle 8 of many between the facade of front and back, soft drawn muscle 8 is soft muscle rope, and its inside at mould bag is matrix arrangement and is uniformly distributed, and soft drawn muscle 8 links together former and later two facades of mould bag, in the process of filling slurry, for limiting the lateral expansion distortion of mould bag, the front and back facade of mould bag is woven with many walings 6 and many horizontal reinforcing bands 7, waling 6 is crude fibre rope, many walings 6 are along mould bag is laterally evenly arranged and interval is certain distance, many horizontal reinforcing band 7 is longitudinally evenly arranged and keeps at a certain distance away, with the colligation node of the soft drawn muscle 8 of facade before and after waling 6 places' of interweaving formation mould bags, the front facade of mould bag is provided with two mould bag filling mouths 3, for the high water slurry of filling in mould bag, mould bag filling mouth 3 places are provided with mould bag filling sleeve, mould bag filling sleeve is double-deck, internal layer is positioned in mould bag, skin is positioned over outside mould bag, before and after in mould bag, facade direction is provided with two elongated mining roadway pack holes 4 and two mining roadway steam vents 2, by mining roadway pack hole 4 filling mining roadway, gas is discharged by mining roadway steam vent 2, the front and back facade of mould bag is equipped with elongated equally distributed the silk hole 5 of matrix that be, penetrate bar silk by bar silk hole 5 the side limit structure inside and outside mould bag is connected into an entirety, before and after mould bag, the top outer of facade is equipped with the hanging ear 1 isometric with mould bag, by steel band can be hung mould bag entirety on mining roadway top board through hanging ear 1.
When the airtight barricade of mould pocket type rapid shaping of the present embodiment is installed, first utilize hanging anchor pole 9 mould bag to be hung on to the correspondence position of mining roadway termination slotting, prop up set up an office post 10 and horizontal backboard 12 simultaneously, utilize through the bar silk in bar silk hole 5 post drawing, paving wire lath 11 promotes that in bag, filling slurry is shaped, then in mould bag, inject high water slip, and in high water slurry, add a certain amount of fast coagulating early strength agent solution simultaneously, after high water slip solidifies, form the airtight barricade of mining roadway, play and effect block pulp airtight to mining roadway termination.
The airtight barricade of mould pocket type rapid shaping of the present utility model comprises the filling slurry of mould bag and mould bag inside, and filling slurry is filled into after mould bag can rapid shaping, is provided with the structure such as soft drawn muscle reserved strong muscle hole to ensure the intensity of barricade in mould bag, this barricade is not only safe and reliable, intensity is high, and obturation effect is good, and applicability is strong, and, constructing operation is simple, can rapid shaping, and stability is high, promote exploitation and the quick joining of filling, consuming time, intensity and the cost of labor operation all reduce greatly.
Embodiment of the present utility model provides for example with for the purpose of describing, and is not exhaustively or by the utility model to be limited to disclosed form.Many modifications and variations are apparent for the ordinary skill in the art.Selecting and describing embodiment is for better explanation principle of the present utility model and practical application, thereby and makes those of ordinary skill in the art can understand the utility model design to be suitable for the various embodiment with various amendments of special-purpose.

Claims (9)

1. the airtight barricade of mould pocket type rapid shaping, is characterized in that, comprises the mould bag of cuboid and the filling slurry of mould bag inside.
2. the airtight barricade of mould pocket type rapid shaping according to claim 1, is characterized in that, the front and back facade of described mould bag is made and formed by high strength fibre woven cloth, and its size is corresponding with the size of entrance to a lane section.
3. the airtight barricade of mould pocket type rapid shaping according to claim 2, is characterized in that, is provided with many equally distributed soft drawn muscle between the front and back facade of described mould bag.
4. the airtight barricade of mould pocket type rapid shaping according to claim 3, it is characterized in that, the front and back facade of described mould bag is many walings of braiding and horizontal reinforcing band evenly, many walings are along laterally evenly arranging and being vertically interwoven in horizontal reinforcing band, and the place of interweaving forms mould bag front and back facade lacing wire point.
5. the airtight barricade of mould pocket type rapid shaping according to claim 2, it is characterized in that, the front facade of described mould bag is provided with two mould bag filling mouths, two elongated mining roadway pack holes, two steam vents and multiple equally distributed silk hole of facade direction before and after described mould bag inside is provided with.
6. the airtight barricade of mould pocket type rapid shaping according to claim 2, is characterized in that, the top of described mould bag is provided with hanging ear.
7. the airtight barricade of mould pocket type rapid shaping according to claim 2, is characterized in that, described mould bag is through fire-resistant antistatic processing.
8. according to the airtight barricade of mould pocket type rapid shaping described in any one in claim 1-7, it is characterized in that, described filling slurry is fly ash base high-water expansion material.
9. the airtight barricade of mould pocket type rapid shaping according to claim 8, is characterized in that, in described filling slurry, is added with fast coagulating early strength agent.
CN201420064758.7U 2014-02-13 2014-02-13 Mold bag type sealed retaining wall capable of being quickly formed Expired - Lifetime CN203756230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420064758.7U CN203756230U (en) 2014-02-13 2014-02-13 Mold bag type sealed retaining wall capable of being quickly formed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420064758.7U CN203756230U (en) 2014-02-13 2014-02-13 Mold bag type sealed retaining wall capable of being quickly formed

Publications (1)

Publication Number Publication Date
CN203756230U true CN203756230U (en) 2014-08-06

Family

ID=51251517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420064758.7U Expired - Lifetime CN203756230U (en) 2014-02-13 2014-02-13 Mold bag type sealed retaining wall capable of being quickly formed

Country Status (1)

Country Link
CN (1) CN203756230U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821559A (en) * 2014-02-13 2014-05-28 山西晋煤集团技术研究院有限责任公司 Mould bag type rapidly-formed hermetic retaining wall
CN104453997A (en) * 2014-10-21 2015-03-25 河南理工大学 Filling air bag separating plate device of mine gob-side entry retaining
CN105569726A (en) * 2015-12-31 2016-05-11 山东深博巷道支护技术有限公司 Gob-side entry retaining method for GFRP (Glass Fiber Reinforced Polymer) tube concrete pier stud and gangue concrete wall
CN105937407A (en) * 2016-06-22 2016-09-14 西安科技大学 Gob-side entry retaining concrete filled wall annular air bag construction method
CN106194250A (en) * 2016-06-22 2016-12-07 西安科技大学 A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN107044107A (en) * 2017-03-24 2017-08-15 重庆路威土木工程设计有限公司 Side slope geotechnical fabric bag slope protection construction method and device
CN111648825A (en) * 2020-06-16 2020-09-11 中铁十四局集团隧道工程有限公司 Tunnel collapsed cavity rapid retaining wall and emergency treatment construction process

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821559A (en) * 2014-02-13 2014-05-28 山西晋煤集团技术研究院有限责任公司 Mould bag type rapidly-formed hermetic retaining wall
CN103821559B (en) * 2014-02-13 2016-06-29 山西晋煤集团技术研究院有限责任公司 The airtight barricade of mould pocket type rapid shaping
CN104453997A (en) * 2014-10-21 2015-03-25 河南理工大学 Filling air bag separating plate device of mine gob-side entry retaining
CN104453997B (en) * 2014-10-21 2016-04-06 河南理工大学 A kind of filling bladder spacer device of coal mine gob-side entry retaining
CN105569726A (en) * 2015-12-31 2016-05-11 山东深博巷道支护技术有限公司 Gob-side entry retaining method for GFRP (Glass Fiber Reinforced Polymer) tube concrete pier stud and gangue concrete wall
CN105937407A (en) * 2016-06-22 2016-09-14 西安科技大学 Gob-side entry retaining concrete filled wall annular air bag construction method
CN106194250A (en) * 2016-06-22 2016-12-07 西安科技大学 A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN105937407B (en) * 2016-06-22 2017-11-10 西安科技大学 A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket
CN106194250B (en) * 2016-06-22 2018-08-03 西安科技大学 A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN107044107A (en) * 2017-03-24 2017-08-15 重庆路威土木工程设计有限公司 Side slope geotechnical fabric bag slope protection construction method and device
CN111648825A (en) * 2020-06-16 2020-09-11 中铁十四局集团隧道工程有限公司 Tunnel collapsed cavity rapid retaining wall and emergency treatment construction process

Similar Documents

Publication Publication Date Title
CN203756230U (en) Mold bag type sealed retaining wall capable of being quickly formed
CN102337906B (en) Construction method for pouring airtight partition wall between recovered roadway and reserved roadway
CN106193368B (en) Connection method based on 3D printing reinforced masonry shear wall and insulation construction
CN106013800B (en) Constructional Col-umn Construction method based on 3D printing filled wall
CN104481568B (en) A kind of fully mechanized coal face gob side entry retaining technique and method of ventilation
CN103628911B (en) Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
CN103397906A (en) Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method
CN203394582U (en) Grouting type filling retaining wall and goaf filling system
CN106121689B (en) A kind of excavation method of non-coal mine underground large stable chamber
CN105089693B (en) One kind improves gob side entry retaining wall and connects top method
CN107013229A (en) Folding telescopic gob side entry retaining roadside packing Flexible formwork assembly and its construction method
CN106968676A (en) The method that cavity is passed through in tunnelling
CN103821559B (en) The airtight barricade of mould pocket type rapid shaping
CN204001779U (en) A kind of built with ribbed bricks wall construction reinforced bar guiding device
CN113027519A (en) Filling material self-built retaining wall and construction method
CN106352749B (en) A kind of method of tunnelling periphery hole homogeneous energy explosion
CN207795304U (en) A kind of underground coal mine fire dam
CN107605494A (en) A kind of crushed zone soft-rock tunnel advance support technology
CN211081970U (en) Assembled reusable flexible filling retaining wall
CN106050303A (en) Underground roadway plugging method and device
CN111764958A (en) Lower port blocking structure of branch roadway and construction method
CN207212354U (en) Folding telescopic gob side entry retaining roadside packing Flexible formwork assembly
CN108661665B (en) Small coal pillar gob-side roadway supporting structure and supporting method thereof
CN206360720U (en) A kind of novel flexible filling isolation barricade
CN209523770U (en) A kind of slip casting combination of steel rope device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140806