CN108677975A - A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection - Google Patents

A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection Download PDF

Info

Publication number
CN108677975A
CN108677975A CN201810833568.XA CN201810833568A CN108677975A CN 108677975 A CN108677975 A CN 108677975A CN 201810833568 A CN201810833568 A CN 201810833568A CN 108677975 A CN108677975 A CN 108677975A
Authority
CN
China
Prior art keywords
slope
seed
soil
dimensional network
grass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810833568.XA
Other languages
Chinese (zh)
Inventor
宾志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Lusheng Garden Construction Co Ltd
Original Assignee
Shaanxi Lusheng Garden Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Lusheng Garden Construction Co Ltd filed Critical Shaanxi Lusheng Garden Construction Co Ltd
Priority to CN201810833568.XA priority Critical patent/CN108677975A/en
Publication of CN108677975A publication Critical patent/CN108677975A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The present invention relates to a kind of three dimensional networks to combine the careless blanket slope protection construction method of environmental protection.This method includes:Side slope is pre-processed, including obtains the side slope soil parameter, and the Slope leveling is made to stablize;Three dimensional network is sprawled to smooth-going from top to down and is tensed, is anchored with fixing piece;Spray Nutrition Soil base or the soil of mixotrophism containing grass-seed of sowing grass seeds by duster;Environmentally friendly careless blanket is unfolded to be laid with from top to down, fixing piece is used in combination to anchor;The careless blanket of the environmental protection of laying is conserved.The present invention can improve slope greening construction quality, and it conducive to the germination of grass-seed and survives, slope greening effect can be improved, it effectively prevent rain drop erosion, grass-seed is avoided to be flushed away, nutrition soil layer provides suitable growing environment for vegetation grass-seed, keeps plant growth vigorous, can realize the greening vegetation effect of good road bank protection.

Description

A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection
Technical field
This disclosure relates to which slope protection project field more particularly to a kind of three dimensional network combine environmental protection careless blanket slope protection construction side Method.
Background technology
Slope protection mainly protects roadbed side slope surface from rain drop erosion, prevents and delay soft rock-soil surface wind Change, is degraded at fragmentation, and the overall stability of roadbed side slope is kept, and beautifies the appearance of a street and harmonizing nature environment.Common slope protection is set Biological protection, engineering protection and geotextile protection are applied.Now, as select biology anti-as possible for the protection method of side slope Shield, to reach the multiple effect of slope protection, greening, beautification.
Roadbed slope biological protection currently mainly has vegetative protection, three-dimension vegetative net protection, hydro seeding, alien earth sparging etc. Mode.Since vegetation growth needs certain period, at the initial stage of greening construction, rainwater causes slope surface to destroy slope wash, Three-dimensional mesh sheet is come to nothing, and whole vegetation is difficult to be formed, and directly affects the effect of slope protection.
Invention content
The disclosure is designed to provide a kind of method that three dimensional network combines the careless blanket of environmental protection to carry out road slope protection greening, in turn One or more is overcome the problems, such as caused by the limitation and defect of the relevant technologies at least to a certain extent.
The embodiment of the present disclosure provides a kind of careless blanket slope protection construction method of three dimensional network combination environmental protection, and this method includes:
Side slope is pre-processed, including obtains the side slope soil parameter, and the Slope leveling is made to stablize;
The top of the slope of the side slope after the pre-treatment is laid with downwards three dimensional network to slope foot, and when laying makes the three dimensional network sprawl It smoothes out and tenses, three dimensional network described in next stage is pressed under three dimensional network described in upper level and realizes overlap joint, fixing piece is used in combination to anchor The three dimensional network;Wherein, the overlap width is not less than 10cm, while overlap institute between the three dimensional network Fixing piece anchoring is stated to reinforce;
Nutrition Soil ingredient is determined according to the soil parameters, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and the system of spraying The standby Nutrition Soil is in formation Nutrition Soil base on the three dimensional network;
The soil of mixotrophism containing grass-seed sow grass seeds by duster in the Nutrition Soil base;Battalion in the wherein described soil of mixotrophism containing grass-seed Foster soil is consistent with the ingredient of Nutrition Soil base, and the grass-seed determines according to the soil parameters;
In the anchor ditch for the top of the slope that the careless blanket front end of environmental protection without grass-seed is laid on the side slope and with the fixing piece anchor Gu then being unfolded to be laid with from top to down by the careless blanket of the environmental protection, environmental protection grass blanket described in next stage is pressed in upper one when being laid with overlap joint Under the careless blanket of the grade environmental protection, while the overlap is anchored with the fixing piece and is reinforced, and the adjacent careless blanket of the environmental protection Overlap width is more than 10cm;
The careless blanket of the environmental protection of laying is conserved.
Wherein, the gradient of the side slope is 45~60 degree.
Wherein, the careless blanket of the environmental protection of laying is conserved, including:
It is conserved using waterwheel, and controls the nozzle on the waterwheel at a distance from the slope surface of the side slope, water yield And movement speed, so that the water sprayed nebulizes and equably moistens the slope surface.
Wherein, the three dimensional network is EM4 type three dimensional networks, mass area ratio 350g/m2, transverse direction and longitudinal direction tensile strength is 2kN/m。
Wherein, the fixing piece is U-shaped nail.
Wherein, fixing piece described in every square meter is no less than 6 when being fixed to the three dimensional network and the careless blanket of the environmental protection.
Wherein, the soil parameters includes at least amount containing soil and acid-base value;The type of the grass-seed and the battalion of injection The thickness for supporting soil matrix layer is determined by side slope soil property amount containing soil and acid-base value.
Wherein, the grass-seed includes one or more of Festuca Arundinacea, torch, false indigo, locust tree, elm.
The embodiment of the present disclosure also provides a kind of careless blanket slope protection construction method of three dimensional network combination environmental protection, and this method includes:
Side slope is pre-processed, including obtains the side slope soil parameter, and the Slope leveling is made to stablize;
The top of the slope of the side slope after the pre-treatment is laid with downwards three dimensional network to slope foot, and when laying makes the three dimensional network sprawl It smoothes out and tenses, three dimensional network described in next stage is pressed under three dimensional network described in upper level and realizes overlap joint, fixing piece is used in combination to anchor The three dimensional network;Wherein, the overlap width is not less than 10cm, while overlap institute between the three dimensional network Fixing piece anchoring is stated to reinforce;
Nutrition Soil ingredient is determined according to the soil parameters, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and the system of spraying The standby Nutrition Soil is in formation Nutrition Soil base on the three dimensional network;
It will be anchored in the anchor ditch for the top of the slope that environmental protection careless blanket front end containing grass-seed is laid on the side slope and with the fixing piece, Then the careless blanket of the environmental protection is unfolded to be laid with from top to down, environmental protection grass blanket described in next stage is pressed in upper level institute when being laid with overlap joint It states under environmentally friendly careless blanket, while the overlap is anchored with the fixing piece and reinforced, and the overlap joint of the adjacent careless blanket of the environmental protection Partial width is more than 10cm;
The careless blanket of the environmental protection of laying is conserved.
Wherein, the gradient of the side slope is less than 45 degree;
Wherein, the careless blanket of the environmental protection of laying is conserved, including:
It is conserved using waterwheel, and controls the nozzle on the waterwheel at a distance from the slope surface of the side slope, water yield And movement speed, so that the water sprayed nebulizes and equably moistens the slope surface.
Wherein, the three dimensional network is EM4 type three dimensional networks, mass area ratio 350g/m2, transverse direction and longitudinal direction tensile strength is 2kN/m。
Wherein, the fixing piece is U-shaped nail.
Wherein, fixing piece described in every square meter is no less than 6 when being fixed to the three dimensional network and the careless blanket of the environmental protection.
Wherein, the soil parameters includes at least amount containing soil and acid-base value;The type of the grass-seed and the battalion of injection The thickness for supporting soil matrix layer is determined by side slope soil property amount containing soil and acid-base value.
Wherein, the grass-seed includes one or more of Festuca Arundinacea, torch, false indigo, locust tree, elm.
The technical scheme provided by this disclosed embodiment can include the following benefits:
In above-described embodiment of the disclosure, when slope greening is constructed, the careless blanket construction of environmental protection is combined using three dimensional network, and should Three-dimensional web structure and the careless blanket of environmental protection can be more effectively fixed in side slope, are conducive to subsequent slope greening and constructed, are simultaneously Raising afforestation effect, side slope carry out pretreatment and obtain side slope soil parameter, according to the soil parameters determine Nutrition Soil at Point and grass-seed, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and spray the Nutrition Soil of preparation in the galvanized wire mesh Upper formation Nutrition Soil base, then in the soil of mixotrophism containing grass-seed of sowing grass seeds by duster in the Nutrition Soil base, by the ring without grass-seed It protects careless blanket to be unfolded to be laid with to limes marginis from top to down, or the Nutrition Soil that directly prepared by injection is in shape on the three dimensional network At Nutrition Soil base, it is then laid with the careless blanket of environmental protection containing grass-seed, finally the careless blanket of the environmental protection of laying is conserved, it is non-in this way Often with targeted, the construction method being adapted for different soil properties, the side slope of different gradient, determination and the battalion wherein used Soil and grass-seed are supported, so as to improve construction quality, and conducive to the germination of grass-seed and is survived, and then slope greening effect can be improved Fruit.It can effectively prevent rain drop erosion in the present embodiment, grass-seed is avoided to be flushed away, it is suitable that nutrition soil layer provides for vegetation grass-seed Growing environment, keep plant growth vigorous, can realize the greening vegetation effect of good road bank protection, meet actual use and want It asks.
Description of the drawings
Fig. 1 shows that three dimensional network combines the careless blanket slope protection construction method flow chart of environmental protection in the embodiment of the present disclosure;
Fig. 2 shows another three dimensional networks in the embodiment of the present disclosure to combine the careless blanket slope protection construction method flow chart of environmental protection;
Fig. 3 shows the side slope schematic diagram after constructing in disclosure exemplary embodiment;
Fig. 4 shows another schematic diagram of side slope after constructing in disclosure exemplary embodiment;
Three dimensional network overlap joint schematic diagram when Fig. 5 shows to be laid in disclosure exemplary embodiment;
Fig. 6 shows U-shaped nail schematic diagram in disclosure exemplary embodiment;
Specific implementation mode
Example embodiment is described more fully with reference to the drawings.However, example embodiment can be with a variety of shapes Formula is implemented, and is not understood as limited to example set forth herein;On the contrary, thesing embodiments are provided so that the disclosure will more Fully and completely, and by the design of example embodiment comprehensively it is communicated to those skilled in the art.Described feature, knot Structure or characteristic can be in any suitable manner incorporated in one or more embodiments.
In addition, attached drawing is only the schematic illustrations of the disclosure, it is not necessarily drawn to scale.Identical attached drawing mark in figure Note indicates same or similar part, thus will omit repetition thereof.
It please refers to shown in Fig. 1, the careless blanket slope protection construction method of environmental protection is combined for a kind of three dimensional network that the embodiment of the present disclosure provides Flow chart, this approach includes the following steps:
S101:Side slope is pre-processed, including obtains the side slope soil parameter, and keeps the Slope leveling steady It is fixed.
Specifically, combining with reference to shown in figure 3~5, detailed measurements can be carried out before pretreatment to construction site topography and geomorphology, are stepped on Survey, the palm seals side slope soil property situation, side slope angle, length of grade and slope periphery plant growth situation, soil sampling inspection, measure amount containing soil and Acid-base value;Then stablize the Slope leveling, main slope surface is answered straight, smooth, smooth and stablized, by the unstable stone of slope surface Or eliminating impurities, must not there are turquoise, danger stone.For the method that unstable slope surface should use special anchoring, Medium Culture is without engineering The bumps such as rubbish and big stone, weeds manually fill and lead up processing for being used at slope surface gully.
S102:The top of the slope of the side slope after the pre-treatment is laid with downwards three dimensional network 1 to slope foot, and when laying makes the three-dimensional Net 1 is sprawled smooth-going and is tensed, and three dimensional network described in next stage 1 is pressed under three dimensional network 1 described in upper level and realizes overlap joint, is used in combination solid Determine part and anchors 5 three dimensional networks 1;Wherein, the overlap width is not less than 10cm between the three dimensional network 1, while described Overlap is anchored with the fixing piece 5 to be reinforced.
The fixation of the three dimensional network 1 can be improved in the present embodiment by width and fixing piece 5 that overlap is arranged Effect is so that it can more effectively be fixed in side slope.Further, the three dimensional network 1 is EM4 type three dimensional networks, unit area Quality 350g/m2, transverse direction and longitudinal direction tensile strength is 2kN/m.Side when can improve construction using the three dimensional network of the specific model The anchoring effect on slope improves construction quality.
S103:Nutrition Soil ingredient is determined according to the soil parameters, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and spray The Nutrition Soil of preparation is penetrated in formation Nutrition Soil base 2 on the three dimensional network 1;
Wherein, the soil parameters includes at least amount containing soil and acid-base value;Injection the Nutrition Soil base 2 thickness by The amount containing soil and acid-base value of the side slope soil property determine that the thickness of Nutrition Soil base 2 can be 2-5 centimetres in the present embodiment.It should Nutrition Soil can be used for improveing side slope soil to improve the germination percentage and survival rate of grass-seed, and then improve afforestation effect.Wherein institute Nutrition Soil is stated to be prepared by following manner:Clayed soil is pulverized and sieved;The crushing is weighed respectively according to preset weight part Clayed soil, base manure, composite fertilizer, binder, water-retaining agent after sieving, be then sufficiently stirred after mixing to get.Wherein institute Stating preset weight part includes:The clayed soil of 8-11 parts by weight, the base manure of 1-3 parts by weight, 0.001-0.005 parts by weight it is compound The water-retaining agent of fertilizer, the binder of 0.1-0.4 parts by weight, 0.1-0.5 parts by weight.The clay content of the wherein described clayed soil is 30%-50%;The plasticity index of the clayed soil is 17-32;The base manure includes stack retting mushroom fertilizer, farm manure, pond sludge, heap Macerate at least one of the chemical fertilizer of rice bran, fertile soil, phosphorous potassium;The composite fertilizer is the composite fertilizer containing nitrate nitrogen;The guarantor Aqua is acrylamide and acrylic acid salt crosslinking copolymerization object.
The Nutrition Soil prepared using the above method, on the one hand can improve the granule that Nutrition Soil occurs after a period of use Structure persistently supplies moisture needed for plant growth, drought resisting, water-saving fertilizer-saving, to improve the hair of taking root of slope greening grass blanket seed Bud rate ensures the growth quality of plant, Prolong green period, and then improves slope greening effect;On the other hand, this method operation letter It is single, it is time-consuming short, effectively increase the construction efficiency of slope revegetation engineering.
S104:The soil of mixotrophism containing grass-seed 3 sow grass seeds by duster in the Nutrition Soil base 2;The wherein described mixotrophism containing grass-seed Nutrition Soil in soil 3 is consistent with the ingredient of the Nutrition Soil base 2, and the grass-seed determines according to the soil parameters.
Specifically, the grass-seed may include one or more of Festuca Arundinacea, torch, false indigo, locust tree, elm.Cause After such grass-seed growth, well developed root system, survival ability is strong, manages and protects conveniently, protection effect is more preferable.Meanwhile according to green requirement again, being It reduces maintenance cost to the greatest extent, in grass-seed selection, generally selects Festuca Arundinacea, torch, false indigo, locust tree, elm well developed root system pipe Shield facilitates nursery stock, and in one embodiment, Festuca Arundinacea is pressed per 20 grams of configurations of square meter, other several seed weights are pressed per square meter 40 Gram configuration.
In addition it is to ensure grass-seed large-area construction bud ratio, before large-area construction, it is necessary to first test seed germination rate, such as Bud ratio is relatively low, it is necessary to replace seed immediately and retest.Seed must be handled before sowing grass seeds by duster, ensure that seed can be uniformly Sprout simultaneously, seed treatment the purpose is to reduce pest and disease damage and promote seed ahead of time germinate.Specific method may include walking as follows Suddenly:
Initial point selection:Choose healthy, full grains vegetable seeds;
Seed disinfection:In the seed disinfection liquid that solution concentration is 4%-6%, selected seed is impregnated 2-3 hours;
Additive treating:It is small that seed after disinfection is put into immersion 2-3 in the additive that solution concentration is 0.1 ‰ -0.2 ‰ When, the additive is 1 by volume ratio:1 promoter and germinator composition;
Seed soaking:The seed is sterilized with after additive treating, is put into the water of preset temperature and is carried out according to preset time It impregnates.
In the seed soaking step, further, Robinia pseudoacacia Seeds, false indigo seed, shrub lespedeza seed, Caragana Microphylla Seed are put into It is impregnated for the first time 24 hours in the water that temperature is 50-60 DEG C;Unexpanded seed is in 50-60 DEG C of water after first time is impregnated Second of immersion 24 hours;Unexpanded seed, which is put into 100 DEG C of boiling water, after impregnating for second boils 10 seconds, places into 5-30 DEG C It is impregnated 24 hours in water.
In another embodiment, alfalfa seed, prairie milk vetch seed, Trifolium repense seed are put into 35~40 DEG C of water and impregnate 12 Hour.
In another embodiment, tall fescue seed, coreopsis seed are put into 5-30 DEG C of water and are impregnated 12 hours;It is wherein every A water was changed every 3 hours, to ensure in water containing sufficient oxygen.
By taking Festuca Arundinacea grass-seed as an example, reach 15 degree or more in temperature, normally 1 week or so Festuca Arundinacea will be sent out after sowing grass seeds by duster Bud, entire slope surface will greening, 10 to 15 days or so, other seeds will germinate, and wait for 1 month to 1 half a month or so Festuca Arundinacea It grows up, Festuca Arundinacea impacts other seedling growths in order to prevent, and using needle Festuca Arundinacea class herbicide, Festuca Arundinacea is killed, Retain other plant.
In another embodiment, more convenient for some maintenances, it does not require nothing more than again green, also requires certain landscape effect , Festuca Arundinacea, alfalfa, false indigo, red clover, coreopsis, caragana microphylla, prairie milk vetch, shrub lespedeza etc. on selection of seedling, per square meter Based on 60 grams, each seed is equal in weight.
The careless blanket grass-seed, that is, seed of environmental protection is handled by the above method, the careless blanket seed of slope greening environmental protection can be not only eliminated and take Disease carrying germ can also improve the resistance of seed, effectively reduce the incidence of the careless blanket seed of slope greening environmental protection.Use present invention side The careless blanket percentage of seedgermination of method treated slope greening environmental protection is up to 93% or more, and the survival rate of seedling is up to 90% or more, significantly Improve slope greening effect.
S105:Careless 4 expansion from top to down of blanket of environmental protection without grass-seed is laid with, it will be environmentally friendly described in next stage when being laid with overlap joint Careless blanket 4 is pressed under environmental protection grass blanket 4 described in upper level, while the overlap is anchored with the fixing piece 5 and reinforced, and adjacent The overlap width of the environmental protection grass blanket 4 is more than 10cm.
Specifically, as shown in fig. 6, the fixing piece 5 is U-shaped nail, the U-shaped nail can use the bar material of diameter 8mm It constitutes, stronger fixation can be kept.Wherein, U-shaped described in every square meter when being fixed to the three dimensional network 1 and the careless blanket 4 of the environmental protection Nail no less than 6 is conducive to construction so that three dimensional network 1 and the careless blanket of environmental protection 4 are fixed smooth, secured.
Please refer to Fig. 5, wherein to 4 overlapping mode of the three dimensional network 1 and the careless blanket of environmental protection, lap width is not less than 10cm, the fixed effect of the three dimensional network 1 can be improved so that it can more by crossing the width that overlap is arranged and fixing piece 5 It is effectively fixed in side slope, is conducive to follow-up greening construction.
S106:The careless blanket of the environmental protection of laying is conserved.
Specifically, can be conserved using waterwheel, and the nozzle on the control waterwheel and the slope surface of the side slope Distance, water yield and movement speed, so that the water sprayed nebulizes and equably moistens the slope surface.It can be prevented in this way by seed It breaks up, improves percentage of seedgermination and survival rate, and then improve slope greening effect.
In order to further increase slope greening effect, when maintenance, in the first preset number of days, supported using the waterwheel Water spray pours the slope surface when shield;After first preset number of days, in the second preset number of days, carried out using the waterwheel Fertilizer is added in the water of pouring when maintenance, to improve seed young shoot and growth of seedling.
Specifically, first preset number of days can be 45 days, i.e. seed maintenance early period generally 45 days, germination period 15 days Depth of wetted soil control is gradually increased depth of wetted soil to 5cm or more, early period in 2cm or so, Seedling Stage according to the development of root system of plant Curing time is that twice, once in the morning and once at night, morning curing time should be completed before 10 points, and maintenance in afternoon should be 16 for maintenance daily Start after point, avoids carrying out wet curing under strong sunlight, in order to avoid cause physiological water shortage and induce pest and disease damage.In height Warm arid season, seed young shoot and seedling should increase 1-2 maintenance daily since ground high temperature is easy injury;It rains or cloudy Maintenance number can suitably be reduced.
Late maintaining is to promote seedling growth, and the fertilizer such as composite fertilizer and urea can be added in watering pours water after 45 days, is applied fertilizer Principle it is multiple on a small quantity, urea by per acre 2 kilograms, composite fertilizer by 2 kilograms per acre applications.The fertilising period is 30-45 days or so, i.e., Second preset number of days is 30-45 days, specifically depending on seedling growth situation.
Wherein, the gradient of the side slope is 45~60 degree.When gradient difference, the anchoring effect of three-dimensional web structure can be influenced The degree that fruit and grass-seed are washed.The moderate side slope of the gradient that 45~60 degree of embodiment of the present disclosure said program pair have compared with Good construction effect so that the three-dimensional web structure can be more effectively fixed on compared on gradient slope, be conducive to subsequent slope greening Construction, and then slope greening construction effect can be improved.
Fig. 2 is please referred to, the careless blanket slope protection construction method stream of environmental protection is combined for another three dimensional network that the embodiment of the present disclosure provides Cheng Tu, this method and above-described embodiment are different only in that, the environmental protection grass without grass-seed is replaced using the careless blanket of environmental protection containing grass-seed Blanket, while Nutrition Soil 3 of only sowing grass seeds by duster.This method can be adapted for the side slope that the gradient is less than 45 degree.Specifically, this method may include Following steps:
S201:Side slope is pre-processed, including obtains the side slope soil parameter, and keeps the Slope leveling steady It is fixed.
Specifically, combining with reference to shown in figure 3~5, detailed measurements can be carried out before pretreatment to construction site topography and geomorphology, are stepped on Survey, the palm seals side slope soil property situation, side slope angle, length of grade and slope periphery plant growth situation, soil sampling inspection, measure amount containing soil and Acid-base value;Then stablize the Slope leveling, main slope surface is answered straight, smooth, smooth and stablized, by the unstable stone of slope surface Or eliminating impurities, must not there are turquoise, danger stone.For the method that unstable slope surface should use special anchoring, Medium Culture is without engineering The bumps such as rubbish and big stone, weeds manually fill and lead up processing for being used at slope surface gully.
S202:The top of the slope of the side slope after the pre-treatment is laid with downwards three dimensional network to slope foot, and when laying makes the three-dimensional Net laying flattening is suitable and tenses, and three dimensional network described in next stage is pressed under three dimensional network described in upper level and realizes overlap joint, fixation is used in combination Part anchors the three dimensional network;Wherein, the overlap width is not less than 10cm, while the clinch between the three dimensional network Divide to be anchored with the fixing piece and reinforce.
The fixation of the three dimensional network 1 can be improved in the present embodiment by width and fixing piece 5 that overlap is arranged Effect is so that it can more effectively be fixed in side slope.Further, the three dimensional network 1 is EM4 type three dimensional networks, unit area Quality 350g/m2, transverse direction and longitudinal direction tensile strength is 2kN/m.Side when can improve construction using the three dimensional network of the specific model The anchoring effect on slope improves construction quality.
S203:Nutrition Soil ingredient is determined according to the soil parameters, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and spray The Nutrition Soil of preparation is penetrated in formation Nutrition Soil base on the three dimensional network.
Wherein, the soil parameters includes at least amount containing soil and acid-base value;Injection the Nutrition Soil base 2 thickness by The amount containing soil and acid-base value of the side slope soil property determine.The Nutrition Soil can be used for improveing side slope soil to improve the germination of grass-seed Rate and survival rate, and then improve afforestation effect.The Nutrition Soil is prepared by following manner:Clayed soil is pulverized and sieved, Weigh clayed soil, base manure, composite fertilizer, binder, water-retaining agent after described pulverize and sieve respectively according to preset weight part, then Be sufficiently stirred after mixing to get.Wherein described preset weight part includes:The clayed soil of 8-11 parts by weight, 1-3 parts by weight Base manure, the composite fertilizer of 0.001-0.005 parts by weight, the binder of 0.1-0.4 parts by weight, 0.1-0.5 parts by weight water-retaining agent. The clay content of the clayed soil is 30%-50%;The plasticity index of the clayed soil is 17-32;The base manure includes At least one of the chemical fertilizer of stack retting mushroom fertilizer, farm manure, pond sludge, stack retting rice bran, fertile soil, phosphorous potassium;The composite fertilizer For the composite fertilizer containing nitrate nitrogen;The water-retaining agent is acrylamide and acrylic acid salt crosslinking copolymerization object.
The Nutrition Soil prepared using the above method, on the one hand can improve the granule that Nutrition Soil occurs after a period of use Structure persistently supplies moisture needed for plant growth, drought resisting, water-saving fertilizer-saving, to improve the hair of taking root of slope greening grass blanket seed Bud rate ensures the growth quality of plant, Prolong green period, and then improves slope greening effect;On the other hand, this method operation letter It is single, it is time-consuming short, effectively increase the construction efficiency of slope revegetation engineering.
S204:In the anchor ditch for the top of the slope that the careless blanket front end of environmental protection containing grass-seed is laid on the side slope and with the fixing piece Then the careless blanket of the environmental protection is unfolded to be laid with from top to down by anchoring, be pressed in environmental protection grass blanket described in next stage when being laid with overlap joint Under environmental protection grass blanket described in level-one, while the overlap is anchored with the fixing piece and is reinforced, and the adjacent careless blanket of the environmental protection Overlap width be more than 10cm.
Specifically, as shown in fig. 6, the fixing piece 5 is U-shaped nail, the U-shaped nail can use the bar material of diameter 8mm It constitutes, stronger fixation can be kept.Wherein, U-shaped described in every square meter when being fixed to the three dimensional network 1 and the careless blanket 4 of the environmental protection Nail no less than 6 is conducive to construction so that three dimensional network 1 and the careless blanket of environmental protection 4 are fixed smooth, secured.
Please refer to Fig. 5, wherein to 4 overlapping mode of the three dimensional network 1 and the careless blanket of environmental protection, lap width is not less than 10cm, the fixed effect of the three dimensional network 1 can be improved so that it can more by crossing the width that overlap is arranged and fixing piece 5 It is effectively fixed in side slope, is conducive to follow-up greening construction.
In the present embodiment, the type of the grass-seed is determined by side slope soil property amount containing soil and acid-base value.The grass-seed May include one or more of Festuca Arundinacea, torch, false indigo, locust tree, elm.After being grown because of such grass-seed, well developed root system, Survival ability is strong, manages and protects conveniently, protection effect is more preferable.Meanwhile according to green requirement again, in order to reduce maintenance cost to the greatest extent, in grass In seed selection, Festuca Arundinacea, torch, false indigo, locust tree, elm well developed root system is generally selected to manage and protect and facilitate nursery stock, in one embodiment In, Festuca Arundinacea is pressed per 20 grams of configurations of square meter, other several seed weights are pressed per 40 grams of configurations of square meter.
In addition it is to ensure grass-seed large-area construction bud ratio, before large-area construction, it is necessary to first test seed germination rate, such as Bud ratio is relatively low, it is necessary to replace seed immediately and retest.Seed must be handled before sowing grass seeds by duster, ensure that seed can be uniformly Sprout simultaneously, seed treatment the purpose is to reduce pest and disease damage and promote seed ahead of time germinate.Specific method can be:
Initial point selection:Choose healthy, full grains vegetable seeds;
Seed disinfection:In the seed disinfection liquid that solution concentration is 4%-6%, selected seed is impregnated 2-3 hours;
Additive treating:It is small that seed after disinfection is put into immersion 2-3 in the additive that solution concentration is 0.1 ‰ -0.2 ‰ When, the additive is 1 by volume ratio:1 promoter and germinator composition;
Seed soaking:The seed is sterilized with after additive treating, is put into the water of preset temperature and is carried out according to preset time It impregnates.
In the seed soaking step, further, Robinia pseudoacacia Seeds, false indigo seed, shrub lespedeza seed, Caragana Microphylla Seed are put into It is impregnated for the first time 24 hours in the water that temperature is 50-60 DEG C;Unexpanded seed is in 50-60 DEG C of water after first time is impregnated Second of immersion 24 hours;Unexpanded seed, which is put into 100 DEG C of boiling water, after impregnating for second boils 10 seconds, places into 5-30 DEG C It is impregnated 24 hours in water.
In another embodiment, alfalfa seed, prairie milk vetch seed, Trifolium repense seed are put into 35~40 DEG C of water and impregnate 12 Hour.
In another embodiment, tall fescue seed, coreopsis seed are put into 5-30 DEG C of water and are impregnated 12 hours;It is wherein every A water was changed every 3 hours, to ensure in water containing sufficient oxygen.
By taking Festuca Arundinacea grass-seed as an example, reach 15 degree or more in temperature, normally 1 week or so Festuca Arundinacea will be sent out after sowing grass seeds by duster Bud, entire slope surface will greening, 10 to 15 days or so, other seeds will germinate, and wait for 1 month to 1 half a month or so Festuca Arundinacea It grows up, Festuca Arundinacea impacts other seedling growths in order to prevent, and using needle Festuca Arundinacea class herbicide, Festuca Arundinacea is killed, Retain other plant.
In another embodiment, more convenient for some maintenances, it does not require nothing more than again green, also requires certain landscape effect , Festuca Arundinacea, alfalfa, false indigo, red clover, coreopsis, caragana microphylla, prairie milk vetch, shrub lespedeza etc. on selection of seedling, per square meter Based on 60 grams, each seed is equal in weight.
The careless blanket grass-seed, that is, seed of environmental protection is handled by the above method, the careless blanket seed of slope greening environmental protection can be not only eliminated and take Disease carrying germ can also improve the resistance of seed, effectively reduce the incidence of the careless blanket seed of slope greening environmental protection.Use present invention side The careless blanket percentage of seedgermination of method treated slope greening environmental protection is up to 93% or more, and the survival rate of seedling is up to 90% or more, significantly Improve slope greening effect.
S205:The careless blanket of the environmental protection of laying is conserved.
Specifically, can be conserved using waterwheel, and the nozzle on the control waterwheel and the slope surface of the side slope Distance, water yield and movement speed, so that the water sprayed nebulizes and equably moistens the slope surface.It can be prevented in this way by seed It breaks up, improves percentage of seedgermination and survival rate, and then improve slope greening effect.
In order to further increase slope greening effect, when maintenance, in the first preset number of days, supported using the waterwheel Water spray pours the slope surface when shield;After first preset number of days, in the second preset number of days, carried out using the waterwheel Fertilizer is added in the water of pouring when maintenance, to improve seed young shoot and growth of seedling.
Specifically, first preset number of days can be 45 days, i.e. seed maintenance early period generally 45 days, germination period 15 days Depth of wetted soil control is gradually increased depth of wetted soil to 5cm or more, early period in 2cm or so, Seedling Stage according to the development of root system of plant Curing time is that twice, once in the morning and once at night, morning curing time should be completed before 10 points, and maintenance in afternoon should be 16 for maintenance daily Start after point, avoids carrying out wet curing under strong sunlight, in order to avoid cause physiological water shortage and induce pest and disease damage.In height Warm arid season, seed young shoot and seedling should increase 1-2 maintenance daily since ground high temperature is easy injury;It rains or cloudy Maintenance number can suitably be reduced.
Late maintaining is to promote seedling growth, and the fertilizer such as composite fertilizer and urea can be added in watering pours water after 45 days, is applied fertilizer Principle it is multiple on a small quantity, urea by per acre 2 kilograms, composite fertilizer by 2 kilograms per acre applications.The fertilising period is 30-45 days or so, i.e., Second preset number of days is 30-45 days, specifically depending on seedling growth situation.
Wherein, the gradient of the side slope is less than degree.When gradient difference, the anchoring effect of three-dimensional web structure can be influenced, with And the degree that grass-seed is washed.Embodiment of the present disclosure said program, which has the side slope of the gentle gradient less than 45 degree, preferably to be applied Work efficiency fruit so that the three-dimensional web structure can be more effectively fixed on compared on gradient slope, be constructed conducive to subsequent slope greening, into And slope greening construction effect can be improved.
Above-described embodiment of the disclosure, being used for different side slopes has targetedly construction method, such as in the gradient When being 45~60 degree, the careless blanket construction method of the environmental protection without grass-seed is combined using three dimensional network, improves slope greening antiscour function, Prevent heavy rain erosion side slope, the grass-seed in Nutrition Soil base is avoided to be flushed away, environmental protection grass blanket provides suitable growth for vegetation Environment, plant growth is vigorous, and afforestation effect is good.When the gradient is less than 45 degree, i.e., for more gentle side slope, using three dimensional network In conjunction with the careless blanket construction method of environmental protection containing grass-seed.There is specific aim very much in this way, for different soil properties, the side slope of different gradient, Adaptable construction method and the Nutrition Soil wherein used and grass-seed are determined, so as to improve construction quality, and conducive to grass It the germination of seed and survives, and then slope greening effect can be improved.It can effectively prevent rain drop erosion in the present embodiment, avoid grass-seed It is flushed away, nutrition soil layer provides suitable growing environment for vegetation grass-seed, keeps plant growth vigorous, can realize good road The greening vegetation effect of road bank protection, meets actual operation requirements..
In the description of the disclosure, it is to be understood that term "center", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of It describes the disclosure and simplifies to describe, do not indicate or imply the indicated device or element must have a particular orientation, with spy Fixed azimuth configuration and operation, therefore should not be understood as the limitation to the disclosure.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the disclosure, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
In the disclosure unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be that machinery connects It connects, can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary in two elements The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the disclosure.
In the disclosure unless specifically defined or limited otherwise, fisrt feature the "upper" of second feature or "lower" It may include that the first and second features are in direct contact, can also not be to be in direct contact but pass through it including the first and second features Between other characterisation contact.Moreover, fisrt feature second feature " on ", " top " and " above " include first special Sign is right over second feature and oblique upper, or is merely representative of fisrt feature level height and is higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include fisrt feature immediately below second feature and obliquely downward, or be merely representative of Fisrt feature level height is less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is contained at least one embodiment or example of the disclosure.In the present specification, schematic expression of the above terms are not It must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in office What can be combined in any suitable manner in one or more embodiments or example.In addition, those skilled in the art can say this Different embodiments or examples described in bright book are engaged and are combined.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to its of the disclosure Its embodiment.This application is intended to cover any variations, uses, or adaptations of the disclosure, these modifications, purposes or Person's adaptive change follows the general principles of this disclosure and includes the undocumented common knowledge in the art of the disclosure Or conventional techniques.The description and examples are only to be considered as illustrative, and the true scope and spirit of the disclosure are by appended Claim is pointed out.

Claims (10)

1. a kind of three dimensional network combines the careless blanket slope protection construction method of environmental protection, which is characterized in that this method includes:
Side slope is pre-processed, including obtains the side slope soil parameter, and the Slope leveling is made to stablize;
The top of the slope of the side slope after the pre-treatment is laid with downwards three dimensional network to slope foot, and when laying makes the three dimensional network sprawl smooth-going And tense, three dimensional network described in next stage is pressed in and realizes and overlaps under three dimensional network described in upper level, is used in combination described in fixing piece anchors Three dimensional network;Wherein, the overlap width is not less than 10cm between the three dimensional network, while the overlap is with described solid Determine part anchoring to reinforce;
Nutrition Soil ingredient is determined according to the soil parameters, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and spray preparation The Nutrition Soil is in formation Nutrition Soil base on the three dimensional network;
The soil of mixotrophism containing grass-seed sow grass seeds by duster in the Nutrition Soil base;Nutrition Soil in the wherein described soil of mixotrophism containing grass-seed Consistent with the ingredient of Nutrition Soil base, the grass-seed determines according to the soil parameters;
The careless blanket of environmental protection without grass-seed is unfolded to be laid with from top to down from top of the slope, is laid with environmental protection grass blanket described in next stage when overlapping It is pressed under environmental protection grass blanket described in upper level, while the overlap is anchored with the fixing piece and reinforced, and the adjacent ring The overlap width for protecting careless blanket is more than 10cm;
The careless blanket of the environmental protection of laying is conserved.
2. construction method according to claim 1, which is characterized in that the gradient of the side slope is 45~60 degree.
3. a kind of three dimensional network combines the careless blanket slope protection construction method of environmental protection, which is characterized in that this method includes:
Side slope is pre-processed, including obtains the side slope soil parameter, and the Slope leveling is made to stablize;
The top of the slope of the side slope after the pre-treatment is laid with downwards three dimensional network to slope foot, and when laying makes the three dimensional network sprawl smooth-going And tense, three dimensional network described in next stage is pressed in and realizes and overlaps under three dimensional network described in upper level, is used in combination described in fixing piece anchors Three dimensional network;Wherein, the overlap width is not less than 10cm between the three dimensional network, while the overlap is with described solid Determine part anchoring to reinforce;
Nutrition Soil ingredient is determined according to the soil parameters, Nutrition Soil is prepared based on the Nutrition Soil ingredient, and spray preparation The Nutrition Soil is in formation Nutrition Soil base on the three dimensional network;
The careless blanket of environmental protection containing grass-seed is unfolded to be laid with from top to down from top of the slope, is laid with environmental protection grass blanket pressure described in next stage when overlapping Under the environmental protection grass blanket described in upper level, while the overlap is anchored with the fixing piece and is reinforced, and the adjacent environmental protection The overlap width of careless blanket is more than 10cm;
The careless blanket of the environmental protection of laying is conserved.
4. construction method according to claim 3, which is characterized in that the gradient of the side slope is less than 45 degree.
5. according to the construction method of claim 1 or 3, which is characterized in that conserve, wrap to the careless blanket of the environmental protection of laying It includes:
It is conserved using waterwheel, and controls the nozzle on the waterwheel at a distance from the slope surface of the side slope, water yield and shifting Dynamic speed, so that the water sprayed nebulizes and equably moistens the slope surface.
6. according to the construction method of claim 1 or 3, which is characterized in that the three dimensional network is EM4 type three dimensional networks, unit plane Product quality 350g/m2, transverse direction and longitudinal direction tensile strength is 2kN/m.
7. according to the construction method of claim 1 or 3, which is characterized in that the fixing piece is U-shaped nail.
8. construction method according to claim 1 or 3, which is characterized in that solid to the three dimensional network and the careless blanket of the environmental protection Fixing piece is no less than 6 described in the every square meter of timing.
9. according to the construction method of claim 1 or 3, which is characterized in that the soil parameters includes at least amount containing soil and acid Basicity;The thickness of the type of the grass-seed and the Nutrition Soil base of injection is by side slope soil property amount containing soil and acid-base value It determines.
10. construction method according to claim 1 or 3, which is characterized in that the grass-seed includes Festuca Arundinacea, torch, purple fringe One or more of Chinese scholartree, locust tree, elm.
CN201810833568.XA 2018-07-26 2018-07-26 A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection Pending CN108677975A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810833568.XA CN108677975A (en) 2018-07-26 2018-07-26 A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810833568.XA CN108677975A (en) 2018-07-26 2018-07-26 A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection

Publications (1)

Publication Number Publication Date
CN108677975A true CN108677975A (en) 2018-10-19

Family

ID=63815164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810833568.XA Pending CN108677975A (en) 2018-07-26 2018-07-26 A kind of careless blanket slope protection construction method of three dimensional network combination environmental protection

Country Status (1)

Country Link
CN (1) CN108677975A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211203A (en) * 2020-10-19 2021-01-12 北京绿矿联合工程技术研究院(有限合伙) High-strength structure organic fiber composite repair method for high and steep slope
CN114718093A (en) * 2022-04-22 2022-07-08 中国科学院成都生物研究所 Method for covering green exposed rock slope by using moss ecological blanket

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1383714A (en) * 2002-06-14 2002-12-11 章梦涛 Mixed planting material for rocky slope and its prepn and construction process
CN102138428A (en) * 2011-04-07 2011-08-03 北京林丰源生态科技有限公司 Vegetation restoration method adopting plant fiber blanket with assist of slurry spraying
CN103290854A (en) * 2013-06-28 2013-09-11 中铁二局股份有限公司 Fast construction method of rock slope protection
CN103774679A (en) * 2012-10-22 2014-05-07 北京林业大学 Rock side slope net hanging method
CN103798047A (en) * 2014-02-27 2014-05-21 黄鹤平 Greening spray planting method
CN106869146A (en) * 2017-02-22 2017-06-20 安徽省交通建设股份有限公司 A kind of careless blanket ecoscape slope protection system and construction method
KR20170076342A (en) * 2015-12-24 2017-07-04 박재희 Environmental planting mat using vegetation polylactic acid(pla) net and construction method thereof
CN107711316A (en) * 2017-11-15 2018-02-23 合肥华福土工合成材料有限公司 A kind of laying method of Ecological Slope vegetation net

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1383714A (en) * 2002-06-14 2002-12-11 章梦涛 Mixed planting material for rocky slope and its prepn and construction process
CN102138428A (en) * 2011-04-07 2011-08-03 北京林丰源生态科技有限公司 Vegetation restoration method adopting plant fiber blanket with assist of slurry spraying
CN103774679A (en) * 2012-10-22 2014-05-07 北京林业大学 Rock side slope net hanging method
CN103290854A (en) * 2013-06-28 2013-09-11 中铁二局股份有限公司 Fast construction method of rock slope protection
CN103798047A (en) * 2014-02-27 2014-05-21 黄鹤平 Greening spray planting method
KR20170076342A (en) * 2015-12-24 2017-07-04 박재희 Environmental planting mat using vegetation polylactic acid(pla) net and construction method thereof
CN106869146A (en) * 2017-02-22 2017-06-20 安徽省交通建设股份有限公司 A kind of careless blanket ecoscape slope protection system and construction method
CN107711316A (en) * 2017-11-15 2018-02-23 合肥华福土工合成材料有限公司 A kind of laying method of Ecological Slope vegetation net

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211203A (en) * 2020-10-19 2021-01-12 北京绿矿联合工程技术研究院(有限合伙) High-strength structure organic fiber composite repair method for high and steep slope
CN114718093A (en) * 2022-04-22 2022-07-08 中国科学院成都生物研究所 Method for covering green exposed rock slope by using moss ecological blanket

Similar Documents

Publication Publication Date Title
CN103270881B (en) Rapid ecological restoration method for rock-soil side slopes
CN105926533B (en) A kind of embedded type ecology consolidates beach method
CN110565660B (en) Spray seeding construction method for slope greening
CN110485441A (en) It repairs with leaching net formula ecological slope protection structure and its construction method of sowing grass seeds by duster in mine
CN110089353A (en) A kind of hard side slope greening restoration method
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN102677684A (en) Spraying and sowing greening method for concrete anchoring and shotcreting slope
CN1140163C (en) Method for planting lawnon slope of highway in south China
CN107100176B (en) A kind of expressway slope greening system
CN109328806A (en) A kind of Tailings Dam ecological treatment method
CN104798664B (en) A kind of high abrupt slope revegetation moisture regulation system
CN1711822A (en) Evergreen vegetation planting method on slope of highway side in southern areas
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN109328809A (en) A kind of Arid&semi-arid area slope ecological system recovery method
CN109328808A (en) A kind of the Northwest's ecological treatment of slope method
CN103210783A (en) Dioscorea opposita planting method
CN106879274B (en) A kind of high steep rock hillside revegetation construct and its restore implantation methods
CN102379201A (en) Method of quick restoration of vegetation in reservoir hydro-fluctuation belt
CN108476649A (en) A kind of gardens abrupt slope plant landscape method
CN104255106A (en) Powdery ridge cultivation method for economic forests on hilly lands
CN103270832A (en) Method for controlling nitrogen and phosphorous non-point source pollution of cropland by using biological ridge
CN109328805A (en) A kind of Rocky Desertification Region ecological treatment of slope method
CN109811776A (en) A kind of assembled lattice Vierendeel girder
CN210946834U (en) Immersed net type ecological slope protection structure for mine restoration
CN107278740A (en) A kind of rocky mountainous area Rice Cropping new technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019