Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of high steep rock hillside revegetation constructs, and apply the structure
Body is built to restore the method for artificial vegetation on high steep rock hillside.
Realize the technical scheme is that
A kind of high steep rock hillside revegetation construct, the construct includes the geotechnique on rock hillside upper layer
Cell compartment, the dimensional metal mesh positioned at geotechnical grid upper layer are filled up in the space that the geotechnical grid is constituted with dimensional metal mesh
Artificial soil and stereoscopic multi-layer time vegetation positioned at artificial soil upper layer.
The geotechnical grid is made of high-intensitive high density polyethylene (HDPE) (HDPE) material, is three-dimensional netted cell compartment knot
Structure, the specification of each cell compartment is 25cm*25cm, high 15cm, and the hole that 15-20 diameter is 1cm is opened in the side of each cell compartment.
Play the role of further storing soil moved in improve the original.
The dimensional metal mesh is made of zinc-plated wire material, and overall dimensions 1.5*1.0m, each specification room is
7cm*7cm, the staggered position rotary of steel wire is at mesh, mesh diameter 2.8mm.Play the work for further fixing geotechnical grid
With.
The artificial soil, that is, soil moved in improve the original material: microbial organic fertilizer, NPK are added after being sieved according to local loam or mellow soil
Compound fertilizer, rice husk, water-retaining agent obtain after being mixed with the ratio of 70%:15%:3%:7%:5%.
The stereoscopic multi-layer time vegetation selects well developed root system, and taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance
Strong kind, in conjunction with the weather conditions and engineering practice of this area, it then follows in due course principle suitablely, multiselect is with shrub, beans
Section plant and indigenous plant kind.
Further, the geotechnical grid is laid on rock slope according to diamond shape, is fixed with inverse u shape holdfast,
Guarantee every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase
Holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and assisted with wooden (bamboo) nail processed, to protect
Demonstrate,prove the firm connection of geotechnical grid and slope surface.
Further, it is laid with dimensional metal mesh on geotechnical grid upper layer, while is fixed using inverse u shape holdfast, guaranteed every
Square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, the adjacent metal mesh of volume two requires to have
10cm is overlapped and is connected respectively with iron wire.
Further, the artificial soil design thickness is 15cm, is added water and stirred soil moved in improve the original material using removed-earth jet sowing machine
Geotechnical grid is filled up after uniformly, implements to sow grass seeds by duster from top to bottom in two times, sow grass seeds by duster thick 7cm for the first time, 10 after soil stabilization of receiving guests~
After 20min, then second is sowed grass seeds by duster to design thickness, lithology is broken, the hard slope section jetting thickness of rock matter can suitably increase when sowing grass seeds by duster
Add.
Further, the stereoscopic multi-layer time vegetation should carry out vernalization processing for the seed of selection, select different cultivars
Between reasonable seed level, layering sow grass seeds by duster, it is ensured that germination percentage.
Further, the stereoscopic multi-layer time vegetation design thickness is 3cm, by soil moved in improve the original material and is planted using removed-earth jet sowing machine
It is mixed by seed, spray slope covering metal mesh, spray slope to design thickness after adding water and stirring uniformly.
The present invention also provides a kind of high steep rock hillside revegetation implantation methods, specifically includes the following steps:
Step 1 clears up slope surface: main cleaning slope surface rubble, unconsolidated formation etc. guarantee that the camber of slope surface before constructing is basic
Unanimously;Surveying setting-out: step 2 determines boundary of works area and operation operating area using level meter and tape measure;
Step 3 is laid with geotechnical grid: geotechnical grid being unfolded, is laid on rock slope according to diamond shape, with
U-typed holdfast is fixed, and guarantees every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee geotechnical grid patch
Attached slope surface, it is necessary to increase holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and with wood/bamboo nail
Son is assisted, to guarantee the firm connection of geotechnical grid and slope surface;
Step 4 is laid with dimensional metal mesh: on the basis of geotechnical grid, being laid with dimensional metal mesh, while using inverted " u "
Type holdfast is fixed, and guarantees every square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, adjacent
The metal meshes of volume two are required to have 10cm to be overlapped and be connected respectively with iron wire;
Step 5 configures soil moved in improve the original material: 2cm, which crossed, according to local loam or mellow soil sieves, microbial organic fertilizer, and NPK compound fertilizer,
Rice husk, water-retaining agent, above-mentioned raw materials are mixed with the ratio of 70%:15%:3%:7%:5%;
Step 6 sprays matrix bottom, that is, artificial soil, designs thickness 15cm, fills up geotechnical grid: soil moved in improve the original material is added
Removed-earth jet sowing machine is added into water and uniformly stirred and carries out construction of sowing grass seeds by duster;Dedicated removed-earth jet sowing machine is selected, which is
5m3;, equipment principle is engine connection transmission portion, the material in feed bin is stirred evenly, then using extruding and pneumatics side
Formula is transported to construction surface, and equably sows grass seeds by duster to side slope surface layer;Implement to sow grass seeds by duster in two times from top to bottom, sow grass seeds by duster thick 7cm for the first time,
10~20min after soil stabilization of receiving guests, then sow grass seeds by duster second to design thickness, lithology is broken, the hard slope section spray of rock matter when sowing grass seeds by duster
Thickness degree can suitably increase;
Step 7, injection matrix surface layer, that is, stereoscopic multi-layer containing vegetation seed time vegetation, designs thickness 3cm, covers metal mesh:
Removed-earth jet sowing machine is added in soil moved in improve the original material and vegetation seed, adds water and stirs and uniformly sprays slope, spray slope to design thickness by above-mentioned steps;
Well developed root system is selected, the kind that taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance are strong;In conjunction with the weather of this area
Condition and engineering practice, it then follows in due course principle suitablely, multiselect shrub, leguminous plant and indigenous plant kind, for
The seed of selection should carry out vernalization processing, select the reasonable seed level between different cultivars, layering to sow grass seeds by duster, it is ensured that germination percentage.
Step 8, seedling stage maintenance: after seed sprouting, watering daily at least once, can be adjusted according to same day weather condition and be poured
Waterside number.Sprinkling fog-like is answered when watering, guarantees being sufficiently humidified so as to for soil matrix;Sprinkler operation preferably carries out sooner or later, forbids in
It is carried out after morning;Periodically fertilising job requirement carries out fertilizer supplement work according to vegetation growth state in due course;Seedling stage will have profession
The daily routine observation of personnel, discovery pest and disease damage are prevented and treated in time;Grass seeds, which is sowed grass seeds by duster, completes the latter moon, should check that grass planting grows feelings comprehensively
Condition gives after-culture to obvious non-uniform position is grown.
Technical effect of the invention:
1, the design of geotechnical grid: using breaking the whole up into parts, change greatly small thought, it is suitable that large stretch of area is separated into size
Cell compartment, reduce the risk that collapses of soil moved in improve the original.And between cell compartment and cell compartment be that hole is connected, will not influence plant root growth and
Water and nutrient is exchanged with each other, and provides advantage for subsequent plant growth.And the height of cell compartment reaches 15cm, can provide and fill
The space of foot is stored for soil moved in improve the original, thus be conducive to vegetation, the growth of especially short arbor.Meanwhile high density polyethylene (HDPE)
(HDPE) the cost of material is low and is easy to be laid with.
2, the design of dimensional metal mesh: overlaying smaller dimensional metal mesh on the upper layer of geotechnical grid, first is that reinforcing
Fixation to geotechnical grid and soil moved in improve the original.Second is that big geotechnical grid is divided into smaller metal cell compartment.Third is that galvanized metal net
Soil can be enhanced to the corrosiveness of iron wire, so as to improve the long-term effectiveness of the system.
3, artificial soil: raw material are easily obtained, and configuration is simple, and cost is relatively low, are conducive to the universal of work.
4, stereoscopic multi-layer time vegetation: using the collocation of the system of taproot and the system of fibrous root, the collocation of draft and shrub is conducive to soil
Fixation.The fixed nitrogen crop such as clover of addition can provide sufficient nutrient for subsequent plant growth.Draft shrub and short
The collocation of dungarunga can more promote the building of plant population and the stabilization of the ecosystem.
5, overall structure bring advantage: for this method by geotechnical grid, metal three dimensional network and artificial soil constitute one
A entirety, but be the unit of oneself again simultaneously, not only it is related but also has any different between the two.It to the eye, is that a structure is non-
The entirety of normal more stable and stronger, still, the geotechnical grid of bottom will integrally be divided into cell again.But between cell compartment and cell compartment again
It is interconnected, a unified organic rock-soil-microorganism-vegetation system is constituted by the root growth of plant.
6, the advantage of implantation methods: due to constructing organic rock-soil-microorganism-vegetation system, construction is simple,
Soil microbial activities in geotechnical grid are stronger, vegetation high survival rate, once forming, can remove the time-consuming expense of later period water wasting from
The maintenance of power;The system can also pass through microorganism from atmosphere from fixed nitrogen by the fixed nitrogen crop such as clover and clover
Decomposition, it is continual that sufficient nutriment is provided for whole system, be conducive to the succession of vegetational type;The system
It is particularly suitable for the high gradient or smooth rock mountain face is formed steady and sustained system, provided by the operation of itself system
Multiple green successful probability and reduction visual pollution.
Specific embodiment
Embodiments of the present invention are specifically described below.
As shown in Figure 1, a kind of high steep rock hillside revegetation construct, the construct are included in the rock hillside
The geotechnical grid on upper layer, the dimensional metal mesh positioned at geotechnical grid upper layer, superpower positioned at 3-dimensional metal web tier glue artificial property
Soil, positioned at the superpower stereoscopic multi-layer for gluing artificial property topsoil time vegetation.
The geotechnical grid is made of high-intensitive high density polyethylene (HDPE) (HDPE) material, is three-dimensional netted cell compartment knot
Structure, the specification of each cell compartment is 25cm*25cm, high 15cm, and the hole that 15-20 diameter is 1cm is opened in the side of each cell compartment.
Play the role of further storing soil moved in improve the original.
The dimensional metal mesh is made of zinc-plated wire material, and overall dimensions 1.5*1.0m, each specification room is
7cm*7cm, the staggered position rotary of steel wire is at mesh, mesh diameter 2.8mm.Play the work for further fixing geotechnical grid
With.
Described superpower to glue artificial property soil i.e. soil moved in improve the original material: adding microorganism after being sieved according to local loam or mellow soil has
Machine fertilizer, NPK compound fertilizer, rice husk, water-retaining agent obtain after being mixed with the ratio of 70%:15%:3%:7%:5%.
The stereoscopic multi-layer time vegetation selects well developed root system, and taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance
Strong kind, in conjunction with the weather conditions and engineering practice of this area, it then follows in due course principle suitablely, multiselect is with shrub, beans
Section plant and indigenous plant kind.
Further, the geotechnical grid is laid on rock slope according to diamond shape, is fixed with inverse u shape holdfast,
Guarantee every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase
Holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and assisted with wooden (bamboo) nail processed, to protect
Demonstrate,prove the firm connection of geotechnical grid and slope surface.
Further, it is laid with dimensional metal mesh on geotechnical grid upper layer, while is fixed using inverse u shape holdfast, guaranteed every
Square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, the adjacent metal mesh of volume two requires to have
10cm is overlapped and is connected respectively with iron wire.
Further, the stereoscopic multi-layer time vegetation should carry out vernalization processing for the seed of selection, select different cultivars
Between reasonable seed level, layering sow grass seeds by duster, it is ensured that germination percentage.
Further, it is described it is superpower to glue artificial property soil design thickness be 15cm, using removed-earth jet sowing machine by soil moved in improve the original material
Geotechnical grid is filled up after adding water and stirring uniformly, implements to sow grass seeds by duster from top to bottom in two times, sow grass seeds by duster thick 7cm for the first time, soil stabilization of receiving guests
Afterwards after 10~20min, then sow grass seeds by duster second to design thickness, when sowing grass seeds by duster lithology is broken, the hard slope section jetting thickness of rock matter can
It is appropriate to increase.
Further, the stereoscopic multi-layer time vegetation design thickness is 3cm, by soil moved in improve the original material and is planted using removed-earth jet sowing machine
It is mixed by seed, spray slope covering metal mesh, spray slope to design thickness after adding water and stirring uniformly.
A kind of high steep rock hillside revegetation implantation methods, specifically includes the following steps:
Step 1 clears up slope surface: main cleaning slope surface rubble, unconsolidated formation etc. guarantee that the camber of slope surface before constructing is basic
Unanimously;Surveying setting-out: step 2 determines boundary of works area and operation operating area using level meter and tape measure;
Step 3 is laid with geotechnical grid: geotechnical grid being unfolded, is laid on rock slope according to diamond shape, with
U-typed holdfast (length 25cm, material are galvanized wire, diameter 6mm) is fixed, guarantees every square meter at least 4 inverse u shapes
Holdfast, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase holdfast density, it is higher to rate of decay
Loosen class slope surface, it is desirable that increase holdfast and assisted with wooden (bamboo) nail processed, to guarantee the secured knot of geotechnical grid and slope surface
It closes;
Step 4 is laid with dimensional metal mesh: on the basis of geotechnical grid, being laid with dimensional metal mesh, while using inverted " u "
Type holdfast (length 25cm, material are galvanized wire, diameter 6mm) is fixed, guarantees every square meter at least 4 inverse u shape anchors
Nail (and the U-typed of position and geotechnical grid nail is staggered), the adjacent metal mesh of volume two requires to have 10cm to be overlapped and be connected respectively with iron wire
It connects;
Step 5 configures soil moved in improve the original material: according to local loam or mellow soil (crossing 2cm sieve), (organic matter contains microbial organic fertilizer
Amount is not less than 5%, and every gram of fertilizer bacterial population total amount is not less than 1000000), NPK compound fertilizer (fertilizer efficiency is not less than 15%), rice
Shell, the ratio mixing of water-retaining agent (sylvite class water-absorbing resin) 70%:15%:3%:7%:5%;
Step 6 is sprayed matrix bottom (thick 15cm, fill up geotechnical grid): removed-earth jet sowing machine is added in soil moved in improve the original material, is added
Water, which stirs evenly, can carry out construction of sowing grass seeds by duster;Dedicated removed-earth jet sowing machine is selected, which is 5m3;, equipment principle
It is engine connection transmission portion, the material in feed bin is stirred evenly, construction is then transported to using extruding and pneumatics mode
Face, and equably sow grass seeds by duster to side slope surface layer;Implement to sow grass seeds by duster in two times from top to bottom, sow grass seeds by duster thick 7cm for the first time, after soil stabilization of receiving guests
(10~20min), then sow grass seeds by duster second to design thickness, lithology is broken, the hard slope section jetting thickness of rock matter can fit when sowing grass seeds by duster
Work as increase;
Step 7 sprays the matrix surface layer (thick 3cm covers metal mesh) containing vegetation seed: by soil moved in improve the original material and vegetation kind
Removed-earth jet sowing machine is added in son, adds water and stirs and uniformly sprays slope, spray slope to design thickness by above-mentioned steps.Well developed root system is selected, is taken root
The strong kind of strong, the drought-resistant, cold resistance of property, impoverishment tolerant, disease and insect resistance., weather conditions and the practical feelings of engineering in conjunction with this area
Condition, it then follows in due course principle suitablely, multiselect shrub, leguminous plant and indigenous plant kind, as spur, shrub lespedeza, false indigo,
Masson pine, pyracantha fortuneana, pittosporum tobira, glossy privet etc..Vernalization processing, rationally broadcasting between selection different cultivars should be carried out for the seed of selection
Deep, layering is sowed grass seeds by duster, it is ensured that germination percentage.Major portion: the control of 1 square metre of seed is in 20g or so, wherein spur (2g/ ㎡), Hu Zhi
Son (3g/ ㎡), false indigo (4g/ ㎡), masson pine (1g/ ㎡), pyracantha fortuneana (1g/ ㎡), pittosporum tobira (1g/ ㎡), glossy privet (2g/ ㎡), dog
Root of the tooth (1g/ ㎡), Festuca Arundinacea (3g/ ㎡), paspalum notatum (1g/ ㎡), alfalfa (1g/ ㎡);
Step 8, seedling stage maintenance: after seed sprouting, watering daily at least once, can be adjusted according to same day weather condition and be poured
Waterside number.Sprinkling fog-like is answered when watering, guarantees being sufficiently humidified so as to for soil matrix (soil moved in improve the original);Sprinkler operation preferably carries out sooner or later, prohibits
Only carry out at noon;Periodically fertilising job requirement carries out fertilizer supplement work according to vegetation growth state in due course;Seedling stage is wanted
There is the daily routine observation of professional, discovery pest and disease damage is prevented and treated in time;Grass seeds, which is sowed grass seeds by duster, completes the latter moon, should check grass planting comprehensively
Growing state gives after-culture to obvious non-uniform position is grown.