CN106879274B - A kind of high steep rock hillside revegetation construct and its restore implantation methods - Google Patents

A kind of high steep rock hillside revegetation construct and its restore implantation methods Download PDF

Info

Publication number
CN106879274B
CN106879274B CN201710102616.3A CN201710102616A CN106879274B CN 106879274 B CN106879274 B CN 106879274B CN 201710102616 A CN201710102616 A CN 201710102616A CN 106879274 B CN106879274 B CN 106879274B
Authority
CN
China
Prior art keywords
geotechnical grid
soil
duster
slope
grass seeds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710102616.3A
Other languages
Chinese (zh)
Other versions
CN106879274A (en
Inventor
黄涛
陈仕涛
杨少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Zhejiang Eco-environment Development Co.,Ltd.
Original Assignee
Huzhou Coal Geological Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huzhou Coal Geological Engineering Co Ltd filed Critical Huzhou Coal Geological Engineering Co Ltd
Priority to CN201710102616.3A priority Critical patent/CN106879274B/en
Publication of CN106879274A publication Critical patent/CN106879274A/en
Application granted granted Critical
Publication of CN106879274B publication Critical patent/CN106879274B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B77/00Machines for lifting and treating soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

The invention discloses a kind of high steep rock hillside revegetation construct and its restore implantation methods.The construct includes the geotechnical grid on rock hillside upper layer, the dimensional metal mesh positioned at geotechnical grid upper layer, fills up artificial soil and the stereoscopic multi-layer time vegetation positioned at artificial soil upper layer in the space that the geotechnical grid and dimensional metal mesh are constituted.The recovery implantation methods pass through geotechnical grid, entirety that metal three dimensional network and artificial soil have constituted one, but are the unit of oneself again simultaneously, are not only related but also have any different between the two.It to the eye, is the entirety of a structure very more stable and stronger, still, the geotechnical grid of bottom will integrally be divided into cell again.But it is interconnected again between cell compartment and cell compartment, a unified organic rock-soil-microorganism-vegetation system is constituted by the root growth of plant.

Description

A kind of high steep rock hillside revegetation construct and its restore implantation methods
Technical field
The present invention relates to a kind of method for recovering vegetation on rock hillside, especially a kind of high steep rock hillside revegetation structure It builds body and its restores implantation methods.
Background technique
Green work answer all to the slope surface of abandoned mine both at home and abroad at present has on the more slow hillside of some gradients and is certain Effect, and to some high steep rock slopes, what traditional soil moved in improve the original spray slope technology was difficult for a long time to consolidate soil moved in improve the original is bonded in smooth Rock surface, the later period, there are the landslides of larger area and the danger collapsed.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of high steep rock hillside revegetation constructs, and apply the structure Body is built to restore the method for artificial vegetation on high steep rock hillside.
Realize the technical scheme is that
A kind of high steep rock hillside revegetation construct, the construct includes the geotechnique on rock hillside upper layer Cell compartment, the dimensional metal mesh positioned at geotechnical grid upper layer are filled up in the space that the geotechnical grid is constituted with dimensional metal mesh Artificial soil and stereoscopic multi-layer time vegetation positioned at artificial soil upper layer.
The geotechnical grid is made of high-intensitive high density polyethylene (HDPE) (HDPE) material, is three-dimensional netted cell compartment knot Structure, the specification of each cell compartment is 25cm*25cm, high 15cm, and the hole that 15-20 diameter is 1cm is opened in the side of each cell compartment. Play the role of further storing soil moved in improve the original.
The dimensional metal mesh is made of zinc-plated wire material, and overall dimensions 1.5*1.0m, each specification room is 7cm*7cm, the staggered position rotary of steel wire is at mesh, mesh diameter 2.8mm.Play the work for further fixing geotechnical grid With.
The artificial soil, that is, soil moved in improve the original material: microbial organic fertilizer, NPK are added after being sieved according to local loam or mellow soil Compound fertilizer, rice husk, water-retaining agent obtain after being mixed with the ratio of 70%:15%:3%:7%:5%.
The stereoscopic multi-layer time vegetation selects well developed root system, and taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance Strong kind, in conjunction with the weather conditions and engineering practice of this area, it then follows in due course principle suitablely, multiselect is with shrub, beans Section plant and indigenous plant kind.
Further, the geotechnical grid is laid on rock slope according to diamond shape, is fixed with inverse u shape holdfast, Guarantee every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase Holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and assisted with wooden (bamboo) nail processed, to protect Demonstrate,prove the firm connection of geotechnical grid and slope surface.
Further, it is laid with dimensional metal mesh on geotechnical grid upper layer, while is fixed using inverse u shape holdfast, guaranteed every Square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, the adjacent metal mesh of volume two requires to have 10cm is overlapped and is connected respectively with iron wire.
Further, the artificial soil design thickness is 15cm, is added water and stirred soil moved in improve the original material using removed-earth jet sowing machine Geotechnical grid is filled up after uniformly, implements to sow grass seeds by duster from top to bottom in two times, sow grass seeds by duster thick 7cm for the first time, 10 after soil stabilization of receiving guests~ After 20min, then second is sowed grass seeds by duster to design thickness, lithology is broken, the hard slope section jetting thickness of rock matter can suitably increase when sowing grass seeds by duster Add.
Further, the stereoscopic multi-layer time vegetation should carry out vernalization processing for the seed of selection, select different cultivars Between reasonable seed level, layering sow grass seeds by duster, it is ensured that germination percentage.
Further, the stereoscopic multi-layer time vegetation design thickness is 3cm, by soil moved in improve the original material and is planted using removed-earth jet sowing machine It is mixed by seed, spray slope covering metal mesh, spray slope to design thickness after adding water and stirring uniformly.
The present invention also provides a kind of high steep rock hillside revegetation implantation methods, specifically includes the following steps:
Step 1 clears up slope surface: main cleaning slope surface rubble, unconsolidated formation etc. guarantee that the camber of slope surface before constructing is basic Unanimously;Surveying setting-out: step 2 determines boundary of works area and operation operating area using level meter and tape measure;
Step 3 is laid with geotechnical grid: geotechnical grid being unfolded, is laid on rock slope according to diamond shape, with U-typed holdfast is fixed, and guarantees every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee geotechnical grid patch Attached slope surface, it is necessary to increase holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and with wood/bamboo nail Son is assisted, to guarantee the firm connection of geotechnical grid and slope surface;
Step 4 is laid with dimensional metal mesh: on the basis of geotechnical grid, being laid with dimensional metal mesh, while using inverted " u " Type holdfast is fixed, and guarantees every square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, adjacent The metal meshes of volume two are required to have 10cm to be overlapped and be connected respectively with iron wire;
Step 5 configures soil moved in improve the original material: 2cm, which crossed, according to local loam or mellow soil sieves, microbial organic fertilizer, and NPK compound fertilizer, Rice husk, water-retaining agent, above-mentioned raw materials are mixed with the ratio of 70%:15%:3%:7%:5%;
Step 6 sprays matrix bottom, that is, artificial soil, designs thickness 15cm, fills up geotechnical grid: soil moved in improve the original material is added Removed-earth jet sowing machine is added into water and uniformly stirred and carries out construction of sowing grass seeds by duster;Dedicated removed-earth jet sowing machine is selected, which is 5m3;, equipment principle is engine connection transmission portion, the material in feed bin is stirred evenly, then using extruding and pneumatics side Formula is transported to construction surface, and equably sows grass seeds by duster to side slope surface layer;Implement to sow grass seeds by duster in two times from top to bottom, sow grass seeds by duster thick 7cm for the first time, 10~20min after soil stabilization of receiving guests, then sow grass seeds by duster second to design thickness, lithology is broken, the hard slope section spray of rock matter when sowing grass seeds by duster Thickness degree can suitably increase;
Step 7, injection matrix surface layer, that is, stereoscopic multi-layer containing vegetation seed time vegetation, designs thickness 3cm, covers metal mesh: Removed-earth jet sowing machine is added in soil moved in improve the original material and vegetation seed, adds water and stirs and uniformly sprays slope, spray slope to design thickness by above-mentioned steps; Well developed root system is selected, the kind that taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance are strong;In conjunction with the weather of this area Condition and engineering practice, it then follows in due course principle suitablely, multiselect shrub, leguminous plant and indigenous plant kind, for The seed of selection should carry out vernalization processing, select the reasonable seed level between different cultivars, layering to sow grass seeds by duster, it is ensured that germination percentage.
Step 8, seedling stage maintenance: after seed sprouting, watering daily at least once, can be adjusted according to same day weather condition and be poured Waterside number.Sprinkling fog-like is answered when watering, guarantees being sufficiently humidified so as to for soil matrix;Sprinkler operation preferably carries out sooner or later, forbids in It is carried out after morning;Periodically fertilising job requirement carries out fertilizer supplement work according to vegetation growth state in due course;Seedling stage will have profession The daily routine observation of personnel, discovery pest and disease damage are prevented and treated in time;Grass seeds, which is sowed grass seeds by duster, completes the latter moon, should check that grass planting grows feelings comprehensively Condition gives after-culture to obvious non-uniform position is grown.
Technical effect of the invention:
1, the design of geotechnical grid: using breaking the whole up into parts, change greatly small thought, it is suitable that large stretch of area is separated into size Cell compartment, reduce the risk that collapses of soil moved in improve the original.And between cell compartment and cell compartment be that hole is connected, will not influence plant root growth and Water and nutrient is exchanged with each other, and provides advantage for subsequent plant growth.And the height of cell compartment reaches 15cm, can provide and fill The space of foot is stored for soil moved in improve the original, thus be conducive to vegetation, the growth of especially short arbor.Meanwhile high density polyethylene (HDPE) (HDPE) the cost of material is low and is easy to be laid with.
2, the design of dimensional metal mesh: overlaying smaller dimensional metal mesh on the upper layer of geotechnical grid, first is that reinforcing Fixation to geotechnical grid and soil moved in improve the original.Second is that big geotechnical grid is divided into smaller metal cell compartment.Third is that galvanized metal net Soil can be enhanced to the corrosiveness of iron wire, so as to improve the long-term effectiveness of the system.
3, artificial soil: raw material are easily obtained, and configuration is simple, and cost is relatively low, are conducive to the universal of work.
4, stereoscopic multi-layer time vegetation: using the collocation of the system of taproot and the system of fibrous root, the collocation of draft and shrub is conducive to soil Fixation.The fixed nitrogen crop such as clover of addition can provide sufficient nutrient for subsequent plant growth.Draft shrub and short The collocation of dungarunga can more promote the building of plant population and the stabilization of the ecosystem.
5, overall structure bring advantage: for this method by geotechnical grid, metal three dimensional network and artificial soil constitute one A entirety, but be the unit of oneself again simultaneously, not only it is related but also has any different between the two.It to the eye, is that a structure is non- The entirety of normal more stable and stronger, still, the geotechnical grid of bottom will integrally be divided into cell again.But between cell compartment and cell compartment again It is interconnected, a unified organic rock-soil-microorganism-vegetation system is constituted by the root growth of plant.
6, the advantage of implantation methods: due to constructing organic rock-soil-microorganism-vegetation system, construction is simple, Soil microbial activities in geotechnical grid are stronger, vegetation high survival rate, once forming, can remove the time-consuming expense of later period water wasting from The maintenance of power;The system can also pass through microorganism from atmosphere from fixed nitrogen by the fixed nitrogen crop such as clover and clover Decomposition, it is continual that sufficient nutriment is provided for whole system, be conducive to the succession of vegetational type;The system It is particularly suitable for the high gradient or smooth rock mountain face is formed steady and sustained system, provided by the operation of itself system Multiple green successful probability and reduction visual pollution.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of high steep rock hillside revegetation construct of the invention.
Specific embodiment
Embodiments of the present invention are specifically described below.
As shown in Figure 1, a kind of high steep rock hillside revegetation construct, the construct are included in the rock hillside The geotechnical grid on upper layer, the dimensional metal mesh positioned at geotechnical grid upper layer, superpower positioned at 3-dimensional metal web tier glue artificial property Soil, positioned at the superpower stereoscopic multi-layer for gluing artificial property topsoil time vegetation.
The geotechnical grid is made of high-intensitive high density polyethylene (HDPE) (HDPE) material, is three-dimensional netted cell compartment knot Structure, the specification of each cell compartment is 25cm*25cm, high 15cm, and the hole that 15-20 diameter is 1cm is opened in the side of each cell compartment. Play the role of further storing soil moved in improve the original.
The dimensional metal mesh is made of zinc-plated wire material, and overall dimensions 1.5*1.0m, each specification room is 7cm*7cm, the staggered position rotary of steel wire is at mesh, mesh diameter 2.8mm.Play the work for further fixing geotechnical grid With.
Described superpower to glue artificial property soil i.e. soil moved in improve the original material: adding microorganism after being sieved according to local loam or mellow soil has Machine fertilizer, NPK compound fertilizer, rice husk, water-retaining agent obtain after being mixed with the ratio of 70%:15%:3%:7%:5%.
The stereoscopic multi-layer time vegetation selects well developed root system, and taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance Strong kind, in conjunction with the weather conditions and engineering practice of this area, it then follows in due course principle suitablely, multiselect is with shrub, beans Section plant and indigenous plant kind.
Further, the geotechnical grid is laid on rock slope according to diamond shape, is fixed with inverse u shape holdfast, Guarantee every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase Holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and assisted with wooden (bamboo) nail processed, to protect Demonstrate,prove the firm connection of geotechnical grid and slope surface.
Further, it is laid with dimensional metal mesh on geotechnical grid upper layer, while is fixed using inverse u shape holdfast, guaranteed every Square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, the adjacent metal mesh of volume two requires to have 10cm is overlapped and is connected respectively with iron wire.
Further, the stereoscopic multi-layer time vegetation should carry out vernalization processing for the seed of selection, select different cultivars Between reasonable seed level, layering sow grass seeds by duster, it is ensured that germination percentage.
Further, it is described it is superpower to glue artificial property soil design thickness be 15cm, using removed-earth jet sowing machine by soil moved in improve the original material Geotechnical grid is filled up after adding water and stirring uniformly, implements to sow grass seeds by duster from top to bottom in two times, sow grass seeds by duster thick 7cm for the first time, soil stabilization of receiving guests Afterwards after 10~20min, then sow grass seeds by duster second to design thickness, when sowing grass seeds by duster lithology is broken, the hard slope section jetting thickness of rock matter can It is appropriate to increase.
Further, the stereoscopic multi-layer time vegetation design thickness is 3cm, by soil moved in improve the original material and is planted using removed-earth jet sowing machine It is mixed by seed, spray slope covering metal mesh, spray slope to design thickness after adding water and stirring uniformly.
A kind of high steep rock hillside revegetation implantation methods, specifically includes the following steps:
Step 1 clears up slope surface: main cleaning slope surface rubble, unconsolidated formation etc. guarantee that the camber of slope surface before constructing is basic Unanimously;Surveying setting-out: step 2 determines boundary of works area and operation operating area using level meter and tape measure;
Step 3 is laid with geotechnical grid: geotechnical grid being unfolded, is laid on rock slope according to diamond shape, with U-typed holdfast (length 25cm, material are galvanized wire, diameter 6mm) is fixed, guarantees every square meter at least 4 inverse u shapes Holdfast, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase holdfast density, it is higher to rate of decay Loosen class slope surface, it is desirable that increase holdfast and assisted with wooden (bamboo) nail processed, to guarantee the secured knot of geotechnical grid and slope surface It closes;
Step 4 is laid with dimensional metal mesh: on the basis of geotechnical grid, being laid with dimensional metal mesh, while using inverted " u " Type holdfast (length 25cm, material are galvanized wire, diameter 6mm) is fixed, guarantees every square meter at least 4 inverse u shape anchors Nail (and the U-typed of position and geotechnical grid nail is staggered), the adjacent metal mesh of volume two requires to have 10cm to be overlapped and be connected respectively with iron wire It connects;
Step 5 configures soil moved in improve the original material: according to local loam or mellow soil (crossing 2cm sieve), (organic matter contains microbial organic fertilizer Amount is not less than 5%, and every gram of fertilizer bacterial population total amount is not less than 1000000), NPK compound fertilizer (fertilizer efficiency is not less than 15%), rice Shell, the ratio mixing of water-retaining agent (sylvite class water-absorbing resin) 70%:15%:3%:7%:5%;
Step 6 is sprayed matrix bottom (thick 15cm, fill up geotechnical grid): removed-earth jet sowing machine is added in soil moved in improve the original material, is added Water, which stirs evenly, can carry out construction of sowing grass seeds by duster;Dedicated removed-earth jet sowing machine is selected, which is 5m3;, equipment principle It is engine connection transmission portion, the material in feed bin is stirred evenly, construction is then transported to using extruding and pneumatics mode Face, and equably sow grass seeds by duster to side slope surface layer;Implement to sow grass seeds by duster in two times from top to bottom, sow grass seeds by duster thick 7cm for the first time, after soil stabilization of receiving guests (10~20min), then sow grass seeds by duster second to design thickness, lithology is broken, the hard slope section jetting thickness of rock matter can fit when sowing grass seeds by duster Work as increase;
Step 7 sprays the matrix surface layer (thick 3cm covers metal mesh) containing vegetation seed: by soil moved in improve the original material and vegetation kind Removed-earth jet sowing machine is added in son, adds water and stirs and uniformly sprays slope, spray slope to design thickness by above-mentioned steps.Well developed root system is selected, is taken root The strong kind of strong, the drought-resistant, cold resistance of property, impoverishment tolerant, disease and insect resistance., weather conditions and the practical feelings of engineering in conjunction with this area Condition, it then follows in due course principle suitablely, multiselect shrub, leguminous plant and indigenous plant kind, as spur, shrub lespedeza, false indigo, Masson pine, pyracantha fortuneana, pittosporum tobira, glossy privet etc..Vernalization processing, rationally broadcasting between selection different cultivars should be carried out for the seed of selection Deep, layering is sowed grass seeds by duster, it is ensured that germination percentage.Major portion: the control of 1 square metre of seed is in 20g or so, wherein spur (2g/ ㎡), Hu Zhi Son (3g/ ㎡), false indigo (4g/ ㎡), masson pine (1g/ ㎡), pyracantha fortuneana (1g/ ㎡), pittosporum tobira (1g/ ㎡), glossy privet (2g/ ㎡), dog Root of the tooth (1g/ ㎡), Festuca Arundinacea (3g/ ㎡), paspalum notatum (1g/ ㎡), alfalfa (1g/ ㎡);
Step 8, seedling stage maintenance: after seed sprouting, watering daily at least once, can be adjusted according to same day weather condition and be poured Waterside number.Sprinkling fog-like is answered when watering, guarantees being sufficiently humidified so as to for soil matrix (soil moved in improve the original);Sprinkler operation preferably carries out sooner or later, prohibits Only carry out at noon;Periodically fertilising job requirement carries out fertilizer supplement work according to vegetation growth state in due course;Seedling stage is wanted There is the daily routine observation of professional, discovery pest and disease damage is prevented and treated in time;Grass seeds, which is sowed grass seeds by duster, completes the latter moon, should check grass planting comprehensively Growing state gives after-culture to obvious non-uniform position is grown.

Claims (6)

1. high steep rock hillside revegetation construct, it is characterised in that: the construct is included in rock hillside upper layer Geotechnical grid, the dimensional metal mesh positioned at geotechnical grid upper layer, the space that the geotechnical grid and dimensional metal mesh are constituted Inside fill up artificial soil and the stereoscopic multi-layer time vegetation positioned at artificial soil upper layer;
The geotechnical grid is made of high-intensitive HDPE material, is three-dimensional netted cell compartment structure, and the specification of each cell compartment is 25cm*25cm, high 15cm, and the hole that 15-20 diameter is 1cm is opened in the side of each cell compartment, plays further storage soil moved in improve the original Effect;
The dimensional metal mesh is made of zinc-plated wire material, overall dimensions 1.5*1.0m, and each specification room is 7cm* 7cm, at mesh, mesh diameter 2.8mm plays the role of further fixing geotechnical grid the staggered position rotary of steel wire;
The artificial soil, that is, soil moved in improve the original material: microbial organic fertilizer is added after being sieved according to local loam or mellow soil, NPK is compound Fertilizer, rice husk, water-retaining agent obtain after being mixed with the ratio of 70%:15%:3%:7%:5%;
The stereoscopic multi-layer time vegetation selects well developed root system, and taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance be strong Kind, in conjunction with the weather conditions and engineering practice of this area, it then follows in due course principle suitablely, multiselect are planted with shrub, pulse family Object and indigenous plant kind;
The revegetation construct is used for high steep rock hillside revegetation, specifically includes the following steps:
Step 1 clears up slope surface: main cleaning slope surface rubble, unconsolidated formation guarantee that the camber of slope surface before constructing is almost the same;
Surveying setting-out: step 2 determines boundary of works area and operation operating area using level meter and tape measure;
Step 3 is laid with geotechnical grid: geotechnical grid being unfolded, is laid on rock slope according to diamond shape, inverse u shape is used Holdfast is fixed, and guarantees every square meter at least 4 inverse u shape holdfasts, in the slope surface of irregularity, to guarantee that geotechnical grid attaches slope Face, it is necessary to increase holdfast density, loosening class slope surface higher to rate of decay, it is desirable that increase holdfast and added with wood/bamboo nail With auxiliary, to guarantee the firm connection of geotechnical grid and slope surface;
Step 4 is laid with dimensional metal mesh: on the basis of geotechnical grid, being laid with dimensional metal mesh, while using inverse u shape anchor Nail is fixed, and guarantees every square meter at least 4 inverse u shape holdfasts, and the U-typed of position and geotechnical grid nail is staggered, and adjacent volume two Metal mesh is required to have 10cm to be overlapped and be connected respectively with iron wire;
Step 5 configures soil moved in improve the original material: crossing 2cm sieve, microbial organic fertilizer, NPK compound fertilizer, rice according to local loam or mellow soil Shell, water-retaining agent, above-mentioned raw materials are mixed with the ratio of 70%:15%:3%:7%:5%;
Step 6 sprays matrix bottom, that is, artificial soil, designs thickness 15cm, fills up geotechnical grid: soil moved in improve the original is added in soil moved in improve the original material Hydroseeder is added into water and uniformly stirred and carries out construction of sowing grass seeds by duster;Dedicated removed-earth jet sowing machine is selected, which is 5m3;, equipment principle is engine connection transmission portion, the material in feed bin is stirred evenly, then using extruding and pneumatics side Formula is transported to construction surface, and equably sows grass seeds by duster to side slope surface layer;Implement to sow grass seeds by duster in two times from top to bottom, sow grass seeds by duster thick 7cm for the first time, 10~20min after soil stabilization of receiving guests, then sow grass seeds by duster second to design thickness, lithology is broken, the hard slope section spray of rock matter when sowing grass seeds by duster Thickness degree suitably increases;
Step 7, injection matrix surface layer, that is, stereoscopic multi-layer containing vegetation seed time vegetation, designs thickness 3cm, covers metal mesh: will be objective Removed-earth jet sowing machine is added in soil material and vegetation seed, adds water and stirs and uniformly sprays slope, spray slope to design thickness by above-mentioned steps;Selection Well developed root system, the kind that taking root property is strong, drought-resistant, cold resistance, impoverishment tolerant, disease and insect resistance are strong;In conjunction with the weather conditions of this area And engineering practice, it then follows in due course principle suitablely, multiselect shrub, leguminous plant and indigenous plant kind, for selecting Seed should carry out vernalization processing, select the reasonable seed level between different cultivars, layering to sow grass seeds by duster, it is ensured that germination percentage;
Step 8, seedling stage maintenance: after seed sprouting, watering daily adjusts irrigation times at least once, according to same day weather condition; Sprinkling fog-like is answered when watering, guarantees being sufficiently humidified so as to for soil matrix;Sprinkler operation preferably carries out sooner or later, forbid at noon into Row;Periodically fertilising job requirement carries out fertilizer supplement work according to vegetation growth state in due course;Seedling stage will have professional daily Routine observation, discovery pest and disease damage are prevented and treated in time;Grass seeds, which is sowed grass seeds by duster, completes the latter moon, grass planting growing state should be checked comprehensively, to life Long obvious non-uniform position gives after-culture.
2. high steep rock hillside revegetation construct according to claim 1, it is characterised in that: the geotechnical grid is pressed It is laid on rock slope according to diamond shape, is fixed with inverse u shape holdfast, guarantee every square meter at least 4 inverse u shape holdfasts, In the slope surface of irregularity, to guarantee that geotechnical grid attaches slope surface, it is necessary to increase holdfast density, to the higher loosening class of rate of decay Slope surface, it is desirable that increase holdfast and assisted with wood/bamboo nail, to guarantee the firm connection of geotechnical grid and slope surface.
3. high steep rock hillside revegetation construct according to claim 1, it is characterised in that: on geotechnical grid upper layer It is laid with dimensional metal mesh, while being fixed using inverse u shape holdfast, guarantees every square meter at least 4 inverse u shape holdfasts, and position It is staggered with the U-typed nail of geotechnical grid, the adjacent metal mesh of volume two is required to have 10cm to be overlapped and be connected respectively with iron wire.
4. high steep rock hillside revegetation construct according to claim 1, it is characterised in that: the artificial soil is set Meter is filled up geotechnical grid after being added water and stirred soil moved in improve the original material uniformly using removed-earth jet sowing machine, divides two from top to bottom with a thickness of 15cm Secondary implementation is sowed grass seeds by duster, and sow grass seeds by duster thick 7cm for the first time, after soil stabilization of receiving guests after 10~20min, then is sowed grass seeds by duster second to design thickness, is sprayed Sowing time is lithology is broken, the hard slope section jetting thickness of rock matter suitably increases.
5. high steep rock hillside revegetation construct according to claim 1, it is characterised in that: the stereoscopic multi-layer Vegetation should carry out vernalization processing for the seed of selection, select the reasonable seed level between different cultivars, layering to sow grass seeds by duster, it is ensured that germination Rate.
6. high steep rock hillside revegetation construct according to claim 1, it is characterised in that: the stereoscopic multi-layer Vegetation design thickness is 3cm, is mixed soil moved in improve the original material with vegetation seed using removed-earth jet sowing machine, and spray slope is covered after adding water and stirring uniformly Lid metal mesh, spray slope to design thickness.
CN201710102616.3A 2017-02-24 2017-02-24 A kind of high steep rock hillside revegetation construct and its restore implantation methods Active CN106879274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102616.3A CN106879274B (en) 2017-02-24 2017-02-24 A kind of high steep rock hillside revegetation construct and its restore implantation methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102616.3A CN106879274B (en) 2017-02-24 2017-02-24 A kind of high steep rock hillside revegetation construct and its restore implantation methods

Publications (2)

Publication Number Publication Date
CN106879274A CN106879274A (en) 2017-06-23
CN106879274B true CN106879274B (en) 2019-09-20

Family

ID=59179373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102616.3A Active CN106879274B (en) 2017-02-24 2017-02-24 A kind of high steep rock hillside revegetation construct and its restore implantation methods

Country Status (1)

Country Link
CN (1) CN106879274B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109845441A (en) * 2018-12-30 2019-06-07 内蒙古蒙草生态环境(集团)股份有限公司 A kind of mining area dregs platform rehabilitation plant layered sowing method
CN114718037A (en) * 2022-03-31 2022-07-08 中国化学工程第十四建设有限公司 Improved honeycomb geogrid installation method
CN114946598B (en) * 2022-06-02 2023-05-16 广东桃林生态环境有限公司 Soil slow-release substrate applied to rockfill environment and preparation and application methods thereof
CN115039630A (en) * 2022-07-19 2022-09-13 中国科学院新疆生态与地理研究所 Tree planting method for rock base surface
CN115045306B (en) * 2022-07-22 2023-03-31 中国科学院地质与地球物理研究所 Slope surface soil protection design method for inter-distribution of straight and fibrous root system vegetation

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1077591A1 (en) * 1982-08-12 1984-03-07 Всесоюзный научно-исследовательский институт нерудных строительных материалов и гидромеханизации Method of recultivation of slopes
KR20090014524A (en) * 2007-08-06 2009-02-11 트랜스코리아개발 주식회사 Artificial soil and method for growing vegetation on a sloped surface using the same
CN205369274U (en) * 2016-02-17 2016-07-06 上海交通大学 Civil engineering structure of complete domatic afforestation worker method in rock matter abrupt slope
CN205357221U (en) * 2016-03-10 2016-07-06 曾福英 Revegetation structure of high steep slag body side slope
CN205712054U (en) * 2016-04-29 2016-11-23 北京金元易生态环境产业股份有限公司 Geotechnical grid and slope protection system

Also Published As

Publication number Publication date
CN106879274A (en) 2017-06-23

Similar Documents

Publication Publication Date Title
CN106879274B (en) A kind of high steep rock hillside revegetation construct and its restore implantation methods
CN105474938B (en) The restorative procedure of the western Funiu Shan Mountain Hills And Low Mountains degraded ecosystem in Henan
CN105926533B (en) A kind of embedded type ecology consolidates beach method
CN110150014A (en) A kind of fertile mandarin orange industrialized planting method
CN104082048B (en) The implantation methods of red date Sustainable high yield
CN109832074B (en) Method for recovering vegetation in karst region lead-zinc ore polluted rocky desertification area
CN102379201B (en) Method of quick restoration of vegetation in reservoir hydro-fluctuation belt
CN109328806A (en) A kind of Tailings Dam ecological treatment method
KR100654174B1 (en) A seed line net for greening
CN101715692A (en) Method for carrying out mine revegetation by environmental-friendly grass mat
CN103210783A (en) Dioscorea opposita planting method
CN102106231A (en) Tripterygium wilfordii hook acclimatization and high-yielding method
WO2011095058A1 (en) Planting structure and methods
CN104705021A (en) Garlic speed planting method
CN104429523A (en) Efficient cultivating method for water fennels through sunshade net in summer
CN210946834U (en) Immersed net type ecological slope protection structure for mine restoration
CN110622643A (en) Ecological restoration method for rock slope in high-latitude severe cold region
CN105165511A (en) Large-scale forestation method for shrub species for especially-poor saline and alkaline land
KR100806148B1 (en) Afforestation method
CN1172572C (en) High-ridge double-row cultivating method for yellow ginger
CN108293453A (en) Sinocalamus latiflorus stays section water storage cuttage breeding method
CN205337116U (en) Straw fixes sand store water and plants blanket
CN106234012A (en) A kind of fruit and vegetable interplanting method
CN104982214A (en) Method applicable to Samut Polygonum cutting seedling
CN104969706A (en) Open type fertilization management method for dwarf and close planting orchard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 210046, 29, Wonderland Road, Qixia District, Jiangsu, Nanjing, 68

Co-patentee after: Chen Shitao

Patentee after: Huang Tao

Co-patentee after: China Coal Zhejiang Eco-environment Development Co.,Ltd.

Address before: 210046, 29, Wonderland Road, Qixia District, Jiangsu, Nanjing, 68

Co-patentee before: Chen Shitao

Patentee before: Huang Tao

Co-patentee before: HUZHOU ZHONGMEI GEOLOGICAL ENGINEERING Co.,Ltd.