CN108560934A - 一种带有镂空结构的pc构件的吊装方法 - Google Patents

一种带有镂空结构的pc构件的吊装方法 Download PDF

Info

Publication number
CN108560934A
CN108560934A CN201810550664.3A CN201810550664A CN108560934A CN 108560934 A CN108560934 A CN 108560934A CN 201810550664 A CN201810550664 A CN 201810550664A CN 108560934 A CN108560934 A CN 108560934A
Authority
CN
China
Prior art keywords
components
lifting appliance
hole
auxiliary lifting
hanging method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810550664.3A
Other languages
English (en)
Inventor
徐冰
周建敏
魏尚起
孙剑
齐麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201810550664.3A priority Critical patent/CN108560934A/zh
Publication of CN108560934A publication Critical patent/CN108560934A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明具体是一种带有镂空结构的PC构件的吊装方法;其特征是,包括制作相应的辅助吊具;在PC构件的本体靠近孔洞的上下方各预留螺栓孔,便于安装吊具;将辅助吊具通过预留的螺栓孔与PC构件连接;辅助吊具与PC构件采用螺栓连接,吊装前确认螺栓紧固到位;将起吊设备与辅助吊具连接并起吊;将PC构件吊装到位后,依次移除起吊设备及辅助吊具。本吊装方法能够有效解决解决留有孔口或窗洞的PC构件在吊装施工时容易破损或变形的问题,并且本吊装方法实施方便,便于拆卸。

Description

一种带有镂空结构的PC构件的吊装方法
技术领域
本发明涉及装配式建筑施工领域,具体是一种带有镂空结构的PC构件的吊装方法。
背景技术
随着装配式建筑的发展,装配率要求越来越高,但是对于留有孔口或窗洞的PC构件,起吊受力后,洞口上部构件的尺寸可能无法满足起吊要求,严重时会损坏整个构件或拉裂预制构件。
发明内容
本发明的目的在于克服上述缺陷,提供一种带有镂空结构的PC构件的吊装方法。
为了达到上述目的,本发明是这样实现的:
一种带有镂空结构的PC构件的吊装方法,
步骤1、实施开始前:
步骤1.1、根据PC构件的外形尺寸,孔洞大小,制作相应的辅助吊具;
步骤1.2、在PC构件的本体靠近孔洞的上下方各预留螺栓孔,便于安装吊具;
步骤2、实施吊装:
步骤2.1、PC构件运输到施工现场后,对PC构件的外形尺寸,吊具预留螺栓孔进行复核;
步骤2.2、将辅助吊具通过预留的螺栓孔与PC构件连接,此时应确认辅助吊具横跨PC构件的孔洞,其中,当孔洞面积超过PC构件整体面积的60%时,采用多个辅助吊具沿PC构件孔洞的纵向、横向方向设置并与PC构件连接,从而对PC构件孔洞边沿进行多方位加固;
步骤2.3、辅助吊具与PC构件采用螺栓连接,吊装前确认螺栓紧固到位;将起吊设备与辅助吊具连接并起吊;
步骤2.4、将PC构件吊装到位后,依次移除起吊设备及辅助吊具。
所述的带有镂空结构的PC构件的吊装方法,所述辅助吊具具体是指由型钢构成的杆形支架,在该支架的两端设置连接通孔并在该支架的其中一端部设置吊装孔。
本吊装方法能够有效解决解决留有孔口或窗洞的PC构件在吊装施工时容易破损或变形的问题,并且本吊装方法实施方便,便于拆卸。
附图说明
图1为本吊装方法中辅助吊具的结构示意图。
图2为本吊装方法的示意图。
具体实施方式
以下通过具体实施例进一步说明本发明。
一种带有镂空结构的PC构件的吊装方法,
步骤1、实施开始前:
步骤1.1、根据PC构件2的外形尺寸,孔洞3大小,制作相应的辅助吊具1;
步骤1.2、在PC构件2的本体靠近孔洞3的上下方各预留螺栓孔,便于安装吊具;
步骤2、实施吊装:
步骤2.1、PC构件运输到施工现场后,对PC构件2的外形尺寸,吊具预留螺栓孔进行复核;
步骤2.2、将辅助吊具1通过预留的螺栓孔与PC构件2连接,此时应确认辅助吊具1横跨PC构件2的孔洞3,其中,当孔洞3面积超过PC构件2整体面积的60%时,采用多个辅助吊具1沿PC构件2孔洞3的纵向、横向方向设置并与PC构件2连接,从而对PC构件2孔洞3边沿进行多方位加固;
步骤2.3、辅助吊具1与PC构件2采用螺栓连接,吊装前确认螺栓紧固到位;将起吊设备与辅助吊具1连接并起吊;
步骤2.4、将PC构件2吊装到位后,依次移除起吊设备及辅助吊具1。
所述的带有镂空结构的PC构件的吊装方法,所述辅助吊具1具体是指由型钢构成的杆形支架,在该支架的两端设置连接通孔11并在该支架的其中一端部设置吊装孔12。
本吊装方法能够有效解决解决留有孔口或窗洞的PC构件在吊装施工时容易破损或变形的问题,并且本吊装方法实施方便,便于拆卸。

Claims (2)

1.一种带有镂空结构的PC构件的吊装方法,其特征是:
步骤1、实施开始前:
步骤1.1、根据PC构件的外形尺寸,孔洞大小,制作相应的辅助吊具;
步骤1.2、在PC构件的本体靠近孔洞的上下方各预留螺栓孔,便于安装吊具;
步骤2、实施吊装:
步骤2.1、PC构件运输到施工现场后,对PC构件的外形尺寸,吊具预留螺栓孔进行复核;
步骤2.2、将辅助吊具通过预留的螺栓孔与PC构件连接,此时应确认辅助吊具横跨PC构件的孔洞,其中,当孔洞面积超过PC构件整体面积的60%时,采用多个辅助吊具沿PC构件孔洞的纵向、横向方向设置并与PC构件连接,从而对PC构件孔洞边沿进行多方位加固;
步骤2.3、辅助吊具与PC构件采用螺栓连接,吊装前确认螺栓紧固到位;将起吊设备与辅助吊具连接并起吊;
步骤2.4、将PC构件吊装到位后,依次移除起吊设备及辅助吊具。
2.根据权利要求1所述的带有镂空结构的PC构件的吊装方法,其特征是:所述辅助吊具具体是指由型钢构成的杆形支架,在该支架的两端设置连接通孔并在该支架的其中一端部设置吊装孔。
CN201810550664.3A 2018-05-31 2018-05-31 一种带有镂空结构的pc构件的吊装方法 Pending CN108560934A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810550664.3A CN108560934A (zh) 2018-05-31 2018-05-31 一种带有镂空结构的pc构件的吊装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810550664.3A CN108560934A (zh) 2018-05-31 2018-05-31 一种带有镂空结构的pc构件的吊装方法

Publications (1)

Publication Number Publication Date
CN108560934A true CN108560934A (zh) 2018-09-21

Family

ID=63552662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810550664.3A Pending CN108560934A (zh) 2018-05-31 2018-05-31 一种带有镂空结构的pc构件的吊装方法

Country Status (1)

Country Link
CN (1) CN108560934A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3863972A (en) * 1972-05-18 1975-02-04 Paul M Thomas System for lifting and handling panels
DE19814612A1 (de) * 1998-04-01 1999-10-07 Ernst Riffel Vorrichtung zum Transportieren von Bauelementen
CN202429868U (zh) * 2012-01-16 2012-09-12 中国建筑一局(集团)有限公司 预制构件新型吊装、就位装置
CN105019669A (zh) * 2015-07-24 2015-11-04 上海市城市建设设计研究总院 U型吊环结构
CN105926953A (zh) * 2016-04-20 2016-09-07 中国建筑第八工程局有限公司 用于预制构件吊装的临时加固结构
CN205555858U (zh) * 2016-03-31 2016-09-07 亿昇(天津)科技有限公司 壳体整体起吊的吊具系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3863972A (en) * 1972-05-18 1975-02-04 Paul M Thomas System for lifting and handling panels
DE19814612A1 (de) * 1998-04-01 1999-10-07 Ernst Riffel Vorrichtung zum Transportieren von Bauelementen
CN202429868U (zh) * 2012-01-16 2012-09-12 中国建筑一局(集团)有限公司 预制构件新型吊装、就位装置
CN105019669A (zh) * 2015-07-24 2015-11-04 上海市城市建设设计研究总院 U型吊环结构
CN205555858U (zh) * 2016-03-31 2016-09-07 亿昇(天津)科技有限公司 壳体整体起吊的吊具系统
CN105926953A (zh) * 2016-04-20 2016-09-07 中国建筑第八工程局有限公司 用于预制构件吊装的临时加固结构

Similar Documents

Publication Publication Date Title
CN204919821U (zh) 一种新型高抗剪承载力预埋件
CN204826419U (zh) 深埋锚具
CN215106573U (zh) 一种钢筋混凝土开洞梁
EP3309327B1 (de) Transportanker
CN205907855U (zh) 一种钢管板组合钢板剪力墙
CN108560934A (zh) 一种带有镂空结构的pc构件的吊装方法
EP2826930B1 (de) Vorrichtungen zum Manipulieren von mehrschaligen flächigen Bauteilen
EP2775063B1 (de) Verbindungsanordnung zur Bildung zweischaliger Betonfertigteile
CN209907737U (zh) 混凝土结构分期施工预留接茬钢筋连接机构
CN208561439U (zh) 水运工程大型预制构件不穿透吊孔结构
CN207568074U (zh) 一种二次结构构件钢筋连接节点
CN214498380U (zh) 沉池吊模加固定位装置
CN204738406U (zh) 一种预制框架柱的防雷装置
CN104085832A (zh) 一种柔性构件提升装置及其提升方法
CN204401871U (zh) 装配式墙板
CN204614975U (zh) 一种防雷引下线
CN209227841U (zh) 墙体与梁平面内连接结构及装配式建筑结构体系
CN110952787A (zh) 一种新型预制混凝土构件起重吊点预埋件体系
CN201474176U (zh) 钢筋续接器
CN206815377U (zh) 一种综合管廊装配体的连接结构
CN205804999U (zh) 预制装配式建筑塔吊的连接结构
CN203834734U (zh) 轻质实心墙板内包钢框架节点的连接结构
CN205444971U (zh) 一种可控frp加固结构延性的装置
CN206649954U (zh) 一种金具穿插连接的绝缘子瓷套
CN202466428U (zh) 用于预制箱梁节段吊装的吊装结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921

RJ01 Rejection of invention patent application after publication