CN108492052A - A kind of electric energy metering device high pressure new clothes business management system - Google Patents

A kind of electric energy metering device high pressure new clothes business management system Download PDF

Info

Publication number
CN108492052A
CN108492052A CN201810307450.3A CN201810307450A CN108492052A CN 108492052 A CN108492052 A CN 108492052A CN 201810307450 A CN201810307450 A CN 201810307450A CN 108492052 A CN108492052 A CN 108492052A
Authority
CN
China
Prior art keywords
module
work order
information
electric energy
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810307450.3A
Other languages
Chinese (zh)
Inventor
杨芾藜
何国军
周全
周艳玲
宫林
陈文礼
籍勇亮
黄磊
刘型志
张兵
周谭杰
何珉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Chongqing Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Chongqing Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201810307450.3A priority Critical patent/CN108492052A/en
Publication of CN108492052A publication Critical patent/CN108492052A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of electric energy metering device high pressure new clothes business management systems, it includes the mobile terminal that system carries out the server-side of the first management operation and carries out the second management operation;Server-side includes:Normal process configuration module, corporate information management's module, workform management module, historical query module, historical data statistical module and role-security module;Mobile terminal includes:Work order list block, task management module, construction process progress module, picture recognition module, historical query module and system setup module.The advantageous effect that the present invention obtains is:Intelligent management carried out to high pressure new clothes business in such a way that B/S softwares are in conjunction with mobile APP, the present invention is easy to operate, convenient and efficient, inquiry convenience, multi dimensional analysis, autgmentability are strong.

Description

A kind of electric energy metering device high pressure new clothes business management system
Technical field
The present invention relates to electric energy metering device technical field, especially a kind of electric energy metering device high pressure new clothes service management System.
Background technology
The existing high pressure new clothes business of State Grid Corporation of China uses always traditional papery workform management mode, need to be by Teams and groups are installed and hand filling and paste bar code when sending working hour and site operation.And papery work order is easy to be stained and lose, this A problem is especially prominent in raining working, and rainwater can drench work order, and the writing in work order is made to thicken difficult identification;Use paper Matter work order there is also the problem of hand filling mistake, make troubles to work is verified;In addition, papery work order is after the completion of operation I.e. filing is sealed up for safekeeping, is not easy Develop Data statistic analysis, management level are difficult to be excavated from a large amount of papery work order profile Valuable information can not recognize real work situation and construction FAQs by papery work order archives, can not be with electric energy Metering device actual installation quality to carry out performance appraisal to the working condition of company or individual.
Invention content
In view of the drawbacks described above of the prior art, it is an object of the invention to provide a kind of electric energy metering device high pressure new clothes Business management system carries out intelligent management, this hair in such a way that B/S softwares are in conjunction with mobile APP to high pressure new clothes business Bright easy to operate, convenient and efficient, inquiry convenience, multi dimensional analysis, autgmentability are strong.
It is realized the purpose of the present invention is technical solution in this way, a kind of electric energy metering device high pressure new clothes business pipe Reason system, it includes:It carries out the server-side of the first management operation and carries out the mobile terminal of the second management operation;
The server-side includes:Normal process configuration module, corporate information management's module, workform management module, history Enquiry module, historical data statistical module and role-security module;
The mobile terminal includes:Work order list block, task management module, construction process progress module, image recognition Module, historical query module and system setup module.
Further, the server-side is B/S structures;
The normal process configuration module, the standardized construction process step for configuring power business, including title are suitable Sequence configuration module and step details configuration module;
The name order configuration module, for configuring each construction procedure title and its sequencing and being shown in mobile terminal Construction process step interface on;
The step details configuration module, in the details for a certain step to be arranged, including step title, step Hold, step prompt picture, whether scans bar code, whether takes pictures and stay shelves, identification of whether taking pictures, identification point selection, help word With these contents of help picture;
Corporate information management's module includes:Organizational information module, information about firms module, information export module;
The organizational information module, for inquiring and edit the title of each organization, address, phone, E-mail address, and The title of its subordinate tissue, address, phone, E-mail address, and delete operation can be carried out to each organization;
The information about firms module, for inquiring and editing the Personal name of the affiliated member of each organization, login name, step on Land password, phone, and delete operation can be carried out to each member;
Described information export module is used for derived weave's structure and its information about firms, so that mobile terminal updates related data.
Further, the workform management module, including create work order module, inquiry work order module, assign work order module, lead It goes to work single module, mobile terminal work order import modul and test evaluation module;
The newly-built work order module, for creating high pressure new clothes vocational work list, the work order information that need to be filled in systems Specifically include stoichiometric point relevant information, customer information, electric energy meter information, current transformer information and voltage transformer information;
The inquiry work order module, for inquire it is unassigned, assigned, implementing, wait evaluating these various states Work order information in progress;
The appointment work order module for work order to be distributed to specified work responsible person and shift member, and is specified Target date, if the real time at the appointed time completes after 24 hours, which is identified by as completion status of exceeding the time limit;
The export work order module, the work order information for exporting server-side encrypts file, so that mobile terminal imports offline Work order information;
The mobile terminal work order import modul, the work order encryption data for importing mobile terminal completion;
The test evaluation module, for calling picture recognition module to existing during importing mobile terminal work order data Photo carries out automated graphics identification scoring, and clicks through the review of pedestrian's work to each scoring and submit the final assessment knot to work order Fruit.
Further, the historical query module, including condition query module, history trouble ticket information inquiry module and history work Single scoring details enquiry module;
The condition query module, for carrying out conditional filtering inquiry to work order, screening conditions include type of service, work order Number, work order state, customer name and keyword query;
The history trouble ticket information inquiry module is used for the essential information of query history work order, including type of service, work order Number, customer information, electric energy meter information, current transformer information, voltage transformer information, work responsible person, shift member, apply Between working hour, actual finish time, work order automatic scoring and work order final score;
The history trouble ticket scores details enquiry module, is used for the scoring details of query history work order, including cancelling stocks reason, The score of reason of exceeding the time limit and scoring point.
Further, the historical data statistical module, for carrying out data statistic analysis to qualified history trouble ticket, Including conditional filtering module, operation summary statistics module, score section statistical module, FAQs collect statistics module, annual work Make quality assessment module and monthly magazine export module;
The conditional filtering module, for screening qualified history trouble ticket, screening conditions include type of service, unit Title, crewmember's title, commencement date and deadline;
The operation summary statistics module, it is complete for counting a certain power supply unit or a certain crewmember institute in a period of time At work order quantity;
The score section statistical module is completed for counting a certain power supply unit or a certain crewmember in a period of time The scoring situation of work order, score section are counted according to 0-20 points, 20-40 points, 40-60 points, 60-80 points, 80-100 points;
The FAQs collect statistics module, for counting a certain power supply unit or a certain crewmember in a period of time The scoring point deduction of points situation of completed work order, statistical result are arranged according to the sequence of number from more to less is deducted points, number of deducting points Most several scoring points are the common site operation problem of the power supply unit or crewmember individual;
The annual work quality assessment module counted a certain power supply unit or a certain for segmentation in a certain annual 12 months The of that month best result of the completed work order of crewmember, minimum point of that month, this month average mark, of that month work order quantity, of that month installation electricity Energy table quantity, and 12 months average mark change curves are produced, to check the annual work of the power supply unit or crewmember Quality;
The monthly magazine export module, the historical data Monthly Bulletin of Statistics Section for exporting a certain power supply unit month, monthly magazine content Including of that month work order sum statistics, of that month installation electric energy meter sum statistics, of that month FAQs statistics, of that month score section statistics, The of that month work order number and installation electric energy meter quantity and its scoring situation of each crewmember.
Further, the role-security module carries out rights management, including metering specific responsibility for the user to login system Module, squad leader's module, crewmember's module;
Module is specialized in the metering, and the user authority management for measuring specific responsibility role, including workform management full powers are limited, gone through History inquires full powers limit, normal process configuration full powers limit, historical data statistics full powers limit;
Squad leader's module is used for the user authority management of squad leader role, including workform management part permission, historical query Full powers limit, historical data Department of Statistics fraction limit;
Crewmember's module is used for the user authority management of crewmember, including workform management part permission, history Query portion permission and historical data Department of Statistics fraction limit.
Further, the mobile terminal is Android APP;
The work order list block, for showing that login user does not complete the shorthand information of work order, including work order letter currently Cease module and work order block of state;
The work order block of state, the current state for showing work order, including do not start state in state, progress, Completion status, completion status of exceeding the time limit, cancelling stocks state;
The task management module, including task details module and task real-time performance module;
The task details module, the essential information for showing work order task, including work order type of service, work order number, The automatic scoring result that customer information, electric energy meter bar code, work responsible person, shift member, construction time, scoring are put;
The task real-time performance module, the performance for showing a certain electric energy meter installation procedure, each step State includes not starting state in state, progress, state being completed, only after installation procedure is fully completed, electric energy meter peace Dress task could submit completion;
The historical query module, including history trouble ticket details enquiry module, history trouble ticket scoring enquiry module;
The history trouble ticket details enquiry module, be used for query history basic details, including type of service, work order number, Customer information, electric energy meter bar code, planned start time, actual finish time;
The history trouble ticket scoring enquiry module, the scene scoring details for inquiring each history trouble ticket and its scene scoring Total score.
Further, the construction process progress module, including take pictures and stay a grade module, bar code scanner module, On-Site Assistance Module, problem declare module;
Described take pictures stays grade module for shooting the work ticket photo for needing to stay shelves, site safety measure photo, mutual inductor Secondary circuit photo, clock of power meter information photo, work order file photo;
The bar code scanner module is for being scanned electric energy meter bar code, if scanning result and work order information phase Symbol, then the step is judged to passing through, and otherwise not passes through;
The effect of the On-Site Assistance module is that auxiliary field worker deeply understands standardized construction workflow steps, is had Body includes construction text prompt, schematic diagram prompt, voice prompt, AR auxiliary;
Described problem declares module and feeds back job site problems for work responsible person and shift's member record, including multiple The step FAQs, verbal description problem condition, scene is selected to photograph to record.
Further, described image identification module includes object identification module, distance-measurement module, color identification module, office Portion's position judging module, live grading module;
The object identification module be used for automatic identification high pressure new clothes business Classical correlation photo in three-phase electric energy meter, adopt Collect equipment and the components such as terminal, test connecting box, secondary wiring, number set, seal;
The distance-measurement module be used for automatic identification high pressure new clothes business Classical correlation photo in three-phase electric energy meter with Spacing between acquisition terminal, between three-phase electric energy meter and test connecting box, between electric energy metering device and metering bin shell;
The color identification module is used for A, B, C phase secondary returning in automatic identification high pressure new clothes business Classical correlation photo Line conductor color;
The local location judgment module is used for the secondary wiring in automatic identification high pressure new clothes business Classical correlation photo Wiring position, in flakes break-make situation, phase sequence sequence;
The scene grading module after high pressure new clothes business photo automatic identification for carrying out judgement scoring, for the point that scores Provide phase reserved portion.
Further, the system setup module, including data update module, log in setup module, work order data export mould Block, historical data reorganization module;
The data update module is used to update the organization, corporator, work order information of APP;
The setup module that logs in is arranged for login function, including remembers user name and user's automated log on;
Encryption work order data are completed for exporting in the work order data export module, so that server-side imports;
The historical data reorganization module for clearing up idle data, can empty be completed that work order generated import clothes The encryption work order data at business end.
By adopting the above-described technical solution, the present invention has the advantage that:With easy to operate, convenient and efficient, look into The advantages that asking convenience, multi dimensional analysis, strong autgmentability is carried out live scoring by system, reduces the influence of human factor automatically, Can find that construction problem, scene supervise rectification, also quickly check construction quality for administrative staff in time, to unit or individual Annual work quality is evaluated, and understands live real work situation, analysis result objective and fair convenient for management level.
Other advantages, target and the feature of the present invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.
Description of the drawings
The description of the drawings of the present invention is as follows:
Fig. 1 is the system construction drawing of electric energy metering device high pressure new clothes business management system.
Fig. 2 is the system flow chart of electric energy metering device high pressure new clothes business management system.
Specific implementation mode
The invention will be further described with reference to the accompanying drawings and examples.
Embodiment:As depicted in figs. 1 and 2;A kind of electric energy metering device high pressure new clothes business management system, it includes: It carries out the server-side of the first management operation and carries out the mobile terminal of the second management operation;In the present embodiment mobile terminal be can be iOS The APP of the APP and Android type of type.
Server-side includes:Normal process configuration module, corporate information management's module, workform management module, historical query Module, historical data statistical module and role-security module;
Mobile terminal includes:Work order list block, task management module, construction process progress module, picture recognition module, Historical query module and system setup module.
Server-side is B/S structures;
Normal process configuration module, the standardized construction process step for configuring power business, including name order are matched Set module and step details configuration module;
Name order configuration module (can be shown in APP construction process steps interface for configuring each construction procedure title On) and its sequencing;
Step details configuration module, the details for a certain step to be arranged, including step title, step content, step Whether whether rapid prompt picture scan bar code, take pictures and stay shelves, identification of whether taking pictures, identification point selection, help word and help These contents of picture;
Corporate information management's module includes:Organizational information module, information about firms module, information export module;
Organizational information module, for inquiring and edit the title of each organization, address, phone, E-mail address, and its under The title of category tissue, address, phone, E-mail address, and delete operation can be carried out to each organization;
Information about firms module, for inquire and edit the Personal name of the affiliated member of each organization, login name, log in it is close Code, phone, and delete operation can be carried out to each member;
Information export module is used for derived weave's structure and its information about firms, so that mobile terminal APP updates related data.
Workform management module, including newly-built work order module, inquiry work order module, assign work order module, export work order module, Mobile terminal work order import modul and test evaluation module;
Newly-built work order module, for creating high pressure new clothes vocational work list in systems, the work order information that need to be filled in is specific Including stoichiometric point relevant information, customer information, electric energy meter information, current transformer information and voltage transformer information;
Inquire work order module, for inquire it is unassigned, assigned, implementing, wait evaluating these various states Ongoing work order information;
Work order module is assigned, for work order to be distributed to specified work responsible person and shift member, and specified completion On the date, if the real time at the appointed time completes after 24 hours, which is identified by as completion status of exceeding the time limit;
Work order module is exported, the work order information for exporting server-side encrypts file, so that mobile terminal imports work order offline Information;
Mobile terminal work order import modul, the work order encryption data for importing mobile terminal completion;
Test evaluation module, for calling picture recognition module to shine scene during importing mobile terminal work order data Piece carries out automated graphics identification scoring, and clicks through the review of pedestrian's work to each scoring and submit the final assessment result to work order.
Historical query module, including condition query module, history trouble ticket information inquiry module and history trouble ticket scoring details Enquiry module;
Condition query module, for work order carry out conditional filtering inquiry, screening conditions include type of service, work order number, Work order state, customer name and keyword query;
History trouble ticket information inquiry module, be used for query history work order essential information, including type of service, work order number, Customer information, electric energy meter information, current transformer information, voltage transformer information, work responsible person, shift member, construction Time, actual finish time, work order automatic scoring and work order final score;
History trouble ticket scores details enquiry module, is used for the scoring details of query history work order, including cancelling stocks reason, exceed the time limit The score of reason and 17 scoring points.
Historical data statistical module, for carrying out data statistic analysis, including condition sieve to qualified history trouble ticket Modeling block, operation summary statistics module, score section statistical module, FAQs collect statistics module, annual work quality evaluation Module and monthly magazine export module;
Conditional filtering module, for screening qualified history trouble ticket, screening conditions include type of service, unit name Title, crewmember's title, commencement date and deadline;
Operation summary statistics module is completed for counting a certain power supply unit or a certain crewmember in a period of time Work order quantity;
Score section statistical module, for counting a certain power supply unit or the completed work order of a certain crewmember in a period of time Scoring situation, score section counted according to 0-20 point, 20-40 points, 40-60 points, 60-80 points, 80-100 points;
FAQs collect statistics module, it is complete for counting a certain power supply unit or a certain crewmember institute in a period of time At the scoring point deduction of points situation of work order, statistical result is arranged according to the sequence of number from more to less is deducted points, and deduction of points number is most Several scoring points be the power supply unit or crewmember individual common site operation problem;
Annual work quality assessment module counted a certain power supply unit or a certain teams and groups for segmentation in a certain annual 12 months The of that month best result of the completed work order of member, minimum point of that month, this month average mark, of that month work order quantity, of that month installation electric energy meter Quantity, and 12 months average mark change curves are produced, to check the annual work quality of the power supply unit or crewmember;
Monthly magazine export module, the historical data Monthly Bulletin of Statistics Section for exporting a certain power supply unit month, monthly magazine content include Of that month work order sum statistics, of that month installation electric energy meter sum statistics, of that month FAQs statistics, of that month score section statistics, each class The of that month work order number and installation electric energy meter quantity and its scoring situation of group membership.
Role-security module carries out rights management, including metering specific responsibility module, Ban Changmo for the user to login system Block, crewmember's module;
Metering specific responsibility module, the user authority management for measuring specific responsibility role, including workform management full powers limit, history are looked into Ask full powers limit, normal process configuration full powers limit, historical data statistics full powers limit;
Squad leader's module is used for the user authority management of squad leader role, including workform management part permission (cannot be commented Point), historical query full powers limit, historical data Department of Statistics fraction limit (monthly magazine cannot be exported);
Crewmember's module is used for the user authority management of crewmember, including workform management part permission (can only be looked into Ask), historical query part permission (can only inquire me complete work order), historical data Department of Statistics fraction limit (this can only be inquired People cannot export monthly magazine).
Mobile terminal is Android APP;
Work order list block, for showing that login user does not complete the shorthand information of work order, including work order information mould currently Block and work order block of state;
Work order block of state, the current state for showing work order, including do not start state in state, progress, be completed State, completion status of exceeding the time limit, cancelling stocks state;
Task management module, including task details module and task real-time performance module;
Task details module, the essential information for showing work order task, including work order type of service, work order number, client The automatic scoring result that information, electric energy meter bar code, work responsible person, shift member, construction time, 17 scorings are put;
Task real-time performance module, the performance for showing 12 step installation procedure of a certain electric energy meter, each step State includes not starting state in state, progress, state being completed, and only after 12 steps are fully completed, electric energy meter installation is appointed Business could submit completion;
Historical query module, including history trouble ticket details enquiry module, history trouble ticket scoring enquiry module;
History trouble ticket details enquiry module is used for the basic details of query history, including type of service, work order number, client Information, electric energy meter bar code, planned start time, actual finish time;
History trouble ticket scoring enquiry module, 17 scene scoring details for inquiring each history trouble ticket and its scene scoring Total score.
Construction process progress module, including take pictures and stay a grade module, bar code scanner module, On-Site Assistance module, problem Shen Report module;
It takes pictures and stays grade module secondary for shooting the work ticket photo for needing to stay shelves, site safety measure photo, mutual inductor Circuit photo, clock of power meter information photo, work order file photo;
Bar code scanner module is for being scanned electric energy meter bar code, if scanning result is consistent with work order information, The step is judged to passing through, and otherwise not passes through;
The effect of On-Site Assistance module is that auxiliary field worker deeply understands standardized construction workflow steps, specific to wrap Include construction text prompt, schematic diagram prompt, voice prompt, AR auxiliary;
Problem declares module and feeds back job site problems for work responsible person and shift's member record, including final election should Step FAQs, verbal description problem condition, scene photograph to record.
Picture recognition module includes that object identification module, distance-measurement module, color identification module, local location judge mould Block, live grading module;
Object identification module is whole for the three-phase electric energy meter in automatic identification high pressure new clothes business Classical correlation photo, acquisition Equipment and the component such as end, test connecting box, secondary wiring, number set, seal;
Distance-measurement module is used for the three-phase electric energy meter in automatic identification high pressure new clothes business Classical correlation photo and acquisition Spacing between terminal, between three-phase electric energy meter and test connecting box, between electric energy metering device and metering bin shell;
A, B, C phase secondary circuit that color identification module is used in automatic identification high pressure new clothes business Classical correlation photo are led Line color;
Local location judgment module is used for the secondary wiring wiring in automatic identification high pressure new clothes business Classical correlation photo Position, in flakes break-make situation, phase sequence sequence;
Live grading module after high pressure new clothes business photo automatic identification for carrying out judgement scoring, for 17 scoring points Provide phase reserved portion.
System setup module, including data update module, log in setup module, work order data export module, historical data Sorting module;
Data update module is used to update the organization, corporator, work order information of APP;
It logs in setup module for login function to be arranged, including remembers user name and user's automated log on;
Encryption work order data are completed for exporting in work order data export module, so that server-side imports;
Historical data reorganization module for clearing up idle data, can empty be completed that work order generated import server-side Encryption work order data.
Present embodiments provide a kind of electric energy metering device high pressure new clothes business management system, system structure such as attached drawing 2 Shown, system includes server-side and mobile terminal two parts, and server-side is B/S frameworks, including normal process configuration module, company's letter Cease management module, workform management module, historical query module, historical data statistical module, role-security module;Mobile terminal is peace Tall and erect APP includes mainly work order list block, task management module, construction process module, picture recognition module, historical query mould Block, system setup module.
In a preferred embodiment of the present invention, high pressure new clothes operation flow is as shown in Fig. 1, and specific implementation step is such as Under:
1) metering specific responsibility Role Users Sign-On services end configures the process step of high pressure new clothes business and each step Title, prompt text, stay shelves to take pictures, identify take pictures, the contents such as common site problems, help information;
2) squad leader's Role Users Sign-On services end, create a work order, fill in customer information, installed electric energy meter information and The 30 remainder content such as mutual inductor information, then preserves, and the work order state is unassigned state at this time;
3) work order is assigned to crewmember, assigned work responsible person and work by squad leader's Role Users by the server-side page Make class member, and specified work order implementation date, work order state becomes having assigned state at this time;
4) squad leader's Role Users export work order task by the server-side page, and work responsible person steps on hand-held terminal device Land mobile terminal APP, updates the data, and checks and distributes to the newest work order task of oneself, and shift member is then led to reach state's net High pressure new clothes business construction site, into horizontal high voltage three-phase meter installation exercise, work order state becomes in-site installation state at this time;
5) at the scene in work progress, work responsible person manages work order task using mobile terminal APP, is installed into electric energy meter Flow interface, the 1st step into horizontal high voltage new clothes operation operate:Using hand-held terminal device shooting contain work ticket signed by, The work ticket photo that work responsible person, work permit people sign, then passes through the step on APP;
6) at the scene in work progress, work responsible person is grasped using the 2nd step of mobile terminal APP into horizontal high voltage new clothes operation Make:Site safety Working Measures are reviewed and validate, then pass through the step on APP;
7) at the scene in work progress, work responsible person is grasped using the 3rd step of mobile terminal APP into horizontal high voltage new clothes operation Make:It hands over work content to shift member, dangerous point is informed, is confided a technological secret, and then passes through the step on APP;
8) at the scene in work progress, work responsible person is grasped using the 4th step of mobile terminal APP into horizontal high voltage new clothes operation Make:Deenergization and electrical verification shoot safety measure photo using APP, then pass through the step on APP;
9) at the scene in work progress, work responsible person is grasped using the 5th step of mobile terminal APP into horizontal high voltage new clothes operation Make:Customer information and electric energy meter information are checked, electric energy meter bar code is scanned using APP, clock of power meter information is then shot and shines Then piece passes through the step on APP;
10) at the scene in work progress, work responsible person is grasped using the 6th step of mobile terminal APP into horizontal high voltage new clothes operation Make:Mutual inductor secondary connection is checked, the photo of transformer secondary circuit is shot using APP, then passes through the step on APP;
11) at the scene in work progress, work responsible person is grasped using the 7th step of mobile terminal APP into horizontal high voltage new clothes operation Make:After stationary electric table and acquisition terminal, the image recognition bat of electric energy meter, acquisition terminal, test connecting box is carried out using APP According to APP shows that the live score of 6 scoring points need to remind shift member in time if scoring is unqualified after calculation process Live rectification is carried out, passes through the step on APP after qualified;
12) at the scene in work progress, work responsible person is grasped using the 8th step of mobile terminal APP into horizontal high voltage new clothes operation Make:After the completion of test connecting box wiring, the image recognition that test connecting box is carried out using APP is taken pictures, and APP passes through calculation process The live score for showing 8 scoring points afterwards need to remind shift member to carry out live rectification in time if scoring is unqualified, qualified Pass through the step on APP afterwards;
13) at the scene in work progress, work responsible person is grasped using the 9th step of mobile terminal APP into horizontal high voltage new clothes operation Make:The three-phase electric energy meter installed to shift member carries out installation quality and wiring check, then passes through the step on APP Suddenly;
14) at the scene in work progress, work responsible person is grasped using the 10th step of mobile terminal APP into horizontal high voltage new clothes operation Make:Live testing, the three-phase electric energy meter installed to shift member carries out installation quality and wiring check, then on APP Pass through the step;
15) at the scene in work progress, work responsible person is grasped using the 11st step of mobile terminal APP into horizontal high voltage new clothes operation Make:It is taken pictures using the image recognition of APP progress electric energy meter, test connecting box, metering cabinet seal, APP is shown after calculation process The live score for showing 3 scoring points need to remind shift member to carry out live rectification in time if scoring is unqualified, it is qualified after Pass through the step on APP;
16) at the scene in work progress, work responsible person is grasped using the 12nd step of mobile terminal APP into horizontal high voltage new clothes operation Make:Work on the spot terminates, and shooting work order files photo;
17) the collected work order field operation data of server-side is imported server-side by metering specific responsibility Role Users, at this time should Work order state becomes waiting for evaluation state;
18) metering specific responsibility Role Users carry out desk checking review, evaluation in the test evaluation page of server-side to the work order The final score of the work order, at this time the work order state become that state is completed.
It should be understood that the part that this specification does not elaborate belongs to the prior art.Finally illustrate, it is above Embodiment is merely illustrative of the technical solution of the present invention and unrestricted, although having been carried out in detail to the present invention with reference to preferred embodiment Illustrate, it will be understood by those of ordinary skill in the art that, technical scheme of the present invention can be modified or replaced equivalently, Without departing from the objective and range of the technical program, it is intended to be within the scope of the claims of the invention.

Claims (10)

1. a kind of electric energy metering device high pressure new clothes business management system, which is characterized in that the system comprises have carry out first It manages the server-side of operation and carries out the mobile terminal of the second management operation;
The server-side includes:Normal process configuration module, corporate information management's module, workform management module, historical query Module, historical data statistical module and role-security module;
The mobile terminal includes:Work order list block, task management module, construction process progress module, picture recognition module, Historical query module and system setup module.
2. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the server-side For B/S structures;
The normal process configuration module, the standardized construction process step for configuring power business, including name order are matched Set module and step details configuration module;
The name order configuration module, for configuring each construction procedure title and its sequencing and being shown in applying for mobile terminal On work process step interface;
The step details configuration module, the details for a certain step to be arranged, including step title, step content, step Whether whether rapid prompt picture scan bar code, take pictures and stay shelves, identification of whether taking pictures, identification point selection, help word and help These contents of picture;
Corporate information management's module includes:Organizational information module, information about firms module, information export module;
The organizational information module, for inquiring and edit the title of each organization, address, phone, E-mail address, and its under The title of category tissue, address, phone, E-mail address, and delete operation can be carried out to each organization;
The information about firms module, for inquire and edit the Personal name of the affiliated member of each organization, login name, log in it is close Code, phone, and delete operation can be carried out to each member;
Described information export module is used for derived weave's structure and its information about firms, so that mobile terminal updates related data.
3. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the work order pipe Module is managed, including newly-built work order module, inquiry work order module, appointment work order module, export work order module, mobile terminal work order import Module and test evaluation module;
The newly-built work order module, for creating high pressure new clothes vocational work list in systems, the work order information that need to be filled in is specific Including stoichiometric point relevant information, customer information, electric energy meter information, current transformer information and voltage transformer information;
The inquiry work order module, for inquire it is unassigned, assigned, implementing, wait evaluating these various states Ongoing work order information;
The appointment work order module, for work order to be distributed to specified work responsible person and shift member, and specified completion On the date, if the real time at the appointed time completes after 24 hours, which is identified by as completion status of exceeding the time limit;
The export work order module, the work order information for exporting server-side encrypts file, so that mobile terminal imports work order offline Information;
The mobile terminal work order import modul, the work order encryption data for importing mobile terminal completion;
The test evaluation module, for calling picture recognition module to shine scene during importing mobile terminal work order data Piece carries out automated graphics identification scoring, and clicks through the review of pedestrian's work to each scoring and submit the final assessment result to work order.
4. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the history is looked into Ask module, including condition query module, history trouble ticket information inquiry module and history trouble ticket scoring details enquiry module;
The condition query module, for work order carry out conditional filtering inquiry, screening conditions include type of service, work order number, Work order state, customer name and keyword query;
The history trouble ticket information inquiry module, be used for query history work order essential information, including type of service, work order number, Customer information, electric energy meter information, current transformer information, voltage transformer information, work responsible person, shift member, construction Time, actual finish time, work order automatic scoring and work order final score;
The history trouble ticket scores details enquiry module, is used for the scoring details of query history work order, including cancelling stocks reason, exceeds the time limit The score of reason and scoring point.
5. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the history number Module according to statistics, for carrying out data statistic analysis, including conditional filtering module, operation overview to qualified history trouble ticket Statistical module, score section statistical module, FAQs collect statistics module, annual work quality assessment module and monthly magazine export mould Block;
The conditional filtering module, for screening qualified history trouble ticket, screening conditions include type of service, unit name Title, crewmember's title, commencement date and deadline;
The operation summary statistics module is completed for counting a certain power supply unit or a certain crewmember in a period of time Work order quantity;
The score section statistical module, for counting a certain power supply unit or the completed work order of a certain crewmember in a period of time Scoring situation, score section counted according to 0-20 point, 20-40 points, 40-60 points, 60-80 points, 80-100 points;
The FAQs collect statistics module, it is complete for counting a certain power supply unit or a certain crewmember institute in a period of time At the scoring point deduction of points situation of work order, statistical result is arranged according to the sequence of number from more to less is deducted points, and deduction of points number is most Several scoring points be the power supply unit or crewmember individual common site operation problem;
The annual work quality assessment module counted a certain power supply unit or a certain teams and groups for segmentation in a certain annual 12 months The of that month best result of the completed work order of member, minimum point of that month, this month average mark, of that month work order quantity, of that month installation electric energy meter Quantity, and 12 months average mark change curves are produced, to check the annual work quality of the power supply unit or crewmember;
The monthly magazine export module, the historical data Monthly Bulletin of Statistics Section for exporting a certain power supply unit month, monthly magazine content include Of that month work order sum statistics, of that month installation electric energy meter sum statistics, of that month FAQs statistics, of that month score section statistics, each class The of that month work order number and installation electric energy meter quantity and its scoring situation of group membership.
6. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that role's power Module is limited, rights management, including metering specific responsibility module, squad leader's module, crewmember's mould are carried out for the user to login system Block;
Module is specialized in the metering, the user authority management for measuring specific responsibility role, including workform management full powers limit, history are looked into Ask full powers limit, normal process configuration full powers limit, historical data statistics full powers limit;
Squad leader's module is used for the user authority management of squad leader role, including workform management part permission, historical query full powers Limit, historical data Department of Statistics fraction limit;
Crewmember's module is used for the user authority management of crewmember, including workform management part permission, historical query Part permission and historical data Department of Statistics fraction limit.
7. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the mobile terminal For Android APP;
The work order list block, for showing that login user does not complete the shorthand information of work order, including work order information mould currently Block and work order block of state;
The work order block of state, the current state for showing work order, including do not start state in state, progress, be completed State, completion status of exceeding the time limit, cancelling stocks state;
The task management module, including task details module and task real-time performance module;
The task details module, the essential information for showing work order task, including work order type of service, work order number, client The automatic scoring result that information, electric energy meter bar code, work responsible person, shift member, construction time, scoring are put;
The task real-time performance module, the performance for showing a certain electric energy meter installation procedure, each step state Including not starting state in state, progress, state being completed, only after installation procedure is fully completed, electric energy meter installation is appointed Business could submit completion;
The historical query module, including history trouble ticket details enquiry module, history trouble ticket scoring enquiry module;
The history trouble ticket details enquiry module is used for the basic details of query history, including type of service, work order number, client Information, electric energy meter bar code, planned start time, actual finish time;
The history trouble ticket scoring enquiry module, scene scoring details and its scene scoring for inquiring each history trouble ticket are always Point.
8. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the construction stream Cheng Jindu modules, including take pictures and a grade module, bar code scanner module, On-Site Assistance module, problem is stayed to declare module;
Described take pictures stays grade module secondary for shooting the work ticket photo for needing to stay shelves, site safety measure photo, mutual inductor Circuit photo, clock of power meter information photo, work order file photo;
The bar code scanner module is for being scanned electric energy meter bar code, if scanning result is consistent with work order information, The step is judged to passing through, and otherwise not passes through;
The effect of the On-Site Assistance module is that auxiliary field worker deeply understands standardized construction workflow steps, specific to wrap Include construction text prompt, schematic diagram prompt, voice prompt, AR auxiliary;
Described problem declares module and feeds back job site problems for work responsible person and shift's member record, including final election should Step FAQs, verbal description problem condition, scene photograph to record.
9. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that described image is known Other module includes object identification module, distance-measurement module, color identification module, local location judgment module, scene scoring mould Block;
The object identification module is whole for the three-phase electric energy meter in automatic identification high pressure new clothes business Classical correlation photo, acquisition Equipment and the component such as end, test connecting box, secondary wiring, number set, seal;
The distance-measurement module is used for the three-phase electric energy meter in automatic identification high pressure new clothes business Classical correlation photo and acquisition Spacing between terminal, between three-phase electric energy meter and test connecting box, between electric energy metering device and metering bin shell;
A, B, C phase secondary circuit that the color identification module is used in automatic identification high pressure new clothes business Classical correlation photo are led Line color;
The local location judgment module is used for the secondary wiring wiring in automatic identification high pressure new clothes business Classical correlation photo Position, in flakes break-make situation, phase sequence sequence;
The scene grading module is provided for carrying out judgement scoring after high pressure new clothes business photo automatic identification for scoring point Phase reserved portion.
10. electric energy metering device high pressure new clothes business management system as described in claim 1, which is characterized in that the system Setup module, including data update module, log in setup module, work order data export module, historical data reorganization module;
The data update module is used to update the organization, corporator, work order information of APP;
The setup module that logs in is arranged for login function, including remembers user name and user's automated log on;
Encryption work order data are completed for exporting in the work order data export module, so that server-side imports;
The historical data reorganization module for clearing up idle data, can empty be completed that work order generated import server-side Encryption work order data.
CN201810307450.3A 2018-04-08 2018-04-08 A kind of electric energy metering device high pressure new clothes business management system Pending CN108492052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810307450.3A CN108492052A (en) 2018-04-08 2018-04-08 A kind of electric energy metering device high pressure new clothes business management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810307450.3A CN108492052A (en) 2018-04-08 2018-04-08 A kind of electric energy metering device high pressure new clothes business management system

Publications (1)

Publication Number Publication Date
CN108492052A true CN108492052A (en) 2018-09-04

Family

ID=63315062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810307450.3A Pending CN108492052A (en) 2018-04-08 2018-04-08 A kind of electric energy metering device high pressure new clothes business management system

Country Status (1)

Country Link
CN (1) CN108492052A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409820A (en) * 2018-09-13 2019-03-01 国网天津市电力公司电力科学研究院 It is a kind of that Delegation Server management system is examined based on the metering of Internet technology mutual inductor on site
CN111652467A (en) * 2020-04-23 2020-09-11 国网上海市电力公司 Work order management-based meter box repairing overall process management method
CN111652466A (en) * 2020-04-23 2020-09-11 国网上海市电力公司 Work order management-based meter box repairing application method
CN113610490A (en) * 2021-07-13 2021-11-05 云南电网有限责任公司 Auxiliary acceptance platform and method for electric energy metering device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102436624A (en) * 2011-09-09 2012-05-02 荣科科技股份有限公司 Method for processing flow and standard of power-marketing site services on basis of handheld terminal
CN104182840A (en) * 2014-08-26 2014-12-03 国家电网公司 Electric marketing metering mobile application system and work method thereof
CN105243440A (en) * 2015-09-29 2016-01-13 国网浙江省电力公司温州供电公司 Marketing mobile working platform based paperless office on-site working method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102436624A (en) * 2011-09-09 2012-05-02 荣科科技股份有限公司 Method for processing flow and standard of power-marketing site services on basis of handheld terminal
CN104182840A (en) * 2014-08-26 2014-12-03 国家电网公司 Electric marketing metering mobile application system and work method thereof
CN105243440A (en) * 2015-09-29 2016-01-13 国网浙江省电力公司温州供电公司 Marketing mobile working platform based paperless office on-site working method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409820A (en) * 2018-09-13 2019-03-01 国网天津市电力公司电力科学研究院 It is a kind of that Delegation Server management system is examined based on the metering of Internet technology mutual inductor on site
CN111652467A (en) * 2020-04-23 2020-09-11 国网上海市电力公司 Work order management-based meter box repairing overall process management method
CN111652466A (en) * 2020-04-23 2020-09-11 国网上海市电力公司 Work order management-based meter box repairing application method
CN111652466B (en) * 2020-04-23 2024-04-09 国网上海市电力公司 Table box repairing application method based on work order management
CN111652467B (en) * 2020-04-23 2024-04-12 国网上海市电力公司 Table box repair whole process management method based on worksheet management
CN113610490A (en) * 2021-07-13 2021-11-05 云南电网有限责任公司 Auxiliary acceptance platform and method for electric energy metering device

Similar Documents

Publication Publication Date Title
CN108492052A (en) A kind of electric energy metering device high pressure new clothes business management system
CN106556605B (en) The digitized representation system of bridge Site Detection typical disease
CN107705020A (en) A kind of overall process intelligence engineering supervisory information managing and control system
CN107748951A (en) Building engineering construction inspection of quality method and system based on BIM
CN107844907A (en) A kind of production schedule and the production management method for sending work examination progress
CN105023200A (en) Power emergency drilling system and emergency drilling method thereof
KR20090129247A (en) Method for network-based facilities integration management and system thereto
CN115619134B (en) Engineering service-based mechanic platform construction method and system
CN109146433A (en) A kind of intelligence recruitment methods and system
CN106127398A (en) A kind of construction costs being applicable to project of transmitting and converting electricity calculates system
CN108520398A (en) Architectural design bidding signing system
CN104463297A (en) Asset two-dimensional code identification application method and device structure
CN107705095A (en) A kind of distributed talent's archive management system
CN108229912A (en) Completion of works acceptance method and storage medium
CN108615080A (en) A kind of power marketing service movement operation client
CN111274774A (en) Industrial building engineering full-process automatic management system
CN107506929A (en) A kind of high-strength bolt construction information monitoring system and method
CN110009293A (en) Finishing management system and method
CN110428176A (en) Project progress checking method and system
CN110991583A (en) Power equipment management system based on APP and two-dimensional code and operation method thereof
CN110083632A (en) A kind of project cost listing service system
CN114511296A (en) High-standard farmland construction project management platform
Andy et al. Causes Leading to poor site coordination in building projects
CN108924369A (en) NPS assessment method for running, systems and management platform based on telephone poll
CN107369002A (en) Engineering project information processing method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180904