CN108411804B - 用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法 - Google Patents
用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法 Download PDFInfo
- Publication number
- CN108411804B CN108411804B CN201810519084.8A CN201810519084A CN108411804B CN 108411804 B CN108411804 B CN 108411804B CN 201810519084 A CN201810519084 A CN 201810519084A CN 108411804 B CN108411804 B CN 108411804B
- Authority
- CN
- China
- Prior art keywords
- bridge
- bailey
- dismantling
- arch bridge
- dismantled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法,属于桥梁施工领域,贝雷反吊组合梁装置包括新建桥梁和若干贝雷反吊装置,新建桥梁并排设置于待拆除旧系杆拱桥旁,若干贝雷反吊装置横跨新建桥梁和待拆除旧系杆拱桥连接两桥,各贝雷反吊装置沿纵桥向平行间隔设置,各贝雷反吊装置均包括一贝雷梁,以及设于贝雷梁上的三组反吊装置。系杆拱桥拆除方法,步骤包括:待拆除旧系杆拱桥旁并排建设新建桥梁;在新建桥梁上搭设若干贝雷反吊装置连接新建桥梁和待拆除旧系杆拱桥;对待拆除旧系杆拱桥进行拆除,先分段拆除拱肋,再拆除系梁。本发明能够在系杆拱桥需原位拆除进行改扩建施工时,实现拱桥无支架拆除。
Description
技术领域
本发明属于桥梁施工领域,适用拱桥拆除等施工。
背景技术
我国20世纪建设桥梁因运营年代较长,不同程度出现老旧危桥,有些因交通饱和、通航能力提升,桥梁不满足使用要求,越来越多的桥需原位拆除进行改扩建施工。系杆拱桥因结合拱桥与梁桥优点,上世纪被广泛采用。因系杆拱桥为超静定体系,常规做法,系杆拱桥拆除时先在河道内搭设支架,支撑系杆及拱肋,然后分段进行拱肋拆除。
由航道通航不断发展提升,大部分通航河道不允许进行封航或通航孔宽度降低,致使部分系杆拱桥拆除时无法进行支架支撑。
发明内容
本发明的目的在于:提出一种用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法,能够在系杆拱桥需原位拆除进行改扩建施工时,实现拱桥无支架拆除。
本发明目的通过下述技术方案来实现:
一种用于系杆拱桥拆除的贝雷反吊组合梁装置,包括新建桥梁和若干贝雷反吊装置,新建桥梁并排设置于待拆除旧系杆拱桥旁,若干贝雷反吊装置横跨新建桥梁和待拆除旧系杆拱桥连接两桥,各贝雷反吊装置沿纵桥向平行间隔设置,各贝雷反吊装置均包括一贝雷梁,以及设于贝雷梁上的三组反吊装置,三组反吊装置分别为连接贝雷梁与新建桥梁的外侧系梁的一组反吊装置,连接贝雷梁与待拆除旧系杆拱桥两系梁的两组反吊装置,各反吊装置均包括精轧螺纹吊杆、上支撑梁和下支撑梁,上支撑梁设于贝雷梁顶面,下支撑梁设于系梁底面,精轧螺纹吊杆连接上支撑梁和下支撑梁。
作为选择,贝雷梁与新建桥梁的两系梁之间还设有中部支撑梁,贝雷梁与待拆除旧系杆拱桥两系梁之间留有间隙。
一种系杆拱桥拆除方法,采用前述用于系杆拱桥拆除的贝雷反吊组合梁装置,步骤依次包括:
1)待拆除旧系杆拱桥旁并排建设新建桥梁;
2)在新建桥梁上搭设若干贝雷反吊装置连接新建桥梁和待拆除旧系杆拱桥;
3)对待拆除旧系杆拱桥进行拆除,先分段拆除拱肋,再拆除系梁。
前述本发明主方案及其各进一步选择方案可以自由组合以形成多个方案,均为本发明可采用并要求保护的方案;且本发明,(各非冲突选择)选择之间以及和其他选择之间也可以自由组合。本领域技术人员在了解本发明方案后根据现有技术和公知常识可明了有多种组合,均为本发明所要保护的技术方案,在此不做穷举。
工作过程为:本发明的用于系杆拱桥拆除的贝雷反吊组合梁装置,该装置适应于改扩建施工,可依托新建桥梁通过该装置进行老桥拆除。拱桥分段拆除时,系梁及拱肋均无法单独自稳,可在新建桥梁上搭设该装置,该装置支撑拱桥系梁,然后先分段拆除拱肋,再拆除系梁,实现拱桥无支架拆除。
当老桥砼拱拱肋拆除时,拱桥系梁部分自重通过自身结构传递至梁端支座,剩余重量传递至本发明装置,路线为:系梁部分自重→下支撑梁→精轧螺纹吊杆→上支撑梁→贝雷梁→新建桥梁,实现老桥无支架拆除。
本发明的有益效果:该装置较传统的支架法拆除工艺,利用新建桥梁进行老桥拆除时支撑,有效避免了在通航孔范围内搭设支架,避免影响航道正常通航,节约成本、提高施工工效、施工操作方便。
附图说明
图1是本发明实施例的立面布置结构示意图;
图2是本发明实施例的侧面布置结构示意图;
图3是本发明实施例的贝雷反吊装置与待拆除旧系杆拱桥连接的正面布置结构示意图;
图4是本发明实施例的贝雷反吊装置与待拆除旧系杆拱桥连接的侧面布置结构示意图;
其中1为新建桥梁、2为贝雷反吊装置、3为待拆除旧系杆拱桥、4为贝雷梁、5为反吊装置、6为系梁、7为精轧螺纹吊杆、8为上支撑梁、9为下支撑梁、10为中部支撑梁、11为拱肋、12为吊杆。
具体实施方式
下列非限制性实施例用于说明本发明。
参考图1-4所示,一种用于系杆拱桥拆除的贝雷反吊组合梁装置,包括新建桥梁1和若干贝雷反吊装置2,新建桥梁1并排设置于待拆除旧系杆拱桥3旁,若干贝雷反吊装置2横跨新建桥梁1和待拆除旧系杆拱桥3连接两桥,各贝雷反吊装置2沿纵桥向平行间隔设置,各贝雷反吊装置2均包括一贝雷梁4,以及设于贝雷梁4上的三组反吊装置5,三组反吊装置5分别为连接贝雷梁4与新建桥梁1的外侧系梁6的一组反吊装置5,连接贝雷梁4与待拆除旧系杆拱桥3两系梁6的两组反吊装置5,各反吊装置5均包括精轧螺纹吊杆7、上支撑梁8和下支撑梁9,上支撑梁8设于贝雷梁4顶面,下支撑梁9设于系梁6底面,精轧螺纹吊杆7连接上支撑梁8和下支撑梁9。贝雷梁4与新建桥梁1的两系梁6之间还设有中部支撑梁10,贝雷梁4与待拆除旧系杆拱桥3两系梁6之间留有间隙。
一种系杆拱桥拆除方法,采用前述的用于系杆拱桥拆除的贝雷反吊组合梁装置,步骤依次包括:
1)待拆除旧系杆拱桥3旁并排建设新建桥梁1;
2)在新建桥梁1上搭设若干贝雷反吊装置连接新建桥梁1和待拆除旧系杆拱桥3;
3)对待拆除旧系杆拱桥3进行拆除,先分段拆除拱肋11,再拆除系梁6。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (1)
1.一种系杆拱桥拆除方法,采用用于系杆拱桥拆除的贝雷反吊组合梁装置,其特征在于用于系杆拱桥拆除的贝雷反吊组合梁装置包括新建桥梁和若干贝雷反吊装置,新建桥梁并排设置于待拆除旧系杆拱桥旁,若干贝雷反吊装置横跨新建桥梁和待拆除旧系杆拱桥连接两桥,各贝雷反吊装置沿纵桥向平行间隔设置,各贝雷反吊装置均包括一贝雷梁,以及设于贝雷梁上的三组反吊装置,三组反吊装置分别为连接贝雷梁与新建桥梁的外侧系梁的一组反吊装置,连接贝雷梁与待拆除旧系杆拱桥两系梁的两组反吊装置,各反吊装置均包括精轧螺纹吊杆、上支撑梁和下支撑梁,上支撑梁设于贝雷梁顶面,下支撑梁设于系梁底面,精轧螺纹吊杆连接上支撑梁和下支撑梁;贝雷梁与新建桥梁的两系梁之间还设有中部支撑梁,贝雷梁与待拆除旧系杆拱桥两系梁之间留有间隙;系杆拱桥拆除方法的步骤依次包括:
1)待拆除旧系杆拱桥旁并排建设新建桥梁;
2)在新建桥梁上搭设若干贝雷反吊装置连接新建桥梁和待拆除旧系杆拱桥;
3)对待拆除旧系杆拱桥进行拆除,先分段拆除拱肋,再拆除系梁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810519084.8A CN108411804B (zh) | 2018-05-28 | 2018-05-28 | 用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810519084.8A CN108411804B (zh) | 2018-05-28 | 2018-05-28 | 用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108411804A CN108411804A (zh) | 2018-08-17 |
CN108411804B true CN108411804B (zh) | 2023-09-29 |
Family
ID=63140567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810519084.8A Active CN108411804B (zh) | 2018-05-28 | 2018-05-28 | 用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108411804B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487696B (zh) * | 2018-11-30 | 2020-09-29 | 中铁大桥局集团有限公司 | 一种钢筋混凝土提篮拱桥的卸架方法和装置 |
CN113802478B (zh) * | 2021-10-29 | 2022-08-02 | 合肥工业大学 | 一种基于拱肋支撑受力的拱桥桥面结构拆除装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001241012A (ja) * | 2000-02-28 | 2001-09-04 | Tomoe Corp | 橋梁の撤去・架設工法 |
RU2237125C1 (ru) * | 2004-01-29 | 2004-09-27 | Открытое акционерное общество "УСК МОСТ" | Способ реконструкции моста через водную преграду |
CN101215825A (zh) * | 2007-12-27 | 2008-07-09 | 中铁四局集团有限公司 | 预应力混凝土系杆拱桥逆序拆除方法 |
CN101886368A (zh) * | 2009-05-14 | 2010-11-17 | 纪宏伟 | 老旧桥梁快速更新法 |
CN203174519U (zh) * | 2013-04-26 | 2013-09-04 | 济南城建集团有限公司 | 贝雷梁反吊支撑体系 |
CN208328727U (zh) * | 2018-05-28 | 2019-01-04 | 中交二航局第四工程有限公司 | 用于系杆拱桥拆除的贝雷反吊组合梁装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11190008A (ja) * | 1997-12-26 | 1999-07-13 | Nkk Corp | 高架橋梁の架替工法 |
-
2018
- 2018-05-28 CN CN201810519084.8A patent/CN108411804B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001241012A (ja) * | 2000-02-28 | 2001-09-04 | Tomoe Corp | 橋梁の撤去・架設工法 |
RU2237125C1 (ru) * | 2004-01-29 | 2004-09-27 | Открытое акционерное общество "УСК МОСТ" | Способ реконструкции моста через водную преграду |
CN101215825A (zh) * | 2007-12-27 | 2008-07-09 | 中铁四局集团有限公司 | 预应力混凝土系杆拱桥逆序拆除方法 |
CN101886368A (zh) * | 2009-05-14 | 2010-11-17 | 纪宏伟 | 老旧桥梁快速更新法 |
CN203174519U (zh) * | 2013-04-26 | 2013-09-04 | 济南城建集团有限公司 | 贝雷梁反吊支撑体系 |
CN208328727U (zh) * | 2018-05-28 | 2019-01-04 | 中交二航局第四工程有限公司 | 用于系杆拱桥拆除的贝雷反吊组合梁装置 |
Also Published As
Publication number | Publication date |
---|---|
CN108411804A (zh) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649325B (zh) | 装配式混凝土剪力墙结构可调节式三角架支撑体系及方法 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN109914244B (zh) | 一种适用于高塔钢混结合横梁钢结构安装及底、顶板混凝土浇筑的弱支架系统及其操作方法 | |
CN108411804B (zh) | 用于系杆拱桥拆除的贝雷反吊组合梁装置及其拆除方法 | |
CN109138431B (zh) | 一种超高层泵管过桥装置及其施工方法 | |
CN105088970A (zh) | 一种波形钢腹板pc箱梁斜拉桥的施工方法 | |
CN110158486A (zh) | 一种架设拼宽梁的架桥机及施工方法 | |
CN202176343U (zh) | 一种自行式多功能模板台车组合装置 | |
CN103758343A (zh) | 钢筋混凝土楼板吊挂式施工方法及其吊挂装置 | |
CN205955185U (zh) | 一种地铁车站轨顶风道专用吊模 | |
CN202482766U (zh) | 大跨度连续梁施工支架结构 | |
CN102418417B (zh) | 大板跨现浇梁密肋楼板早拆模板支模体系 | |
CN102418415B (zh) | 小板跨现浇梁密肋楼板早拆模板支模体系 | |
CN201144524Y (zh) | 拆除墙架柱的加固装置 | |
CN212002169U (zh) | 一种剪力墙高处混凝土悬挑结构支模平台 | |
CN105113806B (zh) | 混凝土楼板置换木楼板施工方法和防水布固定结构 | |
CN105064703B (zh) | 一种用于砌块砌体墙砌筑的标尺装置 | |
CN204663546U (zh) | 一种可调节宽度的简易顶模台车 | |
CN203755677U (zh) | 钢筋混凝土楼板施工用下悬吊挂式吊挂装置 | |
CN206721692U (zh) | 一种拱梁组合连续刚构桥扣挂支结合式施工装置 | |
CN208328727U (zh) | 用于系杆拱桥拆除的贝雷反吊组合梁装置 | |
CN215860222U (zh) | 隧道二衬缺陷整治可调式支撑系统 | |
CN110359548A (zh) | 一种钢桁架悬挂混合系统及施工方法 | |
CN103437305A (zh) | 一种城市轨道地下线整体道床中心水沟模板 | |
CN205224579U (zh) | 钢框模板与自承式桁架板组合混凝土快拆体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |