CN108000702A - 双向先张法预应力混凝土轨道板模具及其应用 - Google Patents
双向先张法预应力混凝土轨道板模具及其应用 Download PDFInfo
- Publication number
- CN108000702A CN108000702A CN201810009503.3A CN201810009503A CN108000702A CN 108000702 A CN108000702 A CN 108000702A CN 201810009503 A CN201810009503 A CN 201810009503A CN 108000702 A CN108000702 A CN 108000702A
- Authority
- CN
- China
- Prior art keywords
- side template
- template
- dual
- counter
- tensioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
- B28B23/043—Wire anchoring or tensioning means for the reinforcements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Description
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810009503.3A CN108000702B (zh) | 2018-01-05 | 2018-01-05 | 双向先张法预应力混凝土轨道板模具及其应用 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810009503.3A CN108000702B (zh) | 2018-01-05 | 2018-01-05 | 双向先张法预应力混凝土轨道板模具及其应用 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108000702A true CN108000702A (zh) | 2018-05-08 |
CN108000702B CN108000702B (zh) | 2023-09-22 |
Family
ID=62049749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810009503.3A Active CN108000702B (zh) | 2018-01-05 | 2018-01-05 | 双向先张法预应力混凝土轨道板模具及其应用 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108000702B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109591162A (zh) * | 2018-12-08 | 2019-04-09 | 曙光装配式建筑科技(浙江)有限公司 | 预制墙板的顶出装置及其施工方法 |
CN110565546A (zh) * | 2019-09-09 | 2019-12-13 | 长沙理工大学 | 一种为桥梁结构装配预应力的可拆卸装置及加固方法 |
CN112922239A (zh) * | 2021-01-28 | 2021-06-08 | 陕西建工第六建设集团有限公司 | 一种建筑构件预应力筋连接装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130264394A1 (en) * | 2010-12-17 | 2013-10-10 | Railway Engineering Research Institute Of China Academy Of Railway Science | Pre-stressed concrete track slab of slab-type ballast-less track |
CN106217590A (zh) * | 2016-09-30 | 2016-12-14 | 中铁二十三局集团有限公司 | 先张轨道板流水机组法生产工装设备及方法 |
CN106476124A (zh) * | 2016-10-11 | 2017-03-08 | 中铁二十三局集团轨道交通工程有限公司 | 一种双向先张法预应力混凝土轨道板模具 |
CN206140658U (zh) * | 2016-09-30 | 2017-05-03 | 中铁二十三局集团有限公司 | 先张轨道板流水机组法生产工装设备 |
CN106758551A (zh) * | 2016-12-05 | 2017-05-31 | 广西三维铁路轨道制造有限公司 | 一种先张法预应力混凝土快速限位装配轨道板 |
CN106863551A (zh) * | 2017-03-03 | 2017-06-20 | 山西高行液压股份有限公司 | 高速铁路crtsⅲ型无砟轨道板成型模具及脱模装置 |
CN106965316A (zh) * | 2017-05-16 | 2017-07-21 | 山西高行液压股份有限公司 | 高速铁路crtsⅲ型无砟轨道板成型模具 |
CN207888894U (zh) * | 2018-01-05 | 2018-09-21 | 河北益铁机电科技有限公司 | 双向先张法预应力混凝土轨道板模具 |
-
2018
- 2018-01-05 CN CN201810009503.3A patent/CN108000702B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130264394A1 (en) * | 2010-12-17 | 2013-10-10 | Railway Engineering Research Institute Of China Academy Of Railway Science | Pre-stressed concrete track slab of slab-type ballast-less track |
CN106217590A (zh) * | 2016-09-30 | 2016-12-14 | 中铁二十三局集团有限公司 | 先张轨道板流水机组法生产工装设备及方法 |
CN206140658U (zh) * | 2016-09-30 | 2017-05-03 | 中铁二十三局集团有限公司 | 先张轨道板流水机组法生产工装设备 |
CN106476124A (zh) * | 2016-10-11 | 2017-03-08 | 中铁二十三局集团轨道交通工程有限公司 | 一种双向先张法预应力混凝土轨道板模具 |
CN106758551A (zh) * | 2016-12-05 | 2017-05-31 | 广西三维铁路轨道制造有限公司 | 一种先张法预应力混凝土快速限位装配轨道板 |
CN106863551A (zh) * | 2017-03-03 | 2017-06-20 | 山西高行液压股份有限公司 | 高速铁路crtsⅲ型无砟轨道板成型模具及脱模装置 |
CN106965316A (zh) * | 2017-05-16 | 2017-07-21 | 山西高行液压股份有限公司 | 高速铁路crtsⅲ型无砟轨道板成型模具 |
CN207888894U (zh) * | 2018-01-05 | 2018-09-21 | 河北益铁机电科技有限公司 | 双向先张法预应力混凝土轨道板模具 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109591162A (zh) * | 2018-12-08 | 2019-04-09 | 曙光装配式建筑科技(浙江)有限公司 | 预制墙板的顶出装置及其施工方法 |
CN110565546A (zh) * | 2019-09-09 | 2019-12-13 | 长沙理工大学 | 一种为桥梁结构装配预应力的可拆卸装置及加固方法 |
CN110565546B (zh) * | 2019-09-09 | 2024-04-16 | 长沙理工大学 | 一种为桥梁结构装配预应力的可拆卸装置及加固方法 |
CN112922239A (zh) * | 2021-01-28 | 2021-06-08 | 陕西建工第六建设集团有限公司 | 一种建筑构件预应力筋连接装置 |
Also Published As
Publication number | Publication date |
---|---|
CN108000702B (zh) | 2023-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847044B (zh) | 一种半预制装配式盖梁施工方法 | |
CN207888894U (zh) | 双向先张法预应力混凝土轨道板模具 | |
CN105365042A (zh) | 一种预制小箱梁的制作方法 | |
CN108000702A (zh) | 双向先张法预应力混凝土轨道板模具及其应用 | |
CN102900024B (zh) | 大型混凝土结构翻升模板的使用方法 | |
CN110847050B (zh) | 一种大跨度预制波形钢腹板组合梁顶底板同步浇筑模板及其使用方法 | |
CN112982967A (zh) | 一种楼板后浇带混凝土浇筑支模方法及模板支撑结构 | |
CN110878522B (zh) | 主塔下横梁施工体系及施工方法 | |
CN218346803U (zh) | 倒锥圆形筒体砼结构的施工结构 | |
CN110524675A (zh) | 一种先张法预制工字梁及其施工方法 | |
CN101537660A (zh) | 一种柔性玻璃钢圆柱模板安装与拆除工艺 | |
CN205206301U (zh) | 整体提升式竖井模板 | |
CN107214816A (zh) | 一种无砟轨道板模具 | |
CN109457591B (zh) | 一种箱梁内模标准段用铝合金模板系统及其施工方法 | |
CN111485887A (zh) | 一种新型工作井模板装置及其施工方法 | |
CN206221165U (zh) | 用于风力发电机的塔筒 | |
CN215630081U (zh) | 用于房屋建筑工程基础承台的装配式钢模 | |
CN219450474U (zh) | 一种空心墩施工用模具 | |
CN210282701U (zh) | 非标准混凝土轨道板脱模专用复合吊具 | |
CN216707883U (zh) | 一种节省空间的石膏立式倒模架 | |
CN215830007U (zh) | 一种楼板后浇带混凝土浇筑模板支撑结构 | |
CN207552939U (zh) | 一种铁路施工用桥墩模板结构 | |
CN216109357U (zh) | 一种梁钢筋加固装置 | |
CN215859053U (zh) | 一种独立支撑后浇带楼板模板支撑结构 | |
CN215330072U (zh) | 一种基础施工中三桩承台不同阶段的放线装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No. 15 North Second Ring East Road, Chang'an District, Shijiazhuang City, Hebei Province, 050043 Applicant after: HEBEI YITIE ELECTROMECHANICAL TECHNOLOGY CO.,LTD. Applicant after: CHINA RAILWAY NO.9 GROUP Co.,Ltd. Applicant after: CARS RAILWAY ENGINEERING Research Institute Applicant after: BEIJING TIEKE SHOUGANG RAIL-TECH. Co.,Ltd. Applicant after: SHENYANG DONGRONG MACHINERY Co.,Ltd. Address before: No. 15 North Second Ring East Road, Chang'an District, Shijiazhuang City, Hebei Province, 050043 Applicant before: HEBEI YITIE ELECTROMECHANICAL TECHNOLOGY CO.,LTD. Applicant before: CHINA RAILWAY NO.9 GROUP Co.,Ltd. Applicant before: CHINA ACADEMY OF RAILWAY SCIENCES RAILWAY ENGINEERING Research Institute Applicant before: BEIJING TIEKE SHOUGANG RAIL-TECH. Co.,Ltd. Applicant before: SHENYANG DONGRONG MACHINERY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||