CN107675674A - The flexible earth anchor gabion positioner of crevasse quick blocking - Google Patents

The flexible earth anchor gabion positioner of crevasse quick blocking Download PDF

Info

Publication number
CN107675674A
CN107675674A CN201710788186.5A CN201710788186A CN107675674A CN 107675674 A CN107675674 A CN 107675674A CN 201710788186 A CN201710788186 A CN 201710788186A CN 107675674 A CN107675674 A CN 107675674A
Authority
CN
China
Prior art keywords
gabion
anchor
anchor pole
positioner
bar portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710788186.5A
Other languages
Chinese (zh)
Other versions
CN107675674B (en
Inventor
张先起
宋超
武小炎
徐存东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201710788186.5A priority Critical patent/CN107675674B/en
Publication of CN107675674A publication Critical patent/CN107675674A/en
Application granted granted Critical
Publication of CN107675674B publication Critical patent/CN107675674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/123Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of flexible earth anchor gabion positioner of crevasse quick blocking, including anchor pole and gabion, anchor pole includes bar portion and inserts ground anchor head, and wherein bar portion is hollow structure, steel wire rope is set with its axle center hole, the end of steel wire rope is fixed on the end for inserting ground anchor head;In bank of river fixing anchor bar gunlock, anchor pole is tilted inside insertion river course along different angle using anchor pole gunlock, recycling moves back linkage and exits the bar portion of each anchor pole, steel wire rope is kept to be connected with inserting ground anchor head, a series of gabion hanging sleeves are held on a steel cord makes gabion be slipped into along inclined steel wire rope in river course.Under the supporting role of anchor pole, each gabion will not be flushed away, and multiple gabions arrive separately at and accumulate after designated area and mutually extrude, and form firm dash main body.Operation is very easy by the present invention, and effect is very good, is adapted in flood season and inrushes and wait Emergency time to use, suitable popularization and application.

Description

The flexible earth anchor gabion positioner of crevasse quick blocking
Technical field
The invention belongs to construction of hydro project cofferdam equipment technical field, and in particular to a kind of to be coordinated with earth anchor insertion riverbed Gabion carries out the device of crevasse quick blocking.
Background technology
The construction of hydraulic engineering is the prerequisite of national economy and social development, in recent years frequently rainstorm weather and different Rainfall often on the high side, rainfall continue to increase, and cause dyke to meet with the increase of super standard flood number.There is crevasse in River Embankment Frequent Accidents, cause large stretch of farmland to be flooded with village, cause local crops by extensive damage and more people's death incidents, and it is right Local environment does great damage, and seriously jeopardizes the survival and development of local resident.When crevasse occurs in dyke, river flood is not It is disconnected to pour into crevasse, now need the efficient quick blocking crevasse of relevant department.Traditional way is by sandbag, stone or gabion throwing Closure crevasse is carried out to crevasse, but because the discharge per unit width of crevasse is big, flow velocity is high, the plugging material such as sandbag, stone, gabion pole Easily washed away by flood, cause closure slowly or closure fails, can not effectively protect people life property safety.
When dykes and dams crevasse, it is necessary in time block dam breach position, but can effectively be blocked currently without good method, Common method is to be pushed into dam breach position, then pour into sandbag bus, truck, and this mode cost is high, effect is poor.When current compared with When big, the truck and sandbag that are put into water will soon be flushed away, and can not play the effect of leak stopping.Method also is to use people The mode of work, PLA soldier practice hand in hand it is in a row jump into the water, then put sandbag later, this mode not only effect Difference, and it is abnormally dangerous.
The content of the invention
The present invention for flood control water blockoff at present used by method and material the problem of water plugging effect difference be present, there is provided it is a kind of The flexibly moorstone with the crevasse quick blocking of quick serially connected filler water blockoff quickly big vast mouth diverse location can be fixed Cage positioner.
To achieve the above object, the present invention adopts the following technical scheme that:A kind of flexible earth anchor gabion of crevasse quick blocking Positioner, including anchor pole and gabion, the anchor pole include bar portion and insert ground anchor head, and both are connected through a screw thread, wherein bar portion For hollow structure, steel wire rope is set with its axle center hole, the end of steel wire rope is fixed on the end for inserting ground anchor head;In river course dike Bank fixing anchor bar gunlock, anchor pole is tilted inside insertion river course along different angle using anchor pole gunlock, recycling moves back linkage will The bar portion of each anchor pole exits, and keeps steel wire rope to be connected with inserting ground anchor head, a series of gabion hanging sleeves are held on a steel cord makes gabion Slipped into along inclined steel wire rope in river course;The anchor pole gunlock includes vehicle frame, and the gunlock that can be overturn is provided with the upside of vehicle frame Main body, belt conveyor is provided with the downside of vehicle frame;The gunlock main body includes track, and track lower end is existed by hinge On the rotation seat of vehicle frame front end, angular adjustment hydraulic cylinder is connected between the bottom of track and vehicle frame;It is provided with the track The weight that can be slided along track, the upper end of weight are connected by drawstring and directive wheel with hoist engine;The axle center position of weight Install and be equipped with axis hole, the bar portion of anchor pole is provided with locking bar mechanism through in the axis hole of weight in the one or both ends of weight.
The belt conveyor is that bearing is provided with the downside of vehicle frame and rotating shaft is provided with bearing, and belt pulley conveys Mechanism outrigger is arranged on bearing by rotating shaft, and it is defeated between the bottom of belt pulley conveying mechanism and vehicle frame to be connected with belt pulley Mechanism is sent to overturn hydraulic cylinder, so as to which belt pulley conveying mechanism is changed into rotating upwardly and downwardly.
The locking bar mechanism is automatic rod reducing machine structure, or is manual rod reducing machine structure.The manual rod reducing machine structure includes one The circular steel ring of individual opening, the steel ring are bolted on the axis hole end of weight, the opening of steel ring away from opening side Both sides by being connected with clamping screw.
Auxiliary support leg is provided with the vehicle frame, and consolidates inserted link with being connected with the lower end of Auxiliary support leg.It is described The plug in earth anchor head region of anchor pole is provided with hangnail.
The linkage that moves back includes support and motor, machine shaft installation driving gear, and the shaft hole sleeve of driven gear is mounted in The bar portion of anchor pole, driven gear engage with driving gear, and the one or both sides of driven gear are provided with automatic lock lever device.It is described Automatic contracting lever apparatus includes fixed card and translation card, and the both sides of fixed card are symmetrically arranged with pilot hole, translate card Both sides are symmetrically arranged with guide draw bar, and both sides guide draw bar is set in together with the matching of corresponding pilot hole, in the fixed card Both sides be respectively arranged with can attract guide draw bar and translate card electromagnet.
The bar portion of the anchor pole is multi-segment thread docking composition, and the threaded connection place between each bar portion is provided with locking Pin.
Beneficial effect:Once the present invention carrys out interim dyke in flood crevasse occurs, flood is gushed out by crevasse, after threatening dike People's property safety, using this method, crevasse can be effectively blocked, reduce danger coefficient, improve plugging effect.
The present invention inserts more anchor poles along different angle using anchor pole gunlock the diverse location in river course, then recycles and moves back Linkage returns the bar portion of each anchor pole, leaves steel wire rope.The end of steel wire rope is fixed on the difference of big vast mouth by inserting ground anchor head Region.Distribution is set with multiple gabions on every steel wire rope, and multiple gabions are slipped to specified location along steel wire rope and constantly accumulated, Cable wire of the steel wire rope as each gabion of connecting, its end is fixed on river levee, and under the draw of steel wire rope, each gabion will not It is flushed away, and multiple gabions arrive separately at and accumulate after designated area and mutually extrude, and form firm dash main body.The present invention Operation is very easy, and effect is very good, is adapted in flood season and inrushes and wait Emergency time to use, suitable popularization and application.
Anchor pole gunlock in the present invention is to hammer anchor pole repeatedly by weight, because anchor pole gunlock of the present invention is at the end of weight Portion employs the rod reducing machine structure for being capable of contracting bar automatically, so can be impacted repeatedly to anchor pole automatically.Make each anchor pole with difference Angle is tightly inserted into flood zones bottom surface.
Brief description of the drawings
Fig. 1 is the installment state schematic diagram of the present invention.
Fig. 2 is the use state diagram of the present invention.
Fig. 3 is A portions mplifying structure schematic diagram in Fig. 1.
Fig. 4 is B portions mplifying structure schematic diagram in Fig. 2.
Fig. 5 is the anchor pole Gunlock structure schematic diagram that the present invention uses.
Fig. 6 be in Fig. 5 D to structural representation.
Fig. 7 is the schematic diagram of locking bar mechanism in Fig. 5.
Fig. 8 is the schematic diagram that linkage is moved back in Fig. 5.
Fig. 9 is C-C cross-sectional views in Fig. 8.
Label 1 is bar portion in figure, and 2 is insert ground anchor head, and 3 be hangnail, and 4 be gabion, and 5 be anchor pole gunlock, and 6 be to move back linkage, 7 It is steel wire rope for locking pin, 8,9 be threaded connector, and 10 be river course.501 be vehicle frame, and 502 is solid for ground for auxiliary supporting leg, 503 Inserted link, 504 be belt conveyor bearing, and 505 be rotating shaft, and 506 be belt conveyor outrigger, and 507 be belt conveyor, 508 be road wheel, and 509 be that belt conveyor overturns hydraulic cylinder, and 510 be rotation seat, and 511 be track, and 512 be angular adjustment liquid Cylinder pressure, 513 be weight, and 514 be locking bar mechanism, and 515 be drawstring, and 516 be directive wheel, and 517 be hoist engine, and 518 be support, 519 For clamping screw.601 be motor, and 602 be driving gear, and 603 be driven gear, and 604 be automatic lock lever device, and 605 be fixation Card, 606 be translation card, and 607 be support base, and 608 be electromagnet, and 609 be guide draw bar.
Embodiment
The flexible earth anchor gabion positioner of crevasse quick blocking as illustrated in figs. 1 and 2, has used anchor pole and gabion 4, And anchor pole gunlock 5.In bank of river fixing anchor bar gunlock 5, anchor pole is tilted into insertion river along different angle using anchor pole gunlock 5 Inside road, recycling moves back linkage 6 and exits the bar portion 1 of each anchor pole, keeps steel wire rope 8 to be connected with inserting ground anchor head 2, will be a series of The hanging sleeve of gabion 4 makes gabion 4 be slipped into along inclined steel wire rope 8 in river course in the upper end of steel wire rope 8.Auxiliary support is provided with vehicle frame Leg, and consolidate inserted link with being connected with the lower end of Auxiliary support leg.
Wherein, referring to Fig. 3 and Fig. 4, anchor pole includes bar portion 1 and inserts ground anchor head 2, and both are connected through a screw thread, wherein bar portion 1 For hollow structure, steel wire rope 8 is set with its axle center hole, the end of steel wire rope 8 is fixed on the end for inserting ground anchor head 2.Anchor pole The region of slotting ground anchor head 2 be provided with hangnail 3.
Referring to Fig. 5 and Fig. 6 anchor pole gunlock 5, the gunlock main body that can be overturn is provided with the upside of vehicle frame, on the downside of vehicle frame It is provided with belt conveyor.
Wherein, gunlock main body includes track, track lower end by hinge on the rotation seat of vehicle frame front end, track Angular adjustment hydraulic cylinder is connected between bottom and vehicle frame;The weight that can be slided along track, weight are installed on the track Upper end pass through drawstring and directive wheel and be connected with hoist engine;The shaft core position of weight is provided with axis hole, and the bar portion 1 of anchor pole is passed through It is through in the axis hole of weight, and the one or both ends of weight is provided with locking bar mechanism.
Wherein, belt conveyor is that bearing is provided with the downside of vehicle frame and rotating shaft is provided with bearing, and belt pulley is defeated Send mechanism outrigger to be arranged on by rotating shaft on bearing, and belt pulley is connected between the bottom of belt pulley conveying mechanism and vehicle frame Conveying mechanism overturns hydraulic cylinder, so as to which belt pulley conveying mechanism is changed into rotating upwardly and downwardly.
Locking bar mechanism is automatic rod reducing machine structure, or is manual rod reducing machine structure.Manual rod reducing machine structure bag shown in Figure 7 The circular steel ring of an opening is included, the steel ring is bolted on the axis hole end of weight away from opening side, and steel ring is opened Both sides at mouthful are by being connected with clamping screw.
Referring to Fig. 8 and Fig. 9, moving back linkage 6 includes support and motor, and machine shaft installs driving gear, driven gear Shaft hole sleeve is mounted in the bar portion 1 of anchor pole, and driven gear engages with driving gear, and the one or both sides of driven gear are provided with automatic lock Lever apparatus.The automatic contracting lever apparatus includes fixed card and translation card, and the both sides of fixed card are symmetrically arranged with pilot hole, The both sides of translation card are symmetrically arranged with guide draw bar, and both sides guide draw bar is set in together with the matching of corresponding pilot hole, in institute The both sides for stating fixed card are respectively arranged with the electromagnet that can attract guide draw bar and translate card.
In addition, anchor pole used in the present invention, its bar portion 1 can be multi-segment thread docking composition, between each bar portion 1 Threaded connection place is provided with locking pin 7.

Claims (9)

1. a kind of flexible earth anchor gabion positioner of crevasse quick blocking, including anchor pole and gabion, it is characterized in that:The anchor pole Including bar portion and ground anchor head is inserted, both are connected through a screw thread, and wherein bar portion is hollow structure, and steel wire is set with its axle center hole Rope, the end of steel wire rope are fixed on the end for inserting ground anchor head;In bank of river fixing anchor bar gunlock, using anchor pole gunlock by anchor pole Tilted along different angle inside insertion river course, recycling moves back linkage and exits the bar portion of each anchor pole, keeps steel wire rope with inserting ground Anchor head connects, and a series of gabion hanging sleeves are held on a steel cord makes gabion be slipped into along inclined steel wire rope in river course;The anchor pole Gunlock includes vehicle frame, and the gunlock main body that can be overturn is provided with the upside of vehicle frame, belt conveyor is provided with the downside of vehicle frame; The gunlock main body includes track, track lower end by hinge on the rotation seat of vehicle frame front end, the bottom of track and car Angular adjustment hydraulic cylinder is connected between frame;The weight that can be slided along track is installed, the upper end of weight leads on the track Drawstring and directive wheel is crossed to be connected with hoist engine;The shaft core position of weight is provided with axis hole, and the bar portion of anchor pole is through weight Axis hole in, and the one or both ends of weight are provided with locking bar mechanism.
2. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 1, it is characterized in that:The belt Conveying mechanism is that bearing is provided with the downside of vehicle frame and rotating shaft is provided with bearing, and belt pulley conveying mechanism outrigger passes through rotating shaft On bearing, and belt pulley conveying mechanism upset hydraulic pressure is connected between the bottom of belt pulley conveying mechanism and vehicle frame Cylinder, so as to which belt pulley conveying mechanism is changed into rotating upwardly and downwardly.
3. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 1, it is characterized in that:The locking bar Mechanism is automatic rod reducing machine structure, or is manual rod reducing machine structure.
4. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 3, it is characterized in that:It is described manual Rod reducing machine structure includes the circular steel ring of an opening, and the steel ring is bolted on the axis hole end of weight away from opening side Portion, the both sides of the opening of steel ring are by being connected with clamping screw.
5. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 1, it is characterized in that:In the car Auxiliary support leg is provided with frame, and consolidates inserted link with being connected with the lower end of Auxiliary support leg.
6. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 1, it is characterized in that:The anchor pole Plug in earth anchor head region be provided with hangnail.
7. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 1, it is characterized in that:It is described to move back bar Mechanism includes support and motor, machine shaft installation driving gear, and the shaft hole sleeve of driven gear is mounted in the bar portion of anchor pole, driven tooth Wheel engages with driving gear, and the one or both sides of driven gear are provided with automatic lock lever device.
8. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 7, it is characterized in that:It is described automatic Contracting lever apparatus includes fixed card and translation card, and the both sides of fixed card are symmetrically arranged with pilot hole, translate the both sides of card Guide draw bar is symmetrically arranged with, both sides guide draw bar is set in together with the matching of corresponding pilot hole, the two of the fixed card Side is respectively arranged with the electromagnet that can attract guide draw bar and translate card.
9. the flexible earth anchor gabion positioner of crevasse quick blocking according to claim 1, it is characterized in that:The anchor pole Bar portion for multi-segment thread docking composition, the threaded connection place between each bar portion is provided with locking pin.
CN201710788186.5A 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking Active CN107675674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710788186.5A CN107675674B (en) 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710788186.5A CN107675674B (en) 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking

Publications (2)

Publication Number Publication Date
CN107675674A true CN107675674A (en) 2018-02-09
CN107675674B CN107675674B (en) 2019-10-29

Family

ID=61135080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710788186.5A Active CN107675674B (en) 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking

Country Status (1)

Country Link
CN (1) CN107675674B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505523A (en) * 2018-04-23 2018-09-07 苏州千层茧农业科技有限公司 A kind of chute-type dam break sand hill grenade instrumentation
CN111911778A (en) * 2020-08-19 2020-11-10 方晓霞 Camera support with self-protection function
CN115075194A (en) * 2022-07-07 2022-09-20 新疆金水工程检测有限公司 Gabion for hydraulic engineering embankment rescue, gabion throwing vehicle and breach rescue method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953638A (en) * 1988-06-27 1990-09-04 The Charles Machine Works, Inc. Method of and apparatus for drilling a horizontal controlled borehole in the earth
CN1274786A (en) * 1999-05-20 2000-11-29 周良勇 Burst stopping umbrella and burst-stopping method thereof
CN201520761U (en) * 2009-09-17 2010-07-07 杨春和 Methane bag charge hole and discharge hole connecting anchor ear
CN201582254U (en) * 2009-12-22 2010-09-15 桐乡辰宇机械有限公司 Anti-disassembly hoop
CN201943578U (en) * 2011-01-20 2011-08-24 天津市辰龙工程机械有限公司 All hydraulic self-propelled jumbolter
CN202706022U (en) * 2012-08-13 2013-01-30 杭州南联地基基础工程有限公司 Recycled post-tensioned prestressing anchor cable pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953638A (en) * 1988-06-27 1990-09-04 The Charles Machine Works, Inc. Method of and apparatus for drilling a horizontal controlled borehole in the earth
CN1274786A (en) * 1999-05-20 2000-11-29 周良勇 Burst stopping umbrella and burst-stopping method thereof
CN201520761U (en) * 2009-09-17 2010-07-07 杨春和 Methane bag charge hole and discharge hole connecting anchor ear
CN201582254U (en) * 2009-12-22 2010-09-15 桐乡辰宇机械有限公司 Anti-disassembly hoop
CN201943578U (en) * 2011-01-20 2011-08-24 天津市辰龙工程机械有限公司 All hydraulic self-propelled jumbolter
CN202706022U (en) * 2012-08-13 2013-01-30 杭州南联地基基础工程有限公司 Recycled post-tensioned prestressing anchor cable pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋伯杰等: "《洪水危机应急预案编制和处理技术》", 31 August 2009, 中国水利水电出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505523A (en) * 2018-04-23 2018-09-07 苏州千层茧农业科技有限公司 A kind of chute-type dam break sand hill grenade instrumentation
CN111911778A (en) * 2020-08-19 2020-11-10 方晓霞 Camera support with self-protection function
CN115075194A (en) * 2022-07-07 2022-09-20 新疆金水工程检测有限公司 Gabion for hydraulic engineering embankment rescue, gabion throwing vehicle and breach rescue method
CN115075194B (en) * 2022-07-07 2024-03-08 王海朋 Gabion for hydraulic engineering embankment rescue, gabion throwing vehicle and breach rescue method

Also Published As

Publication number Publication date
CN107675674B (en) 2019-10-29

Similar Documents

Publication Publication Date Title
CN107675674B (en) The flexible earth anchor gabion positioning device of crevasse quick blocking
CN109322285B (en) Breach plugging system and method
CN208502796U (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gantry type support construction
CN107620289B (en) Dot matrix earth anchor gabion crevasse quick blocking construction system
CN109026038B (en) TBM shield body is anti-to sidewinder walking support device and application method
CN107653835B (en) The dot matrix screw anchor flexibility transmission device that crevasse blocks
CN107620287B (en) The hard anchor pole crevasse plugging system of drilling type
CN102031766A (en) Hydroelectric barrage building machine
CN105201529B (en) Double tow ties up Flexible formwork assembly and its placement methods to a kind of gob side entry retaining crosswise
CN114438965B (en) Breach blocking device and rapid blocking method
CN104534168A (en) Deep pipe burying machine
DE102015009590B4 (en) Empty pipe laying machine for cable trays
CN208949951U (en) A kind of riverway sludge cleaning plant
CN209569015U (en) A kind of antitorque moment device of chute-type matched with sinking method shaft excavation machine
CN207499873U (en) A kind of pipe jacking tool
CN206173905U (en) Take upset steel dam of hydraulic pressure locking
CN206128016U (en) Novel structure hydraulic flap gate
CN206784389U (en) Quick block up fabricated construction system and erecting device
CN107130605A (en) Rivers and lakes breach a dyke fast blockage ship and blocking method
CN108005023A (en) A kind of breach plugging device using serial floating body, method
CN115075186B (en) Emergency danger-removing equipment based on flood disasters
CN104372774A (en) Automatic switch of pocket floor moraine discharging gate
CN206873458U (en) Rivers and lakes breach a dyke fast blockage ship
CN212612262U (en) Flood prevention sand bag filling device
CN204644987U (en) A kind of water storage flood discharge device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Xianqi

Inventor after: Chen Zhiqiang

Inventor after: Wu Xiaoyan

Inventor after: Song Chao

Inventor after: Liang Shikui

Inventor after: Xu Cundong

Inventor before: Zhang Xianqi

Inventor before: Song Chao

Inventor before: Wu Xiaoyan

Inventor before: Xu Cundong

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant