CN206830207U - A kind of tunnel splash guard reinforcing steel bar laying device - Google Patents

A kind of tunnel splash guard reinforcing steel bar laying device Download PDF

Info

Publication number
CN206830207U
CN206830207U CN201720349416.3U CN201720349416U CN206830207U CN 206830207 U CN206830207 U CN 206830207U CN 201720349416 U CN201720349416 U CN 201720349416U CN 206830207 U CN206830207 U CN 206830207U
Authority
CN
China
Prior art keywords
main body
stand main
splash guard
steel bar
reinforcing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720349416.3U
Other languages
Chinese (zh)
Inventor
杨廷锋
田宗保
张葳
王少宏
朱增耀
谢涛
胡宝春
吴俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc-Shec Railway Engineering Co Ltd
Shaanxi China Railway Extension Machinery Co Ltd
Original Assignee
Cccc-Shec Railway Engineering Co Ltd
Shaanxi China Railway Extension Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc-Shec Railway Engineering Co Ltd, Shaanxi China Railway Extension Machinery Co Ltd filed Critical Cccc-Shec Railway Engineering Co Ltd
Priority to CN201720349416.3U priority Critical patent/CN206830207U/en
Application granted granted Critical
Publication of CN206830207U publication Critical patent/CN206830207U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a kind of tunnel splash guard reinforcing steel bar laying device, it is related to constructing tunnel equipment technical field, it is characterized in including stand main body, the lower section of the stand main body sets running gear, twin-roll hoist engine, arc track is provided with stand main body, the laying carriage device with lifting governor motion is provided with the track, and safe construction platform is provided with described stand main body.Its advantage is to carry pull-type regulation laying dolly using stand main body, and safe construction platform is set in stand main body, and strong applicability, mechanization degree is high, and labor intensity is low, securely and reliably.

Description

A kind of tunnel splash guard reinforcing steel bar laying device
Technical field
A kind of plant equipment is the utility model is related to, is a kind of constructing tunnel equipment, is used more particularly to a kind of tunnel Splash guard reinforcing steel bar laying device.
Background technology
It is that simple stand adds artificial laying that domestic anchor bar of waterproof plate in tunnels laying is blanket at present, erection of equipment worker fortune With requiring that individual skill qualification is higher, initial stage, input cost was low, using more popularizing.But following defect be present:1st, exist Carried off in process of deployment, it is necessary to manually carry on reinforcing bar, splash guard, geotextiles these pavers, labor intensity is big, mechanization Degree is low;2nd, labour cost is higher, and laying quality specification does not reach requirement.3rd, using loading machine coordinating operation, difficulty of construction Reach, while mechanical wounding hidden danger is larger.4th, stand operating platform is in larger distance apart from tunnel Chu Zhi faces, security risk be present.
Utility model content
In view of this, main purpose of the present utility model is to provide a kind of tunnel splash guard reinforcing steel bar laying device.
The technical solution adopted in the utility model is:
A kind of tunnel splash guard reinforcing steel bar laying device, including stand main body, the lower section of the stand main body set walking dress Put, twin-roll hoist engine, arc track is provided with stand main body, be provided with the paving with lifting governor motion on the track If carriage device, safe construction platform is provided with described stand main body.
More specifically scheme includes:The sleeve-shaped that described lifting governor motion includes being fixed on laying carriage device is adjusted The adjusting rod in base and the insertion adjusting base is saved, is opened from top to bottom on described adjusting base and described adjusting rod There are multiple adjustment holes, described adjusting rod is fixed by inserting the pin in the adjustment hole.
Further, described safe construction platform has multiple layerings to be arranged in described stand main body.
Further, the roller of described twin-roll hoist engine is cylindrical in shape is separated into twin-roll knot by intermediate isolating flange Structure.
Further, described safe construction platform includes fixed support plate and retractable support plate, is stretched in described Length adjustment chute is provided with supporting plate, mounting hole, the described length of locking pin insertion are provided with described fixed support plate Adjust connection supporting plate and retractable support plate in chute and described mounting hole.
The utility model provides a kind of tunnel splash guard reinforcing steel bar laying device, and the device has advantages below:1、
Pull-type regulation laying dolly is carried using stand main body, and safe construction platform, pin are set in stand main body Shallow cut is deep-cut to Tunnel wall, the problem of hole section is inconsistent, improves applicability, present 2 people of work of originally 5 people are just It can complete, also greatly improve raising mechanization degree due to rotating uniform laying quality, reduce labor strength;
2nd, safe construction platform is the scalable platform with chute, shortens the distance of platform and tunnel support face, keeps away Exempt from security risk.
3rd, using twin-roll hoist engine, avoid that reel raises machine cylinder and occurs skidding, to sting rope, diameter of cylinder excessive etc. fatal Defect, realizes safe and reliable, reduces the effect of fault rate.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of pull-type regulation laying dolly in the utility model;
Fig. 3 is the structural representation of safe construction platform in the utility model.
Fig. 4 is the structural representation of twin-roll hoist engine in the utility model.
Embodiment
The utility model is described in detail below in conjunction with accompanying drawing and specific embodiment, herein signal of the present utility model Property embodiment and explanation be used for explaining the utility model, but be not intended as to restriction of the present utility model.
Referring to figs. 1 to Fig. 4, the utility model discloses a kind of tunnel splash guard reinforcing steel bar laying device, including stand master Body 1, it is arranged on the running gear and twin-roll hoist engine 15 of the lower section of stand main body 1.Running gear drives whole stand main body Slide.Arc track 2 is provided with stand main body, laying carriage device 3 of the installation with lifting governor motion, is carried in orbit Drawing laying carriage device 3, arcuately track 2 is run.Lifting governor motion includes the sleeve-shaped being fixed on laying carriage device 3 Adjusting rod 5 in adjusting base 4 and insertion adjusting base, is provided with more from top to bottom on adjusting base 4 and described adjusting rod 5 Individual adjustment hole 6, described adjusting rod 5 are fixed by inserting the pin in the adjustment hole 6, at work the endoporus of splash guard 14 It is fixed on after installing rotating shaft steel pipe on laying carriage device 3.The safe construction that multiple layering installations are provided with stand main body 1 is put down Platform 4.Safe construction platform includes fixed support plate 7 and retractable support plate 8, and length adjustment chute is provided with retractable support plate 7 9, mounting hole 10, the described length adjustment chute 11 of locking pin insertion and described mounting hole are provided with fixed support plate 7 The supporting plate that is connected in 10 7 and retractable support plate 8.The roller of twin-roll hoist engine is cylindrical in shape by the displacement type of two pieces of triangles Special-shaped gusset 12 is separated into double-roller structure in clamping shape connection isolation flange 13.
Its operation principle is that manually waterproof cloth is pushed under stand with lorry, and rotating shaft steel pipe is penetrated into splash guard endoporus Afterwards, dolly is dropped down onto into equal height, be fixed on dolly, manually gently dropped splash guard and be fixed on the splash guard of bottom In tunnel wall, waterproof cloth is slowly risen by steel wire rope and hoist engine with telecontrolled rotating hoist engine, manually welded on hot melt piece Take over control water cloth, reduce and deploy waterproof cloth on the high hole wall of artificial manpower, by scaling platform operating personnel can safety in tunnel Constructed the optional position in road.This method can be used with reinforcing bar is tied up in laying geotextiles,
The technical scheme disclosed in the utility model embodiment is described in detail above, it is used herein specifically Embodiment is set forth to the principle and embodiment of the utility model embodiment, and the explanation of above example is only applicable to Help understands the principle of the utility model embodiment;Meanwhile for those of ordinary skill in the art, it is real according to the utility model Example is applied, the there will be changes in embodiment and application, in summary, this specification content should not be understood For to limitation of the present utility model.

Claims (3)

  1. A kind of 1. tunnel splash guard reinforcing steel bar laying device, it is characterised in that including
    Stand main body, the lower section of the stand main body set running gear, twin-roll hoist engine, curved track are provided with stand main body Road, the laying carriage device with lifting governor motion is provided with the track, safety is provided with described stand main body Construction platform, the safe construction platform are that multiple layerings are arranged in described stand main body, and the safe construction platform includes Fixed support plate and retractable support plate, length adjustment chute is provided with described retractable support plate, in described fixed support Mounting hole is provided with plate, locking pin inserts connection supporting plate in described length adjustment chute and described mounting hole and stretched Supporting plate.
  2. 2. tunnel according to claim 1 splash guard reinforcing steel bar laying device, it is characterised in that described lifting regulation machine Structure includes the adjusting rod in the sleeve-shaped adjusting base being fixed on laying carriage device and the insertion adjusting base, described Adjusting base and described adjusting rod on be provided with multiple adjustment holes from top to bottom, described adjusting rod is by inserting the regulation Pin in hole is fixed.
  3. 3. tunnel according to claim 1 splash guard reinforcing steel bar laying device, it is characterised in that described twin-roll elevator The roller of machine is cylindrical in shape is separated into double-roller structure by intermediate isolating flange.
CN201720349416.3U 2017-04-05 2017-04-05 A kind of tunnel splash guard reinforcing steel bar laying device Active CN206830207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720349416.3U CN206830207U (en) 2017-04-05 2017-04-05 A kind of tunnel splash guard reinforcing steel bar laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720349416.3U CN206830207U (en) 2017-04-05 2017-04-05 A kind of tunnel splash guard reinforcing steel bar laying device

Publications (1)

Publication Number Publication Date
CN206830207U true CN206830207U (en) 2018-01-02

Family

ID=60768029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720349416.3U Active CN206830207U (en) 2017-04-05 2017-04-05 A kind of tunnel splash guard reinforcing steel bar laying device

Country Status (1)

Country Link
CN (1) CN206830207U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468558A (en) * 2018-05-31 2018-08-31 中铁隧道集团二处有限公司 A kind of anchor bar of waterproof plate in tunnels laying trolley with multiple degrees of freedom regulatory function
CN109736859A (en) * 2019-02-28 2019-05-10 庆云汉诚隧道工程机械有限公司 A kind of self-propelled multifunctional constructing tunnel car body, trolley and construction method
CN110566246A (en) * 2019-09-29 2019-12-13 中铁十七局集团第一工程有限公司 Tunnel arc-shaped side top plate laying device and method
CN116163652A (en) * 2023-04-26 2023-05-26 中铁八局集团电务工程有限公司 Tunnel punching equipment and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468558A (en) * 2018-05-31 2018-08-31 中铁隧道集团二处有限公司 A kind of anchor bar of waterproof plate in tunnels laying trolley with multiple degrees of freedom regulatory function
CN109736859A (en) * 2019-02-28 2019-05-10 庆云汉诚隧道工程机械有限公司 A kind of self-propelled multifunctional constructing tunnel car body, trolley and construction method
CN109736859B (en) * 2019-02-28 2020-04-17 庆云汉诚隧道工程机械有限公司 Self-propelled multifunctional tunnel construction vehicle body, trolley and construction method
CN110566246A (en) * 2019-09-29 2019-12-13 中铁十七局集团第一工程有限公司 Tunnel arc-shaped side top plate laying device and method
CN116163652A (en) * 2023-04-26 2023-05-26 中铁八局集团电务工程有限公司 Tunnel punching equipment and construction method thereof

Similar Documents

Publication Publication Date Title
CN206830207U (en) A kind of tunnel splash guard reinforcing steel bar laying device
CN106698207B (en) The construction method of shield machine is disassembled in hole
CN201494438U (en) Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN109137744B (en) Asymmetric construction method and control method for main truss of large-span flexible suspension bridge
CN108678752B (en) Shaft equipment rapid installation process
CN106087752B (en) Multispan cable-carried arch bridge construction method
CN112160290B (en) Construction device and construction method for cast-in-place concrete panel of upstream slope of dam
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN110306524A (en) The foundation reinforcing structure and method of the Heavy Equipment-hoisting of the unclosed building of proximity
CN105507167A (en) Construction method for replacing suspender of tied-arch bridge by PLC (Programmable Logic Controller) synchronous tensioning
CN106761780A (en) Shield tunnel deformation repair method under a kind of ground Loading
CN108004925A (en) Prestress reinforced concrete circular arch tower construction method
CN107269114A (en) Road safety job execution barrier structure and its construction method
CN104343086A (en) Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon
CN206829163U (en) A kind of high artesian section construction Yield rainfall relation device
CN204023597U (en) A kind of trailer system of carrying large caisson
CN109706918B (en) Reinforcing cage orifice forming device for hoisting limited space and construction method thereof
CN108221512A (en) Adjustable track laying machine
CN103574158A (en) Super-large diameter pressure steel tube inclined shaft three-hanging-point installation method
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN110065888A (en) A kind of cable crane main rope Demolition Construction method
CN107435331A (en) A kind of Bower Anchor ingot of arch bridge two sides
CN206874293U (en) Subway tunnel soft oil support device
CN109440654B (en) Construction equipment capable of realizing bridge spanning on non-closed road and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Yang Yanfeng

Inventor after: Tian Zongbao

Inventor after: Zhang Wei

Inventor after: Wang Shaohong

Inventor after: Zhu Zengyao

Inventor after: Xie Tao

Inventor after: Hu Baochun

Inventor after: Wu Junjie

Inventor before: Yang Tingfeng

Inventor before: Tian Zongbao

Inventor before: Zhang Wei

Inventor before: Wang Shaohong

Inventor before: Zhu Zengyao

Inventor before: Xie Tao

Inventor before: Hu Baochun

Inventor before: Wu Junjie

CB03 Change of inventor or designer information