CN107435331A - A kind of Bower Anchor ingot of arch bridge two sides - Google Patents

A kind of Bower Anchor ingot of arch bridge two sides Download PDF

Info

Publication number
CN107435331A
CN107435331A CN201710816812.7A CN201710816812A CN107435331A CN 107435331 A CN107435331 A CN 107435331A CN 201710816812 A CN201710816812 A CN 201710816812A CN 107435331 A CN107435331 A CN 107435331A
Authority
CN
China
Prior art keywords
anchoring pile
arch bridge
concrete piles
bower anchor
anchor ingot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710816812.7A
Other languages
Chinese (zh)
Inventor
黄宁
张猛
王浩
曾潇
张畛
魏民
吴冬云
刘俊丰
任书懋
陈春锋
张昶
黄�俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Chongqing Communications Construction Group Co Ltd
Original Assignee
CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd filed Critical CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Priority to CN201710816812.7A priority Critical patent/CN107435331A/en
Publication of CN107435331A publication Critical patent/CN107435331A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Abstract

The present invention discloses a kind of Bower Anchor ingot of arch bridge two sides,Including filling in the anchoring pile in middle weak weathered stratum,The surface of anchoring pile, which is set, is improved anchoring pile and ground cohesive force and the concrete piles of bearing capacity,Concrete piles are used and are disposably molded in anchoring pile continuous placing to give full play to earth resistance,The crater wall contact site of concrete piles and middle weak weathered stratum pours closely knit,The vertical component effect of anchoring pile is provided with the rail for preventing that cable wire from slipping,The side of anchoring pile is provided with the assembly pulley of connection cable means wind cable,Assembly pulley includes the first slip race,Second slides race,Assembly pulley connects that regulation wind cable is flexible two buckle and adjust tackle pulley by anchor ring,Can firmly it be embedded in middle moderately weathered rock,Give full play to the effect of earth resistance,Security performance is excellent,Improve the cohesive force of anchoring pile and ground and bear pressure,And ensure the resistance to plucking stability of stake,It is convenient for installing,It is novel in design,It is a kind of good innovation scheme.

Description

A kind of Bower Anchor ingot of arch bridge two sides
Technical field
The present invention relates to Arch Bridge Construction field, more particularly to the Bower Anchor ingot of arch bridge two sides.
Background technology
Develop with the swift and violent hair of highway in China construction, cross over mountain stream valley in mountain area, river, the bridge in river are numerous.It is more Bridge and completes bridge due to can not be cast-in-place or considering the factor such as construction technology and cost using the method for prefabrication and lifting The construction of agent structure, particularly Large-span Precast arch bridge it is assembled relatively conventional.
Hoisting with Cableway System is a kind of conventional and more ripe bridge member Lift-on/Lift-off System.Cable crane is mostly that both ends are consolidated at present Fixed pattern, cable need to be fixed on Bower Anchor ingot, so as to being pulled during arch bridge assembly, the structure of Bower Anchor ingot particularly important, If Bower Anchor ingot does not have fixed or position to be fitted without security incident when appropriately, easily causing operation, there is deficiency, no Can meet the needs of social development.
In summary, for prior art the defects of, it is accordingly required in particular to a kind of Bower Anchor ingot of arch bridge two sides, to solve existing skill The deficiency of art.
The content of the invention
For the deficiencies in the prior art, security incident is easily caused, the present invention proposes a kind of master of arch bridge two sides Anchor ingot, it is novel in design, can firmly it be embedded in middle moderately weathered rock, it is ensured that the resistance to plucking stability of anchor ingot, solved existing There is the defects of technology.
To achieve these goals, technical scheme is as follows:
A kind of Bower Anchor ingot of arch bridge two sides, including fill and be provided with the anchoring pile in middle weak weathered stratum, the surface of anchoring pile Improve anchoring pile and ground cohesive force and the concrete piles of bearing capacity, concrete piles used to give full play to earth resistance disposably in Anchoring pile continuous placing is molded, and the crater wall contact site of concrete piles and middle weak weathered stratum pours closely knit, and the vertical component effect of anchoring pile is provided with The rail for preventing cable wire from slipping, the side of anchoring pile are provided with the assembly pulley of connection cable means wind cable, and assembly pulley includes first Slide race, second slide race, assembly pulley connects that regulation wind cable is flexible two buckle and adjust tackle pulley by anchor ring.
C35 concretes are used in concrete piles of the present invention, the dosage of the concrete piles on anchoring pile surface is 50.4 cubic metres.
Further, the bearing capacity of the substrate of described anchoring pile and side wall is more than 0.3MPa.
Further, the distance of described rail and anchoring pile bottom is 45cm, and rail uses 38Kg/m rail.
It is arc-shaped in the of the present invention first slip race, the second shape for sliding race.
Further, a diameter of 32cm of described anchor ring.
The reinforcement to play the role of fastening is provided with the side of rail of the present invention, the shape of reinforcement is T-shaped.
Further, the length of described anchoring pile is 700cm.
The beneficial effects of the invention are as follows:It is simple in construction, it can firmly be embedded in middle moderately weathered rock, give full play to soil The effect of drag, security performance is excellent, improves the cohesive force of anchoring pile and ground and bears pressure, and ensures the resistance to plucking stability of stake, It is convenient for installing, it is novel in design, it is a kind of good innovation scheme.
Brief description of the drawings
Describe the present invention in detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the side structure schematic diagram of the present invention;
Fig. 2 is the planar structure schematic diagram of the present invention.
100- anchoring piles in figure, weak weathered stratum in 110-, 120- assembly pulleys, 121- first slide race, and 122- second is slided Driving wheel groove, 130- rail, 140- anchor rings.
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below Conjunction is specifically illustrating, and the present invention is expanded on further.
Referring to Fig. 1, Fig. 2, a kind of Bower Anchor ingot of arch bridge two sides, including fill in the anchoring pile in middle weak weathered stratum 110 100, the surface of anchoring pile 100, which is set, is improved anchoring pile 100 and ground cohesive force and the concrete piles of bearing capacity, and concrete piles are in order to fill Distribution waves earth resistance and uses and be disposably molded in anchoring pile continuous placing, and concrete piles contact with the crater wall of middle weak weathered stratum 110 Portion pour it is closely knit, the vertical component effect of anchoring pile 100 be provided with prevent cable wire slip rail 130, the side of anchoring pile 100 is provided with connection The assembly pulley 120 of cable means wind cable, assembly pulley 120 include the first slip race 121, second and slide race 122, assembly pulley 120 connect that regulation wind cable is flexible two buckle and adjust tackle pulley by anchor ring 140.
In addition, concrete piles use C35 concretes, the dosage of the concrete piles on the surface of anchoring pile 100 is 50.4 cubic metres.The substrate of anchoring pile It is more than 0.3MPa with the bearing capacity of side wall.The distance of rail 130 and the bottom of anchoring pile 100 is 45cm, and rail 130 uses 38Kg/m steel Rail.First shape for sliding the slip race 122 of race 121, second is arc-shaped.A diameter of 32cm of anchor ring 140.Rail 130 side is provided with the reinforcement to play the role of fastening, and the shape of reinforcement is T-shaped.The length of anchoring pile 100 is 700cm.
During anchoring pile should be embedded in (weak) weathered rock formation, it is desirable to which substrate and side wall bearing capacity are not less than 0.3MPa (if basis is held Carrying power can not meet to require, designer should be notified to make design modification in time);Single 50.4 cubic metres of Bower Anchor heavy stone used as an anchor C35 concretes dosage.
Anchoring pile concrete piles disposably continuous placing must finish;In order to give full play to the effect of earth resistance, concrete connects with crater wall Contact portion point should fully pour closely knit, to improve the cohesive force of anchoring pile and ground and bearing capacity, and ensure the resistance to plucking stability of stake.
To prevent cable wire from slipping, a pre-buried 38Kg/m rail at away from anchor bottom 45cm.
During excavation of foundation pit, anchorage rope pulling force effect direction is paid attention to, supporting plate should be located at leading edge (leaning on river direction).
The construction method of skewback is:
Skewback basis uses Open-cut Foundation, and because cranny development is relatively abundant at bridge site, design is forbidden using large-scale Explosion means, in order to avoid the stabilization of disturbed strata itself.Therefore use the method for small pit goaf presplit blasting to be excavated, it is aided with excavator Carry out excavation construction.And set and cut on the outside of foundation ditch, ditch, it is ensured that draining is unimpeded, ensures construction safety.Repair a fortune in foundation ditch side Defeated sidewalk, the transport cubic metre of earth and stone to spoil ground.
Before excavation of foundation pit, foundation ditch plan-position and present ground elevation are measured, just excavated after declaration.To keep away Exempt from the destruction larger to natural landscape, excavation of foundation pit side slope is unsuitable too slow, and strictly the side slope of side slope 0.3~0.5 is applied by drawing Edge-to-edge's slope supporting is dug on work, side, it is ensured that stability of slope safety.
1st, drainage of foundation pit
Intercepting ditch is set in foundation ditch top of the slope side before excavation of foundation pit.During excavation of foundation pit to designed elevation, draining is laid in bottom Ditch, prevent that immersion causes base bearing capacity to reduce to rainy pit water accumulation for a long time in construction.
2nd, foundation ditch rock excavation
Top of the slope crag is removed before construction and excavates the surface vegetation of scope, is carried out repetition measurement, setting-out, is performed intercepting water outside side slope Ditch, complete the construction of transport sidewalk.
The cubic meter of stone uses cut and cover tunneling, from top to bottom layering, partial excavation.
(1) rock excavation method
Excavation uses 1.0m3Backacter and 8 air compressor machine constructions, are transported the cubic metre of earth and stone by slag releasing channel by dump truck To spoil ground.When excavation of foundation pit is within from design basal surface 30cm, the excavation of remaining rock stratum is carried out using air compressor machine machine, is equipped with Pneumatic pick manual amendment basal surface tooth bank and side slope.
(2) rock blasting method
In excavation, when running into high basement rock intensity and mechanical equivalent of light excavation difficulty, opened using the method for small pit goaf presplit blasting Dig, away from that in the range of substrate 1.0m the method for explosion must not be used to excavate, to ensure the integrality of substrate rock stratum and intensity.It can use Following blasting scheme:
1) blasting method:Using stage excavation from top to bottom, every layer of shoulder height is about 5m, using medium-length hole blasting.
2) protection of side slope:Cushion is reserved during explosion, using presplitting and photoface exploision.
3) blasting technique designs:Blasting-technical parameters are empirically chosen with code requirement, and explosive payload is finally by testing Big gun is chosen, adjusts, finally determines its reasonable dose.
(3) points for attention
1) will be in strict accordance with the accurate setting-out of the physical dimension of skewback and position when skewback excavates;
2) whether skewback should be verified accurately after excavating rock fracture or landslide phenomenon below skewback bottom surface, pinpointing the problems should Contact, resolve through consultation with designing unit in time;
3) skewback bottom surface should be complete fresh scar, should be cleaned up before concrete placings, it is ensured that concrete is combined reliably with basement rock.
Skewback concrete construction:
Skewback concrete construction key issue be:Temperature Controlling of Mass Concrete, prevent harmful cracks;Pre-buried interim hinge is applied Work precision controlling;Using scientific and reasonable temperature control scheme, cooling water pipe is laid in rationally layering, it is ensured that skewback mass concrete Quality;Reasonable selection positioning process and advanced measurement and positioning means ensure the precision of built-in fitting;From finishing template system, Optimize concrete proportioning, appearance looks elegant.
Skewback concrete is C30 concretes.Concrete mixing plant centralized production, chute put in storage, and internal vibration rod vibrates.Skewback Concrete project amount is larger, and built-in fitting position installation accuracy requires high at arch springing, and arch springing inclined-plane size Control is strict, using dividing platform Rank, segmented construction.Arch springing inclined-plane template is spliced using steel form.
Main arch rib arrangement and method for construction summation:
Bridge main arch is reinforced concrete ribbed arch, and ribbed arch construction use is cast-in-place, can not because arch bridge headroom is big compared with high and span Using Full space support construction.Constructed with reference to my company the experience of similar bridge, using the assembled steel construction bow member under arch rib Construction method is constructed.Specific method is:Steel arch-shelf section, which is lifted, using the CABLEWAY ERECTION SYSTEM for being located at two sides carries out assembly, And absolute altitude is adjusted, lay the lumps of wood, installation form, cast-in-place arch rib in assembled good steel arch-shelf.
Sarasota and tower foundation:
After king-tower is located at abutment, gate-type pylon is combined into using universal rod body, king-tower elevation is by bridge elevation and main rope sag Control, and ensure certain safe space, so as to the construction of spandrel construction.Pylon dissipates spelling and formed at the scene, and universal rod body is used 30kN or 50kN hoist engine handlings, protection network is set during assembled, it is ensured that high-altitude working safety.Pylon assembly stage and installation After completion, also waist, top guy should be set in appropriate location around, and lead to according to the height and stressing conditions of pylon These guys adjustment pylon perpendicularity is crossed, and ensures the stability of pylon, guy is fixed in main earth anchor with wire cable anchor before and after pylon On pre-buried ring, pylon side guy is anchored on the crosswind cable earth anchor of pylon two.
Conscientiously various universal rod body gusset plates, patch bolt etc. are tested before pylon installation, prevent the bar of damage Part is used on pylon, and installation should be carried out strictly by design, and bolt will be tightened enough as in design quantity, after pylon installation, Also pylon is gone through again one time, the bolt in leakage will be filled, and the bolt not tightened will tighten, and in hoisting process In inspected periodically, after the completion of withdraw interim wind cable, and adjust with permanent guy that pylon is vertical, and guy uses steel wire rope, with The connection of pylon earth anchor is solid and reliable, to ensure the stability of pylon in use.Set 1 big roller straight in cable saddle Footpath is that 400mm places the steel wire ropes of 1 main push-towing rope Φ 56, sets 8 trundles, diameter 350mm, places the lifting of 2 hauling rope 2 Rope, 4 knotted ropes.All hauling ropes enter hoist engine at rear anchor by rear anchor reversed pulley.All hoisting ropes are after bottom of towe is swung to Into the hoist engine being positioned on the bank.I-steel is placed between cable saddle and universal rod body crossbeam and makees distribution beam and skid beam, I-steel With rod member firm welding, to prevent cable saddle from toppling, cable saddle back-off enters I-steel, and sets haulage cable to tower in Sarasota both sides Bottom hoist engine is in order to adjusting saddle's position.Cable saddle installation sets Simple gin-pole using in tower top, and block part is lifted with 5t hoist engines It is assembled after to tower top.
Main rope uses 2-1 φ 56mm steel wire ropes, and main rope passes through the cable saddle being positioned on king-tower top, and left and right sides is each on tower top If one group of Hoisting Cableway.Main rope passes through the Mobile type cable saddle being positioned on main tower top and is anchored on the earth anchor of two sides, and span is 140m, sag are 10m (L/14), and lift heavy ability 150kN, tackling system is by 2 80KN hoist engines, hoist engine earth anchor, φ 21.5mm steel wire ropes and 2 200KN sport cars system compositions, trailer system is by φ 24mm steel wire ropes, 2 80KN hoist engines and main rope Sport car forms.
The erection installation of funicular system:
Funicular system is in Sarasota installation and adjusts perpendicularity, pylon installation check, by starting to set up afterwards.From One on the bank main earth anchor start, set interim hauling rope through two king-tower upper frames, hauling rope uses φ 19.5mm steel wire ropes, with interim Track cable is drawn and crosses an overhead by hauling rope, then allows track cable to pass through sport car, while installs hauling rope and hoisting rope, is pressed Regulation is by straw line, hoisting rope and sport car, lower hanging sleeve around track cable then was drawn into bank.Cross two overheads and race is installed again Car system, through opposite bank overhead and enter earth anchor.Track cable is tightened up and anchored by defined erection sag, hauling rope and Hoisting rope enters hoist engine after installing.It is after one group of erection of main cable installation and then another set of to install with this set main rope Main rope.
Before cable installation, close inspection its abrasion, fracture of wire situation are answered, is unsatisfactory for firmly making using the steel wire rope of standard With, while the security of cable saddle, sport car, lower extension, hoist engine etc. is conscientiously checked, ensure its safe operation.Steel wire rope end The connection at end or anchoring process are correct, ensure that its is solid and reliable., should be tight by professional quality inspection personnel after funicular system installation Lattice check the reliability and security of each part, and main rope, the sag of working cable will meet the requirements, can formally be transported after acceptance(check) OK.
The beneficial effects of the invention are as follows:It is simple in construction, it can firmly be embedded in middle moderately weathered rock, give full play to soil The effect of drag, security performance is excellent, improves the cohesive force of anchoring pile and ground and bears pressure, and ensures the resistance to plucking stability of stake, It is convenient for installing, it is novel in design, it is a kind of good innovation scheme.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation Merely illustrating the principles of the invention described in book, it is of the invention without departing from the spirit and scope of the present invention also to have respectively Kind changes and improvements, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by Appended claims and its equivalent define.

Claims (8)

1. a kind of Bower Anchor ingot of arch bridge two sides, including fill in the anchoring pile in middle weak weathered stratum, it is characterised in that:The table of anchoring pile Face sets the concrete piles for being improved anchoring pile and ground cohesive force and bearing capacity, and concrete piles use to give full play to earth resistance Disposably be molded in anchoring pile continuous placing, the crater wall contact site of concrete piles and middle weak weathered stratum pour it is closely knit, anchoring pile it is vertical Portion is provided with the rail for preventing that cable wire from slipping, and the side of anchoring pile is provided with the assembly pulley of connection cable means wind cable, assembly pulley bag Race is slided containing first, second slides race, and assembly pulley connects that regulation wind cable is flexible two buckle and adjust tackle pulley by anchor ring.
A kind of 2. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:Described concrete piles use C35 concretes, The dosage of the concrete piles on anchoring pile surface is 50.4 cubic metres.
A kind of 3. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:The substrate and side wall of described anchoring pile Bearing capacity be more than 0.3MPa.
A kind of 4. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:Described rail and anchoring pile bottom Distance is 45cm, and rail uses 38Kg/m rail.
A kind of 5. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:Described first slides race, the Two shapes for sliding race are arc-shaped.
A kind of 6. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:Described anchor ring it is a diameter of 32cm。
A kind of 7. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:The side of described rail is provided with The reinforcement to play the role of fastening, the shape of reinforcement are T-shaped.
A kind of 8. Bower Anchor ingot of arch bridge two sides according to claim 1, it is characterised in that:The length of described anchoring pile is 700cm。
CN201710816812.7A 2017-09-12 2017-09-12 A kind of Bower Anchor ingot of arch bridge two sides Pending CN107435331A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710816812.7A CN107435331A (en) 2017-09-12 2017-09-12 A kind of Bower Anchor ingot of arch bridge two sides

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710816812.7A CN107435331A (en) 2017-09-12 2017-09-12 A kind of Bower Anchor ingot of arch bridge two sides

Publications (1)

Publication Number Publication Date
CN107435331A true CN107435331A (en) 2017-12-05

Family

ID=60462102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710816812.7A Pending CN107435331A (en) 2017-09-12 2017-09-12 A kind of Bower Anchor ingot of arch bridge two sides

Country Status (1)

Country Link
CN (1) CN107435331A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944162A (en) * 2019-03-11 2019-06-28 中铁五局集团有限公司 A kind of Combined light anchorage and construction method for large-tonnage Hoisting with Cableway System
CN113356036A (en) * 2021-04-23 2021-09-07 中铁大桥局集团第五工程有限公司 Cable tower foundation structure combined with bridge abutment and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864737A (en) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 Secondary vertical rotating construction method for arch rib of long-span steel arch bridge
CN102020206A (en) * 2010-12-17 2011-04-20 长江水利委员会长江勘测规划设计研究院 Ropeway transport system of long-span steep terrain wind power device
CN202187287U (en) * 2011-07-30 2012-04-11 四川省交通运输厅公路规划勘察设计研究院 Small-medium span suspension bridge anchorage structure under weak geological conditions
CN205634685U (en) * 2016-03-29 2016-10-12 中建钢构江苏有限公司 Cable crane hoist
CN107059617A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 A kind of interim anchorage of combined type
CN207685825U (en) * 2017-09-12 2018-08-03 重庆交通建设(集团)有限责任公司 A kind of Bower Anchor ingot of arch bridge two sides

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864737A (en) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 Secondary vertical rotating construction method for arch rib of long-span steel arch bridge
CN102020206A (en) * 2010-12-17 2011-04-20 长江水利委员会长江勘测规划设计研究院 Ropeway transport system of long-span steep terrain wind power device
CN202187287U (en) * 2011-07-30 2012-04-11 四川省交通运输厅公路规划勘察设计研究院 Small-medium span suspension bridge anchorage structure under weak geological conditions
CN205634685U (en) * 2016-03-29 2016-10-12 中建钢构江苏有限公司 Cable crane hoist
CN107059617A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 A kind of interim anchorage of combined type
CN207685825U (en) * 2017-09-12 2018-08-03 重庆交通建设(集团)有限责任公司 A kind of Bower Anchor ingot of arch bridge two sides

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944162A (en) * 2019-03-11 2019-06-28 中铁五局集团有限公司 A kind of Combined light anchorage and construction method for large-tonnage Hoisting with Cableway System
CN113356036A (en) * 2021-04-23 2021-09-07 中铁大桥局集团第五工程有限公司 Cable tower foundation structure combined with bridge abutment and construction method thereof

Similar Documents

Publication Publication Date Title
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN102031784B (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106958256B (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN102305075A (en) Vertical shaft construction method under unfavorable geological condition
CN106968260A (en) The device and method come down for Strengthening Tunnel mountain body entrance
CN207777770U (en) A kind of precast spliced pipe fitting jacking system
CN104213509B (en) A kind of cable hoisting anchor cable formula anchorage construction method
CN108412501A (en) Under wear oil pipeline shallow depth loess tunnels construction method
CN105274922B (en) A kind of antiskid key steel-pipe pile composite construction and method for repairing landslide roadbed
CN107795749A (en) A kind of precast spliced pipe fitting jacking system and its construction method
CN108049417A (en) A kind of high-locality landslide body reinforces method of disposal
CN206667273U (en) Device for Strengthening Tunnel mountain body entrance landslide
CN113774917B (en) Safe construction method for earth and rockfill excavation and side slope supporting engineering
CN110043269A (en) A kind of excavation construction process of freeway tunnel barrel
CN108561139A (en) A kind of horizontal reinforcement concrete steel pile pile pre support method
CN111576454A (en) Combined protective structure for side slope retaining wall and steel pipe pile and construction method thereof
CN109706945A (en) Come down fracture belt tunnel construction method
CN206888990U (en) A kind of Shallow Covered Metro Station separates open type structure
CN107435331A (en) A kind of Bower Anchor ingot of arch bridge two sides
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN110106867A (en) Manual digging pile construction method between railcar station track
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN204112318U (en) A kind of technique device improving CFG guncreting pile bearing capacity
CN207685825U (en) A kind of Bower Anchor ingot of arch bridge two sides

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171205