CN202187287U - Small-medium span suspension bridge anchorage structure under weak geological conditions - Google Patents

Small-medium span suspension bridge anchorage structure under weak geological conditions Download PDF

Info

Publication number
CN202187287U
CN202187287U CN2011202757658U CN201120275765U CN202187287U CN 202187287 U CN202187287 U CN 202187287U CN 2011202757658 U CN2011202757658 U CN 2011202757658U CN 201120275765 U CN201120275765 U CN 201120275765U CN 202187287 U CN202187287 U CN 202187287U
Authority
CN
China
Prior art keywords
foundation
anchorage
suspension bridge
geological conditions
structure under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202757658U
Other languages
Chinese (zh)
Inventor
田波
蒋劲松
谭邦明
庄卫林
林智敏
周霆
宋扬
何畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Original Assignee
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute filed Critical Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority to CN2011202757658U priority Critical patent/CN202187287U/en
Application granted granted Critical
Publication of CN202187287U publication Critical patent/CN202187287U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A small-medium span suspension bridge anchorage structure under weak geological conditions can effectively avoid construction risk and reduce construction difficulty and construction costs, and comprises an anchorage (10). A pile group foundation fixedly integrated with the anchorage is arranged under the anchorage (10) and formed by foundation piles (30) and bearing platforms (20). The foundation piles (30) are longitudinally and transversely embedded in a weak foundation soil body at intervals, the bearing platforms (20) are fixedly connected onto the pile tops of the foundation piles (30), and the bottom surfaces of the bearing platforms (20) are contacted with the weak foundation soil body.

Description

Medium and small span suspension bridge anchorage structure under the weak geological conditions
Technical field
The utility model relates to civil construction project, is specially adapted to the anchorage structure of medium and small span suspension bridge under the weak geological conditions.
Background technology
Earth anchored suspension bridge in the bridge engineering need be passed to ground through anchorage with the huge pulling force of main push-towing rope.Under the geological conditions good conditions, adopt the tunnel-type anchorage power transmission usually, under weak geological conditions, adopt the gravity anchor power transmission usually.The tradition gravity anchor mainly relies on the uplift force of the weight opposing main push-towing rope of anchorage self, relies on the horizontal force of frictional force opposing main push-towing rope between anchorage and basis.When anchorage place geological conditions was bad, traditional gravity anchor needed bigger engineering size, and engineering quantitys such as excavation of foundation pit, ground processing are huge simultaneously, and the construction period is longer, in work progress, also had bigger construction risk.Medium and small suspension bridge of striding the footpath under the little situation of main push-towing rope power, can adopt special anchorage structure, solves engineering cost and construction risk problem.
The utility model content
The utility model technical problem to be solved provides medium and small span suspension bridge anchorage structure under a kind of weak geological conditions, can avoid construction risk effectively, reduces difficulty of construction and construction costs.
It is following that the utility model solves the technical scheme that its technical problem adopted:
Medium and small span suspension bridge anchorage structure under the weak geological conditions of the utility model; Comprise anchorage; It is characterized in that: said anchorage below is provided with the be multi-column pier foundation of one fixed with it; The cushion cap that this multi-column pier foundation is embedded in the foundation pile in the soft foundation soil body by vertical, lateral separation and is consolidated in its top constitutes, and the cushion cap bottom surface contacts with the soft foundation soil body.
The beneficial effect of the utility model is, the anchorage size reduces greatly, need not carry out deep pit digging, supporting and soft foundation is handled, and can avoid construction risk effectively, reduces difficulty of construction and construction costs, helps simultaneously shortening the construction period.
Description of drawings
This manual comprises following three width of cloth accompanying drawings:
Fig. 1 is the elevational schematic view of medium and small span suspension bridge anchorage structure under the weak geological conditions of the utility model;
Fig. 2 is the lateral view of medium and small span suspension bridge anchorage structure under the weak geological conditions of the utility model;
Fig. 3 is the vertical view of medium and small span suspension bridge anchorage structure under the weak geological conditions of the utility model.
Member shown in the figure, toponym and pairing mark: anchorage 10, cushion cap 20, foundation pile 30, anterior foundation pile 30a, rear portion foundation pile 30b.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
See figures.1.and.2; Medium and small span suspension bridge anchorage structure under the weak geological conditions of the utility model; Comprise anchorage 10; Below anchorage 10, being provided with fixed with it is the multi-column pier foundation of one, and the cushion cap 20 that this multi-column pier foundation is embedded in the foundation pile 30 in the soft foundation soil body by vertical, lateral separation and is consolidated in its top constitutes, and cushion cap 20 bottom surfaces contact with the soft foundation soil body.Uplift force by anchorage 10, cushion cap 20 opposing main rope of suspension bridge; The horizontal force of main push-towing rope is born by the clump of piles under the cushion cap 20; Therefore can reduce anchorage 10 sizes greatly, and need not carry out deep pit digging, supporting and soft foundation handled, so can avoid construction risk effectively; Reduce difficulty of construction and construction costs, help simultaneously shortening the construction period.
With reference to Fig. 1, said foundation pile 30 comprises anterior foundation pile 30a and the rear portion foundation pile 30b that is separately positioned on cushion cap 20 lower front, lower rear, and pile foundation all adopts the socketed pile design, and pile foundation is imbedded the degree of depth of basement rock and confirmed according to basement rock weathering line.
With reference to Fig. 1, Fig. 2 and Fig. 3; Anchorage 10 is structurally consistent with traditional gravity anchor; Can be divided into anchor chamber, male cone body, sealing off and covering anchorage section, saddle weight four parts, be variable cross-section wedge shape rib body, anchor chamber, male cone body, sealing off and covering anchorage section are mainly born the effect of main rope of suspension bridge power transition in anchorage.Said foundation pile 30 adopts the stake hole pouring pile usually, and it is identical with traditional bridge pile foundation construction to construct.
Some principles of medium and small span suspension bridge anchorage structure under the weak geological conditions of the above the utility model that just explains through diagrams; Be not be to the utility model be confined to shown in described concrete structure and the scope of application in; So every the modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.

Claims (2)

1. medium and small span suspension bridge anchorage structure under the weak geological conditions; Comprise anchorage (10); It is characterized in that: said anchorage (10) below is provided with the be multi-column pier foundation of one fixed with it; This multi-column pier foundation is embedded in the foundation pile (30) in the soft foundation soil body by vertical, lateral separation and is consolidated in the cushion cap (20) on its top, and cushion cap (20) bottom surface contacts with the soft foundation soil body.
2. medium and small span suspension bridge anchorage structure under the weak geological conditions as claimed in claim 1; It is characterized in that: said foundation pile (30) comprises anterior foundation pile (30a) and the rear portion foundation pile (30b) that is separately positioned on cushion cap (20) lower front, lower rear; All adopt socketed pile, its degree of depth of imbedding basement rock is confirmed according to basement rock weathering line.
CN2011202757658U 2011-07-30 2011-07-30 Small-medium span suspension bridge anchorage structure under weak geological conditions Expired - Fee Related CN202187287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202757658U CN202187287U (en) 2011-07-30 2011-07-30 Small-medium span suspension bridge anchorage structure under weak geological conditions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202757658U CN202187287U (en) 2011-07-30 2011-07-30 Small-medium span suspension bridge anchorage structure under weak geological conditions

Publications (1)

Publication Number Publication Date
CN202187287U true CN202187287U (en) 2012-04-11

Family

ID=45918748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202757658U Expired - Fee Related CN202187287U (en) 2011-07-30 2011-07-30 Small-medium span suspension bridge anchorage structure under weak geological conditions

Country Status (1)

Country Link
CN (1) CN202187287U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351121A (en) * 2016-11-01 2017-01-25 中国科学院武汉岩土力学研究所 Suspension cable bridge abutment type pre-stress anchorage
CN107059617A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 A kind of interim anchorage of combined type
CN107401118A (en) * 2016-07-22 2017-11-28 中国科学院武汉岩土力学研究所 A kind of suspension bridge pier-stage type prestressing force anchorage
CN107435331A (en) * 2017-09-12 2017-12-05 重庆交通建设(集团)有限责任公司 A kind of Bower Anchor ingot of arch bridge two sides
CN111350530A (en) * 2020-03-25 2020-06-30 中国电建集团中南勘测设计研究院有限公司 Tunnel anchor anchorage
CN111485493A (en) * 2020-03-25 2020-08-04 中国电建集团中南勘测设计研究院有限公司 Suspension bridge anchorage structure and implementation method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401118A (en) * 2016-07-22 2017-11-28 中国科学院武汉岩土力学研究所 A kind of suspension bridge pier-stage type prestressing force anchorage
CN106351121A (en) * 2016-11-01 2017-01-25 中国科学院武汉岩土力学研究所 Suspension cable bridge abutment type pre-stress anchorage
CN107059617A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 A kind of interim anchorage of combined type
CN107435331A (en) * 2017-09-12 2017-12-05 重庆交通建设(集团)有限责任公司 A kind of Bower Anchor ingot of arch bridge two sides
CN111350530A (en) * 2020-03-25 2020-06-30 中国电建集团中南勘测设计研究院有限公司 Tunnel anchor anchorage
CN111485493A (en) * 2020-03-25 2020-08-04 中国电建集团中南勘测设计研究院有限公司 Suspension bridge anchorage structure and implementation method thereof
CN111485493B (en) * 2020-03-25 2022-05-24 中国电建集团中南勘测设计研究院有限公司 Suspension bridge anchorage structure and implementation method thereof

Similar Documents

Publication Publication Date Title
CN202187287U (en) Small-medium span suspension bridge anchorage structure under weak geological conditions
CN102677695B (en) Mutually-embedded ecological building block retaining wall and construction method thereof
CN203145038U (en) lattice column type tower crane foundation
CN203034464U (en) Truss type foundation pit supporting structure
CN102352601A (en) Tunnel type composite anchorage
CN201809779U (en) Open caisson foundation of power transmission line iron tower
CN102828525A (en) Foundation structure of power transmission line tower
CN202543966U (en) Pile-supported cantilever retaining wall
CN202227368U (en) Underground groove structured anti-floating structure
CN202559368U (en) Subsidence-reducing pile structure of capped steel pipe of immersed tunnel
CN204139199U (en) For the gear protection structure of levelling of the land
CN207582459U (en) A kind of prefabricated steel-pipe pile of variable cross-section
CN105297764A (en) Offshore wind plant fan single pile foundation and construction method thereof
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN204435407U (en) A kind of batter post group anchor formula rock foundation
CN202187345U (en) Gravity type anchorage construction in Karst regions
CN204662246U (en) steep slope bridge pier structure
CN201502065U (en) Anchor rod joint excavation compound basis
CN202187288U (en) Compound tunnel anchorage
CN204238209U (en) A kind of back-up sand bamboo joint pile
CN201202120Y (en) Mixing pile foundation pit supporting structure
CN203977433U (en) Soft Deep Foundation Pit engineering composite supporting construction
CN201865118U (en) Grouting spiral anchor base
CN201588222U (en) Superposed digging/embedding foundation
CN213805472U (en) Transmission line tower anchor rope screw pile-cushion cap foundation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120411

Termination date: 20120730