CN107059617A - A kind of interim anchorage of combined type - Google Patents
A kind of interim anchorage of combined type Download PDFInfo
- Publication number
- CN107059617A CN107059617A CN201611211321.1A CN201611211321A CN107059617A CN 107059617 A CN107059617 A CN 107059617A CN 201611211321 A CN201611211321 A CN 201611211321A CN 107059617 A CN107059617 A CN 107059617A
- Authority
- CN
- China
- Prior art keywords
- anchorage
- cable
- anchor
- concrete
- interim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
A kind of interim anchorage of combined type, the anchorage includes pile foundation, anchor cable, anchor pole, anchorage concrete, counterweight, cable;Anchorage concrete is arranged on the top of pile foundation, and counterweight is arranged on the top of anchorage concrete;Anchor pole is arranged on the side of anchorage concrete, and cable is arranged on the opposite side of anchorage concrete;Cable is arranged along the length of anchor cable.The interim anchorage of combined type is in the pulling force come by cable transmission, transmitted first along cable to the anchor pole being attached thereto, effectively decompose the pulling force of cable transmission, again slipping property is done by what the stronger shearing resistance of pile foundation can be effectively ensured Anchor Foundation, ensure Anchor Foundation not along basal plane slip, the extraction-resistant behavior and anti-overturning of anchorage with larger withdrawal resistance, can be effectively ensured in the counterweight of anchorage top of concrete and the anchor pole of cable offside.
Description
Technical field
The present invention relates to a kind of interim anchorage structures, specifically a kind of collection pile foundation, anchor pole, with overweighting integral answer
Box-like interim anchorage.
Background technology
Anchorage is the structure of a kind of stabilization, is typically carried by the cable being attached thereto to other structures and encircles stabilization
Pulling force effect, to ensure the steady in a long-term of other structures, the effect of anchorage is particularly significant, and the stability of anchorage mainly needs to consider
The anti-slipping property of anchorage structures, do toppling property and resistance to plucking.The structure type of conventional anchorage has gravity anchor, tunnel type anchor
Fixed, rock anchor cable anchorage, pile foundation support table anchor.
There is more strict code requirement for the anchorage as permanent works, be typically designed rigorous, construction requirement is tight
Lattice, such as in recent years obtain tremendous development Analysis of Suspension Bridges ' Anchorage, constantly broken through with the span of suspension bridge, the structure of its anchorage and
Scale is also continued to increase therewith, and to the interim anchorage for temporary project, because its use time is short, part anchorage is being used
After also need to remove, this is accomplished by being that anchorage optimizes design to facing.
With the continuous breakthrough of Bridges in Our Country technology, corresponding working measure also makes rapid progress, associated jury anchor
The structure and scale of heavy stone used as an anchor also refresh constantly.
The content of the invention
The present invention be directed to a kind of collection pile foundation of interim anchorage design, anchor pole, with overweighting integral combined type jury anchor
Heavy stone used as an anchor.
Above-mentioned purpose is realized, the present invention uses following technical scheme:A kind of interim anchorage of combined type, the anchorage includes pile foundation
Plinth 1, anchor cable 2, anchor pole 3, anchorage concrete 4, counterweight 5, cable 6;
Anchorage concrete 4 is arranged on the top of pile foundation 1, and counterweight 5 is arranged on the top of anchorage concrete 4;Anchor pole 3 is set
In the side of anchorage concrete 4, cable 6 is arranged on the opposite side of anchorage concrete 4;Anchor cable 2 is diagonally disposed in anchorage concrete 4
It is interior, and stretch into counterweight 5;Length of the cable 6 along anchor cable 2 is arranged.
The angular range of anchor cable 2 and horizontal direction is 10 ° -60 °.
This interim anchorage of combined type, based on concrete anchorage, using along the cable that is connected with anchorage along long line side
To cable, anchor pole is set, directly the pulling force of cable is transmitted to ground, to reduce the stress of anchorage;On the downside of anchorage concrete
Pile foundation is set, the resistant slide power of anchorage is increased with the stronger shear behavior of pile foundation;Set in the anchorage side of cable offside
Anchor pole, to strengthen the anti-overturning and extraction-resistant behavior of anchorage;Increase counterweight in anchorage top of concrete, anchorage can be increased comprehensively
Anti-slipping property, do toppling property and resistance to plucking, while again be beneficial to interim anchorage dismounting.
Brief description of the drawings
Fig. 1 is elevational schematic view of the present invention.
Fig. 2 is floor map of the present invention.
In figure:1st, pile foundation, 2, anchor cable, 3, anchor pole, 4, anchorage concrete, 5, counterweight, 6, cable.
Embodiment
As shown in Figure 1-2, the interim anchorage of combined type is in the pulling force come by cable transmission, first along cable to therewith
Connected anchor pole transmission, effectively decomposes the pulling force of cable transmission, then anchorage can be effectively ensured by the stronger shearing resistance of pile foundation
Basic does slipping property, it is ensured that Anchor Foundation is not along basal plane slip, the counterweight of anchorage top of concrete and the anchor of cable offside
The extraction-resistant behavior and anti-overturning of anchorage with larger withdrawal resistance, can be effectively ensured in bar.
Claims (7)
1. a kind of interim anchorage of combined type, it is characterised in that:The anchorage includes pile foundation (1), anchor cable (2), anchor pole (3), anchorage
Concrete (4), counterweight (5), cable (6);
Anchorage concrete (4) is arranged on the top of pile foundation (1), and counterweight (5) is arranged on the top of anchorage concrete (4);Anchor pole
(3) side of anchorage concrete 4 is arranged on, cable (6) is arranged on the opposite side of anchorage concrete (4);Anchor cable (2) is diagonally disposed
In anchorage concrete (4), and stretch into counterweight (5);Length of the cable (6) along anchor cable (2) is arranged.
2. the interim anchorage of a kind of combined type according to claim 1, it is characterised in that:Anchor cable (2) and the folder of horizontal direction
Angular region is 10 ° -60 °.
3. the interim anchorage of a kind of combined type according to claim 1, it is characterised in that:The interim anchorage of the combined type, with mixed
Based on solidifying soil anchorage, cable, anchor pole are set using along the cable being connected with anchorage along long line direction, directly by the pulling force of cable
Transmitted to ground, to reduce the stress of anchorage.
4. the interim anchorage of a kind of combined type according to claim 1, it is characterised in that:Stake is set on the downside of anchorage concrete
Basis, the resistant slide power of anchorage is increased with the stronger shear behavior of pile foundation.
5. the interim anchorage of a kind of combined type according to claim 1, it is characterised in that:Set in the anchorage side of cable offside
Anchor pole is put, to strengthen the anti-overturning and extraction-resistant behavior of anchorage.
6. the interim anchorage of a kind of combined type according to claim 1, it is characterised in that:Match somebody with somebody in anchorage top of concrete increase
Weight, can increase the anti-slipping property of anchorage comprehensively, do toppling property and resistance to plucking, while being beneficial to the dismounting of interim anchorage again.
7. the interim anchorage of a kind of combined type according to claim 1, it is characterised in that:The interim anchorage of combined type is by cable
During the pulling force that rope transmission comes, transmitted first along cable to the anchor pole being attached thereto, effectively the pulling force of decomposition cable transmission, then by
What the stronger shearing resistance of pile foundation can be effectively ensured Anchor Foundation does slipping property, it is ensured that Anchor Foundation not along basal plane slip,
The counterweight of anchorage top of concrete and the anchor pole of cable offside with larger withdrawal resistance, can be effectively ensured anchorage extraction-resistant behavior and
Anti-overturning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611211321.1A CN107059617A (en) | 2016-12-24 | 2016-12-24 | A kind of interim anchorage of combined type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611211321.1A CN107059617A (en) | 2016-12-24 | 2016-12-24 | A kind of interim anchorage of combined type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107059617A true CN107059617A (en) | 2017-08-18 |
Family
ID=59624521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611211321.1A Pending CN107059617A (en) | 2016-12-24 | 2016-12-24 | A kind of interim anchorage of combined type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059617A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107435331A (en) * | 2017-09-12 | 2017-12-05 | 重庆交通建设(集团)有限责任公司 | A kind of Bower Anchor ingot of arch bridge two sides |
CN109667226A (en) * | 2018-12-14 | 2019-04-23 | 中建八局第四建设有限公司 | A kind of cable wind rope construction method |
CN111501548A (en) * | 2020-04-22 | 2020-08-07 | 中交一公局集团有限公司 | Anchor block structure and construction method thereof |
CN111894026A (en) * | 2020-04-10 | 2020-11-06 | 中铁上海工程局集团有限公司 | Tunnel type pile foundation bearing platform combined anchorage structure and installation method thereof |
CN112695621A (en) * | 2020-12-31 | 2021-04-23 | 中交路桥华南工程有限公司 | Construction method of counterweight type bridge pier |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1553466A (en) * | 1967-02-08 | 1969-01-10 | ||
CN202187287U (en) * | 2011-07-30 | 2012-04-11 | 四川省交通运输厅公路规划勘察设计研究院 | Small-medium span suspension bridge anchorage structure under weak geological conditions |
CN102704397A (en) * | 2012-06-28 | 2012-10-03 | 中铁十三局集团第一工程有限公司 | Light anchorage structure |
CN103046561A (en) * | 2012-12-31 | 2013-04-17 | 中国建筑西南勘察设计研究院有限公司 | Anchored row pile and anchorage wall combined retaining structure |
CN203668827U (en) * | 2014-01-14 | 2014-06-25 | 山东省交通规划设计院 | Overhung type main cable anchoring structure suitable for anchor-span-free self-anchored suspension bridge |
CN204266121U (en) * | 2014-11-12 | 2015-04-15 | 中铁十八局集团有限公司 | Button anchor system combinations formula pile foundation support table anchorage |
CN105714678A (en) * | 2014-11-30 | 2016-06-29 | 郑州大学 | Composite gravity anchorage |
CN106087742A (en) * | 2016-07-22 | 2016-11-09 | 中国科学院武汉岩土力学研究所 | A kind of suspension bridge pier-stage type prestressing force anchorage |
CN206562614U (en) * | 2016-12-24 | 2017-10-17 | 中铁十八局集团有限公司 | A kind of interim anchorage of combined type |
-
2016
- 2016-12-24 CN CN201611211321.1A patent/CN107059617A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1553466A (en) * | 1967-02-08 | 1969-01-10 | ||
CN202187287U (en) * | 2011-07-30 | 2012-04-11 | 四川省交通运输厅公路规划勘察设计研究院 | Small-medium span suspension bridge anchorage structure under weak geological conditions |
CN102704397A (en) * | 2012-06-28 | 2012-10-03 | 中铁十三局集团第一工程有限公司 | Light anchorage structure |
CN103046561A (en) * | 2012-12-31 | 2013-04-17 | 中国建筑西南勘察设计研究院有限公司 | Anchored row pile and anchorage wall combined retaining structure |
CN203668827U (en) * | 2014-01-14 | 2014-06-25 | 山东省交通规划设计院 | Overhung type main cable anchoring structure suitable for anchor-span-free self-anchored suspension bridge |
CN204266121U (en) * | 2014-11-12 | 2015-04-15 | 中铁十八局集团有限公司 | Button anchor system combinations formula pile foundation support table anchorage |
CN105714678A (en) * | 2014-11-30 | 2016-06-29 | 郑州大学 | Composite gravity anchorage |
CN106087742A (en) * | 2016-07-22 | 2016-11-09 | 中国科学院武汉岩土力学研究所 | A kind of suspension bridge pier-stage type prestressing force anchorage |
CN206562614U (en) * | 2016-12-24 | 2017-10-17 | 中铁十八局集团有限公司 | A kind of interim anchorage of combined type |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107435331A (en) * | 2017-09-12 | 2017-12-05 | 重庆交通建设(集团)有限责任公司 | A kind of Bower Anchor ingot of arch bridge two sides |
CN109667226A (en) * | 2018-12-14 | 2019-04-23 | 中建八局第四建设有限公司 | A kind of cable wind rope construction method |
CN109667226B (en) * | 2018-12-14 | 2021-04-16 | 中建八局第四建设有限公司 | Cable rope construction method |
CN111894026A (en) * | 2020-04-10 | 2020-11-06 | 中铁上海工程局集团有限公司 | Tunnel type pile foundation bearing platform combined anchorage structure and installation method thereof |
CN111501548A (en) * | 2020-04-22 | 2020-08-07 | 中交一公局集团有限公司 | Anchor block structure and construction method thereof |
CN111501548B (en) * | 2020-04-22 | 2021-11-19 | 中交一公局集团有限公司 | Anchor block structure and construction method thereof |
CN112695621A (en) * | 2020-12-31 | 2021-04-23 | 中交路桥华南工程有限公司 | Construction method of counterweight type bridge pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059617A (en) | A kind of interim anchorage of combined type | |
CN204266121U (en) | Button anchor system combinations formula pile foundation support table anchorage | |
CN102900021A (en) | Split mounting type bridge wet joint construction method | |
CN202530769U (en) | Large span steel structure high-altitude subsection hoisting support system | |
CN103938914A (en) | Portable pole centralizing device and method for centralizing telegraph pole | |
CN208619139U (en) | A kind of multifunction mine anchor shaft anchor cable | |
CN206562614U (en) | A kind of interim anchorage of combined type | |
CN204266133U (en) | A kind of pier stud reinforcing cage whole lifting structure | |
CN203593556U (en) | High safety tower crane | |
CN106958242A (en) | Steel pile casting is installed and method for dismounting | |
CN206986907U (en) | A kind of side slope down-the-hole drill drilling operation platform | |
CN203855967U (en) | Drilling and filling trolley on slope gallery | |
CN202731938U (en) | Super-soft rock stratum coal bunker well wall ring beam support device | |
CN202577342U (en) | T-type retaining wall structure | |
CN204917745U (en) | Portable portal crane | |
CN107419733A (en) | A kind of side slope down-the-hole drill drilling operation platform | |
CN203383215U (en) | Soil nail for fixing side slope in high strength | |
CN203781713U (en) | High slope support material transport device | |
CN205188837U (en) | Cable suspension device suitable for hang basket | |
CN206545423U (en) | A kind of building structure drag-line antidetonation system | |
CN102587370B (en) | Serially anchorable anchor and uses thereof | |
CN203306950U (en) | Detachable heavy portal frame | |
CN202731945U (en) | Cable for underground coal mine tunnel U-shaped steel shed locking leg support | |
CN205475220U (en) | Prestressed anchorage hitch constructs | |
CN205114817U (en) | Rod is hung in subway construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |