CN204266133U - A kind of pier stud reinforcing cage whole lifting structure - Google Patents

A kind of pier stud reinforcing cage whole lifting structure Download PDF

Info

Publication number
CN204266133U
CN204266133U CN201420752918.7U CN201420752918U CN204266133U CN 204266133 U CN204266133 U CN 204266133U CN 201420752918 U CN201420752918 U CN 201420752918U CN 204266133 U CN204266133 U CN 204266133U
Authority
CN
China
Prior art keywords
pier
reinforcement cage
closed enclosure
column reinforcement
vase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420752918.7U
Other languages
Chinese (zh)
Inventor
叶成诚
江辉
李一帆
郭乐
张新水
朱德军
刘琳
周向国
陆海锋
滕传杰
鲁文元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201420752918.7U priority Critical patent/CN204266133U/en
Application granted granted Critical
Publication of CN204266133U publication Critical patent/CN204266133U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种墩柱钢筋笼整体吊装结构,其特征是:以双拼槽钢通过螺栓连接形成一封闭围框,以封闭围框固定在墩柱钢筋笼花瓶墩的颈部,并以形成封闭围框的双拼槽钢作为花瓶墩箍筋横担;在封闭围框上设置各吊耳,起吊钢丝绳穿设在各吊耳中,起吊设备利用起吊钢丝绳起吊封闭围框并使墩柱钢筋笼呈竖直吊运,封闭围框与墩柱钢筋笼花瓶墩的形状相吻合;用于牵引墩柱钢筋笼的缆风绳固定连接在放置于地面上的混凝土预制块上。本实用新型使墩柱钢筋笼能快速吊运到位,并确保墩柱钢筋笼整体吊装不变形,从而保证工程进度,提高工程质量。

The utility model discloses an integral hoisting structure of a pier-column reinforcement cage, which is characterized in that: a closed enclosure is formed by connecting double channel steels through bolts, and the closed enclosure is fixed on the neck of the pier-column reinforcement cage vase pier, and The double channel steel forming the closed enclosure is used as the stirrup cross arm of the vase pier; the lifting lugs are set on the closed enclosure, and the lifting wire rope is passed through each lifting lug. The lifting equipment uses the lifting wire rope to lift the closed enclosure and make the pier The column reinforcement cage is hoisted vertically, and the closed enclosure matches the shape of the pier column reinforcement cage vase pier; the cable wind rope used to pull the pier column reinforcement cage is fixedly connected to the concrete prefabricated block placed on the ground. The utility model enables the steel cage of the pier column to be hoisted in place quickly, and ensures that the overall hoisting of the steel bar cage of the pier column does not deform, thereby ensuring the progress of the project and improving the quality of the project.

Description

A kind of pier stud reinforcing cage whole lifting structure
Technical field
The hoisting structure of a kind of pier stud reinforcing cage of the utility model, be more particularly a kind of when being applied in cushion cap pier stud integrated construction in pier stud reinforcing cage whole lifting structure.
Background technology
Cushion cap pier stud integrated construction is that one can greatly reduce construction operation amount on construction supplementary structure and bridge, thus the technique significantly improving working conditions, speed up the work, save the operation of manually taking and tearing pier shaft scaffold open, reduce high-rise working risk; Reduce the duration, simple to operate, save labour, save consumptive material and drop into.
Pier stud reinforcing cage has top vase pier usually and the external diameter that connects with vase pier is less than the neck of vase pier, cushion cap pier stud integrated construction is in construction bearing platform process, will by the integral hoisting of pier stud reinforcing cage in cushion cap reinforcing bar, and can guarantee that pier stud reinforcing cage is indeformable in handling, but, the open report of not relevant integral hoisting method so far, because pier stud reinforcing cage overall weight and volume are all very large, suspension centre is directly set on pier stud reinforcing cage and is difficult to ensure that pier stud steel bar overall is indeformable.
Such as, in the elevated project in line interval, Beijing Metro swallow room, this project interval is all ground elevated project, and substructure is pile foundation, cushion cap and pier stud, without bent cap.In cushion cap reinforcement construction, show in conjunction with Beijing meteorological data, local wind-force rank reaches 3 ~ 4 grades, each pier stud reinforcing cage weight is between 7.546t ~ 24.567t, if conveniently the direct mode lifted pier stud reinforcing cage will cause pier stud reinforcing bar hoisting process to produce distortion, meanwhile, cannot lift in enormous quantities, therefore programming is affected.
Utility model content
The utility model is the weak point for avoiding existing for above-mentioned prior art, provides a kind of pier stud reinforcing cage whole lifting structure, pier stud reinforcing cage can be put in place fast in handling, and guarantee that pier stud reinforcing bar is indeformable, thus ensure programming, improve workmanship.
The utility model is that technical solution problem adopts following technical scheme:
The feature of the utility model pier stud reinforcing cage whole lifting structure is: be bolted formation one with Two bors d's oeuveres channel-section steel and close and enclose frame (4), the neck that frame (4) is fixed on pier stud reinforcing cage vase pier (1) is enclosed with described closing, and to form the closed stirrup cross-arm of Two bors d's oeuveres channel-section steel as vase pier (1) enclosing frame (4); Described closed enclosing on frame (4), each hanger is set, hoisting wirerope (2) is located in described each hanger, lifting appliance utilizes described hoisting wirerope (2) to lift by crane and closes and encloses frame (4) and make pier stud reinforcing cage (6) in vertical handling, and the described shape of enclosing frame (4) and described pier stud reinforcing cage vase pier (1) of closing matches; Cable wind rope (5) for drawing pier stud reinforcing cage (6) is fixedly connected on and is positioned over ground concrete precast block (10).
The feature of the utility model pier stud reinforcing cage whole lifting structure is also:
The square that described concrete precast block (10) is the length of side is 1.5m, weight is 8.5 tons, arrange suspension ring in the surrounding of described concrete precast block (10), cable wind rope (5) is fixedly connected on described suspension ring.
Described closed enclosing in frame (4), " ten " word is provided with dowel (7), keep closing that to enclose frame (4) indeformable with the booster action of described dowel (7), described dowel (7) adopts fining twisted steel.
For pier stud reinforcing cage vase pier (1) that end face is rectangular, described closing encloses frame (4) rectangle frame also for matching.
Compared with the prior art, the utility model beneficial effect is embodied in:
1, the utility model is hung by pier stud reinforcing cage with channel-section steel cross-arm, lifting transhipment is carried out with hanger, the frame that encloses that its shaped steel is formed ensure that pier stud reinforcing cage is firmly integrally-built, enclose between frame and pier stud reinforcing cage and form multiple origin of force, effectively ensure that in pier stud reinforcing cage handling process indeformable; Concrete precast block is adopted to fix cable wind rope, safe and reliable, can be used for the more location of underground utilities, need not earth anchor be set up.
2, the utility model can be reused, and substantially increases operating efficiency, provides sound assurance for coordinating programming;
3, the pier stud reinforcing cage vase pier in handling is enclosed in and encloses on cross-arm that frame formed by closing by the utility model, and handling process safety is reliable; Its structure is simple, easy to implement.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the utility model;
Fig. 2 closes in the utility model to enclose frame floor map;
Fig. 3 closes in the utility model to enclose frame and coordinate schematic front view with hoisting wirerope;
Fig. 4 is that the utility model utilizes shoulder pole to carry out the lifting structural representation of transition;
Number in the figure: 1 vase pier, 2 hoisting wireropes, 3 shoulder poles, 4 close enclose frame, 4A crossbeam, 4B end carriage, 5 cable wind ropes, 6 pier stud reinforcing cages, 7 dowels, 8 lifting wire rope, 9 cushion caps, 10 concrete precast blocks.
Detailed description of the invention
See Fig. 1, Fig. 2 and Fig. 3, the present embodiment pier stud reinforcing cage whole lifting structure is bolted formation one with Two bors d's oeuveres channel-section steel to close and enclose frame 4, the neck that frame 4 is fixed on the vase pier 1 of pier stud reinforcing cage 6 is enclosed to close, and to form the closed stirrup cross-arm of Two bors d's oeuveres channel-section steel as vase pier 1 enclosing frame; Closed enclosing on frame 4, each hanger is set, hoisting wirerope 2 is located in each hanger, lifting appliance utilizes hoisting wirerope 2 to lift by crane and closes and encloses frame 4 and make pier stud reinforcing cage 6 in vertical handling above cushion cap 9, and the closed frame 4 that encloses matches with the shape of pier stud reinforcing cage vase pier 1.
In concrete enforcement, " ten " word is provided with dowel 7 closing to enclose in frame 1, keeps closing that to enclose frame 4 indeformable with the booster action of dowel 7, dowel 7 adopts fining twisted steel.
As shown in Figure 2, for the pier stud reinforcing cage vase pier 1 that end face is rectangular in the present embodiment, it closes the rectangle frame enclosing frame 4 and be set to match, and is specifically bolted by the pair of beams 4A be arranged in parallel and a pair end carriage 4B and makes; In order to guaranteed strength, the dowel 7 in rectangle frame is twice " ten " word muscle, and two fining twisted steels intersected in " ten " misplace in different elevation, to ensure that fining twisted steel is straight muscle.
In order to ensure that lifting steadily, for the rectangle frame shown in Fig. 2, both sides hoisting wirerope 2 can be independently set for both sides crossbeam 4A, both sides lifting rope 2 shares the two ends at the shoulder pole 3 in level, and lifting appliance carries out lifting by the lifting wire rope 8 being arranged on the two ends of shoulder pole 3 at the two ends of shoulder pole 3.
Cable wind rope 5 for drawing pier stud reinforcing cage in the present embodiment is fixedly connected on and is positioned over ground concrete precast block 10, the square that concrete precast block 10 is length of sides is 1.5m, weight is 8.5 tons, the steel mesh reinforcement of two-layer Φ 14 is set in concrete precast block 10, suspension ring being set in the surrounding of concrete precast block 10, establishing cable wind rope 5 for drawing.Draw and set cable wind rope 5 to be impacts as ensureing pier stud reinforcing cage not by wind, earth anchor can be set up when usual cable wind rope is fixed on ground, but in the location that underground utilities are more, arrange earth anchor and probably damage underground utilities, the utility model adopts concrete precast block to address this problem.
Assembling and handling process: be transported to pier stud construction location after the colligation of pier stud reinforcing cage completes, fix by loop wheel machine supporting leg, hoisting structure installation, lifting, joint bar, cable wind rope.

Claims (4)

1.一种墩柱钢筋笼整体吊装结构,其特征是:以双拼槽钢通过螺栓连接形成一封闭围框(4),以所述封闭围框(4)固定在墩柱钢筋笼花瓶墩(1)的颈部,并以形成封闭围框(4)的双拼槽钢作为花瓶墩(1)的箍筋横担;在所述封闭围框(4)上设置各吊耳,起吊钢丝绳(2)穿设在所述各吊耳中,起吊设备利用所述起吊钢丝绳(2)起吊封闭围框(4)并使墩柱钢筋笼(6)呈竖直吊运,所述封闭围框(4)与所述墩柱钢筋笼花瓶墩(1)的形状相吻合;用于牵引墩柱钢筋笼(6)的缆风绳(5)固定连接在放置于地面上的混凝土预制块(10)上。 1. A pier column reinforcement cage integral hoisting structure is characterized in that: a closed enclosure (4) is formed by connecting with double channel steels by bolts, and is fixed on the pier column reinforcement cage vase pier with the described closed enclosure (4) (1) neck, and form the double channel steel of closed enclosure (4) as the stirrup crossarm of vase pier (1); each lug is set on described closed enclosure (4), and the lifting wire rope (2) It is installed in the lifting lugs, and the lifting equipment utilizes the lifting wire rope (2) to lift the closed enclosure (4) and make the pier column reinforcement cage (6) be lifted vertically, and the closed enclosure (4) coincides with the shape of the vase pier (1) of the pier column reinforcement cage (1); the cable wind rope (5) for pulling the pier column reinforcement cage (6) is fixedly connected to the concrete prefabricated block (10) placed on the ground )superior. 2.根据权利要求1所述的墩柱钢筋笼整体吊装结构,其特征是:所述混凝土预制块(10)是边长为1.5m、重量为8.5吨的正方体,在所述混凝土预制块(10)的四周设置吊环,缆风绳(5)固定连接在所述吊环上。 2. pier column reinforcement cage overall hoisting structure according to claim 1, is characterized in that: described concrete prefabricated block (10) is the cube that side length is 1.5m, and weight is 8.5 tons, in described concrete prefabricated block (10) 10) suspension rings are set around, and the cable wind rope (5) is fixedly connected on the suspension rings. 3.根据权利要求1所述的墩柱钢筋笼整体吊装结构,其特征是:在所述封闭围框(4)中呈“十”字设置有连接筋(7),以所述连接筋(7)的加强作用保持封闭围框(4)不变形,所述连接筋(7)采用精轧螺纹钢。 3. The overall hoisting structure of the pier column reinforcement cage according to claim 1, characterized in that: in the closed enclosure (4), a "ten" character is provided with a connecting rib (7), with the connecting rib ( The reinforcing effect of 7) keeps the closed enclosure (4) from being deformed, and the connecting rib (7) is made of finish-rolled rebar. 4.根据权利要求1所述的墩柱钢筋笼整体吊装结构,其特征是:对于顶面呈矩形的墩柱钢筋笼花瓶墩(1),所述封闭围框(4)亦为相吻合的矩形框。 4. The overall hoisting structure of the pier column reinforcement cage according to claim 1, characterized in that: for the pier column reinforcement cage vase pier (1) with a rectangular top surface, the closed enclosure (4) is also matched Rectangle.
CN201420752918.7U 2014-12-03 2014-12-03 A kind of pier stud reinforcing cage whole lifting structure Expired - Fee Related CN204266133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420752918.7U CN204266133U (en) 2014-12-03 2014-12-03 A kind of pier stud reinforcing cage whole lifting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420752918.7U CN204266133U (en) 2014-12-03 2014-12-03 A kind of pier stud reinforcing cage whole lifting structure

Publications (1)

Publication Number Publication Date
CN204266133U true CN204266133U (en) 2015-04-15

Family

ID=52801005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420752918.7U Expired - Fee Related CN204266133U (en) 2014-12-03 2014-12-03 A kind of pier stud reinforcing cage whole lifting structure

Country Status (1)

Country Link
CN (1) CN204266133U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842602A (en) * 2018-07-16 2018-11-20 浙江交工集团股份有限公司 A kind of hyperboloid vase pier framework of steel reinforcement
CN109667226A (en) * 2018-12-14 2019-04-23 中建八局第四建设有限公司 A kind of cable wind rope construction method
CN111676817A (en) * 2020-06-01 2020-09-18 中铁八局集团第二工程有限公司 Construction method of pier column type bridge upright column movable cable rope device
CN113944099A (en) * 2021-10-29 2022-01-18 中交路桥建设有限公司 Gate-type pier capping beam built-in anti-seismic reinforcing steel bar structure and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842602A (en) * 2018-07-16 2018-11-20 浙江交工集团股份有限公司 A kind of hyperboloid vase pier framework of steel reinforcement
CN109667226A (en) * 2018-12-14 2019-04-23 中建八局第四建设有限公司 A kind of cable wind rope construction method
CN111676817A (en) * 2020-06-01 2020-09-18 中铁八局集团第二工程有限公司 Construction method of pier column type bridge upright column movable cable rope device
CN113944099A (en) * 2021-10-29 2022-01-18 中交路桥建设有限公司 Gate-type pier capping beam built-in anti-seismic reinforcing steel bar structure and construction method thereof
CN113944099B (en) * 2021-10-29 2023-09-26 中交路桥建设有限公司 Built-in anti-seismic steel bar structure of door pier capping beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN104727236B (en) A kind of whole bridge beam based on ground supports transfers the construction method of dismounting system
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN203569872U (en) Same layer lifting type cantilever frame device
CN204185120U (en) Mobile unit dolly in place
CN103243963B (en) A kind of suspended holding pole segmental hoisting steel pipe pole method
CN204875821U (en) Steel cofferdam structure is used in construction of high pile platform of bridge
CN107142954B (en) A steel hanging box hoisting system for overall hoisting and hoisting method thereof
CN203769086U (en) Concrete embedded part
CN102277999A (en) Large-section portal steel structure holding pole
CN211473342U (en) Overhanging scaffolding pole with anti-skid device
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN204040033U (en) Anchor jacked pile piling structure
CN102747836B (en) Overhang steel member-based disassembling method for support frame
CN203128003U (en) Special hanger for cast-in-situ bored pile steel reinforcement cage
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN202658874U (en) Flexible wall connecting piece device
CN101644045B (en) Construction method of bagged sand drain of height-limited highway section
CN205151615U (en) Small -size hoisting machine suitable for cable shaft well head
CN206917297U (en) A kind of large-span steel girder upper air installing system in place
CN206902713U (en) Oblique cord pile pulling system
CN205329707U (en) Device can be recycled to 10kV pole
CN205276895U (en) Interior wall body lifts by crane assembly auxiliary assembly
CN204112327U (en) The puller system of anchor formula horizontal drag strength core stake
CN203307836U (en) Tower crane pile reinforcing structure
CN205476507U (en) Inside pump line fixing device of jacking platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

CF01 Termination of patent right due to non-payment of annual fee