CN211473342U - Overhanging scaffolding pole with anti-skid device - Google Patents

Overhanging scaffolding pole with anti-skid device Download PDF

Info

Publication number
CN211473342U
CN211473342U CN201922038028.5U CN201922038028U CN211473342U CN 211473342 U CN211473342 U CN 211473342U CN 201922038028 U CN201922038028 U CN 201922038028U CN 211473342 U CN211473342 U CN 211473342U
Authority
CN
China
Prior art keywords
connecting rod
peg
bolt
fixed
upper flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922038028.5U
Other languages
Chinese (zh)
Inventor
彭波
王剑
李万军
汪林
�田�浩
叶俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201922038028.5U priority Critical patent/CN211473342U/en
Application granted granted Critical
Publication of CN211473342U publication Critical patent/CN211473342U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型涉及主要支在地上的脚手架领域,具体为一种带有防滑装置的悬挑脚手架立杆。一种带有防滑装置的悬挑脚手架立杆,包括连接杆(1),其特征是:还包括栓钉(2),连接杆(1)采用工字型钢,栓钉(2)由栓柱(21)的顶端固定在栓盘(22)的中心处构成,连接杆(1)的上翼缘板和下上翼缘板这两处分别固定一个栓钉(2),栓钉(2)以栓柱(21)的底端贴合并垂直固定在连接杆(1)上。本实用新型结构简单,制造快捷,使用方便,安全可靠。

Figure 201922038028

The utility model relates to the field of scaffolds mainly supported on the ground, in particular to a cantilever scaffolding pole with anti-skid devices. An overhanging scaffolding pole with an anti-skid device, comprising a connecting rod (1), characterized in that it further comprises a peg (2), the connecting rod (1) is made of I-shaped steel, and the peg (2) is formed by a stud The top end of (21) is fixed at the center of the peg plate (22), and the upper flange plate and the lower upper flange plate of the connecting rod (1) are respectively fixed with a peg (2), and the peg (2) The bottom end of the bolt (21) is attached and vertically fixed on the connecting rod (1). The utility model has the advantages of simple structure, quick manufacture, convenient use, safety and reliability.

Figure 201922038028

Description

带有防滑装置的悬挑脚手架立杆Overhanging scaffolding pole with anti-skid device

技术领域technical field

本实用新型涉及主要支在地上的脚手架领域,具体为一种带有防滑装置的悬挑脚手架立杆。The utility model relates to the field of scaffolds mainly supported on the ground, in particular to an overhanging scaffold pole with an anti-skid device.

背景技术Background technique

随着我国房屋建筑业蓬勃发展,政府及企业对安全文明施工要求的提高,房屋建筑施工普遍需要搭设外脚手架,中高层、高层房屋建筑更是全面采用工字钢悬挑脚手架来满足安全文明施工需要。目前,悬挑架搭设时,底层立杆固定点、斜拉钢丝绳限位支点多采用焊接螺纹钢的形式,材料下料、焊接质量不能得到有效保证,给脚手架使用埋下安全隐患。With the vigorous development of my country's housing construction industry and the increasing requirements of the government and enterprises for safe and civilized construction, housing construction generally requires the erection of external scaffolding, and I-beam cantilever scaffolding is fully used in mid-to-high-rise and high-rise buildings to meet safe and civilized construction. need. At present, when the cantilever is erected, the fixed point of the bottom pole and the limit fulcrum of the cable-stayed wire rope are mostly in the form of welded threaded steel. The material cutting and welding quality cannot be effectively guaranteed, and the use of scaffolding has hidden safety hazards.

实用新型内容Utility model content

为了克服现有技术的缺陷,提供一种结构简单、制造快捷、使用方便、安全可靠的脚手架设施,本实用新型公开了一种带有防滑装置的悬挑脚手架立杆。In order to overcome the defects of the prior art and provide a scaffolding facility with simple structure, quick manufacture, convenient use, safety and reliability, the utility model discloses a cantilever scaffolding pole with an anti-skid device.

本实用新型通过如下技术方案达到发明目的:The utility model achieves the purpose of the invention through the following technical solutions:

一种带有防滑装置的悬挑脚手架立杆,包括连接杆,其特征是:还包括栓钉,连接杆采用工字型钢,栓钉由栓柱的顶端固定在栓盘的中心处构成,连接杆的上翼缘板和下上翼缘板这两处分别固定一个栓钉,栓钉以栓柱的底端贴合并垂直固定在连接杆上。A cantilever scaffolding pole with anti-skid device, including connecting rod, characterized in that: it also includes pegs, the connecting rod is made of I-shaped steel, and the pegs are formed by fixing the top of the pegs at the center of the pegs, and connecting the rods. The upper flange plate and the lower upper flange plate of the rod are respectively fixed with a peg, and the peg is attached to the bottom end of the peg and is vertically fixed on the connecting rod.

所述的带有防滑装置的悬挑脚手架立杆,其特征是:栓钉焊接固定在连接杆上,栓钉距连接杆一端的距离是栓钉距连接杆另一端距离的~倍;栓柱的长度是栓柱外径的7~10倍,栓盘的外径是栓柱外径的1.5~3倍。The cantilever scaffolding pole with anti-skid device is characterized in that: the peg is welded and fixed on the connecting rod, and the distance between the peg and one end of the connecting rod is ~ times the distance between the peg and the other end of the connecting rod; The length of the bolt is 7-10 times the outer diameter of the bolt, and the outer diameter of the bolt plate is 1.5-3 times the outer diameter of the bolt.

所述的带有防滑装置的悬挑脚手架立杆的使用方法,其特征是:按如下步骤依次实施:The use method of the cantilevered scaffolding pole with the anti-skid device is characterized in that: the following steps are performed in sequence:

① 设栓钉:采用工字型钢作为连接杆,由栓柱的顶端固定在栓盘的中心处构成栓钉,① Setting the stud: I-shaped steel is used as the connecting rod, and the top of the stud is fixed at the center of the stud to form a stud.

在连接杆的上翼缘板和下上翼缘板上分别定位放线定出第一根外架立杆的安装位置以及斜拉钢丝绳的限位支点位置,所述安装位置和限位支点位置都作为定位位置,放线完成后,将栓钉以栓柱的底端分别贴合固定在连接杆的上翼缘板和下上翼缘板上的所述的定位位置,焊接施工完成后须检查焊接质量;On the upper flange plate and the lower upper flange plate of the connecting rod, respectively locate and pay out the installation position of the first outer frame vertical rod and the position of the limit fulcrum of the cable-stayed wire rope. The installation position and the position of the limit fulcrum All of them are used as positioning positions. After the pay-off is completed, the bottom ends of the bolts are attached and fixed to the positioning positions on the upper flange plate and the lower upper flange plate of the connecting rod respectively. After the welding construction is completed, it must be Check welding quality;

② 吊装:将钢丝绳拴系在栓钉的栓柱上,通过起吊机械(如倒链、吊车等)拉动钢丝绳并吊起连接杆,逐根组装成脚手架,起吊过程中栓盘对钢丝绳起限位和防滑作用。② Hoisting: tie the wire rope to the stud of the stud, pull the wire rope and hoist the connecting rods by lifting machinery (such as reverse chains, cranes, etc.), and assemble them into scaffolding one by one. and anti-slip effect.

所述的带有防滑装置的悬挑脚手架立杆的使用方法,其特征是:The use method of the cantilever scaffolding pole with anti-skid device is characterized in that:

步骤①时,栓钉焊接固定在连接杆上,栓钉距连接杆一端的距离是栓钉距连接杆另一端距离的5~20倍;栓柱的长度是栓柱外径的7~10倍,栓盘的外径是栓柱外径的1.5~3倍。In step ①, the stud is welded and fixed on the connecting rod, and the distance between the stud and one end of the connecting rod is 5 to 20 times the distance between the stud and the other end of the connecting rod; the length of the stud is 7 to 10 times the outer diameter of the stud. , the outer diameter of the plug disk is 1.5 to 3 times the outer diameter of the plug column.

在工字钢悬挑脚手架搭设施工中,悬挑层架体立杆需要设置支点防止其滑动失稳;斜拉钢丝绳安装完成后,防止其滑动失去作用而设置限位装置。采用本实用新型,可以结合脚手架搭设布置图,通过在悬挑工字钢上对应位置焊接栓钉以保证脚手架底层立杆固定点、斜拉钢丝绳限位支点施工质量,确保悬挑脚手架使用安全,焊接支点后的工字钢可以重复利用。In the construction of the I-beam cantilever scaffolding, the cantilevered layer frame body needs to be set with a fulcrum to prevent it from sliding and unstable; after the installation of the cable-stayed wire rope is completed, a limit device is set to prevent it from sliding out of function. By adopting the utility model, it is possible to combine the scaffold erection layout diagram, and by welding the studs at the corresponding positions on the cantilevered I-beam, to ensure the construction quality of the fixed point of the bottom pole of the scaffold and the limit fulcrum of the oblique-pulled steel wire rope, and to ensure the safety of the cantilevered scaffolding. The I-beam after welding the fulcrum can be reused.

本实用新型具有如下有益效果:The utility model has the following beneficial effects:

1. 采用成品栓钉焊接到工字钢上即可完成施工,相比传统钢筋下料切割,再进行焊接施工,节约了大量人力;1. The finished stud is welded to the I-beam to complete the construction. Compared with the traditional steel bar cutting and cutting, and then welding construction, a lot of manpower is saved;

2. 栓钉焊接施工质量更可靠,能够消除传统焊接施工质量参差不齐带来的安全隐患;2. The construction quality of stud welding is more reliable, which can eliminate the potential safety hazards caused by the uneven quality of traditional welding construction;

3. 圆柱体的栓钉作为限位装置时,能够最大程度减少斜拉钢丝绳的磨损;3. When the stud of the cylinder is used as a limiting device, it can minimize the wear of the cable-stayed wire rope;

4. 采用栓钉作为固定支点和限位装置,更美观更耐腐蚀。4. Use studs as fixed fulcrum and limit device, which is more beautiful and corrosion-resistant.

附图说明Description of drawings

图1是本实用新型的结构示意图。Figure 1 is a schematic structural diagram of the present invention.

具体实施方式Detailed ways

以下通过具体实施例进一步说明本实用新型。The present utility model is further described below through specific embodiments.

实施例1Example 1

一种带有防滑装置的悬挑脚手架立杆,包括连接杆1和栓钉2,如图1所示,具体结构是:A cantilever scaffolding pole with anti-skid device, including connecting rod 1 and peg 2, as shown in Figure 1, the specific structure is:

连接杆1采用工字型钢,栓钉2由栓柱21的顶端固定在栓盘22的中心处构成,连接杆1的上翼缘板和下上翼缘板这两处分别固定一个栓钉2,栓钉2以栓柱21的底端贴合并垂直固定在连接杆1上。The connecting rod 1 is made of I-shaped steel, and the peg 2 is formed by fixing the top of the peg 21 at the center of the peg plate 22. The upper flange plate and the lower upper flange plate of the connecting rod 1 are respectively fixed with a peg 2. , the peg 2 is attached to the bottom end of the peg 21 and is vertically fixed on the connecting rod 1 .

本实施例中:栓钉2焊接固定在连接杆1上,栓钉2距连接杆1一端的距离是栓钉2距连接杆1另一端距离的5~20倍;栓柱21的长度是栓柱21外径的7~10倍,栓盘22的外径是栓柱21外径的1.5~3倍。In this embodiment, the peg 2 is welded and fixed on the connecting rod 1, and the distance between the peg 2 and one end of the connecting rod 1 is 5-20 times the distance between the peg 2 and the other end of the connecting rod 1; the length of the peg 21 is the length of the peg 2. The outer diameter of the post 21 is 7 to 10 times, and the outer diameter of the plug plate 22 is 1.5 to 3 times the outer diameter of the plug post 21 .

本实施例使用时,按如下步骤依次实施:When this embodiment is used, follow the steps to implement in turn:

① 设栓钉:采用工字型钢作为连接杆1,由栓柱21的顶端固定在栓盘22的中心处构成栓钉2,① Setting the stud: I-shaped steel is used as the connecting rod 1, and the top of the stud 21 is fixed at the center of the stud plate 22 to form the stud 2,

在连接杆1的上翼缘板和下上翼缘板上分别定位放线定出第一根外架立杆的安装位置以及斜拉钢丝绳的限位支点位置,所述安装位置和限位支点位置都作为定位位置,放线完成后,将栓钉2以栓柱21的底端分别贴合焊接固定在连接杆1的上翼缘板和下上翼缘板上的所述的定位位置,焊接完成后须检查焊接质量;On the upper flange plate and the lower upper flange plate of the connecting rod 1, respectively locate and pay out the installation position of the first outer frame vertical rod and the position of the limit fulcrum of the cable-stayed wire rope. The installation position and the limit fulcrum The positions are all used as positioning positions. After the pay-off is completed, the bottom ends of the pegs 2 are welded and fixed on the upper flange plate and the lower upper flange plate of the connecting rod 1 respectively. The positioning positions, After the welding is completed, the welding quality must be checked;

栓钉2距连接杆1一端的距离是栓钉2距连接杆1另一端距离的5~20倍;栓柱21的长度是栓柱21外径的7~10倍,栓盘22的外径是栓柱21外径的1.5~3倍;The distance between the peg 2 and one end of the connecting rod 1 is 5 to 20 times the distance between the peg 2 and the other end of the connecting rod 1; the length of the peg 21 is 7 to 10 times the outer diameter of the peg 21, and the outer diameter of the peg plate 22 It is 1.5 to 3 times the outer diameter of the bolt 21;

② 吊装:将钢丝绳拴系在栓钉2的栓柱21上,通过起吊机械(如倒链、吊车等)拉动钢丝绳并吊起连接杆1,逐根组装成脚手架,起吊过程中栓盘22对钢丝绳起限位和防滑作用。② Hoisting: Tie the wire rope to the bolt 21 of the bolt 2, pull the wire rope and hoist the connecting rod 1 by a lifting machine (such as a chain, crane, etc.), and assemble it into a scaffold one by one. During the lifting process, 22 pairs of bolt discs The steel wire rope plays the role of limit and anti-skid.

Claims (2)

1.一种带有防滑装置的悬挑脚手架立杆,包括连接杆(1),其特征是:还包括栓钉(2),连接杆(1)采用工字型钢,栓钉(2)由栓柱(21)的顶端固定在栓盘(22)的中心处构成,连接杆(1)的上翼缘板和下上翼缘板这两处分别固定一个栓钉(2),栓钉(2)以栓柱(21)的底端贴合并垂直固定在连接杆(1)上。1. A cantilever scaffolding pole with anti-skid device, comprising a connecting rod (1), characterized in that: also comprising a peg (2), the connecting rod (1) adopts I-shaped steel, and the peg (2) is made of The top end of the bolt (21) is fixed at the center of the bolt plate (22), and the upper flange plate and the lower upper flange plate of the connecting rod (1) are respectively fixed with a bolt (2), and the bolt ( 2) The bottom end of the bolt (21) is attached and vertically fixed on the connecting rod (1). 2.如权利要求1所述的带有防滑装置的悬挑脚手架立杆,其特征是:栓钉(2)焊接固定在连接杆(1)上,栓钉(2)距连接杆(1)一端的距离是栓钉(2)距连接杆(1)另一端距离的5~20倍;栓柱(21)的长度是栓柱(21)外径的7~10倍,栓盘(22)的外径是栓柱(21)外径的1.5~3倍。2. The cantilever scaffolding pole with anti-skid device as claimed in claim 1, characterized in that: the peg (2) is welded and fixed on the connecting rod (1), and the peg (2) is away from the connecting rod (1) The distance from one end of the bolt (2) to the other end of the connecting rod (1) is 5 to 20 times; the length of the bolt (21) is 7 to 10 times the outer diameter of the bolt (21), and the bolt plate (22) The outer diameter of the bolt is 1.5 to 3 times the outer diameter of the bolt (21).
CN201922038028.5U 2019-11-22 2019-11-22 Overhanging scaffolding pole with anti-skid device Expired - Fee Related CN211473342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922038028.5U CN211473342U (en) 2019-11-22 2019-11-22 Overhanging scaffolding pole with anti-skid device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922038028.5U CN211473342U (en) 2019-11-22 2019-11-22 Overhanging scaffolding pole with anti-skid device

Publications (1)

Publication Number Publication Date
CN211473342U true CN211473342U (en) 2020-09-11

Family

ID=72377082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922038028.5U Expired - Fee Related CN211473342U (en) 2019-11-22 2019-11-22 Overhanging scaffolding pole with anti-skid device

Country Status (1)

Country Link
CN (1) CN211473342U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778102A (en) * 2019-11-22 2020-02-11 上海宝冶集团有限公司 Overhanging scaffold upright rod with anti-skid device and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778102A (en) * 2019-11-22 2020-02-11 上海宝冶集团有限公司 Overhanging scaffold upright rod with anti-skid device and use method thereof

Similar Documents

Publication Publication Date Title
CN102070071B (en) Steel reinforcement cage hoisting method
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN102635070B (en) The Construction Method of the Intertwined Vertical Rotation of Steel Towers of Cable-Stayed Bridge
CN103711078A (en) Temporary girder-type support for bridge construction and dismantling method thereof
CN105275253A (en) Equal-diameter rod erecting device and application method thereof
CN205527400U (en) Lifting mechanism
CN211473342U (en) Overhanging scaffolding pole with anti-skid device
CN211622534U (en) Movable cantilever operation platform
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN207484292U (en) Bent cap bed die removes device
CN221917159U (en) Self-unloading device for crane boom of tower crane
CN219931554U (en) A cantilevered steel structure construction platform with formwork system
CN208618838U (en) A kind of safety device
CN206220461U (en) A kind of packaged type I-steel hoistway operation platform
CN206457187U (en) A kind of pole of mounting steel chimney
CN206158207U (en) Construction is with platform of unloading
CN102747836B (en) Overhang steel member-based disassembling method for support frame
CN203626227U (en) Unloading structure of cantilever scaffold
CN110778102A (en) Overhanging scaffold upright rod with anti-skid device and use method thereof
CN207739607U (en) A kind of elevator well crosshead
CN207863502U (en) A kind of Construction of Steel Structure life line bracket
CN204551898U (en) A kind of inclined in two-way heavy in section box lattice column
CN206917297U (en) A kind of large-span steel girder upper air installing system in place

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200911

CF01 Termination of patent right due to non-payment of annual fee