CN206298286U - A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam - Google Patents

A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam Download PDF

Info

Publication number
CN206298286U
CN206298286U CN201620911464.2U CN201620911464U CN206298286U CN 206298286 U CN206298286 U CN 206298286U CN 201620911464 U CN201620911464 U CN 201620911464U CN 206298286 U CN206298286 U CN 206298286U
Authority
CN
China
Prior art keywords
electrical dust
dust precipitator
wet electrical
hanging beam
body equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620911464.2U
Other languages
Chinese (zh)
Inventor
欧阳德
杨建平
吕强
李勤华
杨辉
李轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd
Original Assignee
Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd filed Critical Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd
Priority to CN201620911464.2U priority Critical patent/CN206298286U/en
Application granted granted Critical
Publication of CN206298286U publication Critical patent/CN206298286U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

A kind of integral hoisting auxiliary hanging beam of wet electrical dust precipitator body equipment, it is the rectangular frame structure matched with wet electrical dust precipitator body equipment, including rectangular framework, rectangular framework matches with the size on 6 root post tops of wet electrical dust precipitator body equipment, reinforcement is provided with framework, the upper hanger being connected with lifting appliance is provided with the upper surface of rectangular framework, the lower hanger being connected with wet electrical dust precipitator body equipment is provided with the upper surface of rectangular framework.The utility model is using the integral hoisting for aiding in hanging beam transition to carry out wet electrical dust precipitator body equipment, body equipment deforms during hoisting process can effectively be prevented, and by 6 root posts of ingenious selection wet electrical dust precipitator body equipment, after column reinforcement, simplify the structure of integral lifting, connector is used as by double-steel wire rope simultaneously, the soft lifting performance effectively realized.

Description

A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam
Technical field
The utility model is related to a kind of equipment hoisting apparatus for work, and in particular to a kind of wet electrical dust precipitator body equipment Integral hoisting less important work device, is mainly used in power plant wet electrical dust precipitator and installs, category large scale equipment hoisting technology field.
Background technology
It is wet for the various environmental requirements for sending out point devices also more and more higher as domestic atmosphere pollution situation is increasingly serious Formula electric cleaner starts to be widely used in domestic each coal-burning power plant as terminal process equipment, and all kinds of wet electrical dust precipitators are also confused Confusingly climb up the wonderful stage of " minimum discharge " smoke gas treatment.
Wet electrical dust precipitator is a kind of for processing the new cleaner containing micro dust and microparticle, is mainly used to remove It is the ideal for administering atmospheric dust pollution containing harmful substances such as the dirt in humid gas, acid mist, water droplet, aerosol, stink, PM2.5 Equipment.The usual abbreviation WESP of wet electrical dust precipitator, the dedusting general principle with dry electric precipitation device is identical, to experience charged, receipts Collection and deashing three phases.But wet electrical dust precipitator belongs to large scale equipment, wet electrical dust precipitator body equipment typically now Installation method be substantially construction method using the lifting combination of high-altitude burst, the method has that amount of high-altitude operation is big, installs and apply Work difficulty is big, security risk is high, low construction efficiency, construction period are long, body idle pattern high belongs to the deficiencies such as critical process, because This urgent need is improved this.
Do not have the discovery to have the patent literature constructed with the utility model by patent retrieval, have with the utility model The patent of certain relation mainly has following:
1st, Patent No. CN201510572539.9, entitled " a kind of steel lifted trunk integral hoisting, directly construction party in place The patent of invention of method ", which disclose a kind of steel lifted trunk integral hoisting, directly construction method in place, comprise the following steps: 1) is integral by steel suspended box cofferdam assembly, and outrigger is set inside steel lifted trunk;2) is in pier corresponding with steel lifted trunk position In multiple steel pile castings, 2~4 steel pile castings are reserved as director element, remaining steel pile casting cutting of steel lifted trunk correspondence pier position Shelve absolute altitude to outrigger, and it is described be cut to outrigger and shelve welded in the steel pile casting of absolute altitude outrigger and shelve bracket;3) is applied Hang equipment steel lifted trunk is hoisted at the corresponding pier position of the steel lifted trunk.
2nd, Patent No. CN201510569110.4, entitled " a kind of integral hoisting method of Wavelike steel webplate part " Patent of invention, which disclose a kind of integral hoisting method of Wavelike steel webplate part, comprise the following steps:In waveform steel It is on the N-1 Wavelike steel webplate sections of web PC box girder bridges that hanging basket advancing is in place, the bottom of the Hanging Basket is fixed on No. N-1 On Wavelike steel webplate sections, top protrude from the leading section of N-1 Wavelike steel webplate sections;N waveform steel is completed in factory The precast assembly of web sections, N Wavelike steel webplates sections is made up of some pieces of vertical bridges to the Wavelike steel webplate of arrangement, each described The gooseneck and temporary support bracing means set through direction across bridge between Wavelike steel webplate are connected;Will using flat top barge N Wavelike steel webplate sections is transported to immediately below its design attitude;Using the tackling system integral lifting N at the top of the Hanging Basket Number Wavelike steel webplate sections is in place, and completes the connection of N Wavelike steel webplates sections and N-1 Wavelike steel webplate sections.
3rd, Patent No. CN201410190975.5, entitled " a kind of conversion beam integral hoisting device for rapid and its lifting side The patent of invention of method ", which disclose a kind of conversion beam integral hoisting device for rapid and its hanging method, and the device includes:Support Vertical rod, grade beam, grade beam bottom cross bar, Tian Liang, chain block and hanging beam;Equidistant grade beam is fixed on support by grade beam bottom cross bar In vertical rod, reinforcing bar colligation, colligation stirrup after first colligation cage bar are carried out on grade beam;Then day beam, steel wire rope, hanging beam, profit are installed Reinforcing bar is sling with chain block, removes grade beam bottom cross bar, progressively transfer to bedding plane, complete reinforcing bar colligation.
So although above-mentioned these patents are directed to the integral hoisting of equipment or workpiece, and it is specific whole to propose some Body hanging method, but all it is not suitable for the integral hoisting of wet electrical dust precipitator body equipment, wet electrical dust precipitator body equipment It is heavy duty work equipment, weight about 90t after combination, and also the installation requirement of wet electrical dust precipitator body equipment is high, using existing Hanging method can not substantially meet requirement, so still needing further to be improved.
Utility model content
The purpose of this utility model is, for the problems of existing wet electrical dust precipitator body equipment lifting, to propose A kind of less important work device of the integral hoisting of wet electrical dust precipitator body equipment, will be wet by using less important work device energy Formula electric cleaner body equipment is existing to be assembled, then integral hoisting again.
In order to reach this purpose, it is auxiliary that the utility model provides a kind of integral hoisting of wet electrical dust precipitator body equipment Hanging beam is helped, is the rectangular frame structure matched with wet electrical dust precipitator body equipment, including rectangular framework is rectangular Framework matches with the size on 6 root post tops of wet electrical dust precipitator body equipment, reinforcement is provided with framework, in rectangle The upper surface of framework be provided with the upper hanger being connected with lifting appliance, be provided with and wet type electricity in the lower surface of rectangular framework The lower hanger of deduster body equipment connection.
Further, described auxiliary hanging beam is rectangle, and there is auxiliary beam centre, forms " day " character form structure;In auxiliary Lower hanger is respectively equipped with below four angles and centre position of hanging beam " day " character form structure, in auxiliary hanging beam " day " character form structure Above be arranged with hanger, and be provided with cross reinforcing rib in the centre of auxiliary hanging beam " day " character form structure.
Further, described lower hanger sets for the interim hanger on 6, with wet electrical dust precipitator body is corresponded Put so that auxiliary hanging beam is vertical connection when being connected with wet electrical dust precipitator body.
Further, described upper hanger is 4-6, is evenly arranged on the upper surface of auxiliary hanging beam, to ensure auxiliary When hanging beam is connected with crane loading, in optimal forced position.
Further, described cross reinforcing rib is Saint Andrew's cross cross reinforcing rib, or rice shape cross reinforcing rib.
Further, to ensure security of the wet electrical dust precipitator body in hoisting process, prevent equipment from deforming, to ash Bucket beam carries out consolidation process;According to wet electrical dust precipitator body construction feature, the H profile steel column of selected equipment is mainly received to lift Power part, and install reinforcing gusset 3 additional to every root post H profile steel.
When using, first wet electrical dust precipitator body equipment is assembled on ground, according still further to wet electrical dust precipitator body Equipment rectangular structure size makes an auxiliary hanging beam, then auxiliary hanging beam is set by steel wire rope with wet electrical dust precipitator body It is standby to couple together, sling auxiliary hanging beam using Large-scale Hoisting equipment, then it is by steel wire rope that wet electrical dust precipitator body equipment is whole Body is lifted by crane, until wet electrical dust precipitator body equipment installation site puts down wet electrical dust precipitator body equipment, completes wet type electricity Deduster body equipment integral hoisting.
Described integral hoisting specific method step is as follows:
1)Wet electric cleaner body equipment combination is carried out on ground;By each part of wet electrical dust precipitator body equipment on ground First assembled according to the structure of wet electric cleaner body equipment;
2)Select the suspension centre of wet electrical dust precipitator body equipment;It is cuboid knot in view of wet electrical dust precipitator body equipment Structure, deadweight is about 90t or so, and when lifting in place, stress point is 6 root posts of vertical direction, therefore selects the 6 root post conduct Interim suspension centre;
3)Suspension centre is reinforced;To prevent equipment stress deformation in hoisting process, 6 root posts need to be reinforced, had Body reinforcement measure is as follows:Because 6 root post is H profile steel, to prevent deformation, gusset is strengthened to 6 H profile steel welding;It is simultaneously anti- Only draw high deformation and 6 interim hangers of lifting are installed on the 6 root post top;
4)Interim hanger is installed:Interim hanger is installed at the top of the selected root post of interim suspension centre 6, interim hanger leads to Welding or screw threads for fastening are crossed at the top of 6 root posts;
5)Design and produce auxiliary hanging beam:To prevent crimp, according to the root post of wet electrical dust precipitator body equipment 6 Tip position size, makes auxiliary hanging beam;Auxiliary hanging beam is rectangle, and there is auxiliary beam centre, forms " day " character form structure;Auxiliary Help above four angles and centre position of hanging beam " day " character form structure and be provided with hanger separately below and lower hanger, and auxiliary The centre of hanging beam " day " character form structure is helped to be provided with the reinforcement of intersection;
6)Lifting prepares:The wet electrical dust precipitator body equipment that will first assemble moves on to lifting scene in place, then will make Good auxiliary hanging beam is transported to lifting scene, and by crane hanging beam will be aided in hang above wet electrical dust precipitator body equipment, Then the interim hanger on the lower hanger and wet electrical dust precipitator body equipment of auxiliary hanging beam is connected with steel wire rope respectively;Use again The upper hanger of steel wire rope connection auxiliary hanging beam is hung, finally the hoisting wirerope for aiding in hanging beam to hang oneself on ear is concentrated and is suspended to large-scale On the suspension hook of device for hoisting, prepare integral hoisting;
7)Integral hoisting;Using crane hanging beam will be aided in sling by hoisting wirerope, sling in auxiliary hanging beam During to certain position, and by by aiding in the steel wire rope under hanging beam on hanger by 6 stress of wet electrical dust precipitator body equipment point Point integral lifting, shifts in place again after being lifted to required height, completes integral hoisting operation.
Operating process is:Site inspection, crane type selecting → crane march into the arena and installs → and wet electrical dust precipitator body sets Standby assembling → wet electrical dust precipitator body equipment is reinforced and the design of lifting lug used for hoisting installation → special hoisting bar and making → wet type electricity Deduster integral hoisting → crane dismounting is withdrawn from the arena.
The utility model has the advantage of:
The utility model can effectively be prevented using the integral hoisting for aiding in hanging beam transition to carry out wet electrical dust precipitator body equipment Only body equipment deformation in hoisting process, and by 6 root posts of ingenious selection wet electrical dust precipitator body equipment, in column After reinforcement, the structure of integral lifting is simplified, while connector is used as by double-steel wire rope, the soft lifting effectively realized Can, the utility model mainly has following some features:
1st, can significantly save man-hour:Conventional construction method is to pour the building foundation of wet electrical dust precipitator to finish friendship An Hou, installs a derrick crane, carries out individual chip package.This project is taken wet electrical dust precipitator body equipment in ground group Install into, then in place, the more conventional installation method with the wet electrical dust precipitator apparatus body integral hoisting that large-scale crane will be assembled, A large amount of work high above the ground are reduced, labour intensity is reduced, efficiency of construction is improve, the duration is shortened, can be with construction foundation working Synchronously carry out;
2nd, it is easy to make to reuse:The auxiliary hanging girder construction for being used is simple, because wet electrical dust precipitator body is whole Body lifting is required, during lifting, column lower end is in hanging free state without fixed, and now entry and exit loudspeaker are because certainly Squeezed state will be caused to ash bucket beam again.To ensure security of the wet electrical dust precipitator body in hoisting process, equipment is prevented Deformation, should carry out consolidation process to ash bucket beam.According to wet electrical dust precipitator body construction feature, the H of equipment is selected after being computed Shaped steel(HW300*300)Column is the main stressed member of lifting, therefore, reinforcing gusset 3 is installed in reply additional per root post H profile steel.
Brief description of the drawings
Fig. 1 is principle schematic of the present utility model;
Fig. 2 is wet electrical dust precipitator body construction schematic diagram of the present utility model;
Fig. 3 is auxiliary hanging girder construction schematic diagram of the present utility model;
Fig. 4 is auxiliary hanging beam overlooking the structure diagram of the present utility model;
Fig. 5 is auxiliary hanging beam lifting stress diagram of the present utility model.
Specific embodiment
The utility model is expanded on further with specific embodiment below in conjunction with the accompanying drawings.
Embodiment one
By accompanying drawing 1 as can be seen that the utility model is related to a kind of wet electrical dust precipitator body equipment integral hoisting to aid in Hanging beam, is the rectangular frame structure matched with wet electrical dust precipitator body equipment, including rectangular framework 101, rectangle The size on 6 root post tops of framework 101 and wet electrical dust precipitator body equipment match, be provided with reinforcement in framework 101 103, the upper hanger 104 being connected with lifting appliance is provided with the upper surface of rectangular framework 101, in rectangular framework Lower surface is provided with the lower hanger 105 being connected with wet electrical dust precipitator body equipment.
Described auxiliary hanging beam 1 is rectangle, and there is auxiliary beam 102 centre, forms " day " character form structure;In auxiliary hanging beam Lower hanger 105 is respectively equipped with below four angles of " day " character form structure and centre position, and in auxiliary hanging beam " day " font knot The centre of structure is provided with cross reinforcing rib 103.
Described lower hanger is that the interim hanger 203 on 6, with wet electrical dust precipitator body 2 corresponds setting so that Auxiliary hanging beam 1 is connected for steel wire rope is vertical when be connected with wet electrical dust precipitator body 2 so that during lifting auxiliary hanging beam 1 with it is wet The Impact direction 107 of the connection of formula electric cleaner body 2 is for vertically downward.
Further, described upper hanger is 4, and 4 upper hangers 104 are separately positioned on each of " day " character form structure The side centre position of individual " mouth " word, to ensure auxiliary hanging beam 1 in lifting in optimal forced position.
Described cross reinforcing rib 103 is Saint Andrew's cross cross reinforcing rib.
To ensure security of the wet electrical dust precipitator body in hoisting process, prevent equipment from deforming, ash bucket beam is carried out Consolidation process;According to wet electrical dust precipitator body construction feature, the H profile steel column 201 of wet electrical dust precipitator body construction is selected To lift main stressed member, and install reinforcing gusset 202 additional to every root post H profile steel.
Described integral hoisting specific method step is as follows:
1)Wet electric cleaner body 2 is carried out on ground to combine;By each part of wet electrical dust precipitator body 2 ground first according to The structure of wet electric cleaner body 2 is assembled;
2)Select the suspension centre of wet electrical dust precipitator body equipment;It is rectangular structure in view of wet electrical dust precipitator body 2, Deadweight is about 90t or so, and when lifting in place, stress point is 6 root posts of vertical direction, therefore selects the conduct of 6 root post 201 Interim suspension centre;
3)Suspension centre is reinforced;To prevent equipment stress deformation in hoisting process, 6 root posts need to be reinforced, had Body reinforcement measure is as follows:Because 6 root post is H profile steel, to prevent deformation, gusset is strengthened to 6 welding of H profile steel column 201 202;It is simultaneously to prevent from drawing high deformation and 6 interim hangers 203 of lifting are installed on the 6 root post top;
4)Interim hanger is installed:Interim hanger, interim hanger are installed at the top of the selected root post of interim suspension centre 6 203 tops that 6 root posts 201 are fastened on by welding or bolt;
5)Design and produce auxiliary hanging beam:In order to prevent crimp, according to the root post of wet electrical dust precipitator body equipment 6 Tip position size, makes auxiliary hanging beam 1;Auxiliary hanging beam 1 is rectangle, and there is auxiliary beam centre, forms " day " character form structure; Aid in above four angles and centre position of hanging beam " day " character form structure and be provided with hanger and lower hanger separately below, and The centre of auxiliary hanging beam " day " character form structure is provided with the reinforcement of intersection;
6)Lifting prepares:The wet electrical dust precipitator body 2 that will first assemble moves on to that lifting scene is in place, then will make Auxiliary hanging beam 1 is transported to lifting scene, and by crane 6 hanging beam 1 will be aided in hang above wet electrical dust precipitator body 2, then The interim hanger on the lower hanger and wet electrical dust precipitator body equipment of auxiliary hanging beam is connected with steel wire rope 3 respectively;Again with lifting The upper hanger of the connection auxiliary hanging beam of steel wire rope 4, will finally be connected to the concentration of hoisting wirerope 4 for aiding in hanging beam to hang oneself on ear and is suspended to On the suspension hook 5 of large-scale boom hoisting, prepare integral hoisting;
7)Integral hoisting;Using crane 6 hanging beam 1 will be aided in sling by hoisting wirerope 4, sling in auxiliary hanging beam 1 Sling during to certain position, but by by the steel wire rope 3 on the lower hanger for aiding in hanging beam 1 by wet electrical dust precipitator body 2 point 6 Stress point integral lifting, the installation site 7 for determining in place is shifted after being lifted to required height again, completes integral hoisting operation.
Operating process is:Site inspection, crane type selecting → crane march into the arena and installs → and wet electrical dust precipitator body sets Standby assembling → wet electrical dust precipitator body equipment is reinforced and the design of lifting lug used for hoisting installation → special hoisting bar and making → wet type electricity Deduster integral hoisting → crane dismounting is withdrawn from the arena.
Embodiment two
As the general principle of embodiment one, simply structure is different for embodiment two, is a kind of wet electrical dust precipitator Body equipment integral hoisting aids in hanging beam, is the rectangular frame structure matched with wet electrical dust precipitator body equipment, including length Square framework, rectangular framework matches with the size on 6 root post tops of wet electrical dust precipitator body equipment, in framework Reinforcement is provided with, the upper hanger being connected with lifting appliance is provided with the upper surface of rectangular framework, in rectangular framework Upper surface be provided with the lower hanger being connected with wet electrical dust precipitator body equipment.
Described auxiliary hanging beam is rectangle, and there is auxiliary beam centre, forms " day " character form structure;In auxiliary hanging beam " day " word Lower hanger is respectively equipped with below four angles of shape structure and centre position, it is symmetrical above auxiliary hanging beam " day " character form structure Hanger is provided with, and a meter font reinforcement is provided with the centre of auxiliary hanging beam " day " character form structure.
Described lower hanger is that the interim hanger on 6, with wet electrical dust precipitator body corresponds setting so that auxiliary Hanging beam is vertical connection when being connected with wet electrical dust precipitator body.
Described upper hanger is 6, is arranged symmetrically in the anti-of auxiliary hanging beam with lower hanger on the upper surface of auxiliary hanging beam Face, during ensureing that auxiliary hanging beam is connected with crane loading, in optimal forced position.
Described cross reinforcing rib is rice shape cross reinforcing rib.
Described integral hoisting specific method step is as embodiment one.
Operating process is:Site inspection, crane type selecting → crane march into the arena and installs → and wet electrical dust precipitator body sets Standby assembling → wet electrical dust precipitator body equipment is reinforced and the design of lifting lug used for hoisting installation → special hoisting bar and making → wet type electricity Deduster integral hoisting → crane dismounting is withdrawn from the arena.
Above-mentioned listed embodiment, simply carries out clear, complete description with reference to accompanying drawing to the technical solution of the utility model; Obviously, described embodiment is only a part of embodiment of the present utility model, rather than whole embodiments.Based on this reality With the embodiment in new, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of the utility model protection.
The utility model has the advantage of:
The utility model can effectively be prevented using the integral hoisting for aiding in hanging beam transition to carry out wet electrical dust precipitator body equipment Only body equipment deformation in hoisting process, and by 6 root posts of ingenious selection wet electrical dust precipitator body equipment, in column After reinforcement, the structure of integral lifting is simplified, while connector is used as by double-steel wire rope, the soft lifting effectively realized Can, the utility model mainly has following some features:
1st, can significantly save man-hour:Conventional construction method is to pour the building foundation of wet electrical dust precipitator to finish friendship An Hou, installs a derrick crane, carries out individual chip package.This project is taken wet electrical dust precipitator body equipment in ground group Install into, then in place, the more conventional installation method with the wet electrical dust precipitator apparatus body integral hoisting that large-scale crane will be assembled, A large amount of work high above the ground are reduced, labour intensity is reduced, efficiency of construction is improve, the duration is shortened, can be with construction foundation working Synchronously carry out;
2nd, it is easy to make to reuse:The auxiliary hanging girder construction for being used is simple, because wet electrical dust precipitator body is whole Body lifting is required, during lifting, column lower end is in hanging free state without fixed, and now entry and exit loudspeaker are because certainly Squeezed state will be caused to ash bucket beam again.To ensure security of the wet electrical dust precipitator body in hoisting process, equipment is prevented Deformation, should carry out consolidation process to ash bucket beam.According to wet electrical dust precipitator body construction feature, the H of equipment is selected after being computed Shaped steel(HW300*300)Column is the main stressed member of lifting, therefore, reinforcing gusset 3 is installed in reply additional per root post H profile steel.

Claims (5)

1. the integral hoisting of a kind of wet electrical dust precipitator body equipment aids in hanging beam, it is characterised in that:It is and wet electrical dust precipitator The rectangular frame structure that body equipment matches, including rectangular framework, rectangular framework and wet electrical dust precipitator body The size on 6 root post tops of equipment matches, and reinforcement is provided with framework, is provided with and rises in the upper surface of rectangular framework The upper hanger that the equipment of hanging is connected, in the case where the upper surface of rectangular framework is provided with and is connected with wet electrical dust precipitator body equipment Hanger.
2. the integral hoisting of wet electrical dust precipitator body equipment as claimed in claim 1 aids in hanging beam, it is characterised in that:It is described Auxiliary hanging beam be rectangle, and there is an auxiliary beam centre, forms " day " character form structure;At four of auxiliary hanging beam " day " character form structure Lower hanger is respectively equipped with below angle and centre position, upper hanger is arranged with above auxiliary hanging beam " day " character form structure, And it is provided with cross reinforcing rib in the centre of auxiliary hanging beam " day " character form structure.
3. the integral hoisting of wet electrical dust precipitator body equipment as claimed in claim 2 aids in hanging beam, it is characterised in that:It is described Lower hanger set for the interim hanger on 6, with wet electrical dust precipitator body is corresponded so that auxiliary hanging beam with wet type It is vertical connection when electric cleaner body is connected.
4. the integral hoisting of wet electrical dust precipitator body equipment as claimed in claim 2 aids in hanging beam, it is characterised in that:It is described Upper hanger be 4-6, be evenly arranged on the upper surface of auxiliary hanging beam, to ensure that auxiliary hanging beam is connected with crane loading When, in optimal forced position.
5. the integral hoisting of wet electrical dust precipitator body equipment as claimed in claim 2 aids in hanging beam, it is characterised in that:It is described Cross reinforcing rib be Saint Andrew's cross cross reinforcing rib, or rice shape cross reinforcing rib.
CN201620911464.2U 2016-08-22 2016-08-22 A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam Active CN206298286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620911464.2U CN206298286U (en) 2016-08-22 2016-08-22 A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620911464.2U CN206298286U (en) 2016-08-22 2016-08-22 A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam

Publications (1)

Publication Number Publication Date
CN206298286U true CN206298286U (en) 2017-07-04

Family

ID=59201806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620911464.2U Active CN206298286U (en) 2016-08-22 2016-08-22 A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam

Country Status (1)

Country Link
CN (1) CN206298286U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107934742A (en) * 2017-12-15 2018-04-20 中国电建集团核电工程公司 Combustion engine lifting device and crawler type combustion engine hanging apparatus
CN109231003A (en) * 2018-11-16 2019-01-18 安徽马钢设备检修有限公司 A kind of method of deduster displacement installation
CN110328471A (en) * 2019-07-10 2019-10-15 二重(德阳)重型装备有限公司 The installation method of the large-size stainless steel internals of petrochemical equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107934742A (en) * 2017-12-15 2018-04-20 中国电建集团核电工程公司 Combustion engine lifting device and crawler type combustion engine hanging apparatus
CN109231003A (en) * 2018-11-16 2019-01-18 安徽马钢设备检修有限公司 A kind of method of deduster displacement installation
CN109231003B (en) * 2018-11-16 2020-03-20 安徽马钢设备检修有限公司 Method for shifting and mounting dust remover
CN110328471A (en) * 2019-07-10 2019-10-15 二重(德阳)重型装备有限公司 The installation method of the large-size stainless steel internals of petrochemical equipment

Similar Documents

Publication Publication Date Title
CN105604334A (en) Rapid-construction method used for overall installation of large-span steel truss
CN206298286U (en) A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN102733615B (en) Unsymmetrical integral lifting construction method
CN102900021A (en) Split mounting type bridge wet joint construction method
CN106044580B (en) A kind of wet electrical dust precipitator body equipment integral hoisting method
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN106429883A (en) Tower crane foundation used for bridge construction
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN106758862B (en) Lattice tubular tower and frame peace tears platform open
CN101105024A (en) Method for setting up box-type bridge body maintain engineering box outer hanging falsework
CN208167536U (en) A kind of operation platform removed for bridge temporary support
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN208120600U (en) A kind of quick provision for disengagement of large size inside-climbing tower crane
CN206625585U (en) A kind of carrying pole device of purlin installation
CN206289544U (en) A kind of simple electric nacelle device
CN210529505U (en) Circulation device is torn open in ann of wet seam template of bridge concatenation formula
CN201645413U (en) Simple gin-pole mechanism for demolishing internal climbing tower crane
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN210263834U (en) Pier stud safety protection construction platform
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN207183801U (en) One kind uses new sail type power distribution equipment framework made of composite insulating material
CN206736745U (en) Goods-shelf type pier shaft external scaffolding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant