CN107542273A - 芯柱式高耸桅杆施工方法 - Google Patents
芯柱式高耸桅杆施工方法 Download PDFInfo
- Publication number
- CN107542273A CN107542273A CN201610467483.5A CN201610467483A CN107542273A CN 107542273 A CN107542273 A CN 107542273A CN 201610467483 A CN201610467483 A CN 201610467483A CN 107542273 A CN107542273 A CN 107542273A
- Authority
- CN
- China
- Prior art keywords
- stem
- construction method
- column type
- core column
- paragraph
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
本发明涉及高耸桅杆。芯柱式高耸桅杆施工方法,包括:步骤一,通过用绑扎于钢构件或混凝土构件上的第一链式起重机把分成4.5~6米长的芯柱从建筑物的边缘部位水平运至基座处;步骤二,第一段芯柱到位后,用第二、第三链式起重机分别吊住芯柱两侧的吊钩,竖起提升至离开基座面4.5~6米停止操作;步骤三,把第二段芯柱用第一起重机运至基座处,用第四第五链式起重机分别吊住芯柱两侧的吊钩,竖起与第一段芯柱对接焊接,换第四、第五链式起重机继续往上提升;此时并把吊钩割下;同时即把第一段的油漆面漆涂刷完成,并把后续的装饰装修工作也一起完成;步骤四,重复步骤二和三完成整个拼接安装。本发明安全方便,操作简单,造价低廉。
Description
技术领域
本发明涉及高耸桅杆, 尤其涉及芯柱式高耸桅杆。
背景技术
目前很多超高层建筑或标志性建筑的顶端都设有用于发射电视电讯信号或起避雷作用的桅杆,在施工安装这些芯柱式塔桅时,由于再升高塔式起重机不太可能,也不经济;因此,比较常用的安装方式是:采用随着高度不断升高的把杆式起重系统和在基底顶升的顶升系统两种。把杆式起重系统存在着安全隐患大,拆除安装杆件复杂等缺陷;而顶升安装又存在着费用居高不下,需要专业单位和人员来完成的困境。
发明内容
本发明旨在解决上述缺陷,提供一种芯柱式高耸桅杆施工方法。本发明安全方便,操作简单,不需要特殊专业人员、专业单位和设备,造价低廉。质量良好。
为解决上述问题,芯柱式高耸桅杆施工方法,它包括:
步骤一,通过用绑扎于钢构件或混凝土构件上的第一链式起重机把分成4.5~6米长的芯柱从建筑物的边缘部位水平运输过来;芯柱两侧用钢丝绳绑扎构成吊钩;
步骤二,第一段芯柱运至基处后,用第二、第三链式起重机分别吊住芯柱两侧的吊钩,慢慢竖起,往上提升,至离开基座面4.5~6米停止操作;
步骤三,把第二段芯柱也用第一起重机运至基座处,用第四第五链式起重机分别吊住芯柱两侧的吊钩,慢慢竖起;与第一段芯柱对接,可采用对接锚板等临时措施,矫正接口质量符合规范要求。之后焊接,检测合格后,第四、第五链式起重机继续往上提升;此时换下第二、第三链式起重机,并把它们使用的吊钩割下,连接处打磨,补油漆;在第四、第五链式起重机往上提升过程中即把第一段的油漆面漆涂刷完成,并把后续的装饰装修工作也一起完成,达到设计和规范要求;
步骤四,重复步骤二和三,完成整个拼接安装任务。
所述的芯柱式高耸桅杆施工方法,所述步骤一还包括在构件下方放置可以循环使用的滚杠。
所述的芯柱式高耸桅杆施工方法,所述步骤二还包括,所述第四第五起重机与第二、第三起重机垂直或平行吊挂在钢结构构件或混凝土构件上。
所述的芯柱式高耸桅杆施工方法,它还包括:安装时注意把芯柱穿过的几层水平支撑不要全部安装,先遗留几个待芯柱整体就位调整合格后再安装,以便给安装芯柱提供较为宽裕的空间。最后安装芯柱的最上部斜支撑。
所述的芯柱式高耸桅杆施工方法,它还包括:安装时,芯柱出基座面超过2米,即在2米处设置带有活口的安全拖拉绳,绳子的数量最少三个,在三个各呈120°度方向把芯柱拉住;待整个芯柱安装完成,矫正合格后,松开缆风绳,结束工作。
本发明通过几组链式起重机可以实现对高耸芯柱式桅杆进行平台安装;安全方便,操作简单,不需要特殊专业人员、专业单位和设备,造价低廉;在基座处重复操作,在出基座面时即完成后续油漆补涂等工序,一次成功,施工安装质量良好。
具体实施方式
本发明芯柱式高耸桅杆施工方法,使用的工具和材料主要包括:5~6个3~5吨的链式起重机;若干段钢丝绳;若干段钢管(或原木)滚杠;若干组用直径18的一级钢煨成的吊钩。安装用的电焊机、砂轮打磨机。
安装时:
通过用钢丝绳绑扎于钢构件(环梁、柱等)或混凝土构件上的第一链式起重机把分成4.5~6米长的芯柱(圆钢或方钢)用钢丝绳绑扎(或直接焊接的直径18的一级钢煨成的吊钩),从建筑物的边缘部位水平运输过来。为了减少摩擦,保护好底漆,可以在构件下方放置可以循环使用的钢管(或原木)滚杠;
第一段芯柱运至基座(钢结构或混凝土)处后,用第二、第三链式起重机分别吊住芯柱两侧的吊钩,慢慢竖起,往上提升,至离开基座面4.5~6米停止操作;
把第二段芯柱也用第一链式起重机运至基座处,用第四、第五链式起重机(该组起重机可以与上一组垂直或平行吊挂在钢结构构件或混凝土构件上)分别吊住芯柱两侧的吊钩,慢慢竖起。与第一段芯柱对接,可采用对接锚板等临时措施,矫正接口质量符合规范要求。之后焊接,检测合格后,第四、第五链式起重机继续往上提升。此时换下第二、第三链式起重机,并把它们使用的吊钩割下,连接处打磨,补油漆。在第四、第五链式起重机往上提升过程中即把第一段的油漆面漆涂刷完成,并把后续的装饰装修工作也一起完成,达到设计和规范要求。
参照上述步骤一段段完成整个拼接安装任务。
在安装时注意把芯柱穿过的几层水平支撑不要全部安装,先遗留几个待芯柱整体就位调整合格后再安装,以便给安装芯柱提供较为宽裕的空间。最后安装芯柱的最上部斜支撑(若有)。
在安装时,芯柱出基座(钢结构或混凝土结构)面超过2米,即在2米处设置带有活口的安全拖拉绳,绳子的数量最少三个,在三个各呈120°度方向把芯柱拉住。待整个芯柱安装完成,矫正合格后,松开缆风绳,结束工作。
Claims (5)
1.芯柱式高耸桅杆施工方法,其特征在于,它包括:
步骤一,通过用绑扎于钢构件或混凝土构件上的第一链式起重机把分成4.5~6米长的芯柱从建筑物的边缘部位水平运输过来;芯柱两侧用钢丝绳绑扎构成吊钩;
步骤二,第一段芯柱运至基处后,用第二、第三链式起重机分别吊住芯柱两侧的吊钩,慢慢竖起,往上提升,至离开基座面4.5~6米停止操作;
步骤三,把第二段芯柱也用第一起重机运至基座处,用第四第五链式起重机分别吊住芯柱两侧的吊钩,慢慢竖起;与第一段芯柱对接,可采用对接锚板等临时措施,矫正接口质量符合规范要求;
之后焊接,检测合格后,第四、第五链式起重机继续往上提升;此时换下第二、第三链式起重机,并把它们使用的吊钩割下,连接处打磨,补油漆;在第四、第五链式起重机往上提升过程中即把第一段的油漆面漆涂刷完成,并把后续的装饰装修工作也一起完成,达到设计和规范要求;
步骤四,重复步骤二和三,完成整个拼接安装任务。
2.根据权利要求1所述的芯柱式高耸桅杆施工方法,其特征在于,所述步骤一还包括在构件下方放置可以循环使用的滚杠。
3.根据权利要求1所述的芯柱式高耸桅杆施工方法,其特征在于,所述步骤二还包括,所述第四第五起重机与第二、第三组起重机垂直或平行吊挂在钢结构构件或混凝土构件上。
4.根据权利要求1所述的芯柱式高耸桅杆施工方法,其特征在于,它还包括:安装时注意把芯柱穿过的几层水平支撑不要全部安装,先遗留几个待芯柱整体就位调整合格后再安装,以便给安装芯柱提供较为宽裕的空间;
最后安装芯柱的最上部斜支撑。
5.根据权利要求1所述的芯柱式高耸桅杆施工方法,其特征在于,它还包括:安装时,芯柱出基座面超过2米,即在2米处设置带有活口的安全拖拉绳,绳子的数量最少三个,在三个各呈120°度方向把芯柱拉住;待整个芯柱安装完成,矫正合格后,松开缆风绳,结束工作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610467483.5A CN107542273B (zh) | 2016-06-24 | 2016-06-24 | 芯柱式高耸桅杆施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610467483.5A CN107542273B (zh) | 2016-06-24 | 2016-06-24 | 芯柱式高耸桅杆施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107542273A true CN107542273A (zh) | 2018-01-05 |
CN107542273B CN107542273B (zh) | 2020-05-26 |
Family
ID=60960936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610467483.5A Active CN107542273B (zh) | 2016-06-24 | 2016-06-24 | 芯柱式高耸桅杆施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107542273B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109132862A (zh) * | 2018-10-25 | 2019-01-04 | 上海宝冶集团有限公司 | 一种用于正倒混合吊装移动分段钢桅杆的小车装置及方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1119508A (en) * | 1966-07-01 | 1968-07-10 | Potain & Cie Ets F | Improvements to devices for telescoping masts or towers, mainly for use in cranes |
JP2659170B2 (ja) * | 1994-05-02 | 1997-09-30 | 関西電力株式会社 | ポール柱地上組立装置 |
CN101435270A (zh) * | 2007-11-13 | 2009-05-20 | 上海宝冶建设有限公司 | 高层柱子分段对接作业方法 |
CN101649684A (zh) * | 2009-09-14 | 2010-02-17 | 常州第一建筑工程有限公司 | 屋顶桅杆的安装方法 |
CN102535939A (zh) * | 2012-01-19 | 2012-07-04 | 湖北省输变电工程公司 | 拉v塔倒装组立工艺 |
-
2016
- 2016-06-24 CN CN201610467483.5A patent/CN107542273B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1119508A (en) * | 1966-07-01 | 1968-07-10 | Potain & Cie Ets F | Improvements to devices for telescoping masts or towers, mainly for use in cranes |
JP2659170B2 (ja) * | 1994-05-02 | 1997-09-30 | 関西電力株式会社 | ポール柱地上組立装置 |
CN101435270A (zh) * | 2007-11-13 | 2009-05-20 | 上海宝冶建设有限公司 | 高层柱子分段对接作业方法 |
CN101649684A (zh) * | 2009-09-14 | 2010-02-17 | 常州第一建筑工程有限公司 | 屋顶桅杆的安装方法 |
CN102535939A (zh) * | 2012-01-19 | 2012-07-04 | 湖北省输变电工程公司 | 拉v塔倒装组立工艺 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109132862A (zh) * | 2018-10-25 | 2019-01-04 | 上海宝冶集团有限公司 | 一种用于正倒混合吊装移动分段钢桅杆的小车装置及方法 |
CN109132862B (zh) * | 2018-10-25 | 2020-07-07 | 上海宝冶集团有限公司 | 一种用于正倒混合吊装移动分段钢桅杆的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107542273B (zh) | 2020-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760197A (zh) | 一种钢柱结构及其控制安装允许误差的方法 | |
CN105397351B (zh) | 一种分段预制后的塔体现场立式安装方法 | |
CN205772984U (zh) | 一种单片钢桁架的吊装装置 | |
CN104675171B (zh) | 大型立式储罐铝合金拱顶整体吊装施工方法 | |
CN103174302A (zh) | 大直径筒仓仓顶的施工方法 | |
CN106703416A (zh) | 狭小空间中钢结构屋架拔杆吊装方法 | |
CN204644884U (zh) | 高桥墩翻模施工钢筋安装移动套架 | |
CN107130770A (zh) | 一种超高层建筑空调水竖井大管径立管倒装施工方法 | |
CN106006425B (zh) | 一种超高层建筑地下机房大型设备吊装运输方法 | |
CN203654702U (zh) | 一种钢筋混凝土烟囱施工操作平台 | |
CN112340590A (zh) | 钢管柱转体起吊的装置和钢管柱转体起吊的方法 | |
CN105274976B (zh) | 水中钢平台预制安装施工方法 | |
CN107542273A (zh) | 芯柱式高耸桅杆施工方法 | |
CN101818563B (zh) | 自升式整体提升移动平台及使用方法 | |
CN104627849B (zh) | 一种用于内天井管道吊装的吊装设备及吊装方法 | |
CN104234636A (zh) | 自升式平台井架安装方法 | |
US9528282B2 (en) | Freestanding elevator platform system | |
CN102116089A (zh) | 大跨度型钢梁拔杆整体提升施工方法 | |
CN108396970A (zh) | 一种平面网架的整体安装方法 | |
JP6554610B2 (ja) | Dc変換器バルブのための組立て方法 | |
CN204080636U (zh) | 钢管拱桥拱肋安装平转支撑定位平台 | |
CN210561720U (zh) | 一种墩柱养护修补操作平台 | |
CN209536831U (zh) | 一种吊装系统 | |
CN206616460U (zh) | 一种附着式桥梁检修吊篮装置 | |
CN105152034B (zh) | 用于斜屋顶幕墙的索道吊装系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |