CN102116089A - 大跨度型钢梁拔杆整体提升施工方法 - Google Patents

大跨度型钢梁拔杆整体提升施工方法 Download PDF

Info

Publication number
CN102116089A
CN102116089A CN2010106248657A CN201010624865A CN102116089A CN 102116089 A CN102116089 A CN 102116089A CN 2010106248657 A CN2010106248657 A CN 2010106248657A CN 201010624865 A CN201010624865 A CN 201010624865A CN 102116089 A CN102116089 A CN 102116089A
Authority
CN
China
Prior art keywords
steel beam
construction method
dead man
adopts
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010106248657A
Other languages
English (en)
Other versions
CN102116089B (zh
Inventor
李田俊
王贤茂
陶官思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
001 Engineering Co ltdqingdao Construction Group
Qingjian Group Co Ltd
Original Assignee
001 Engineering Co ltdqingdao Construction Group
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 001 Engineering Co ltdqingdao Construction Group, Qingjian Group Co Ltd filed Critical 001 Engineering Co ltdqingdao Construction Group
Priority to CN201010624865.7A priority Critical patent/CN102116089B/zh
Publication of CN102116089A publication Critical patent/CN102116089A/zh
Application granted granted Critical
Publication of CN102116089B publication Critical patent/CN102116089B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种大跨度型钢梁拔杆整体提升施工方法,针对跨度大、造型复杂的特点采用了大跨度型钢梁在现场拼装焊接、现场制作简易的拔杆进行整体提升的施工方法,解决了传统施工方法要求场地宽阔,采用大型机械设备吊装、造价高的缺点;为场地狭窄、周边环境复杂的工程提供了一种新型施工方法。采用本方法进行大跨度钢结构型钢梁施工时,型钢梁在工厂中按要求分段加工,全部为现场拼装焊接,避免了高空作业,焊接质量易保证,避免了采用多台大型机械设备吊装的场地要求,降低了工程成本,缩短了工期。

Description

大跨度型钢梁拔杆整体提升施工方法
技术领域
本发明涉及一种大跨度型钢梁拔杆整体提升施工方法,属于建筑领域。
背景技术
对于大跨度型钢梁钢结构,传统的施工方法为:采用多台大型机械设备协同吊装的施工方法,这种施工方法需要场地宽阔,多台大型机械设备同时协作,造价较高。
发明内容
针对现有技术存在的不足,本发明所要解决的技术问题是,提供一种大跨度型钢梁拔杆整体提升施工方法,避免了高空作业,焊接质量易保证,避免了采用多台大型机械设备吊装的场地要求,降低了工程成本,缩短了工期。
为解决上述技术问题,本发明采取的技术方案是,一种大跨度型钢梁拔杆整体提升施工方法,包括下列步骤:
(1)制作简易拔杆装置,先选择一钢板底座,在钢板底座上纵向焊接一立杆,在钢板底座与立杆的连接部位焊接肋板,在立杆顶端焊接一横梁,在横梁两端均焊接一个吊耳,在立杆与横梁之间焊接两个斜撑;
(2)在型钢梁两侧的混凝土梁或柱上设置地脚螺栓,将制作的简易拔杆安装在地脚螺栓上;
(3)将各段型钢梁按照编号吊装到安装位置下方的楼板上,在楼板上进行型钢梁焊接拼装,固定于倒链下端的挂钩上;
(4)用倒链钩住吊耳,安排两端的工人同步拉动倒链,使型钢梁稳步水平提升;
(5)提升到设计标高后与混凝土梁或柱中的埋件采用板件连接,节点焊接完成经仔细检查后,慢慢松开拔杆上的钢丝绳进行试卸载;观察连接点的受力情况,确认无异常后,将拔杆全部卸载;然后用塔吊将拔杆吊到下一榀梁的位置,重复以上的步骤,直至型钢梁全部安装完成。
优化的,上述大跨度型钢梁拔杆整体提升施工方法,其步骤(1)中,其横梁采用32a工字钢;吊耳采用200×150×30的钢板制作,在中心开孔;立杆采用圆钢管168×8;斜撑采用圆钢管76×4;底座采用400×400×30的钢板;加劲肋板采用116×120×14的钢板。
优化的,上述大跨度型钢梁拔杆整体提升施工方法,其步骤(4)中,倒链采用10t的手拉葫芦进行提升。
本发明针对跨度大、造型复杂的特点采用了大跨度型钢梁在现场拼装焊接、现场制作简易的拔杆进行整体提升的施工方法,解决了传统施工方法要求场地宽阔,采用大型机械设备吊装、造价高的缺点;为场地狭窄、周边环境复杂的工程提供了一种新型施工方法。采用本方法进行大跨度钢结构型钢梁施工时,型钢梁在工厂中按要求分段加工,全部为现场拼装焊接,避免了高空作业,焊接质量易保证,避免了采用多台大型机械设备吊装的场地要求,降低了工程成本,缩短了工期。
附图说明
下面结合附图及其实施例对本发明进一步详细说明。
图1是本发明的简易拔杆的结构示意图。
具体实施方式
如图1所示,本发明为一种大跨度型钢梁拔杆整体提升施工方法,包括下列步骤:
(1)制作简易拔杆装置,先选择一钢板底座1,在钢板底座1上纵向焊接一立杆2,在钢板底座1与立杆2的连接部位焊接肋板3,在立杆2顶端焊接一横梁4,在横梁4两端均焊接一个吊耳5,在立杆2与横梁4之间焊接两个斜撑6;横梁4采用32a工字钢;吊耳5采用200×150×30的钢板制作,在中心开孔;立杆采用圆钢管168×8;斜撑6采用圆钢管76×4;底座1采用400×400×30的钢板;加劲肋板采用116×120×14的钢板。(2)在型钢梁两侧的混凝土梁或柱上设置地脚螺栓,将制作的简易拔杆安装在地脚螺栓上;(3)将各段型钢梁按照编号吊装到安装位置下方的楼板上,在楼板上进行型钢梁焊接拼装,固定于倒链下端的挂钩上;(4)用倒链钩住吊耳,安排两端的工人同步拉动倒链,使型钢梁稳步水平提升;倒链采用10t的手拉葫芦进行提升。(5)提升到设计标高后与混凝土梁或柱中的埋件采用板件连接,节点焊接完成经仔细检查后,慢慢松开拔杆上的钢丝绳进行试卸载;观察连接点的受力情况,确认无异常后,将拔杆全部卸载;然后用塔吊将拔杆吊到下一榀梁的位置,重复以上的步骤,直至型钢梁全部安装完成。提升到一米位置后停止吊装,观察钢梁和拔杆的受力情况,确认吊点、钢丝绳安全的情况后才能继续起吊,吊装前需调整钢梁两端的标高,待钢梁两端标高一致后,通知两端工人用倒链同步提升;钢梁在提升过程中,要时刻观察两端的提升高度,随时调整。钢梁提升到图纸设计位置附近后,用水准仪测量钢梁的标高,调整钢梁的标高满足设计要求后,按照设计节点将钢梁同预埋在梁或柱上的埋件连接。两侧的钢梁连接点经过仔细核查无误后,通知两侧的工人慢慢松开拔杆上的钢丝绳进行试卸载;观察连接点的受力情况,确认无异常后,将拔杆全部御载,完成型钢梁的提升工作。然后用塔吊将拔杆机具吊到下一榀梁的位置,重复以上的步骤,直至钢梁安装全部完成。制作简易拔杆之前根据大跨度型钢梁的重量确定简易拔杆的材料规格;计算出拔杆上手拉葫芦的受力大小,确定手拉葫芦的型号;对混凝土结构、拔杆本身、钢丝绳进行受力分析,确保达到安全系数。根据钢结构设计规范和钢梁的受力特点确定型钢梁的加工段。
当然,上述说明并非是对本发明的限制,本发明也并不限于上述举例,本技术领域的普通技术人员,在本发明的实质范围内,作出的变化、改型、添加或替换,都应属于本发明的保护范围。

Claims (3)

1.一种大跨度型钢梁拔杆整体提升施工方法,包括下列步骤:
(1)制作简易拔杆装置,先选择一钢板底座,在钢板底座上纵向焊接一立杆,在钢板底座与立杆的连接部位焊接肋板,在立杆顶端焊接一横梁,在横梁两端均焊接一个吊耳,在立杆与横梁之间焊接两个斜撑;
(2)在型钢梁两侧的混凝土梁或柱上设置地脚螺栓,将制作的简易拔杆安装在地脚螺栓上;
(3)将各段型钢梁按照编号吊装到安装位置下方的楼板上,在楼板上进行型钢梁焊接拼装,固定于倒链下端的挂钩上;
(4)用倒链钩住吊耳,安排两端的工人同步拉动倒链,使型钢梁稳步水平提升;
(5)提升到设计标高后与混凝土梁或柱中的埋件采用板件连接,节点焊接完成经仔细检查后,慢慢松开拔杆上的钢丝绳进行试卸载;观察连接点的受力情况,确认无异常后,将拔杆全部卸载;然后用塔吊将拔杆吊到下一榀梁的位置,重复以上的步骤,直至型钢梁全部安装完成。
2.根据权利要求1所述的大跨度型钢梁拔杆整体提升施工方法,其特征在于:所述步骤(1)中,其横梁采用32a工字钢;吊耳采用200×150×30的钢板制作,在中心开孔;立杆采用圆钢管168×8;斜撑采用圆钢管76×4;底座采用400×400×30的钢板;加劲肋板采用116×120×14的钢板。
3.根据权利要求1所述的大跨度型钢梁拔杆整体提升施工方法,其特征在于:所述步骤(4)中,倒链采用10t的手拉葫芦进行提升。
CN201010624865.7A 2010-12-31 2010-12-31 大跨度型钢梁拔杆整体提升施工方法 Expired - Fee Related CN102116089B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010624865.7A CN102116089B (zh) 2010-12-31 2010-12-31 大跨度型钢梁拔杆整体提升施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010624865.7A CN102116089B (zh) 2010-12-31 2010-12-31 大跨度型钢梁拔杆整体提升施工方法

Publications (2)

Publication Number Publication Date
CN102116089A true CN102116089A (zh) 2011-07-06
CN102116089B CN102116089B (zh) 2015-11-25

Family

ID=44215001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010624865.7A Expired - Fee Related CN102116089B (zh) 2010-12-31 2010-12-31 大跨度型钢梁拔杆整体提升施工方法

Country Status (1)

Country Link
CN (1) CN102116089B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225408A (zh) * 2013-04-18 2013-07-31 成军 大跨度网架多桅杆独立式整体吊装施工方法
CN103302745A (zh) * 2012-03-12 2013-09-18 艾乐迈铁科公司 安装提升环的方法和设备以及提升环成型零件
CN107558744A (zh) * 2016-06-30 2018-01-09 中国二十冶集团有限公司 大面积钢网架单管拔杆群联动控制同步提升施工方法
CN108425503A (zh) * 2018-05-17 2018-08-21 中国建筑第二工程局有限公司 一种大跨度钢梁安装滑移与提升结合装置及其施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04265349A (ja) * 1991-02-19 1992-09-21 Hazama Gumi Ltd プレキャスト梁の施工方法
JPH0790929A (ja) * 1993-09-21 1995-04-04 Shimizu Corp Src梁の構築方法
CN1793590A (zh) * 2005-12-28 2006-06-28 上海市第一建筑有限公司 一种自升式可变形可拆卸整体提升钢平台系统及施工方法
CN101255768A (zh) * 2008-03-21 2008-09-03 宁波建工集团有限公司 一种大跨度钢桁架高空安装方法
CN101446135A (zh) * 2008-12-25 2009-06-03 上海市第一建筑有限公司 超高空超长巨型梁桁架法整体提升系统及施工方法
CN101519913A (zh) * 2008-12-29 2009-09-02 青建集团股份公司 大跨度复杂造型钢结构屋盖整体提升施工方法
CN201439644U (zh) * 2008-12-29 2010-04-21 青岛建设集团零零一工程有限公司 钢网架提升拔杆
CN101762430A (zh) * 2008-11-17 2010-06-30 无锡速捷脚手架工程有限公司 一种脚手架立杆扣盘内侧焊缝抗剪承载力试验方法
CN101864842A (zh) * 2010-06-28 2010-10-20 中广核工程有限公司 一种核电厂工程的施工方法
CN101891120A (zh) * 2010-06-22 2010-11-24 江苏省电力公司徐州供电公司 旋转式起吊提升装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04265349A (ja) * 1991-02-19 1992-09-21 Hazama Gumi Ltd プレキャスト梁の施工方法
JPH0790929A (ja) * 1993-09-21 1995-04-04 Shimizu Corp Src梁の構築方法
CN1793590A (zh) * 2005-12-28 2006-06-28 上海市第一建筑有限公司 一种自升式可变形可拆卸整体提升钢平台系统及施工方法
CN101255768A (zh) * 2008-03-21 2008-09-03 宁波建工集团有限公司 一种大跨度钢桁架高空安装方法
CN101762430A (zh) * 2008-11-17 2010-06-30 无锡速捷脚手架工程有限公司 一种脚手架立杆扣盘内侧焊缝抗剪承载力试验方法
CN101446135A (zh) * 2008-12-25 2009-06-03 上海市第一建筑有限公司 超高空超长巨型梁桁架法整体提升系统及施工方法
CN101519913A (zh) * 2008-12-29 2009-09-02 青建集团股份公司 大跨度复杂造型钢结构屋盖整体提升施工方法
CN201439644U (zh) * 2008-12-29 2010-04-21 青岛建设集团零零一工程有限公司 钢网架提升拔杆
CN101891120A (zh) * 2010-06-22 2010-11-24 江苏省电力公司徐州供电公司 旋转式起吊提升装置
CN101864842A (zh) * 2010-06-28 2010-10-20 中广核工程有限公司 一种核电厂工程的施工方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103302745A (zh) * 2012-03-12 2013-09-18 艾乐迈铁科公司 安装提升环的方法和设备以及提升环成型零件
CN103302745B (zh) * 2012-03-12 2016-03-02 艾乐迈铁科集团 安装提升环的方法和设备以及提升环成型零件
CN103225408A (zh) * 2013-04-18 2013-07-31 成军 大跨度网架多桅杆独立式整体吊装施工方法
CN103225408B (zh) * 2013-04-18 2015-05-20 南通大学 大跨度网架多桅杆独立式整体吊装施工方法
CN107558744A (zh) * 2016-06-30 2018-01-09 中国二十冶集团有限公司 大面积钢网架单管拔杆群联动控制同步提升施工方法
CN108425503A (zh) * 2018-05-17 2018-08-21 中国建筑第二工程局有限公司 一种大跨度钢梁安装滑移与提升结合装置及其施工方法

Also Published As

Publication number Publication date
CN102116089B (zh) 2015-11-25

Similar Documents

Publication Publication Date Title
CN106836498B (zh) 一种超大跨度体育场看台屋盖钢桁架吊装施工工法
CN103291076B (zh) 弧形框架内多层次钢桁架分片逆向吊装施工方法
CN103711323B (zh) 利用移动式管桁架平台安装屋面反吊顶板施工方法
CN203947771U (zh) 一种贝雷梁悬吊模板支撑体系
CN107191676A (zh) 埋地管道施工方法
CN110528863B (zh) 一种用于外斜面施工的吊篮装置及施工方法
CN103195256A (zh) 吊柱式钢结构胎架法施工工法
CN105569242A (zh) 一种叠合楼板的装配方法
CN102877637A (zh) 一种解决悬挑梁底部墙面施工操作平台的方法
CN203654702U (zh) 一种钢筋混凝土烟囱施工操作平台
CN102116089A (zh) 大跨度型钢梁拔杆整体提升施工方法
CN105019664A (zh) 箱房式电气室的高空滑移安装法
CN104989111A (zh) 钢结构高层吊装施工方法
CN104153586A (zh) 一种用悬索吊来安装檩条的施工方法
CN111792540A (zh) 全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法
CN108894509B (zh) 钢结构装配式住宅预制夹心保温外墙板无外架施工方法
CN101831916B (zh) 一种大型套筒螺栓框架组合式安装的方法
CN110130653A (zh) 一种局限区域内框架钢梁利用卷扬吊装的施工方法
CN213976724U (zh) 一种幕墙单元体轨道吊装结构
CN103982046A (zh) 一种屈曲约束支撑的吊装和安装方法
JP6534938B2 (ja) ライニングプレート据付兼雨養生治具及びこの治具を用いたライニングプレート据付方法
CN111620223B (zh) 一种支座二次受力转换提升网架施工方法
CN111847272A (zh) 既有建筑物的改造用塔吊的支撑方法
CN206903178U (zh) 提升式电梯井钢平台
CN113668401A (zh) 一种基于大跨径桥梁墩台上安装运输平台的吊装工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 266001 Shandong County Road Shinan District de Qingdao City, No. 1

Applicant after: Qingdao Bohai Construction Group Co., Ltd.

Applicant after: Qingjian Group Co., Ltd.

Address before: 266001 Shandong County Road Shinan District de Qingdao City, No. 1

Applicant before: 001 Engineering Co.,Ltd.Qingdao Construction Group

Applicant before: Qingjian Group Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: 001 ENGINEERING CO., LTD. QINGDAO CONSTRUCTION GROUP TO: QINGDAO BOHAI CONSTRUCTION GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20181231

CF01 Termination of patent right due to non-payment of annual fee