CN107419052A - 120t转炉更换炉衬耐火材料后的烘炉方法 - Google Patents
120t转炉更换炉衬耐火材料后的烘炉方法 Download PDFInfo
- Publication number
- CN107419052A CN107419052A CN201710576527.2A CN201710576527A CN107419052A CN 107419052 A CN107419052 A CN 107419052A CN 201710576527 A CN201710576527 A CN 201710576527A CN 107419052 A CN107419052 A CN 107419052A
- Authority
- CN
- China
- Prior art keywords
- furnace
- coke
- oxygen
- baker
- furnace lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
- C21C5/42—Constructional features of converters
- C21C5/44—Refractory linings
- C21C5/441—Equipment used for making or repairing linings
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Coke Industry (AREA)
Abstract
本发明公开了一种120t转炉更换炉衬耐火材料后的烘炉方法,包括如下步骤:(1)烘炉前向炉内加入8吨焦炭,1吨废旧木材,将木材引燃;(2)下枪吹氧待木材着火后,从炉顶料仓分批向炉内加焦炭,(3)氧流量的控制,下枪前将流量设定在5000m³/h,根据燃烧情况将流量调整到8000m³/h,(4)氧枪枪位控制,开吹前氧枪距炉内焦炭顶面的高度为2.5m,20分钟之后,提高氧枪枪位,保持炉衬温度均匀升高;(5)底吹控制:打开底吹装置吹氮气,(6)烘炉结束:烘炉后期炉衬温度达到780℃‑820℃,烘炉结束,提枪后立即兑铁水吹炼。本发明实现烘炉匀速升温,使炉衬耐火材料中的自然水和结晶水完全脱除,烘炉后炉衬转结合紧密,炉膛温度达到设计要求,缩短烘炉时间,延长炉衬的使用寿命。
Description
技术领域
本发明属于炼钢企业120吨转炉更换炉衬耐火材料后的烘炉方法,特别是一种120t转炉更换炉衬耐火材料后的烘炉方法。
背景技术
转炉烘炉的目的是为了脱除炉衬耐火材料中的自然水和结晶水,以免在冶炼钢水时由于炉温上升太快,水份大量膨胀造成炉体胀裂、鼓泡或变形甚至炉墙倒塌,影响转炉炉衬的强度和使用寿命。
120t转炉开新炉烘炉时间4小时,不但烘炉时间长而且炉温升温不均匀,造成烘炉效果效果差,炉衬寿命缩短。
发明内容
本发明的目的在于提供一种120t转炉更换炉衬耐火材料后的烘炉方法,可以实现烘炉匀速升温,使炉衬耐火材料中的自然水和结晶水完全脱除,烘炉后炉衬转结合紧密,炉膛温度达到设计要求,可以缩短烘炉时间,延长炉衬的使用寿命。
本发明的目的是这样实现的:一种120t转炉更换炉衬耐火材料后的烘炉方法,包括如下步骤:
(1)烘炉前向炉内加入8吨焦炭,1吨废旧木材,用棉纱浸柴油点燃从炉口投入,将木材引燃;
(2)下枪吹氧待木材着火后,从炉顶料仓分批向炉内加焦炭,第一批焦炭,前120分钟内分3次加入,每次加入一吨焦炭,以后每批间隔20分钟加入0.5吨焦炭,烘炉时间为2.5-3.5小时;
(3)氧流量的控制,下枪前将流量设定在5000m³/h,根据烘烤时间、枪位及焦炭燃烧的情况,流量调整到8000m³/h,焦炭均匀燃烧之后流量保持不变;
(4)氧枪枪位控制,开吹前氧枪距炉内焦炭顶面的高度为2.5m,在氧枪开吹20分钟之后,随着炉内温度和炉衬温度的升高,及时加入焦炭,同时提高氧枪枪位以减缓炉内温度的升高趋势,保持炉衬温度均匀升高;
(5)底吹控制:打开底吹装置吹氮气,每块透气砖供气量为38-42m³/h;
(6)烘炉结束:烘炉后期炉衬温度达到780°C -820°C,烘炉结束,提枪后立即兑铁水吹炼。
烘炉的焦炭分11批加入,其中第一批分3次加入3吨焦炭,以后的批次每批分别加入0.5吨焦炭。
第一批加入焦炭的吹氧时间为120分钟,以后每加一批焦炭的吹氧时间为15分钟。
炉衬温度均匀升高的数值为每分钟升高3°C。
烘炉氧枪吹氧的供氧氧气的压力为0.2Mpa,氧气流量为5000-8000 m³/h。
烘炉时有关参数控制见表1:
表1:
转炉烘炉期间,测量风机入口烟气温度,适当提高风机转速,检查风机在高速运转时大于1100转/分钟,液力偶合器的油温是否在控制范围内波动(小于70摄氏度),检查电机电流情况,是否运行在额定电流范围内(149A),控制烟罩的位置,保证将其停放在下限位范围(0~+50mm)。
本发明的实施效果:
1、烘炉后炉衬砖紧密结合,炉膛温度达到预定要求。
2、缩短了烘炉时间,由原先的4小时减少到3小时。
3、炉衬寿命延长,炉衬寿命最高达到11000炉。
本发明实现了烘炉匀速升温,使炉衬耐火材料中的自然水和结晶水完全脱除,烘炉后炉衬转结合紧密,炉膛温度达到设计要求,缩短了烘炉时间,延长了炉衬的使用寿命。
具体实施方式
一种120t转炉更换炉衬耐火材料后的烘炉方法,该方法包括以下操作步骤:
(1)烘炉前向炉内加入8吨大焦,1吨废旧木材,用棉纱浸柴油点燃从炉口投入,将木材引燃。
(2)下枪吹氧待木材着火后,从炉顶料仓分批向炉内加焦碳,第一批焦碳,前120分钟内分3次,每次加1吨,间隔时间为40分钟,共加入3吨焦碳,以后每隔20分钟加入0.5t焦碳,烘炉时间为3小时左右。
(3)氧流量的控制,下枪前将流量设定在5000m3/h,根据烘烤时间、枪位及焦炭燃烧的情况,调整流量到 8000m3/h,焦炭均匀燃烧之后流量基本保持不变。
(4)氧枪枪位控制,开吹前20分钟氧枪距炉内焦炭顶面的距离为2.5m(距炉底3.8m),整个烘炉过程在开吹20分钟之后,随着炉内温度和炉衬温度的升高趋势及时加入焦炭,并且改变氧枪枪位。动枪依据是:当炉内温度升高过快时,每分钟炉内温度升高超过10°C时,加入焦炭,同时提高氧枪以减缓炉内温度的升高趋势,同时增加炉内固定热值使炉衬温度均匀升高;均匀升高的数量为分钟升高3°C,当炉内温度升高速度降低时,降低氧枪枪位以加速炉内焦炭的燃烧速度,迅速提高炉内温度使炉衬温度继续匀速稳定的升高。
(5)底吹控制:底吹开氮气,每块透气砖供气量为40m3/h左右。
(6)烘炉结束:烘炉后期炉衬温度应达到800±10℃左右为最佳。烘炉结束提枪后,前后来回小角度摇炉,小角度为5度以内,从炉口观察,如残焦不多,不倒炉内残渣立即兑铁吹炼。
Claims (5)
1.一种120t转炉更换炉衬耐火材料后的烘炉方法,其特征是包括如下步骤:
(1)烘炉前向炉内加入8吨焦炭,1吨废旧木材,用棉纱浸柴油点燃从炉口投入,将木材引燃;
(2)下枪吹氧待木材着火后,从炉顶料仓分批向炉内加焦炭,第一批焦炭,前120分钟内分3次加入,每次加入一吨焦炭,以后每批间隔20分钟加入0.5吨焦炭,烘炉时间为2.5-3.5小时;
(3)氧流量的控制,下枪前将流量设定在5000m³/h,根据烘烤时间、枪位及焦炭燃烧的情况,流量调整到8000m³/h,焦炭均匀燃烧之后流量保持不变;
(4)氧枪枪位控制,开吹前氧枪距炉内焦炭顶面的高度为2.5m,在氧枪开吹20分钟之后,随着炉内温度和炉衬温度的升高,及时加入焦炭,同时提高氧枪枪位以减缓炉内温度的升高趋势,保持炉衬温度均匀升高;
(5)底吹控制:打开底吹装置吹氮气,每块透气砖供气量为38-42m³/h;
(6)烘炉结束:烘炉后期炉衬温度达到780°C -820°C,烘炉结束,提枪后立即兑铁水吹炼。
2.根据权利要求1所述的120t转炉更换炉衬耐火材料后的烘炉方法,其特征是:烘炉的焦炭分11批加入,其中第一批分3次加入3吨焦炭,以后的批次每批分别加入0.5吨焦炭。
3.根据权利要求1所述的120t转炉更换炉衬耐火材料后的烘炉方法,其特征是:第一批加入焦炭的吹氧时间为120分钟,以后每加一批焦炭的吹氧时间为15分钟。
4.根据权利要求1所述的120t转炉更换炉衬耐火材料后的烘炉方法,其特征是:炉衬温度均匀升高的数值为每分钟升高3°C。
5.根据权利要求1所述的120t转炉更换炉衬耐火材料后的烘炉方法,其特征是:烘炉氧枪吹氧的供氧氧气的压力为0.2Mpa,氧气流量为5000-8000 m³/h。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710576527.2A CN107419052A (zh) | 2017-07-14 | 2017-07-14 | 120t转炉更换炉衬耐火材料后的烘炉方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710576527.2A CN107419052A (zh) | 2017-07-14 | 2017-07-14 | 120t转炉更换炉衬耐火材料后的烘炉方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107419052A true CN107419052A (zh) | 2017-12-01 |
Family
ID=60426495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710576527.2A Pending CN107419052A (zh) | 2017-07-14 | 2017-07-14 | 120t转炉更换炉衬耐火材料后的烘炉方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107419052A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109988590A (zh) * | 2017-12-29 | 2019-07-09 | 新疆八一钢铁股份有限公司 | 一种大型高炉使用低热态强度焦炭的冶炼方法 |
CN111928674A (zh) * | 2020-08-13 | 2020-11-13 | 楚雄滇中有色金属有限责任公司 | 一种精准控制ps转炉烘炉温度的方法 |
CN114152093A (zh) * | 2021-09-23 | 2022-03-08 | 贵州金源锰业股份有限公司 | 一种直流电炉烘炉方法 |
CN114350885A (zh) * | 2022-01-07 | 2022-04-15 | 鞍钢股份有限公司 | 一种顶底复吹转炉开炉方法 |
CN114737016A (zh) * | 2022-04-29 | 2022-07-12 | 马鞍山钢铁股份有限公司 | 一种大型转炉的烘炉方法 |
CN115418433A (zh) * | 2022-09-09 | 2022-12-02 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 一种转炉开新炉高温烘炉方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5935408B2 (ja) * | 1978-12-18 | 1984-08-28 | 川崎製鉄株式会社 | 底吹き転炉の炉内昇熱方法 |
CN102719591A (zh) * | 2011-03-30 | 2012-10-10 | 鞍钢股份有限公司 | 一种转炉多步骤烘炉方法 |
CN103397139A (zh) * | 2013-08-11 | 2013-11-20 | 山西太钢不锈钢股份有限公司 | 一种中频炉炉衬的烘烤方法 |
CN104673955A (zh) * | 2015-03-05 | 2015-06-03 | 山东钢铁股份有限公司 | 一种转炉停炉保温方法 |
CN104928433A (zh) * | 2015-06-01 | 2015-09-23 | 山东钢铁股份有限公司 | 一种顶底复吹转炉的烘炉方法 |
-
2017
- 2017-07-14 CN CN201710576527.2A patent/CN107419052A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5935408B2 (ja) * | 1978-12-18 | 1984-08-28 | 川崎製鉄株式会社 | 底吹き転炉の炉内昇熱方法 |
CN102719591A (zh) * | 2011-03-30 | 2012-10-10 | 鞍钢股份有限公司 | 一种转炉多步骤烘炉方法 |
CN103397139A (zh) * | 2013-08-11 | 2013-11-20 | 山西太钢不锈钢股份有限公司 | 一种中频炉炉衬的烘烤方法 |
CN104673955A (zh) * | 2015-03-05 | 2015-06-03 | 山东钢铁股份有限公司 | 一种转炉停炉保温方法 |
CN104928433A (zh) * | 2015-06-01 | 2015-09-23 | 山东钢铁股份有限公司 | 一种顶底复吹转炉的烘炉方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109988590A (zh) * | 2017-12-29 | 2019-07-09 | 新疆八一钢铁股份有限公司 | 一种大型高炉使用低热态强度焦炭的冶炼方法 |
CN111928674A (zh) * | 2020-08-13 | 2020-11-13 | 楚雄滇中有色金属有限责任公司 | 一种精准控制ps转炉烘炉温度的方法 |
CN114152093A (zh) * | 2021-09-23 | 2022-03-08 | 贵州金源锰业股份有限公司 | 一种直流电炉烘炉方法 |
CN114152093B (zh) * | 2021-09-23 | 2024-04-12 | 贵州金源锰业股份有限公司 | 一种直流电炉烘炉方法 |
CN114350885A (zh) * | 2022-01-07 | 2022-04-15 | 鞍钢股份有限公司 | 一种顶底复吹转炉开炉方法 |
CN114737016A (zh) * | 2022-04-29 | 2022-07-12 | 马鞍山钢铁股份有限公司 | 一种大型转炉的烘炉方法 |
CN114737016B (zh) * | 2022-04-29 | 2023-10-27 | 马鞍山钢铁股份有限公司 | 一种大型转炉的烘炉方法 |
CN115418433A (zh) * | 2022-09-09 | 2022-12-02 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 一种转炉开新炉高温烘炉方法 |
CN115418433B (zh) * | 2022-09-09 | 2023-09-26 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 一种转炉开新炉高温烘炉方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107419052A (zh) | 120t转炉更换炉衬耐火材料后的烘炉方法 | |
CN104928433B (zh) | 一种顶底复吹转炉的烘炉方法 | |
CN101619375B (zh) | 顶底复吹转炉防止电除尘泄爆的方法 | |
CN102745651A (zh) | 一种节能、环保的沸腾炉升温方法 | |
CN106967448A (zh) | 一种干熄焦系统耐材大面积更换后的烘炉方法 | |
CN111020086A (zh) | 一种高炉开炉快速引煤气的方法 | |
CN101353579B (zh) | 一种7.63米焦炉负压炉内烘炉方法 | |
CN104611487A (zh) | 一种高炉烘炉控制炉顶温度的方法 | |
JPS5822527B2 (ja) | ペレツトを焼成する方法および装置 | |
CN108411064A (zh) | 电炉废钢预热的方法 | |
CN102559994A (zh) | 电炉铁水烘炉方法 | |
CN107326201A (zh) | 一种预合金粉熔炼中频炉新炉的烘炉方法 | |
CN1361290A (zh) | 一种高炉开炉方法 | |
CN106048115A (zh) | 一种高炉休风后炉顶点火的方法 | |
CN115418433B (zh) | 一种转炉开新炉高温烘炉方法 | |
CN111440913A (zh) | 一种熔融还原炉灌铁水启动的方法 | |
CN1301871A (zh) | 高炉预热炉缸开炉法 | |
CN110499402A (zh) | 一种冶金设备使用改进方案 | |
CN116987837A (zh) | 转炉的烘炉工艺 | |
CN219772158U (zh) | 一种使用纯高炉煤气烘热风炉系统 | |
SU933705A1 (ru) | Способ задувки доменной печи | |
CN116929082A (zh) | 一种利用富氧侧吹熔炼炉及电热前床烘炉方法 | |
KR100435563B1 (ko) | 전기로에서 탈탄속도 향상을 통한 용강제조방법 | |
CN106643137A (zh) | 一种新的节能环保型台车炉 | |
SU431219A1 (ru) | Способ сушки воздухонагревателей доменных печей |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171201 |
|
WD01 | Invention patent application deemed withdrawn after publication |