CN107220464A - 一种基于bim的桥梁施工过程仿真及风险控制方法 - Google Patents
一种基于bim的桥梁施工过程仿真及风险控制方法 Download PDFInfo
- Publication number
- CN107220464A CN107220464A CN201710535175.6A CN201710535175A CN107220464A CN 107220464 A CN107220464 A CN 107220464A CN 201710535175 A CN201710535175 A CN 201710535175A CN 107220464 A CN107220464 A CN 107220464A
- Authority
- CN
- China
- Prior art keywords
- bim
- construction
- work progress
- bridge
- models
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种基于BIM的桥梁施工过程仿真及风险控制方法,包括如下步骤:一、建立桥梁的BIM模型并通过3D打印机将施工过程中所需构件模型打印出来;二、利用BIM模型及3D打印模型模拟桥梁施工的各工序及过程,对施工过程中各种可能影响桥梁结构安全的风险进行分析识别;三、对BIM模型通过有限元分析计算出各种风险下桥梁结构的变化情况,确定施工过程监测部位及监测控制数据;四、利用BIM模型及3D打印模型进行施工过程演示及人员培训,同时作为施工样板引路;五、在现场施工过程中对施工过程进行监测及风险控制。本发明在桥梁施工过程中可进行有效监测并对可能出现的各类风险进行防范控制,方法简洁,效果好,实用性强。
Description
技术领域
本发明属于建筑领域,具体涉及一种基于BIM的桥梁施工过程仿真及风险控制方法。
背景技术
目前我国桥梁发展迅速,已建设了多座不同结构形式、大跨径、高墩柱的桥梁,取得了令世界瞩目的成就。如何准确地分析及识别桥梁施工过程中的风险,并制定相应的控制及监测措施,在保证安全的情况下确保桥梁施工质量、进度是桥梁施工单位面临研究难题。
建筑信息模型(BIM模型)是以建筑工程项目的各项相关信息数据作为基础,建立起三维的建筑模型,通过数字信息仿真模拟建筑物所具有的真实信息。BIM模型具有可视化,比较直观的优点,目前BIM的应用也越来越多,但是仍然具有实现不了像实体模型可以直接触摸操作的缺点,因而难以实现在施工过程中进行有效的监测并对可能出现的各类风险进行防范及控制;目前建筑工程的样板引路基本上是直接建造部分样板实体进行展示,虽然直观,但是实体模型具有重量大,体量大,占用空间多,建造及拆装麻烦,重复利用率底,成本较高。
发明内容
本发明要解决的技术问题是:提供一种基于BIM的桥梁施工过程仿真及风险控制方法,本方法利用建立的BIM模型结合有限元分析,按照BIM模型分析及识别出的各种施工风险进行模拟计算,达到指导施工及施工监测的目的。
本发明解决技术问题的技术方案如下:
本发明一种基于BIM的桥梁施工过程仿真及风险控制方法,包括如下步骤:
步骤一:根据桥梁设计图纸中桥梁的设计参数利用建筑信息化技术建立桥梁的BIM模型,通过3D打印机将该BIM模型在施工过程中所需的构件模型打印出来;
步骤二:利用建立的BIM模型及3D打印模型模拟桥梁施工的各个工序及过程,对施工过程中的各种可能影响桥梁结构安全的风险进行分析识别;
步骤三:对建立的BIM模型通过有限元分析计算出各种风险下桥梁结构的变化情况,确定施工过程监测部位及监测控制数据,以降低现场施工过程中的各类风险;
步骤四:利用BIM模型及3D打印模型结合桥梁施工过程需监测的部位和监测控制数据进行施工过程的演示及人员培训,同时作为施工样板引路。
步骤五:在现场施工过程中对施工过程进行监测,实现施工过程中的风险控制。
进一步地,所述步骤二中的模拟桥梁施工的各个工序及过程,包括桥梁施工过程中所有的施工工序及过程或者选择所需要进行模拟的施工工序及过程。
进一步地,所述步骤二中各种可能影响桥梁结构安全的风险,包括由施工人员、施工设备、施工材料、施工方法、施工工序、施工时气温、施工过程中的恶劣天气、施工运输道路、社会公用道路中的单一因素或多个因素综合造成的风险。
进一步地,所述步骤二中的风险分析识别是通过BIM模型及3D模型的施工过程模拟,分析出所述风险的影响因素,建立风险清单,并制定相应的解决措施。
进一步地,所述步骤三中对建立的BIM模型通过有限元分析计算,是将BIM模型通过转换成有限元分析软件所需的计算模型或者利用相应的BIM模型软件的有限元计算软件进行所述风险条件下的分析计算。
进一步地,所述步骤三中施工过程监测部位及监测控制数据,是通过有限元分析计算确定的以及设计图纸中要求的施工过程中监测部位及监测控制数据。
进一步地,所述步骤四中利用BIM模型及3D打印模型结合桥梁施工过程需监测的部位和监测控制数据进行施工过程的演示及人员培训,是通过BIM模型的可视化、人机交互的特性进行虚拟的模拟演示及3D打印模型的可实体操作的特性进行现实操作演示,指导施工技术人员进行施工方案设计,对施工人员进行培训及技术交底;所述的施工样板引路,是将施工过程中质量及安全的控制要点,通过对BIM模型转换成多媒体显示、将BIM模型打印成所需的展示图片、将3D打印的构件模型进行样板展示来达到施工样板引路的目的,为所述的施工过程风险控制奠定基础。
本发明所述方法利用桥梁的BIM模型结合有限元分析,按照桥梁BIM模型分析及识别出的各种施工风险进行模拟计算,达到指导施工及施工监测并能对施工的各类风险进行控制的目的;本发明所述方法利用3D打印技术,将BIM模型按照需要缩放打印,具有模型大小可控,且模型材质一般为塑料,比较轻便,可以直接让人上手操作演示,达到与实体同等的效果。
本发明所述的方法不仅限于桥梁施工,对其它方面的建设工程施工均可借鉴,并能达到同样的目的,满足施工过程仿真及风险控制的需要。
附图说明
图1是本发明所述方法的流程图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
实施例1:
如图1所示,一种基于BIM的桥梁施工过程仿真及风险控制方法,包括如下步骤:
步骤一:根据桥梁设计图纸中桥梁的设计参数利用建筑信息化技术建立桥梁的BIM模型,通过3D打印机将该BIM模型在施工过程中所需的构件模型打印出来;打印构件模型时可以使用塑料材质的耗材,并按照需要进行缩放打印,这样打印出来的构件模型轻便,适合进行演示操作,达到与实体同等的效果;
步骤二:利用建立的BIM模型及3D打印模型模拟桥梁施工的各个工序及过程,对施工过程中的各种可能影响桥梁结构安全的风险进行分析识别;利用桥梁的BIM模型以及3D打印模型模拟施工过程时,具有可视性,直观性,实操性,有利于施工风险的分析识别;
步骤三:对建立的BIM模型通过有限元分析计算出各种风险下桥梁结构的变化情况,确定施工过程监测部位及监测控制数据;
步骤四:利用BIM模型及3D打印模型结合桥梁施工过程需监测的部位和监测控制数据进行施工过程的演示及人员培训,同时作为施工样板引路。
步骤五:在现场施工过程中对施工过程进行监测,实现施工过程中的风险防范及控制。
本实施例中所述步骤二中的模拟桥梁施工的各个工序及过程为桥梁施工过程中所有的施工工序及过程或者选择所需要进行模拟的施工工序及过程。也就是说本发明所述方法适合桥梁施工的整个过程,也可以对桥梁施工的某个特定过程应用本发明所述方法;
本实施例中所述步骤二中各种可能影响桥梁结构安全的风险,包括由施工人员、施工设备、施工材料、施工方法、施工工序、施工时气温、施工过程中的恶劣天气、施工运输道路、社会公用道路等因素中的单一因素或多个因素综合造成的各类风险。
本实施例中所述步骤二中的风险分析识别是通过BIM模型及3D模型的施工过程模拟,分析出所述风险的影响因素,建立风险清单,并制定相应的解决措施。
本实施例中所述步骤三中对建立的BIM模型通过有限元分析计算,是将BIM模型通过转换成有限元分析软件所需的计算模型或者利用相应的BIM模型软件的有限元计算软件进行所述风险条件下的分析计算。
本实施例中所述步骤三中施工过程监测部位及监测控制数据,是通过有限元分析计算确定的监测部位及监测控制数据以及设计图纸中要求的施工过程中监测部位及监测控制数据。
本实施例中所述步骤四中利用BIM模型及3D打印模型结合桥梁施工过程需监测的部位和监测控制数据进行施工过程的演示及人员培训,是通过BIM模型的可视化、人机交互的特性进行虚拟的模拟演示及3D打印模型的可实体操作的特性进行现实操作演示,指导施工技术人员进行施工方案设计,对施工人员进行培训及技术交底;所述的施工样板引路,是将施工过程中质量及安全的控制要点,通过对BIM模型转换成多媒体显示、将BIM模型打印成所需的展示图片、将3D打印的构件模型进行样板展示来达到施工样板引路的目的,为所述的施工过程风险控制奠定基础。
下面以本发明应用于山区高墩柱刚构桥梁悬臂浇筑法施工过程为例对本发明作进一步说明。
悬臂浇筑法指的是在桥墩两侧设置工作平台,平衡地逐段向跨中悬臂浇筑水泥混凝土梁体,并逐段施加预应力的施工方法。
悬臂浇筑法主要设备是一对能行走的挂篮,挂篮在已经张拉锚固并与墩身连成整体的梁段上移动,绑扎钢筋、立模、浇筑混凝土、施预应力都在其上进行。完成本段施工后,挂篮对称向前各移动一节段,进行下一对梁段施工,循序前行,直至悬臂梁段浇筑完成。
悬臂浇筑法技术目前已经比较成熟,在国内桥梁中的应用也较多,但是不可否认的是:悬臂浇筑法对施工工艺的掌握熟练程度,梁体两端施工的平衡性,挂篮设备的稳定性,多跨悬臂梁体合拢前梁体的稳定性,分段施工梁体的预拱度控制,预应力张拉控制,气温的影响,风力的影响,施工环境的影响等等,都是施工过程中风险控制的重点及难点,一处控制不好都可能造成非常严重的后果,因此悬臂浇筑法施工中的施工风险的防范、施工监测、作业人员培训等尤其显得重要。
其具体实施步骤是:
(1)建立高墩柱刚构桥梁的BIM模型,包括桥梁的墩柱、0#块、分节浇筑的梁段、钢筋、预应力管道、钢绞线、挂篮、塔吊、运输电梯等,通过测量的地形数据,建立地形数字模型;
(2)按照悬臂法施工顺序,用3D打印机打印出挂篮设备、桥梁的桥墩、梁段、钢筋及预应力管道等各个构件模型;
(3)利用BIM模型、地形数字模型及3D打印模型,进行悬臂法施工过程仿真模拟;
(4)通过施工过程模拟,进行风险分析及识别,如:设计图纸中存在的错误或不合理,分节浇筑的梁段对称施工的失衡,挂篮设备超重、挂篮设备的安装及行走时的不对称、失稳,梁段混凝土浇筑的顺序错误、悬臂梁体合拢前梁体的稳定性,预应力张拉的顺序,梁体合拢时的气温影响,风力的影响,山区复杂地形环境对施工的影响等;
(5)对识别的风险进行分类,对于影响桥梁结构的风险,用有限元分析计算在这些风险下,施工过程中挂篮设备、桥墩、梁块等结构的应力及位移变化情况,为编制桥梁施工方案提供依据并确定施工监测部位及监测的控制数据;
(6)利用BIM模型及3D打印模型指导施工技术方案设计;通过演示及实际操作,对作业人员进行交底及培训;用BIM模型及3D模型作为施工样板达到样板引路的目的。
(7)按照制定的施工技术方案指导施工并对施工过程进行监测,实现施工实施过程中的风险防范及控制。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (7)
1.一种基于BIM的桥梁施工过程仿真及风险控制方法,包括如下步骤:
步骤一:根据桥梁设计图纸中桥梁的设计参数利用建筑信息化技术建立桥梁的BIM模型,通过3D打印机将该BIM模型在施工过程中所需的构件模型打印出来;
步骤二:利用建立的BIM模型及3D打印模型模拟桥梁施工的各个工序及过程,对施工过程中的各种可能影响桥梁结构安全的风险进行分析识别;
步骤三:对建立的BIM模型通过有限元分析计算出各种风险下桥梁结构的变化情况,确定施工过程监测部位及监测控制数据,以降低现场施工过程中的各类风险;
步骤四:利用BIM模型及3D打印模型结合桥梁施工过程需监测的部位和监测控制数据进行施工过程的演示及人员培训,同时作为施工样板引路。
步骤五:在现场施工过程中对施工过程进行监测,实现施工过程中的风险控制。
2.根据权利要求1所述一种基于BIM的桥梁施工过程仿真及风险控制方法,其特征在于:所述步骤二中的模拟桥梁施工的各个工序及过程为桥梁施工过程中所有的施工工序及过程或者选择所需要进行模拟的施工工序及过程。
3.根据权利要求1所述一种基于BIM的桥梁施工过程仿真及风险控制方法,其特征在于:所述步骤二中各种可能影响桥梁结构安全的风险,包括由施工人员、施工设备、施工材料、施工方法、施工工序、施工时气温、施工过程中的恶劣天气、施工运输道路、社会公用道路中的单一因素或多个因素综合造成的各类风险。
4.根据权利要求1所述一种基于BIM的桥梁施工过程仿真及风险控制方法,其特征在于:所述步骤二中的风险分析识别是通过BIM模型及3D模型的施工过程模拟,分析出所述风险的影响因素,建立风险清单,并制定相应的解决措施。
5.根据权利要求1所述一种基于BIM的桥梁施工过程仿真及风险控制方法,其特征在于:所述步骤三中对建立的BIM模型通过有限元分析计算,是将BIM模型通过转换成有限元分析软件所需的计算模型或者利用相应的BIM模型软件的有限元计算软件进行所述风险条件下的分析计算。
6.根据权利要求1所述一种基于BIM的桥梁施工过程仿真及风险控制方法,其特征在于:所述步骤三中施工过程监测部位及监测控制数据,是通过有限元分析计算确定的监测部位及监测控制数据以及设计图纸中要求的施工过程中监测部位及监测控制数据。
7.根据权利要求1所述一种基于BIM的桥梁施工过程仿真及风险控制方法,其特征在于:所述步骤四中利用BIM模型及3D打印模型结合桥梁施工过程需监测的部位和监测控制数据进行施工过程的演示及人员培训,是通过BIM模型的可视化、人机交互的特性进行虚拟的模拟演示及3D打印模型的可实体操作的特性进行现实操作演示,指导施工技术人员进行施工方案设计,对施工人员进行培训及技术交底;所述的施工样板引路,是将施工过程中质量及安全的控制要点,通过对BIM模型转换成多媒体显示、将BIM模型打印成所需的展示图片、将3D打印的构件模型进行样板展示来达到施工样板引路的目的,为所述的施工过程风险控制奠定基础。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710535175.6A CN107220464A (zh) | 2017-06-28 | 2017-06-28 | 一种基于bim的桥梁施工过程仿真及风险控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710535175.6A CN107220464A (zh) | 2017-06-28 | 2017-06-28 | 一种基于bim的桥梁施工过程仿真及风险控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107220464A true CN107220464A (zh) | 2017-09-29 |
Family
ID=59951527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710535175.6A Pending CN107220464A (zh) | 2017-06-28 | 2017-06-28 | 一种基于bim的桥梁施工过程仿真及风险控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107220464A (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107783750A (zh) * | 2017-11-21 | 2018-03-09 | 北京恒华伟业科技股份有限公司 | 一种桥梁信息显示方法、装置及系统 |
CN107818227A (zh) * | 2017-11-17 | 2018-03-20 | 厦门大学 | 一种基于bim的桥梁检测信息管理方法及系统 |
CN108053472A (zh) * | 2017-12-13 | 2018-05-18 | 苏州科技大学 | 一种基于三维模型组景的假山设计方法 |
CN108153983A (zh) * | 2017-12-27 | 2018-06-12 | 江苏壹鼎崮机电科技有限公司 | 基于bim的扁平钢箱梁智能管养方法及系统 |
CN109138149A (zh) * | 2018-10-19 | 2019-01-04 | 河南中能国隆新材料科技有限公司 | 装配式建筑pc构件的安装施工方法及其制得的装配式建筑 |
CN109518607A (zh) * | 2018-11-23 | 2019-03-26 | 云南建投基础工程有限责任公司 | 一种基于有限元模拟分析的桥梁斜向顶升施工方法 |
CN110472375A (zh) * | 2019-09-18 | 2019-11-19 | 中国十七冶集团有限公司 | 一种基于bim的非对称悬索桥施工管控方法 |
CN110804955A (zh) * | 2019-11-27 | 2020-02-18 | 江西省公路桥梁工程有限公司 | 基于bim的桥梁施工方法 |
CN111274693A (zh) * | 2020-01-17 | 2020-06-12 | 北京恒华伟业科技股份有限公司 | 一种施工过程的仿真方法、装置及系统 |
CN111898186A (zh) * | 2020-07-22 | 2020-11-06 | 四川省第十一建筑有限公司 | 一种bim技术在样板临设中的应用方法 |
CN112283827A (zh) * | 2020-10-16 | 2021-01-29 | 广州市机电安装有限公司 | 一种制冷机房施工方法 |
CN112508339A (zh) * | 2020-11-10 | 2021-03-16 | 浙江鑫润工程管理有限公司 | 一种施工质量安全风险管理方法、系统、装置和存储介质 |
CN112837015A (zh) * | 2021-02-05 | 2021-05-25 | 广东电网有限责任公司广州供电局 | 仓储安全管理方法、装置、计算机设备和存储介质 |
CN113268904A (zh) * | 2021-05-08 | 2021-08-17 | 中铁建工集团有限公司 | 单层平板网壳屋盖结构逆作建设全周期的风险控制方法 |
CN113268794A (zh) * | 2021-04-27 | 2021-08-17 | 广州市机电安装有限公司 | 基于dfma的消防泵房施工方法 |
CN113486417A (zh) * | 2021-05-29 | 2021-10-08 | 中铁建工集团有限公司 | 一种控制主塔和钢梁施工仿真系统 |
CN116049935A (zh) * | 2022-12-14 | 2023-05-02 | 中电建路桥集团有限公司 | 连续箱梁施工易裂化区域识别及全过程数字化监测方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150248504A1 (en) * | 2014-03-01 | 2015-09-03 | Benjamin F. GLUNZ | Method and system for creating composite 3d models for building information modeling (bim) |
CN105204793A (zh) * | 2015-09-23 | 2015-12-30 | 中国十七冶集团有限公司 | 一种将bim和3d打印技术应用在施工中的方法 |
CN106088598A (zh) * | 2016-06-12 | 2016-11-09 | 中国十七冶集团有限公司 | 一种运用bim技术进行施工样板引路的方法 |
-
2017
- 2017-06-28 CN CN201710535175.6A patent/CN107220464A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150248504A1 (en) * | 2014-03-01 | 2015-09-03 | Benjamin F. GLUNZ | Method and system for creating composite 3d models for building information modeling (bim) |
CN105204793A (zh) * | 2015-09-23 | 2015-12-30 | 中国十七冶集团有限公司 | 一种将bim和3d打印技术应用在施工中的方法 |
CN106088598A (zh) * | 2016-06-12 | 2016-11-09 | 中国十七冶集团有限公司 | 一种运用bim技术进行施工样板引路的方法 |
Non-Patent Citations (3)
Title |
---|
张楚俊 等: "BIM技术在桥梁建设中的应用", 《交通科技》 * |
张迎春 等: "BIM技术在装配式建筑全寿命周期中的应用研究", 《中国住宅设施》 * |
李红学 等: "基于BIM的桥梁工程设计与施工优化研究", 《工程管理学报》 * |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107818227A (zh) * | 2017-11-17 | 2018-03-20 | 厦门大学 | 一种基于bim的桥梁检测信息管理方法及系统 |
CN107818227B (zh) * | 2017-11-17 | 2020-02-04 | 厦门大学 | 一种基于bim的桥梁检测信息管理方法及系统 |
CN107783750A (zh) * | 2017-11-21 | 2018-03-09 | 北京恒华伟业科技股份有限公司 | 一种桥梁信息显示方法、装置及系统 |
CN108053472A (zh) * | 2017-12-13 | 2018-05-18 | 苏州科技大学 | 一种基于三维模型组景的假山设计方法 |
CN108153983A (zh) * | 2017-12-27 | 2018-06-12 | 江苏壹鼎崮机电科技有限公司 | 基于bim的扁平钢箱梁智能管养方法及系统 |
CN109138149A (zh) * | 2018-10-19 | 2019-01-04 | 河南中能国隆新材料科技有限公司 | 装配式建筑pc构件的安装施工方法及其制得的装配式建筑 |
CN109518607A (zh) * | 2018-11-23 | 2019-03-26 | 云南建投基础工程有限责任公司 | 一种基于有限元模拟分析的桥梁斜向顶升施工方法 |
CN110472375A (zh) * | 2019-09-18 | 2019-11-19 | 中国十七冶集团有限公司 | 一种基于bim的非对称悬索桥施工管控方法 |
CN110804955A (zh) * | 2019-11-27 | 2020-02-18 | 江西省公路桥梁工程有限公司 | 基于bim的桥梁施工方法 |
CN111274693B (zh) * | 2020-01-17 | 2023-08-08 | 北京恒华伟业科技股份有限公司 | 一种施工过程的仿真方法、装置及系统 |
CN111274693A (zh) * | 2020-01-17 | 2020-06-12 | 北京恒华伟业科技股份有限公司 | 一种施工过程的仿真方法、装置及系统 |
CN111898186A (zh) * | 2020-07-22 | 2020-11-06 | 四川省第十一建筑有限公司 | 一种bim技术在样板临设中的应用方法 |
CN112283827A (zh) * | 2020-10-16 | 2021-01-29 | 广州市机电安装有限公司 | 一种制冷机房施工方法 |
CN112508339A (zh) * | 2020-11-10 | 2021-03-16 | 浙江鑫润工程管理有限公司 | 一种施工质量安全风险管理方法、系统、装置和存储介质 |
CN112508339B (zh) * | 2020-11-10 | 2023-11-10 | 浙江鑫润工程管理有限公司 | 一种施工质量安全风险管理方法、系统、装置和存储介质 |
CN112837015A (zh) * | 2021-02-05 | 2021-05-25 | 广东电网有限责任公司广州供电局 | 仓储安全管理方法、装置、计算机设备和存储介质 |
CN112837015B (zh) * | 2021-02-05 | 2022-12-16 | 广东电网有限责任公司广州供电局 | 仓储安全管理方法、装置、计算机设备和存储介质 |
CN113268794A (zh) * | 2021-04-27 | 2021-08-17 | 广州市机电安装有限公司 | 基于dfma的消防泵房施工方法 |
CN113268904A (zh) * | 2021-05-08 | 2021-08-17 | 中铁建工集团有限公司 | 单层平板网壳屋盖结构逆作建设全周期的风险控制方法 |
CN113486417A (zh) * | 2021-05-29 | 2021-10-08 | 中铁建工集团有限公司 | 一种控制主塔和钢梁施工仿真系统 |
CN113486417B (zh) * | 2021-05-29 | 2024-01-19 | 中铁建工集团有限公司 | 一种控制主塔和钢梁施工仿真系统 |
CN116049935A (zh) * | 2022-12-14 | 2023-05-02 | 中电建路桥集团有限公司 | 连续箱梁施工易裂化区域识别及全过程数字化监测方法 |
CN116049935B (zh) * | 2022-12-14 | 2023-11-10 | 中电建路桥集团有限公司 | 连续箱梁施工易裂化区域识别及全过程数字化监测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107220464A (zh) | 一种基于bim的桥梁施工过程仿真及风险控制方法 | |
CN104715113B (zh) | 利用bim实现钢桁拱桥施工仿真的方法和装置 | |
Zhou et al. | Thoughts on the development of bridge technology in China | |
CN107832498A (zh) | 一种基于bim的复杂施工工艺技术交底方法 | |
CN107905109A (zh) | 跨越式桥梁现浇平台模拟等荷载分段预压施工方法 | |
CN103603262B (zh) | 斜高墩大跨径连续梁的线形控制方法 | |
CN106758871A (zh) | 一种全悬臂施工预应力混凝土连续刚构桥及其施工方法 | |
CN109409827A (zh) | 一种基于虚实对比的工程建设中施工进度的监控方法 | |
CN107016194A (zh) | 基于多尺度有限元建模的桥梁缆索体系劣化性能分析方法 | |
CN103114524A (zh) | 轻型波形钢-高强活性粉末混凝土组合桥面板 | |
CN110439301A (zh) | 一种可精准调节角度倾斜钢管混凝土柱与环形梁的施工方法 | |
CN108133107A (zh) | 一种基于bim模型的frp-混凝土装配方法 | |
CN107066752A (zh) | 应用bim技术的dj180架桥机临近既有线架梁模拟施工方法 | |
CN103147385A (zh) | 双拼式矮塔斜拉桥 | |
KR20220011515A (ko) | Bim을 이용한 교량 형상관리 장치 및 방법 | |
CN105302938A (zh) | 一种组装式桁架内力计算方法 | |
CN206887771U (zh) | 一种小跨径板梁施工平台结构 | |
Qiu et al. | Resilience enhancement of using prefabrication technology for post-accident restoration of coastal infrastructure | |
CN109242971A (zh) | 一种梁式桥三维模型信息交互平台 | |
Yuan et al. | Replacement of the fire-damaged long suspenders of the Runyang Suspension Bridge | |
Tawadrous et al. | Performance evaluation of a new precast concrete bridge deck system | |
CN108193600A (zh) | 提高大跨连续刚构桥抗裂性能的方法和组合结构箱梁 | |
CN110714416A (zh) | 一种基于bim的大悬臂梁桥梁体临时固结施工结构和方法 | |
CN101510224A (zh) | 基于位移影响线的连续刚构桥体外预应力加固设计方法 | |
Xu et al. | Integral lifting of a three-span continuous beam bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170929 |
|
RJ01 | Rejection of invention patent application after publication |