CN113486417A - 一种控制主塔和钢梁施工仿真系统 - Google Patents
一种控制主塔和钢梁施工仿真系统 Download PDFInfo
- Publication number
- CN113486417A CN113486417A CN202110595749.5A CN202110595749A CN113486417A CN 113486417 A CN113486417 A CN 113486417A CN 202110595749 A CN202110595749 A CN 202110595749A CN 113486417 A CN113486417 A CN 113486417A
- Authority
- CN
- China
- Prior art keywords
- simulation
- bridge
- construction
- data
- simulated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004088 simulation Methods 0.000 title claims abstract description 273
- 238000010276 construction Methods 0.000 title claims abstract description 204
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 97
- 239000010959 steel Substances 0.000 title claims abstract description 97
- 238000012544 monitoring process Methods 0.000 claims abstract description 90
- 238000012360 testing method Methods 0.000 claims abstract description 40
- 238000007405 data analysis Methods 0.000 claims abstract description 24
- 238000006243 chemical reaction Methods 0.000 claims abstract description 12
- 238000005516 engineering process Methods 0.000 claims abstract description 9
- 238000004458 analytical method Methods 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 claims description 54
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 42
- 230000007246 mechanism Effects 0.000 claims description 40
- 239000007788 liquid Substances 0.000 claims description 39
- 238000012545 processing Methods 0.000 claims description 33
- 239000000463 material Substances 0.000 claims description 31
- 230000008569 process Effects 0.000 claims description 30
- 239000004567 concrete Substances 0.000 claims description 22
- 238000013461 design Methods 0.000 claims description 17
- 230000009467 reduction Effects 0.000 claims description 14
- 238000003860 storage Methods 0.000 claims description 9
- 239000002994 raw material Substances 0.000 claims description 8
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 238000011056 performance test Methods 0.000 abstract description 3
- 230000009471 action Effects 0.000 abstract description 2
- 238000007599 discharging Methods 0.000 description 12
- 238000006073 displacement reaction Methods 0.000 description 9
- 229910001220 stainless steel Inorganic materials 0.000 description 9
- 239000010935 stainless steel Substances 0.000 description 9
- 239000000725 suspension Substances 0.000 description 9
- 238000004364 calculation method Methods 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000000605 extraction Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000011148 porous material Substances 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 206010036086 Polymenorrhoea Diseases 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 238000012549 training Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000002861 polymer material Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110595749.5A CN113486417B (zh) | 2021-05-29 | 2021-05-29 | 一种控制主塔和钢梁施工仿真系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110595749.5A CN113486417B (zh) | 2021-05-29 | 2021-05-29 | 一种控制主塔和钢梁施工仿真系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113486417A true CN113486417A (zh) | 2021-10-08 |
CN113486417B CN113486417B (zh) | 2024-01-19 |
Family
ID=77933289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110595749.5A Active CN113486417B (zh) | 2021-05-29 | 2021-05-29 | 一种控制主塔和钢梁施工仿真系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113486417B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114770977A (zh) * | 2022-06-17 | 2022-07-22 | 成都飞机工业(集团)有限责任公司 | 一种自动铺丝工装的设计方法、装置、设备及存储介质 |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080046897A (ko) * | 2006-11-23 | 2008-05-28 | 연세대학교 산학협력단 | 강교량의 정보 제공 및 가공 방법 |
WO2009158559A1 (en) * | 2008-06-26 | 2009-12-30 | Siemens Product Lifecycle Management Software Inc. | System and method for constructing virtual nc controllers for machine tool simulation |
CN101798848A (zh) * | 2010-03-05 | 2010-08-11 | 北京纽曼帝莱蒙膜建筑技术有限公司 | 使用机械运动模拟模型动态模拟张拉结构施工的方法 |
CN102880769A (zh) * | 2012-10-23 | 2013-01-16 | 上海建工集团股份有限公司 | 大跨径混凝土斜拉桥的施工控制方法与预拱度计算方法 |
CN106097819A (zh) * | 2016-07-31 | 2016-11-09 | 重庆交通大学 | 用于实验教学的桥梁仿真检测方法及系统 |
CN107220464A (zh) * | 2017-06-28 | 2017-09-29 | 中国十七冶集团有限公司 | 一种基于bim的桥梁施工过程仿真及风险控制方法 |
US20180374168A1 (en) * | 2016-03-30 | 2018-12-27 | Komatsu Ltd. | Simulation system and simulation method |
WO2019074139A1 (ko) * | 2017-10-12 | 2019-04-18 | (주)태성에스엔아이 | 가상 건설 현장에서의 시뮬레이션 실행 방법 및 이에 사용되는 관리 서버 |
CN109783851A (zh) * | 2018-12-10 | 2019-05-21 | 中国铁路设计集团有限公司 | 基于3dgis和bim技术的铁路系杆拱桥施工仿真系统和方法 |
CN109948222A (zh) * | 2019-03-12 | 2019-06-28 | 北京工业大学 | 一种将建筑工程项目隐蔽信息显性化的方法 |
US20190333270A1 (en) * | 2018-04-30 | 2019-10-31 | Do Been KIM | Method and program for calculating stiffness coefficient of bridge by using ambient vibration test data |
CN111335186A (zh) * | 2020-03-05 | 2020-06-26 | 青岛理工大学 | 转体桥梁安全监测预警方法、系统、存储介质、预警平台 |
CN111625971A (zh) * | 2020-03-06 | 2020-09-04 | 中国十七冶集团有限公司 | 一种装配式混凝土桥梁预制构件拼装方法 |
CN111733787A (zh) * | 2020-05-14 | 2020-10-02 | 中电建路桥集团有限公司 | 桥梁桩基施工过程中溶洞处理效果检测方法及系统 |
-
2021
- 2021-05-29 CN CN202110595749.5A patent/CN113486417B/zh active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080046897A (ko) * | 2006-11-23 | 2008-05-28 | 연세대학교 산학협력단 | 강교량의 정보 제공 및 가공 방법 |
WO2009158559A1 (en) * | 2008-06-26 | 2009-12-30 | Siemens Product Lifecycle Management Software Inc. | System and method for constructing virtual nc controllers for machine tool simulation |
CN101798848A (zh) * | 2010-03-05 | 2010-08-11 | 北京纽曼帝莱蒙膜建筑技术有限公司 | 使用机械运动模拟模型动态模拟张拉结构施工的方法 |
CN102880769A (zh) * | 2012-10-23 | 2013-01-16 | 上海建工集团股份有限公司 | 大跨径混凝土斜拉桥的施工控制方法与预拱度计算方法 |
US20180374168A1 (en) * | 2016-03-30 | 2018-12-27 | Komatsu Ltd. | Simulation system and simulation method |
CN106097819A (zh) * | 2016-07-31 | 2016-11-09 | 重庆交通大学 | 用于实验教学的桥梁仿真检测方法及系统 |
CN107220464A (zh) * | 2017-06-28 | 2017-09-29 | 中国十七冶集团有限公司 | 一种基于bim的桥梁施工过程仿真及风险控制方法 |
WO2019074139A1 (ko) * | 2017-10-12 | 2019-04-18 | (주)태성에스엔아이 | 가상 건설 현장에서의 시뮬레이션 실행 방법 및 이에 사용되는 관리 서버 |
US20190333270A1 (en) * | 2018-04-30 | 2019-10-31 | Do Been KIM | Method and program for calculating stiffness coefficient of bridge by using ambient vibration test data |
CN109783851A (zh) * | 2018-12-10 | 2019-05-21 | 中国铁路设计集团有限公司 | 基于3dgis和bim技术的铁路系杆拱桥施工仿真系统和方法 |
CN109948222A (zh) * | 2019-03-12 | 2019-06-28 | 北京工业大学 | 一种将建筑工程项目隐蔽信息显性化的方法 |
CN111335186A (zh) * | 2020-03-05 | 2020-06-26 | 青岛理工大学 | 转体桥梁安全监测预警方法、系统、存储介质、预警平台 |
CN111625971A (zh) * | 2020-03-06 | 2020-09-04 | 中国十七冶集团有限公司 | 一种装配式混凝土桥梁预制构件拼装方法 |
CN111733787A (zh) * | 2020-05-14 | 2020-10-02 | 中电建路桥集团有限公司 | 桥梁桩基施工过程中溶洞处理效果检测方法及系统 |
Non-Patent Citations (3)
Title |
---|
刘海宽等: ""支架施工斜拉桥体系转换方案的优选与施工控制"", 《筑路机械与施工机械化》, no. 5, pages 119 - 124 * |
张谢东等: ""混合梁斜拉桥合理成桥状态确定方法研究"", 《武汉理工大学学报(交通科学与工程版)》, vol. 39, no. 5, pages 920 - 924 * |
郭锋: ""独塔空间扭索面-全漂浮体系斜拉桥桥塔施工控制研究"", 《山西交通科技》, no. 03, pages 49 - 52 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114770977A (zh) * | 2022-06-17 | 2022-07-22 | 成都飞机工业(集团)有限责任公司 | 一种自动铺丝工装的设计方法、装置、设备及存储介质 |
CN114770977B (zh) * | 2022-06-17 | 2022-10-25 | 成都飞机工业(集团)有限责任公司 | 一种自动铺丝工装的设计方法、装置、设备及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN113486417B (zh) | 2024-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Fanaie et al. | Response modification factor of mixed structures | |
CN105740560B (zh) | 一种钢管拱肋节段胎架法连续拼装施工用模拟拼装方法 | |
CN103233527B (zh) | 一种工程结构基于位移的抗震设计方法 | |
CN113776965B (zh) | 一种载荷作用下涵洞土拱变化规律的模拟试验装置及方法 | |
CN208949708U (zh) | 一种抗震桥墩 | |
CN110306672A (zh) | 一种多层大空间建筑结构及其设计方法 | |
CN113486417B (zh) | 一种控制主塔和钢梁施工仿真系统 | |
CN105484165B (zh) | 一体化预应力张拉框架结构及其制作和使用方法 | |
CN103161348B (zh) | 工程结构多目标性能化抗震评估方法 | |
Yavari | Shaking table tests on the response of reinforced concrete frames with non-seismic detailing | |
CN212321037U (zh) | 大跨连续钢箱梁桥超大比例气弹模型自然风场涡振试验装置 | |
CN110889245B (zh) | 水力式升船机塔柱结构耦联体系流固耦合地震动响应分析方法 | |
CN111175068B (zh) | 一种用于斜拉桥典型损伤模拟装置的方法 | |
Liu et al. | Pushover analysis of Daikai subway station during the Osaka-Kobe earthquake in 1995 | |
CN111188281A (zh) | 一种预制梁架设施工机械横向移动支撑系统及施工方法 | |
CN103106297B (zh) | 热力检查室结构的数据处理方法及其计算机辅助设计系统 | |
CN111855130B (zh) | 大跨连续钢箱梁桥超大比例气弹模型自然风场涡振试验装置 | |
CN111622091B (zh) | 一种预制桥墩的受力试验方法 | |
CN114016420A (zh) | 独墩柱钢桥梁装配式施工工法 | |
CN111893990A (zh) | 一种钢管桩支架预压装置及预压方案 | |
Balsamo et al. | Seismic Rehabilitation of a Full-Scale RC Structure using GFRP Laminates | |
Shutova et al. | Analyzing efficiency of two-layer foundations for a power transmission line portal based on a numerical experiment | |
CN109930477A (zh) | 一种梁式桥摩擦摆支座快速选型的方法 | |
CN115344936A (zh) | 一种高墩连续刚构桥施工方法 | |
GAO et al. | Structural Design Study of Suspended Glass Trestle Based on Construction Technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 100160 Nord tower 1, 128 South Fourth Ring Road West, Fengtai District, Beijing. Applicant after: China Railway Construction Engineering Group Applicant after: China Railway Construction Group No.2 Construction Co.,Ltd. Address before: 100160 Nord tower 1, 128 South Fourth Ring Road West, Fengtai District, Beijing. Applicant before: China Railway Construction Engineering Group Applicant before: CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP SHANDONG Co.,Ltd. |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Mingyan Inventor after: Zang Guozhi Inventor after: Gao Yong Inventor after: Meng Yang Inventor after: Zhang Ziming Inventor after: Chen Lin Inventor after: Zhang Hongyong Inventor after: Zhao Yanbin Inventor after: Zhang He Inventor after: Shan Hongyi Inventor after: Wang Jun Inventor after: Yan Tingda Inventor before: Li Chunyu Inventor before: Zhang Hongyong Inventor before: Meng Yang Inventor before: Zhao Mingyan Inventor before: Chen Lin Inventor before: Gu Chunmao Inventor before: Wang Jun Inventor before: Yan Tingda Inventor before: Gao Yong Inventor before: Zhang He Inventor before: Zhao Yanbin |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |