CN107187267A - A kind of installation method of theme park plastic stone rockery - Google Patents

A kind of installation method of theme park plastic stone rockery Download PDF

Info

Publication number
CN107187267A
CN107187267A CN201710557302.2A CN201710557302A CN107187267A CN 107187267 A CN107187267 A CN 107187267A CN 201710557302 A CN201710557302 A CN 201710557302A CN 107187267 A CN107187267 A CN 107187267A
Authority
CN
China
Prior art keywords
mesh sheet
mortar
plastic stone
theme park
installation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710557302.2A
Other languages
Chinese (zh)
Inventor
王波
吴哲
吴朝强
马晓明
付继飞
于海洋
余枫
张岩
刘舒妍
朱明勇
冼炬华
徐建峰
王洁
张秀涛
秦瑶
何佳南
洪晓琼
陈新兰
李宁
苗婧婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN201710557302.2A priority Critical patent/CN107187267A/en
Publication of CN107187267A publication Critical patent/CN107187267A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C5/00Processes for producing special ornamental bodies
    • B44C5/06Natural ornaments; Imitations thereof

Abstract

The present invention provides a kind of installation method of theme park plastic stone rockery, comprises the following steps:The first step:Integrated support platform:1) packway workbench is installed;2) stair passage is installed:3) safety rope system is installed;Second step:Mesh sheet panel is installed:1) mesh sheet is transported;2) mesh sheet is installed:3rd step:Spraying:1) encapsulated layer mortar mixes slurry;2) encapsulated layer mortar is whitewashed:4th step:Engraving:5th step:Maintenance.The be the theme plastic stone rockery in park of the installation method for the theme park plastic stone rockery that the present invention is provided is installed and provides a whole set of construction technology, and the construction technology for improving large-scale plastic stone rockery in theme park is random big, the uneven situation of construction quality.

Description

A kind of installation method of theme park plastic stone rockery
Technical field
The invention belongs to building engineering field, it is related to a kind of installation method of plastic stone rockery, and in particular in theme park Plastic stone rockery installation method.
Background technology
Theme park plastic stone rockery is to draw classical bag, stone-type, by manually mould come natural stone.Structural portion Divide the metal being connected by steel structure frame, the artificial hillock panel steel skeleton of supportive reinforcement welding, with panel steel skeleton front Silk screen and the non-combustible base material composition of back side connection.Facing layer segment is silicate cement mud mortar bottom, then smears another Outer one layer, for the portland cement surface layer for the alterable thickness carved, with board design and intention desired ratio model, is opened up The texture and profile of natural stone as defined in sample product and panel.
But constructed the whole of not complete each feasible integrated construction key for theme park plastic stone rockery Body construction method, it is random big, and construction quality is uneven.
The content of the invention
It is an object of the invention to provide a kind of installation method of theme park plastic stone rockery, this method is specifically designed for integrated Operation platform, plastic stone rockery panel, encapsulated layer, carving layer propose a whole set of construction technology, improve big shape in theme park The construction technology of rockery is random big, the uneven situation of construction quality.
To achieve these goals, the present invention provides a kind of installation method of theme park plastic stone rockery, including following step Suddenly:
The first step:Integrated support platform
1) packway workbench is installed
Wooden boards and vertical safety jack are installed on each horizontal section steel extended, while installing top steel pipe Set up according to order from bottom to up railing, safety net and foot guard plate, subregion;
2) stair passage is installed
Using two kinds of forms of precast stair or field fabrication, it is fixed to by welding manner on horizontal section steel;
3) safety rope system is installed
Every layer of packway workbench is constructed while installation, installs steel pipe railing, safety net, foot guard plate and stair, Secure latch is fixed on the horizontal section steel of upper strata by way of lockset or welding, and lifeline is set accordingly;
Second step:Mesh sheet panel is installed
1) mesh sheet is transported
Mesh sheet is transported to job site from mesh sheet storage location, steel cage is made according to mesh sheet panel size, will be every Secondary need mesh sheet to be mounted is put down by cage vertical transport to designated mounting region by manually carrying out heap to integrated construction Platform;
2) mesh sheet is installed
Mesh sheet hanging point is marked in secondary steel structure, mesh sheet is suspended to the commissure of telltale mark, placement when installing And mesh sheet is fixed temporarily using welding manner, interim fixed mesh sheet obtains checking comprehensively fixes mesh sheet after in the mode of welding entirely;
3rd step:Spraying
1) encapsulated layer mortar mixes slurry
The ratio that bedding mortar powder and water are added into 5.5-7L water according to every 25kg powders is mixed, using mechanical agitation side Formula, stirs, and stirring 3-5 minutes, are made bedding mortar every time;
2) encapsulated layer mortar is whitewashed
Bedding mortar whitewashing is carried out in mesh sheet using pulp shooting machine, during whitewashing, air mass flow is adjusted, makes nozzle position The injection pressure of formation preferably uses " S " or " several " font to spray circuit in more than 0.4MPa, spraying circuit;After mortar spraying immediately Exerted oneself to be compacted with spatula, floating, plucking, form encapsulated layer, when multiple tracks is sprayed, each coating thickness is no more than 50 millimeters;
4th step:Engraving
Mortar powder and water will be carved to mix according to the ratio of every 25kg powders addition 5.5-7L water, using mechanical agitation side Formula, stirs, and stirring 3-5 minutes, are made engraving mortar every time;
Engraving mortar is carried out using pulp shooting machine to whitewash, stand 15 minutes after the completion of whitewashing, then carry out in encapsulation layer surface Shape moulds engraving;
5th step:Maintenance
Complete to be covered comprehensively using maintenance blanket for the 2nd day, then starting water seasoning with sebific duct, degree of watering with it is secondary Number should ensure that maintenance blanket, and often moistening is defined, and curing period must not be less than 14d, after curing period terminates, and maintenance blanket, which continues to cover, to be retained Until the colored drawing stage.
Further, the first step 3) in fill safety lock and lifeline every 10-12 meter amperes.
Further, the 3rd step 1) described in bedding mortar be MCCYJ-B.
Further, the 3rd step 2) in mesh sheet both sides spray encapsulated layer.
Further, the 3rd step 2) in multiple tracks spray when, per pass spraying with preceding road spray terminate time interval be 30- 60 minutes.
Further, the 3rd step 2) in conserve within 5 days after encapsulated layer spraying, specific method is:Blanket is conserved to carry out entirely Face is covered, and then starts water seasoning with sebific duct, and degree of watering should ensure that maintenance blanket with number of times, and often moistening is defined, and conserves 5 days.
Further, it is MCCYJ-E or MCCYJ-N that mortar is carved described in the 4th step.
Plastic stone rockery main support structure include it is prefabricated, roll formed steel construction section bar or concrete walls, be mainly used in support false Mountain grillage and bottom frame.
Secondary (auxiliary) supporting construction of plastic stone rockery includes suspension bracket, strut, angle section, groove material, reinforcing bar and similar workpiece, uses It is bundled in by artificial hillock grillage on main support structure.Secondary supporting construction includes accurately adjusting artificial hillock panel steel skeleton Position simultaneously reduces the making in site part of installation deviation as far as possible.
Plastic stone rockery operation platform is divided into synthetic operation platform and traditional scaffold and safe fence system.There is synthesis The region of workbench, cantilever girder steel (horizontal section steel) has both sides function:One is the reinforcing bar face for supporting plastic stone rockery engineering Plate, two be the springboard and safety jack of support scaffolding.Synthetic operation platform includes safety jack, and vertical safety jack is installed to The horizontal section steel each extended, while providing and installing top steel pipe railing, safety net, springboard and foot guard plate.It is in office why not Need or the region of comprehensive scaffold can not be built, such as waterfall and indoor area, should provide and build traditional type scaffold or its He suitably pass through mode.Scaffold for broadening specifies all regions that it is " storage platform ", should provide and install Platform earth material with suitable broadening and sufficient intensity.
Plastic stone rockery panel, comprising prefabricated panel and field fabrication panel, these panels are made up of reinforcement welding, and are adhered to There are wire netting and non-combustible backing material.According to intention and the molded dimension of design, the most non-horizontal surface of plastic stone rockery panel is made Type, no packaging.
Plastic stone rockery mortar surface layer, mainly includes encapsulated layer and carving layer.Using pneumatic spray operation mode by silicic acid Salt cement plaster is sprayed onto different-thickness;Then the pneumatic spray operation of carving layer, the line for reaching intention and design requirement are carried out Reason and natural rock feature.Then theme spraying operation will be carried out to plastic stone rockery.
The present invention is under the specific theme background in theme park and intention requirement, plastic stone rockery construction technology and traditional architecture Engineering construction process is compared, with following features:
Operation strategies are wide, plastic stone rockery can carry out as requested the indoor and outdoor such as waterfall area, anti-pool, sound-absorbing area each The construction of scape.Theme style and function are abundant.
Complexity use flexibly, the scope that can contact for different themes park visitor and specific scene distribution, can Selection is simple, medium, complicated different complexity.
Construction process is rigorous and specification, is performed in plastic stone rockery construction process in strict accordance with each procedure, and each operation Construction be mutually linked, it is all linked with one another, it is to avoid construction it is chaotic and unordered.
Profession coordination is strong, and operable space is rich.Game equipment, electromechanics, audio, light can be interted in plastic stone rockery And building etc. other professional constructions.And flexible arrangement and installation are carried out by the distinctive structure type of plastic stone rockery.
Function can be met, with certain alternative.Plastic stone rockery also may be used while moulding and intention requirement is met With by size and arrangement play go along with sb. to guard him, platform, step on cloth etc. act on.
The installation method for the theme park plastic stone rockery that the present invention is provided, can be used in theme park indoor and outdoors reinforcing bar In the main building structure such as concrete, steel construction, flexible arrangement can be also carried out in Site development.Also can individually it be used in simultaneously The ornamental regions such as landscape effect, indoor independent moulding, sign label.
The beneficial effects of the present invention are:
The installation method for the theme park plastic stone rockery that the present invention is provided can reduce the construction risk in similar engineering, improve Efficiency of construction, reduces project's earlier stage expense, more reduces construction cost, and comprehensive benefit is protruded, and benefit growth point is enriched.
Embodiment
This hair is illustrated with the embodiment for mountain artificial hillock installation of being thundered in the engineering of specific Shanghai Disneyland exploration island below Bright technical scheme.
Material and equipment
1. pulp shooting machine is purchased from Bang Muen plant equipment (Shanghai) Co., Ltd..
2. cement:MCCYJ-B, MCCJY-N and MCCJY-E are purchased from Beijing Newayxun Construction Project Consulting Technology Co., Ltd, its Middle MCCYJ-B is that bedding mortar powder, MCCJY-N and MCCJY-E are respectively that the different facing of two kinds of sand particle sizes carves mortar Powder, is mixed into mortar with water when using and uses.
Other material and facilities do not mentioned are material and facility commonly used in the art.
Embodiment 1
It is as follows that the thunderous mountain plastic stone rockery in exploration island installs Specific construction step:
Overall auxiliary frame is welded according to detail of design before artificial hillock construction, the horizontal section steel of framework surface extension is used In the installation of support platform or mesh sheet.
The first step:Integrated support platform
1) packway workbench is installed
Wooden boards and vertical safety jack are installed on each horizontal section steel extended, while installing top steel pipe Set up according to order from bottom to up railing, safety net and foot guard plate, subregion;
2) stair passage is installed
Using two kinds of forms of precast stair or field fabrication, it is fixed to by welding manner on horizontal section steel;
3) safety rope system is installed
Every layer of packway workbench is constructed while installation, installs steel pipe railing, safety net, foot guard plate and stair, Secure latch is fixed on the horizontal section steel of upper strata by way of lockset or welding, and lifeline is set accordingly;It is wherein every Safety lock and lifeline are filled every 12 meter amperes.Use steel strand wires as lifeline in construction, safety lock is locked for this area convention security.
Second step:Mesh sheet panel is installed
1) mesh sheet is transported
Mesh sheet is transported to job site from mesh sheet storage location, steel cage is made according to mesh sheet panel size, will be every Secondary need mesh sheet to be mounted is put down by cage vertical transport to designated mounting region by manually carrying out heap to integrated construction Platform;
2) mesh sheet is installed
Mesh sheet hanging point is marked in secondary steel structure, mesh sheet is suspended to the commissure of telltale mark, placement when installing And mesh sheet is fixed temporarily using welding manner, interim fixed mesh sheet obtains checking comprehensively fixes mesh sheet after in the mode of welding entirely; Mesh sheet is metal mesh sheet, predominantly chicken coop net and Dense mesh screen, is selected according to the requirement of different construction areas.
3rd step:Spraying
1) encapsulated layer mortar mixes slurry
The ratio that bedding mortar powder and water are added into 6L water according to every 25kg powders is mixed, using mechanical agitation mode, Stir, stirring 4 minutes, are made bedding mortar every time;Bedding mortar powder uses MCCYJ-B.
2) encapsulated layer mortar is whitewashed
Bedding mortar whitewashing is carried out in mesh sheet using pulp shooting machine, during whitewashing, air mass flow is adjusted, makes nozzle position The injection pressure of formation preferably uses " S " or " several " font to spray circuit in more than 0.4MPa, spraying circuit;After mortar spraying immediately Exerted oneself to be compacted with spatula, floating, plucking, form encapsulated layer, when multiple tracks is sprayed, each coating thickness is no more than 50 millimeters;Wherein Mesh sheet both sides spray encapsulated layer;When multiple tracks is sprayed, it is 45 minutes that per pass spraying, which sprays the time interval terminated with preceding road,.
Air compressor is connected as pulp shooting machine with pulp shooting machine shower nozzle and provides whitewashing power, and air compressor operating pressure should be set It is set to 0.5-0.8MPa, preferably 0.6MPa.It is declined slightly by pulp shooting machine shower nozzle injection pressure to more than 0.4MPa.
Carry out conserving for 5 days after encapsulated layer spraying, specific method is:Maintenance blanket is covered comprehensively, is then started with sebific duct Water seasoning, degree of watering should ensure that maintenance blanket with number of times, and often moistening is defined, and conserves 5 days.
4th step:Engraving
Mortar powder and water will be carved to mix according to the ratio of every 25kg powders addition 6L water, using mechanical agitation mode, Stir, every time stirring 5 minutes;
Engraving mortar is carried out using pulp shooting machine to whitewash, stand 15 minutes after the completion of whitewashing, then carry out in encapsulation layer surface Shape moulds engraving;Engraving mortar uses MCCYJ-E, and the carving layer mortar mixed was finished in 60 minutes.
Spouting plant is identical with encapsulated layer whitewashing with condition, carves and is carried out according to advance detail of design.
5th step:Maintenance
Covered comprehensively using maintenance blanket complete engraving the 2nd day, then start water seasoning with sebific duct, journey of watering Degree should ensure that maintenance blanket with number of times, and often moistening is defined, and curing period must not be less than 14d, after curing period terminates, and maintenance blanket continues to cover Lid retains until the colored drawing stage.
In-process review is all carried out after the completion of each step, it is ensured that construction is consistent with design idea.
The initial intention that the installation method that the thunderous mountain plastic stone rockery engineering in exploration island is provided by using the present invention is realized And design idea, realize the mysterious and marvellous of it, show uniqueness style characteristic, embody its it is grand with it is grand.
The park from above-described embodiment as can be seen that the installation method for the theme park plastic stone rockery that the present invention is provided is the theme Plastic stone rockery install and provide a whole set of construction technology, the construction technology for improving large-scale plastic stone rockery in theme park is random Property big, the uneven situation of construction quality.

Claims (7)

1. a kind of installation method of theme park plastic stone rockery, it is characterised in that comprise the following steps:
The first step:Integrated support platform
1) packway workbench is installed
Wooden boards and vertical safety jack are installed on each horizontal section steel extended, while installing top steel pipe column Set up according to order from bottom to up bar, safety net and foot guard plate, subregion;
2) stair passage is installed
Using two kinds of forms of precast stair or field fabrication, it is fixed to by welding manner on horizontal section steel;
3) safety rope system is installed
Every layer of packway workbench is constructed while installation, is installed steel pipe railing, safety net, foot guard plate and stair, is passed through Secure latch is fixed on the horizontal section steel of upper strata by lockset or the mode of welding, and sets lifeline accordingly;
Second step:Mesh sheet panel is installed
1) mesh sheet is transported
Mesh sheet is transported to job site from mesh sheet storage location, steel cage is made according to mesh sheet panel size, will be needed every time Mesh sheet to be mounted is by cage vertical transport to designated mounting region, by manually carrying out heap to integrated operation platform;
2) mesh sheet is installed
Mesh sheet hanging point is marked in secondary steel structure, mesh sheet is suspended to the commissure of telltale mark when installing, dispose and make Mesh sheet is fixed temporarily with welding manner, and interim fixed mesh sheet obtains checking comprehensively fixes mesh sheet after in the mode of welding entirely;
3rd step:Spraying
1) encapsulated layer mortar mixes slurry
The ratio that bedding mortar powder and water are added into 5.5-7L water according to every 25kg powders is mixed, using mechanical agitation mode, Stir, stirring 3-5 minutes, are made bedding mortar every time;
2) encapsulated layer mortar is whitewashed
Bedding mortar whitewashing is carried out in mesh sheet using pulp shooting machine, during whitewashing, air mass flow is adjusted, forms nozzle position Injection pressure in more than 0.4MPa, spraying circuit preferably use " S " or " several " font spraying circuit;Immediately with smearing after mortar spraying Knife exerts oneself to be compacted, floating, plucking, forms encapsulated layer, and when multiple tracks is sprayed, each coating thickness is no more than 50 millimeters;
4th step:Engraving
Mortar powder and water will be carved to mix according to the ratio of every 25kg powders addition 5.5-7L water, using mechanical agitation mode, Stir, stirring 3-5 minutes, are made engraving mortar every time;
Engraving mortar is carried out using pulp shooting machine to whitewash, stand 15 minutes after the completion of whitewashing, then carry out shape in encapsulation layer surface Mould engraving;
5th step:Maintenance
Complete to be covered comprehensively using maintenance blanket for the 2nd day, then starting water seasoning with sebific duct, degree of watering should with number of times Ensure maintenance blanket often moistening is defined, curing period must not be less than 14d, after curing period, terminates, maintenance blanket continue cover retain until The colored drawing stage.
2. the installation method of theme park plastic stone rockery as claimed in claim 1, it is characterised in that the first step 3) in every 10-12 meter amperes fill safety lock and lifeline.
3. the installation method of theme park plastic stone rockery as claimed in claim 1, it is characterised in that the 3rd step 1) described in bottom Layer mortar powder is MCCYJ-B.
4. the installation method of theme park plastic stone rockery as claimed in claim 1, it is characterised in that the 3rd step 2) in mesh sheet two Side sprays encapsulated layer.
5. the installation method of theme park plastic stone rockery as claimed in claim 1, it is characterised in that the 3rd step 2) in multiple tracks spray Tu Shi, it is 30-60 minutes that per pass spraying, which sprays the time interval terminated with preceding road,.
6. the installation method of theme park plastic stone rockery as claimed in claim 1, it is characterised in that the 3rd step 2) in encapsulated layer Carry out conserving for 5 days after spraying, specific method is:Maintenance blanket is covered comprehensively, then starts water seasoning with sebific duct, journey of watering Degree should ensure that maintenance blanket with number of times, and often moistening is defined, and conserves 5 days.
7. the installation method of theme park plastic stone rockery as claimed in claim 1, it is characterised in that carved described in the 4th step Mortar powder is MCCYJ-E or MCCYJ-N.
CN201710557302.2A 2017-07-10 2017-07-10 A kind of installation method of theme park plastic stone rockery Pending CN107187267A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710557302.2A CN107187267A (en) 2017-07-10 2017-07-10 A kind of installation method of theme park plastic stone rockery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710557302.2A CN107187267A (en) 2017-07-10 2017-07-10 A kind of installation method of theme park plastic stone rockery

Publications (1)

Publication Number Publication Date
CN107187267A true CN107187267A (en) 2017-09-22

Family

ID=59883463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710557302.2A Pending CN107187267A (en) 2017-07-10 2017-07-10 A kind of installation method of theme park plastic stone rockery

Country Status (1)

Country Link
CN (1) CN107187267A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1730294A (en) * 2005-08-24 2006-02-08 张奇志 Ecological plastic stone rockery and making method thereof
CN104773023A (en) * 2015-04-20 2015-07-15 江苏山水环境建设集团股份有限公司 Retaining wall attached steel frame-dense net combined on-site molded GRC artificial hill and construction method thereof
CN106436928A (en) * 2016-11-16 2017-02-22 中冶建筑研究总院有限公司 Waterproof construction method for plastic stone rockery and waterproof structure
CN106799924A (en) * 2015-11-26 2017-06-06 湖北黄梅景秀前程园艺有限公司 A kind of method that utilization discarded tailing makes rockwork

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1730294A (en) * 2005-08-24 2006-02-08 张奇志 Ecological plastic stone rockery and making method thereof
CN104773023A (en) * 2015-04-20 2015-07-15 江苏山水环境建设集团股份有限公司 Retaining wall attached steel frame-dense net combined on-site molded GRC artificial hill and construction method thereof
CN106799924A (en) * 2015-11-26 2017-06-06 湖北黄梅景秀前程园艺有限公司 A kind of method that utilization discarded tailing makes rockwork
CN106436928A (en) * 2016-11-16 2017-02-22 中冶建筑研究总院有限公司 Waterproof construction method for plastic stone rockery and waterproof structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王波 等: "主题公园塑石假山施工关键技术研究", 《工业建筑》 *

Similar Documents

Publication Publication Date Title
CN101338595B (en) Construction method of haydite dry concrete wall
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN106382023B (en) Pseudo-classic architecture and its manufacturing method
JP2003504541A (en) Building panel and its manufacturing equipment
CN102535846B (en) One-step forming construction process for integrally pouring housing construction
CN108412093A (en) A kind of Modern Landscape decoration loam wall and its construction method
CN106592810A (en) Construction method of wrapping fair brick masonry for concrete structure of historic building
CN106760146A (en) A kind of assembled porcelain earthenware brick for building and the construction process using the porcelain earthenware brick
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN106278065B (en) Imitative stone decoration element and its production method
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN105088914B (en) A kind of prefabricated and installation method of cobble pattern prefabricated board
US20070234664A1 (en) Method of forming a decorative concrete wall
CN102561607A (en) Reverse construction method of reversely nailed wood rafter roof boarding of concrete eave of pseudo-classic architecture
CN206189921U (en) Archaistic building
CN107187267A (en) A kind of installation method of theme park plastic stone rockery
CN1132985C (en) Formwork and its use method in building construction and outside decoration
CN107972400B (en) Method for manufacturing artificial large rockery
CN206554360U (en) A kind of assembled porcelain earthenware brick for building and the house built using the porcelain earthenware brick
Onderdonk The Ferro-concrete Style: Reinforced Concrete in Modern Architecture, with Four Hundred Illustrations of European and American Ferro-concrete Design
CN115354781A (en) Template-free decoration-free cast-in-place structure and construction method thereof
CN108412143A (en) Standard decoration hollow body railing and its construction method after a kind of
CN1038117C (en) Making method for colour facing concrete board
CN101210442B (en) Construction method for column and architrave cornice
CN113266091A (en) Construction process of space torsional curved-surface wood grain fair-faced concrete wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922