CN107060396A - A kind of fully-prefabricated assembled construction of transformer substation method and structure - Google Patents
A kind of fully-prefabricated assembled construction of transformer substation method and structure Download PDFInfo
- Publication number
- CN107060396A CN107060396A CN201710058799.3A CN201710058799A CN107060396A CN 107060396 A CN107060396 A CN 107060396A CN 201710058799 A CN201710058799 A CN 201710058799A CN 107060396 A CN107060396 A CN 107060396A
- Authority
- CN
- China
- Prior art keywords
- construction
- modular structure
- prefabricated
- transformer station
- fully
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000001360 synchronised effect Effects 0.000 claims abstract description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 230000008676 import Effects 0.000 claims description 9
- 238000007493 shaping process Methods 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims description 3
- 230000009466 transformation Effects 0.000 claims 2
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 210000003195 fascia Anatomy 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000003325 tomography Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
- E04H5/04—Transformer houses; Substations or switchgear houses
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Power Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Housings And Mounting Of Transformers (AREA)
Abstract
The invention discloses a kind of fully-prefabricated assembled construction of transformer substation method and structure, this method passes through early stage Deepen Design, by transformer station's agent structure, equipment built-in fitting and related pipeline are designed as modular prefabricated components, each component, which is prefabricated in the factory and transported after the completion of pre-buried to job site progress assembly, can complete the main structure construction of transformer station, and the progress synchronous with its agent structure of the electric operation of transformer station, i.e. the upper layer main body structural module assembling construction of transformer station while, prefabricated panel in the room of intermediate layer is carried out to install, and lower floor's electrical equipment of constructing is installed and cable threading, realize electrical construction progress synchronous with civil engineering, present invention construction simple and fast, the narrow and small problem in construction site can be solved, solve the problems, such as labor shortage, solve the problems such as equipment installation scene is pre-buried intricate, greatly improve construction benefit, accelerating construction progress, it is cost-effective.
Description
Technical field
The present invention relates to technical field of building construction, especially a kind of fully-prefabricated assembled construction of transformer substation method and knot
Structure.
Background technology
At present, monolithic reinforced concrete structure is used domestic transformer station's agent structure, cast-in-place structural working procedure is more more, passed
Process conditions of uniting require high.In a line city, the construction of transformer station has that expropriation of land is difficult, land used is small, the construction period is short and will to environment
The features such as asking higher, in order to solve a series of this problem, using fully-prefabricated assembled transformer station.Can by the construction at complete prefabricated station
Produce positive role in terms of ambient influnence, construction quality, security risk, construction speed, reduce to builder's experience and
Technology is relied on, and forms factory lines production, assembled in situ, do mechanization operation and play with building blocks at similar automobile.Concrete is pre-
Product is adapted in the countries and regions of artificial shortage, such as Beijing of Japan, the U.S., Hong Kong and the country, Shanghai, Shenzhen and Guangzhou pearl
Tessellated region etc., current China operating personnel on building-site is largely the elderly, labour's tomography, prefabricated dress occurs
Application with formula transformer station is conducive to avoiding this problem.
The content of the invention
The technical problems to be solved by the invention are:A kind of fully-prefabricated assembled construction of transformer substation method and structure are provided,
To overcome the deficiencies in the prior art.
What the present invention was realized in:
A kind of fully-prefabricated assembled construction of transformer substation method, this method by transformer station's agent structure, is set by early stage Deepen Design
Standby built-in fitting and related pipeline are designed as modular prefabricated components, and each component is prefabricated in the factory and transported after the completion of pre-buried to applying
Work scene, which carries out assembly, can complete the main structure construction of transformer station, and the electric operation of transformer station is synchronous with its agent structure
While progress, i.e. the upper layer main body structural module assembling construction of transformer station, carry out prefabricated panel in the room of intermediate layer and install, and
Lower floor's electrical equipment of constructing is installed and cable threading, realizes electrical construction progress synchronous with civil engineering.
In a kind of foregoing fully-prefabricated assembled construction of transformer substation method, transformer station's agent structure includes cylinder, beam
Body, floor, stair and inside and outside wall board modular structure, above-mentioned component are prefabricated within factory's stage, and then transport is existing to constructing
Carry out assembled, the various related spools that substation is needed are embedded in respective modules component in advance, and with respective modules component
Interior reinforcing bar offsets one from another, and pours shaping simultaneously with modular structure in factory, while setting correspondence phase on modular structure
The import and export of pipeline are closed, equipment built-in fitting is embedded in respective modules component and consolidated with the bar connecting in respective modules in advance
It is fixed, and the bonding strength for pouring shaping simultaneously with modular structure to improve pre-buried precision and improve equipment built-in fitting in factory.
In a kind of foregoing fully-prefabricated assembled construction of transformer substation method, at the construction field (site), the module of connection will be needed each other
Member position correspondence, and by the reinforcing bar colligation at the place that is connected to each other, adjacent block element joints are poured by cast-in-place mode and realized
Each modular structure is connected as that transformer station's agent structure is integrally formed, and related pipeline realizes connection by mutual import and export.
A kind of fully-prefabricated assembled construction of transformer substation structure, including transformer station's agent structure, transformer station's agent structure bag
Cylinder, beam body, floor, stair and inside and outside wall board modular structure are included, on request by cylinder, beam body, floor, stair and inside and outside wall board
Modular structure is arranged on specified location, and above-mentioned modular structure, which is connected to each other, locates assembling reinforcement and setting cast-in-place concrete portion envelops
Reinforcing bar, corresponding pipeline is set in cylinder, beam body, floor, stair and inside and outside wall board modular structure and the pipeline with it is corresponding
Reinforcing bar is offset one from another in modular structure, and the import and export of correspondence pipeline are set on above-mentioned modular structure, and equipment connection built-in fitting is set
Put on respective modules component, the connection built-in fitting gos deep into consolidating in respective modules component and with the bar connecting in modular structure
It is fixed.
By adopting the above-described technical solution, compared with prior art, the present invention is by Deepen Design, by transformer station's main body
Structure and equipment built-in fitting etc. are designed as prefabricated components, and each component is transported to job site after the completion of processing factory is prefabricated and pre-buried
Assembled, simple and fast of constructing is carried out, the narrow and small problem in construction site can be solved, labor shortage is solved the problems, such as, solve equipment pipe
The problems such as line scene is pre-buried intricate, greatly improves construction benefit, accelerating construction progress, cost-effective.
Brief description of the drawings
Accompanying drawing 1 is the structural representation one of the present invention;
Accompanying drawing 2 is the structural representation two of the present invention.
Embodiment
Embodiments of the invention:A kind of fully-prefabricated assembled construction of transformer substation method, this method by early stage Deepen Design,
Transformer station's agent structure, equipment built-in fitting and related pipeline are designed as modular prefabricated components, each component is prefabricated in the factory
And it is pre-buried after the completion of transport and carry out assembly to job site and can complete the main structure construction of transformer station, and transformer station is electric
Operation it is synchronous with its agent structure carry out, i.e., the upper layer main body structural module assembling construction of transformer station while, carry out in the middle of
The indoor prefabricated panel of layer is installed, and lower floor's electrical equipment of constructing is installed and cable threading, realizes that electrical construction is same with civil engineering
Step is carried out.
Wherein described transformer station's agent structure includes cylinder, beam body, floor, stair and inside and outside wall board modular structure, above-mentioned
Component is prefabricated within factory's stage, then transports to job site and carries out assembled, the various related spools that substation is needed
Be embedded in respective modules component, and offset one from another with the reinforcing bar in respective modules component in advance, and in factory with module structure
Part pours shaping simultaneously, while setting the import and export of the related pipeline of correspondence on modular structure, equipment built-in fitting is embedded in advance
Fix in respective modules component and with the bar connecting in respective modules, and pour simultaneously with modular structure in factory shaping with
Improve pre-buried precision and improve the bonding strength of equipment built-in fitting;At the construction field (site), the modular structure position of connection will be needed each other
Correspondence, and by the reinforcing bar colligation at the place that is connected to each other, adjacent block element joints are poured by cast-in-place mode and realize each module structure
Part is connected as that transformer station's agent structure is integrally formed, and related pipeline realizes connection by mutual import and export.
A kind of fully-prefabricated assembled construction of transformer substation structure formed according to the above method, as shown in drawings, including becomes
Power station agent structure, transformer station's agent structure includes cylinder 1, beam body 2, floor 3, stair 4 and the modular structure of inside and outside wall board 5,
Cylinder 1, beam body 2, floor 3, stair 4 and the modular structure of inside and outside wall board 5 are arranged on specified location, above-mentioned modular structure on request
It is connected to each other and place's assembling reinforcement and cast-in-place concrete portion envelops reinforcing bar is set, in cylinder 1, beam body 2, floor 3, stair 4 and interior
Corresponding pipeline 6 is set in the modular structure of Side fascia 5 and the pipeline 6 offsets one from another with reinforcing bar in corresponding modular structure, upper
The import and export that correspondence pipeline 6 is set on modular structure are stated, equipment connection built-in fitting 7 is arranged on respective modules component, the connection
Built-in fitting 7 gos deep into respective modules component and fixed with the bar connecting in modular structure.
The description of such scheme is the invention for being understood that and using for ease of those skilled in the art, is familiar with
The personnel of art technology obviously can easily make various modifications to embodiment, therefore, and the invention is not restricted to above-mentioned reality
Scheme, those skilled in the art's the method according to the invention does not depart from improvement and modification that scope made and all should
Within protection scope of the present invention.
Claims (4)
1. a kind of fully-prefabricated assembled construction of transformer substation method, it is characterised in that:This method is by early stage Deepen Design, by power transformation
Stand agent structure, equipment built-in fitting and related pipeline is designed as modular prefabricated components, and each component is prefabricated in the factory and pre-buried
After the completion of transport and carry out assembly to job site and can complete the main structure construction of transformer station, and the electric operation of transformer station with
While the synchronization progress of its agent structure, i.e. the upper layer main body structural module assembling construction of transformer station, carry out in the room of intermediate layer
Prefabricated panel is installed, and lower floor's electrical equipment of constructing is installed and cable threading, realizes electrical construction progress synchronous with civil engineering.
2. a kind of fully-prefabricated assembled construction of transformer substation method according to claim 1, it is characterised in that:The transformer station
Agent structure includes cylinder, beam body, floor, stair and inside and outside wall board modular structure, and above-mentioned component is prefabricated within factory's stage
It is good, then transport to job site and carry out assembly, the various related spools that substation is needed are embedded in respective modules component in advance
It is interior, and offset one from another with the reinforcing bar in respective modules component, and shaping is poured simultaneously with modular structure in factory, while in mould
The import and export of the related pipeline of correspondence are set on module component, equipment built-in fitting be embedded in advance in respective modules component and with corresponding mould
Bar connecting in block is fixed, and in factory with modular structure simultaneously pour shaping with improve pre-buried precision and raising equipment it is pre-
The bonding strength of embedded part.
3. a kind of fully-prefabricated assembled construction of transformer substation method according to claim 2, it is characterised in that:It is existing in construction
, the modular structure position correspondence of connection will be needed each other, and by the reinforcing bar colligation at the place that is connected to each other, phase is poured by cast-in-place mode
Adjacent modular structure junction realizes that each modular structure is connected as that transformer station's agent structure is integrally formed, and related pipeline passes through mutual
Import and export and realize connection.
4. a kind of fully-prefabricated assembled construction of transformer substation structure, including transformer station's agent structure, it is characterised in that:Power transformation station owner
Body structure includes cylinder(1), beam body(2), floor(3), stair(4)And inside and outside wall board(5)Modular structure, on request by cylinder
(1), beam body(2), floor(3), stair(4)And inside and outside wall board(5)Modular structure be arranged on specified location, above-mentioned modular structure that
This junction assembling reinforcement and setting cast-in-place concrete portion envelops reinforcing bar, in cylinder(1), beam body(2), floor(3), stair
(4)And inside and outside wall board(5)Corresponding pipeline is set in modular structure(6)And the pipeline(6)With reinforcing bar in corresponding modular structure
Offset one from another, correspondence pipeline is set on above-mentioned modular structure(6)Import and export, equipment connection built-in fitting(7)It is arranged on correspondence
On modular structure, the connection built-in fitting(7)Go deep into respective modules component and fixed with the bar connecting in modular structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710058799.3A CN107060396A (en) | 2017-01-23 | 2017-01-23 | A kind of fully-prefabricated assembled construction of transformer substation method and structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710058799.3A CN107060396A (en) | 2017-01-23 | 2017-01-23 | A kind of fully-prefabricated assembled construction of transformer substation method and structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107060396A true CN107060396A (en) | 2017-08-18 |
Family
ID=59598047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710058799.3A Pending CN107060396A (en) | 2017-01-23 | 2017-01-23 | A kind of fully-prefabricated assembled construction of transformer substation method and structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060396A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457504A (en) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | A kind of building method of BIM assembly integrated intelligents substation |
CN109296230A (en) * | 2018-11-09 | 2019-02-01 | 尤利卡(江苏)集成电气有限公司 | A kind of pin-connected panel substation complete machine structure |
CN109653549A (en) * | 2017-10-10 | 2019-04-19 | 湘能楚天电力有限公司 | A kind of magic cube type integrated transformer substation |
CN110424447A (en) * | 2019-08-27 | 2019-11-08 | 建华建材(中国)有限公司 | A kind of assembled substation integration foundation structure and its construction method |
CN111706127A (en) * | 2020-05-29 | 2020-09-25 | 南京南瑞继保工程技术有限公司 | Indoor transformer substation construction method |
CN113737942A (en) * | 2021-07-30 | 2021-12-03 | 嘉兴恒创电力设计研究院有限公司 | Fully-bolted assembled steel structure and construction method thereof |
CN114541758A (en) * | 2022-03-03 | 2022-05-27 | 中建八局第二建设有限公司 | Efficient and rapid construction method for electromechanical assembly type design and construction full flow |
RU2773897C1 (en) * | 2021-11-15 | 2022-06-14 | Юрий Владимирович Кузнецов | Method for manufacturing reinforced concrete buildings for substations |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0633519A (en) * | 1992-07-16 | 1994-02-08 | Ryohei Yamamoto | Prefabricated house |
CN101806095A (en) * | 2010-03-15 | 2010-08-18 | 中山市快而居房屋预制件有限公司 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
CN104563288A (en) * | 2014-10-30 | 2015-04-29 | 徐曼 | Reinforced concrete frame gridding slab prefabricated energy-saving house |
CN106193370A (en) * | 2015-05-04 | 2016-12-07 | 北新集团建材股份有限公司 | The sectioned wall of a kind of built-in electric wire penetration pipe and installation method |
CN206581652U (en) * | 2017-01-23 | 2017-10-24 | 深圳市粤网电力建设发展有限公司 | A kind of fully-prefabricated assembled construction of transformer substation structure |
-
2017
- 2017-01-23 CN CN201710058799.3A patent/CN107060396A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0633519A (en) * | 1992-07-16 | 1994-02-08 | Ryohei Yamamoto | Prefabricated house |
CN101806095A (en) * | 2010-03-15 | 2010-08-18 | 中山市快而居房屋预制件有限公司 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
CN104563288A (en) * | 2014-10-30 | 2015-04-29 | 徐曼 | Reinforced concrete frame gridding slab prefabricated energy-saving house |
CN106193370A (en) * | 2015-05-04 | 2016-12-07 | 北新集团建材股份有限公司 | The sectioned wall of a kind of built-in electric wire penetration pipe and installation method |
CN206581652U (en) * | 2017-01-23 | 2017-10-24 | 深圳市粤网电力建设发展有限公司 | A kind of fully-prefabricated assembled construction of transformer substation structure |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653549A (en) * | 2017-10-10 | 2019-04-19 | 湘能楚天电力有限公司 | A kind of magic cube type integrated transformer substation |
CN108457504A (en) * | 2018-03-27 | 2018-08-28 | 湘能楚天电力有限公司 | A kind of building method of BIM assembly integrated intelligents substation |
CN109296230A (en) * | 2018-11-09 | 2019-02-01 | 尤利卡(江苏)集成电气有限公司 | A kind of pin-connected panel substation complete machine structure |
CN109296230B (en) * | 2018-11-09 | 2023-08-25 | 尤利卡(江苏)集成电气有限公司 | Assembled transformer substation complete machine structure |
CN110424447A (en) * | 2019-08-27 | 2019-11-08 | 建华建材(中国)有限公司 | A kind of assembled substation integration foundation structure and its construction method |
CN111706127A (en) * | 2020-05-29 | 2020-09-25 | 南京南瑞继保工程技术有限公司 | Indoor transformer substation construction method |
CN113737942A (en) * | 2021-07-30 | 2021-12-03 | 嘉兴恒创电力设计研究院有限公司 | Fully-bolted assembled steel structure and construction method thereof |
RU2773897C1 (en) * | 2021-11-15 | 2022-06-14 | Юрий Владимирович Кузнецов | Method for manufacturing reinforced concrete buildings for substations |
CN114541758A (en) * | 2022-03-03 | 2022-05-27 | 中建八局第二建设有限公司 | Efficient and rapid construction method for electromechanical assembly type design and construction full flow |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060396A (en) | A kind of fully-prefabricated assembled construction of transformer substation method and structure | |
CN106869172B (en) | In-situ deposited prefabricated split-mounting type subway underground station construction method | |
CN105178357B (en) | Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition | |
CN103104040B (en) | A kind of assembling frame bean column node and construction method adopting vertical connection | |
CN103410317A (en) | Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part | |
CN106854873A (en) | A kind of engineering method and garage parking in precast spliced sinking type garage parking | |
CN107558626A (en) | A kind of prefabricated assembled wall structure and the method using this structure building house | |
CN104975716A (en) | Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete | |
CN206545215U (en) | A kind of precast spliced sinking type garage parking | |
CN109537851A (en) | A kind of method for prefabricating of assembled pipe well | |
CN105064555A (en) | Structural wallboard for superimposed decorative layer and insulating layer and construction method | |
CN107227870A (en) | Transformer substation building spliced by prefabricated parts | |
CN110409492A (en) | The combination assembled piping lane of one kind more structures containing superposed member and its construction method | |
CN108708394A (en) | A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support | |
CN113250494A (en) | Assembled integrated toilet and construction method | |
CN109914644A (en) | A kind of assembled heat insulation masonry wall and preparation method thereof | |
CN210263131U (en) | Assembled is from stagnant water underground pipe gallery structure | |
CN206581652U (en) | A kind of fully-prefabricated assembled construction of transformer substation structure | |
CN110421709A (en) | A kind of production method of Side fascia | |
CN109797777A (en) | Assembled is constructed from sealing underground pipe gallery and construction method | |
CN101761287A (en) | Reinforced concrete windowsill coping adverse construction method | |
CN207063610U (en) | Transformer substation building spliced by prefabricated parts | |
CN104314318B (en) | A kind of high accuracy positioning guider and its application method | |
CN108979205B (en) | Staggered floor flow construction method for super high-rise residential structure | |
CN207144563U (en) | A kind of assembled communication base station room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |
|
RJ01 | Rejection of invention patent application after publication |