CN107060396A - A kind of fully-prefabricated assembled construction of transformer substation method and structure - Google Patents

A kind of fully-prefabricated assembled construction of transformer substation method and structure Download PDF

Info

Publication number
CN107060396A
CN107060396A CN201710058799.3A CN201710058799A CN107060396A CN 107060396 A CN107060396 A CN 107060396A CN 201710058799 A CN201710058799 A CN 201710058799A CN 107060396 A CN107060396 A CN 107060396A
Authority
CN
China
Prior art keywords
construction
modular structure
prefabricated
transformer station
fully
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710058799.3A
Other languages
Chinese (zh)
Inventor
刘明亮
王加鑫
张家胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guangdong Grid Power Construction And Development Co Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
Shenzhen Guangdong Grid Power Construction And Development Co Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guangdong Grid Power Construction And Development Co Ltd, China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical Shenzhen Guangdong Grid Power Construction And Development Co Ltd
Priority to CN201710058799.3A priority Critical patent/CN107060396A/en
Publication of CN107060396A publication Critical patent/CN107060396A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/04Transformer houses; Substations or switchgear houses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Power Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

The invention discloses a kind of fully-prefabricated assembled construction of transformer substation method and structure, this method passes through early stage Deepen Design, by transformer station's agent structure, equipment built-in fitting and related pipeline are designed as modular prefabricated components, each component, which is prefabricated in the factory and transported after the completion of pre-buried to job site progress assembly, can complete the main structure construction of transformer station, and the progress synchronous with its agent structure of the electric operation of transformer station, i.e. the upper layer main body structural module assembling construction of transformer station while, prefabricated panel in the room of intermediate layer is carried out to install, and lower floor's electrical equipment of constructing is installed and cable threading, realize electrical construction progress synchronous with civil engineering, present invention construction simple and fast, the narrow and small problem in construction site can be solved, solve the problems, such as labor shortage, solve the problems such as equipment installation scene is pre-buried intricate, greatly improve construction benefit, accelerating construction progress, it is cost-effective.

Description

A kind of fully-prefabricated assembled construction of transformer substation method and structure
Technical field
The present invention relates to technical field of building construction, especially a kind of fully-prefabricated assembled construction of transformer substation method and knot Structure.
Background technology
At present, monolithic reinforced concrete structure is used domestic transformer station's agent structure, cast-in-place structural working procedure is more more, passed Process conditions of uniting require high.In a line city, the construction of transformer station has that expropriation of land is difficult, land used is small, the construction period is short and will to environment The features such as asking higher, in order to solve a series of this problem, using fully-prefabricated assembled transformer station.Can by the construction at complete prefabricated station Produce positive role in terms of ambient influnence, construction quality, security risk, construction speed, reduce to builder's experience and Technology is relied on, and forms factory lines production, assembled in situ, do mechanization operation and play with building blocks at similar automobile.Concrete is pre- Product is adapted in the countries and regions of artificial shortage, such as Beijing of Japan, the U.S., Hong Kong and the country, Shanghai, Shenzhen and Guangzhou pearl Tessellated region etc., current China operating personnel on building-site is largely the elderly, labour's tomography, prefabricated dress occurs Application with formula transformer station is conducive to avoiding this problem.
The content of the invention
The technical problems to be solved by the invention are:A kind of fully-prefabricated assembled construction of transformer substation method and structure are provided, To overcome the deficiencies in the prior art.
What the present invention was realized in:
A kind of fully-prefabricated assembled construction of transformer substation method, this method by transformer station's agent structure, is set by early stage Deepen Design Standby built-in fitting and related pipeline are designed as modular prefabricated components, and each component is prefabricated in the factory and transported after the completion of pre-buried to applying Work scene, which carries out assembly, can complete the main structure construction of transformer station, and the electric operation of transformer station is synchronous with its agent structure While progress, i.e. the upper layer main body structural module assembling construction of transformer station, carry out prefabricated panel in the room of intermediate layer and install, and Lower floor's electrical equipment of constructing is installed and cable threading, realizes electrical construction progress synchronous with civil engineering.
In a kind of foregoing fully-prefabricated assembled construction of transformer substation method, transformer station's agent structure includes cylinder, beam Body, floor, stair and inside and outside wall board modular structure, above-mentioned component are prefabricated within factory's stage, and then transport is existing to constructing Carry out assembled, the various related spools that substation is needed are embedded in respective modules component in advance, and with respective modules component Interior reinforcing bar offsets one from another, and pours shaping simultaneously with modular structure in factory, while setting correspondence phase on modular structure The import and export of pipeline are closed, equipment built-in fitting is embedded in respective modules component and consolidated with the bar connecting in respective modules in advance It is fixed, and the bonding strength for pouring shaping simultaneously with modular structure to improve pre-buried precision and improve equipment built-in fitting in factory.
In a kind of foregoing fully-prefabricated assembled construction of transformer substation method, at the construction field (site), the module of connection will be needed each other Member position correspondence, and by the reinforcing bar colligation at the place that is connected to each other, adjacent block element joints are poured by cast-in-place mode and realized Each modular structure is connected as that transformer station's agent structure is integrally formed, and related pipeline realizes connection by mutual import and export.
A kind of fully-prefabricated assembled construction of transformer substation structure, including transformer station's agent structure, transformer station's agent structure bag Cylinder, beam body, floor, stair and inside and outside wall board modular structure are included, on request by cylinder, beam body, floor, stair and inside and outside wall board Modular structure is arranged on specified location, and above-mentioned modular structure, which is connected to each other, locates assembling reinforcement and setting cast-in-place concrete portion envelops Reinforcing bar, corresponding pipeline is set in cylinder, beam body, floor, stair and inside and outside wall board modular structure and the pipeline with it is corresponding Reinforcing bar is offset one from another in modular structure, and the import and export of correspondence pipeline are set on above-mentioned modular structure, and equipment connection built-in fitting is set Put on respective modules component, the connection built-in fitting gos deep into consolidating in respective modules component and with the bar connecting in modular structure It is fixed.
By adopting the above-described technical solution, compared with prior art, the present invention is by Deepen Design, by transformer station's main body Structure and equipment built-in fitting etc. are designed as prefabricated components, and each component is transported to job site after the completion of processing factory is prefabricated and pre-buried Assembled, simple and fast of constructing is carried out, the narrow and small problem in construction site can be solved, labor shortage is solved the problems, such as, solve equipment pipe The problems such as line scene is pre-buried intricate, greatly improves construction benefit, accelerating construction progress, cost-effective.
Brief description of the drawings
Accompanying drawing 1 is the structural representation one of the present invention;
Accompanying drawing 2 is the structural representation two of the present invention.
Embodiment
Embodiments of the invention:A kind of fully-prefabricated assembled construction of transformer substation method, this method by early stage Deepen Design, Transformer station's agent structure, equipment built-in fitting and related pipeline are designed as modular prefabricated components, each component is prefabricated in the factory And it is pre-buried after the completion of transport and carry out assembly to job site and can complete the main structure construction of transformer station, and transformer station is electric Operation it is synchronous with its agent structure carry out, i.e., the upper layer main body structural module assembling construction of transformer station while, carry out in the middle of The indoor prefabricated panel of layer is installed, and lower floor's electrical equipment of constructing is installed and cable threading, realizes that electrical construction is same with civil engineering Step is carried out.
Wherein described transformer station's agent structure includes cylinder, beam body, floor, stair and inside and outside wall board modular structure, above-mentioned Component is prefabricated within factory's stage, then transports to job site and carries out assembled, the various related spools that substation is needed Be embedded in respective modules component, and offset one from another with the reinforcing bar in respective modules component in advance, and in factory with module structure Part pours shaping simultaneously, while setting the import and export of the related pipeline of correspondence on modular structure, equipment built-in fitting is embedded in advance Fix in respective modules component and with the bar connecting in respective modules, and pour simultaneously with modular structure in factory shaping with Improve pre-buried precision and improve the bonding strength of equipment built-in fitting;At the construction field (site), the modular structure position of connection will be needed each other Correspondence, and by the reinforcing bar colligation at the place that is connected to each other, adjacent block element joints are poured by cast-in-place mode and realize each module structure Part is connected as that transformer station's agent structure is integrally formed, and related pipeline realizes connection by mutual import and export.
A kind of fully-prefabricated assembled construction of transformer substation structure formed according to the above method, as shown in drawings, including becomes Power station agent structure, transformer station's agent structure includes cylinder 1, beam body 2, floor 3, stair 4 and the modular structure of inside and outside wall board 5, Cylinder 1, beam body 2, floor 3, stair 4 and the modular structure of inside and outside wall board 5 are arranged on specified location, above-mentioned modular structure on request It is connected to each other and place's assembling reinforcement and cast-in-place concrete portion envelops reinforcing bar is set, in cylinder 1, beam body 2, floor 3, stair 4 and interior Corresponding pipeline 6 is set in the modular structure of Side fascia 5 and the pipeline 6 offsets one from another with reinforcing bar in corresponding modular structure, upper The import and export that correspondence pipeline 6 is set on modular structure are stated, equipment connection built-in fitting 7 is arranged on respective modules component, the connection Built-in fitting 7 gos deep into respective modules component and fixed with the bar connecting in modular structure.
The description of such scheme is the invention for being understood that and using for ease of those skilled in the art, is familiar with The personnel of art technology obviously can easily make various modifications to embodiment, therefore, and the invention is not restricted to above-mentioned reality Scheme, those skilled in the art's the method according to the invention does not depart from improvement and modification that scope made and all should Within protection scope of the present invention.

Claims (4)

1. a kind of fully-prefabricated assembled construction of transformer substation method, it is characterised in that:This method is by early stage Deepen Design, by power transformation Stand agent structure, equipment built-in fitting and related pipeline is designed as modular prefabricated components, and each component is prefabricated in the factory and pre-buried After the completion of transport and carry out assembly to job site and can complete the main structure construction of transformer station, and the electric operation of transformer station with While the synchronization progress of its agent structure, i.e. the upper layer main body structural module assembling construction of transformer station, carry out in the room of intermediate layer Prefabricated panel is installed, and lower floor's electrical equipment of constructing is installed and cable threading, realizes electrical construction progress synchronous with civil engineering.
2. a kind of fully-prefabricated assembled construction of transformer substation method according to claim 1, it is characterised in that:The transformer station Agent structure includes cylinder, beam body, floor, stair and inside and outside wall board modular structure, and above-mentioned component is prefabricated within factory's stage It is good, then transport to job site and carry out assembly, the various related spools that substation is needed are embedded in respective modules component in advance It is interior, and offset one from another with the reinforcing bar in respective modules component, and shaping is poured simultaneously with modular structure in factory, while in mould The import and export of the related pipeline of correspondence are set on module component, equipment built-in fitting be embedded in advance in respective modules component and with corresponding mould Bar connecting in block is fixed, and in factory with modular structure simultaneously pour shaping with improve pre-buried precision and raising equipment it is pre- The bonding strength of embedded part.
3. a kind of fully-prefabricated assembled construction of transformer substation method according to claim 2, it is characterised in that:It is existing in construction , the modular structure position correspondence of connection will be needed each other, and by the reinforcing bar colligation at the place that is connected to each other, phase is poured by cast-in-place mode Adjacent modular structure junction realizes that each modular structure is connected as that transformer station's agent structure is integrally formed, and related pipeline passes through mutual Import and export and realize connection.
4. a kind of fully-prefabricated assembled construction of transformer substation structure, including transformer station's agent structure, it is characterised in that:Power transformation station owner Body structure includes cylinder(1), beam body(2), floor(3), stair(4)And inside and outside wall board(5)Modular structure, on request by cylinder (1), beam body(2), floor(3), stair(4)And inside and outside wall board(5)Modular structure be arranged on specified location, above-mentioned modular structure that This junction assembling reinforcement and setting cast-in-place concrete portion envelops reinforcing bar, in cylinder(1), beam body(2), floor(3), stair (4)And inside and outside wall board(5)Corresponding pipeline is set in modular structure(6)And the pipeline(6)With reinforcing bar in corresponding modular structure Offset one from another, correspondence pipeline is set on above-mentioned modular structure(6)Import and export, equipment connection built-in fitting(7)It is arranged on correspondence On modular structure, the connection built-in fitting(7)Go deep into respective modules component and fixed with the bar connecting in modular structure.
CN201710058799.3A 2017-01-23 2017-01-23 A kind of fully-prefabricated assembled construction of transformer substation method and structure Pending CN107060396A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710058799.3A CN107060396A (en) 2017-01-23 2017-01-23 A kind of fully-prefabricated assembled construction of transformer substation method and structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710058799.3A CN107060396A (en) 2017-01-23 2017-01-23 A kind of fully-prefabricated assembled construction of transformer substation method and structure

Publications (1)

Publication Number Publication Date
CN107060396A true CN107060396A (en) 2017-08-18

Family

ID=59598047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710058799.3A Pending CN107060396A (en) 2017-01-23 2017-01-23 A kind of fully-prefabricated assembled construction of transformer substation method and structure

Country Status (1)

Country Link
CN (1) CN107060396A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457504A (en) * 2018-03-27 2018-08-28 湘能楚天电力有限公司 A kind of building method of BIM assembly integrated intelligents substation
CN109296230A (en) * 2018-11-09 2019-02-01 尤利卡(江苏)集成电气有限公司 A kind of pin-connected panel substation complete machine structure
CN109653549A (en) * 2017-10-10 2019-04-19 湘能楚天电力有限公司 A kind of magic cube type integrated transformer substation
CN110424447A (en) * 2019-08-27 2019-11-08 建华建材(中国)有限公司 A kind of assembled substation integration foundation structure and its construction method
CN111706127A (en) * 2020-05-29 2020-09-25 南京南瑞继保工程技术有限公司 Indoor transformer substation construction method
CN113737942A (en) * 2021-07-30 2021-12-03 嘉兴恒创电力设计研究院有限公司 Fully-bolted assembled steel structure and construction method thereof
CN114541758A (en) * 2022-03-03 2022-05-27 中建八局第二建设有限公司 Efficient and rapid construction method for electromechanical assembly type design and construction full flow
RU2773897C1 (en) * 2021-11-15 2022-06-14 Юрий Владимирович Кузнецов Method for manufacturing reinforced concrete buildings for substations

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0633519A (en) * 1992-07-16 1994-02-08 Ryohei Yamamoto Prefabricated house
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
CN106193370A (en) * 2015-05-04 2016-12-07 北新集团建材股份有限公司 The sectioned wall of a kind of built-in electric wire penetration pipe and installation method
CN206581652U (en) * 2017-01-23 2017-10-24 深圳市粤网电力建设发展有限公司 A kind of fully-prefabricated assembled construction of transformer substation structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0633519A (en) * 1992-07-16 1994-02-08 Ryohei Yamamoto Prefabricated house
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
CN106193370A (en) * 2015-05-04 2016-12-07 北新集团建材股份有限公司 The sectioned wall of a kind of built-in electric wire penetration pipe and installation method
CN206581652U (en) * 2017-01-23 2017-10-24 深圳市粤网电力建设发展有限公司 A kind of fully-prefabricated assembled construction of transformer substation structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653549A (en) * 2017-10-10 2019-04-19 湘能楚天电力有限公司 A kind of magic cube type integrated transformer substation
CN108457504A (en) * 2018-03-27 2018-08-28 湘能楚天电力有限公司 A kind of building method of BIM assembly integrated intelligents substation
CN109296230A (en) * 2018-11-09 2019-02-01 尤利卡(江苏)集成电气有限公司 A kind of pin-connected panel substation complete machine structure
CN109296230B (en) * 2018-11-09 2023-08-25 尤利卡(江苏)集成电气有限公司 Assembled transformer substation complete machine structure
CN110424447A (en) * 2019-08-27 2019-11-08 建华建材(中国)有限公司 A kind of assembled substation integration foundation structure and its construction method
CN111706127A (en) * 2020-05-29 2020-09-25 南京南瑞继保工程技术有限公司 Indoor transformer substation construction method
CN113737942A (en) * 2021-07-30 2021-12-03 嘉兴恒创电力设计研究院有限公司 Fully-bolted assembled steel structure and construction method thereof
RU2773897C1 (en) * 2021-11-15 2022-06-14 Юрий Владимирович Кузнецов Method for manufacturing reinforced concrete buildings for substations
CN114541758A (en) * 2022-03-03 2022-05-27 中建八局第二建设有限公司 Efficient and rapid construction method for electromechanical assembly type design and construction full flow

Similar Documents

Publication Publication Date Title
CN107060396A (en) A kind of fully-prefabricated assembled construction of transformer substation method and structure
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN103104040B (en) A kind of assembling frame bean column node and construction method adopting vertical connection
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN107558626A (en) A kind of prefabricated assembled wall structure and the method using this structure building house
CN104975716A (en) Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN109537851A (en) A kind of method for prefabricating of assembled pipe well
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN107227870A (en) Transformer substation building spliced by prefabricated parts
CN110409492A (en) The combination assembled piping lane of one kind more structures containing superposed member and its construction method
CN108708394A (en) A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support
CN113250494A (en) Assembled integrated toilet and construction method
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN206581652U (en) A kind of fully-prefabricated assembled construction of transformer substation structure
CN110421709A (en) A kind of production method of Side fascia
CN109797777A (en) Assembled is constructed from sealing underground pipe gallery and construction method
CN101761287A (en) Reinforced concrete windowsill coping adverse construction method
CN207063610U (en) Transformer substation building spliced by prefabricated parts
CN104314318B (en) A kind of high accuracy positioning guider and its application method
CN108979205B (en) Staggered floor flow construction method for super high-rise residential structure
CN207144563U (en) A kind of assembled communication base station room

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication