CN106930407A - Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 - Google Patents
Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 Download PDFInfo
- Publication number
- CN106930407A CN106930407A CN201710250156.9A CN201710250156A CN106930407A CN 106930407 A CN106930407 A CN 106930407A CN 201710250156 A CN201710250156 A CN 201710250156A CN 106930407 A CN106930407 A CN 106930407A
- Authority
- CN
- China
- Prior art keywords
- coupling assembly
- plate
- steel pipe
- pipe column
- winglet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 117
- 239000010959 steel Substances 0.000 title claims abstract description 117
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 235000010627 Phaseolus vulgaris Nutrition 0.000 title claims abstract description 19
- 244000046052 Phaseolus vulgaris Species 0.000 title claims abstract description 19
- 230000008878 coupling Effects 0.000 claims abstract description 118
- 238000010168 coupling process Methods 0.000 claims abstract description 118
- 238000005859 coupling reaction Methods 0.000 claims abstract description 118
- 238000012545 processing Methods 0.000 claims abstract description 8
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 210000005069 ears Anatomy 0.000 claims 1
- 238000010923 batch production Methods 0.000 abstract description 4
- 238000003466 welding Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2415—Brackets, gussets, joining plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2454—Connections between open and closed section profiles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710250156.9A CN106930407B (zh) | 2017-04-17 | 2017-04-17 | Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710250156.9A CN106930407B (zh) | 2017-04-17 | 2017-04-17 | Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106930407A true CN106930407A (zh) | 2017-07-07 |
CN106930407B CN106930407B (zh) | 2023-04-25 |
Family
ID=59436905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710250156.9A Active CN106930407B (zh) | 2017-04-17 | 2017-04-17 | Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930407B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108517961A (zh) * | 2018-05-25 | 2018-09-11 | 夏念涛 | 一种快速装配钢结构梁柱直插式安装节点及其安装方法 |
CN108532757A (zh) * | 2018-04-25 | 2018-09-14 | 青岛理工大学 | 完全装配式钢结构连接组件及安装方法 |
CN109972726A (zh) * | 2019-03-18 | 2019-07-05 | 上海鹄鸫重工机械有限公司 | 一种钢骨架结构房 |
CN110306659A (zh) * | 2019-05-24 | 2019-10-08 | 孔瑞清 | 钢结构梁柱连接节点及其施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005133336A (ja) * | 2003-10-28 | 2005-05-26 | Nippon Steel Corp | 鋼管柱とh形鋼梁の接合構造とその接合施工方法 |
CN104100007A (zh) * | 2014-07-16 | 2014-10-15 | 天元建设集团有限公司 | 双耳板式方管柱与h型钢架可变梁高装配节点及施工方法 |
CN106400957A (zh) * | 2016-06-07 | 2017-02-15 | 西安建筑科技大学 | 一种全预制装配式梁柱节点 |
CN206873624U (zh) * | 2017-04-17 | 2018-01-12 | 天元建设集团有限公司 | 一种y型双耳式方管柱与h型钢梁柱节点及连接件 |
-
2017
- 2017-04-17 CN CN201710250156.9A patent/CN106930407B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005133336A (ja) * | 2003-10-28 | 2005-05-26 | Nippon Steel Corp | 鋼管柱とh形鋼梁の接合構造とその接合施工方法 |
CN104100007A (zh) * | 2014-07-16 | 2014-10-15 | 天元建设集团有限公司 | 双耳板式方管柱与h型钢架可变梁高装配节点及施工方法 |
CN106400957A (zh) * | 2016-06-07 | 2017-02-15 | 西安建筑科技大学 | 一种全预制装配式梁柱节点 |
CN206873624U (zh) * | 2017-04-17 | 2018-01-12 | 天元建设集团有限公司 | 一种y型双耳式方管柱与h型钢梁柱节点及连接件 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532757A (zh) * | 2018-04-25 | 2018-09-14 | 青岛理工大学 | 完全装配式钢结构连接组件及安装方法 |
CN108532757B (zh) * | 2018-04-25 | 2019-10-08 | 青岛理工大学 | 完全装配式钢结构连接组件及安装方法 |
CN108517961A (zh) * | 2018-05-25 | 2018-09-11 | 夏念涛 | 一种快速装配钢结构梁柱直插式安装节点及其安装方法 |
CN109972726A (zh) * | 2019-03-18 | 2019-07-05 | 上海鹄鸫重工机械有限公司 | 一种钢骨架结构房 |
CN110306659A (zh) * | 2019-05-24 | 2019-10-08 | 孔瑞清 | 钢结构梁柱连接节点及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106930407B (zh) | 2023-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106930407A (zh) | Y型双耳式方管柱与h型钢梁柱节点、连接件及施工方法 | |
CN107060089A (zh) | 方钢管与h型钢的四梁柱节点、装配式连接件及施工方法 | |
CN107023077A (zh) | 方管柱与h型钢的角梁柱节点、装配式连接件及施工方法 | |
CN206873641U (zh) | 一种方钢管柱与h型钢的角梁柱节点及装配式连接件 | |
CN107035000A (zh) | 方管柱与h型钢的边梁柱节点、装配式连接件及施工方法 | |
CN108517962A (zh) | 一种榫卯与螺栓混合装配式钢结构梁柱节点 | |
CN203755443U (zh) | 装配整体式叠合框架结构 | |
CN206873642U (zh) | 一种方钢管柱与h型钢的四梁柱节点及装配式连接件 | |
CN110067383A (zh) | 一种建筑施工梁柱混凝土浇筑密实型组合式模板 | |
CN206873624U (zh) | 一种y型双耳式方管柱与h型钢梁柱节点及连接件 | |
CN206873640U (zh) | 一种方钢管柱与h型钢的边梁柱节点及装配式连接件 | |
CN110241917A (zh) | 加强型装配式梁柱连接节点 | |
CN103758208B (zh) | 装配整体式叠合框架结构 | |
CN109162353A (zh) | 一种钢混凝土装配式连接节点 | |
CN212773558U (zh) | 装配式建筑转换层套筒连接钢筋用定位装置 | |
CN209040286U (zh) | 一种钢混凝土装配式连接节点 | |
CN210395374U (zh) | 一种用于工法桩的插入型钢 | |
CN212336340U (zh) | 一种装配式钢管混凝土柱-复合翼缘工字梁的梁柱边节点 | |
CN107989230A (zh) | 一种l型装配式芯柱钢板剪力墙及其装配施工方法 | |
CN210621946U (zh) | 一种新型的混凝土框架与混凝土墙板的u型连接装置 | |
CN208934117U (zh) | 一种装配式钢骨异形柱与混凝土梁的连接构造 | |
CN209194817U (zh) | 一种标准化多向梁 | |
CN207092260U (zh) | 一种榫铆钢结构模块化房屋 | |
CN207538225U (zh) | 钢结构仿古歇山屋面建筑的柱梁相交节点结构 | |
CN208803631U (zh) | 轻钢格栅混凝土叠合柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province Patentee after: TIANYUAN CONSTRUCTION GROUP Co.,Ltd. Country or region after: China Patentee after: Veterans (Shandong) Construction Group Co.,Ltd. Patentee after: LINYI TIANFANG CONSTRUCTION RESEARCH TESTING CO.,LTD. Address before: No.63, Yinqueshan Road, Lanshan District, Linyi City, Shandong Province Patentee before: TIANYUAN CONSTRUCTION GROUP Co.,Ltd. Country or region before: China Patentee before: SHANDONG HONGDA REAL ESTATE Co.,Ltd. Patentee before: LINYI TIANFANG CONSTRUCTION RESEARCH TESTING CO.,LTD. |